Atch 13_AFI 32-1024_Standard Facility Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Nellis AFB Multiple Award Construction Contract (MACC) Solicitation, newest first.
File Type Posted
SYNOPSIS_OF_AWARD.docx DOCX document
Atch_62__Nellis_Creech_AFB_Facility_Metering_Requirements.pdf PDF
Atch_60_ETL_07-04_AF_Carpet_Standard.pdf PDF
16RA100_Tech_QA_(Part_3).pdf PDF
Atch_61__AF_Facility_Metering_Policy.pdf PDF
Atch_01_MACC_SOW_Revision_1.pdf PDF
FA4861-16-R-A100-0006_Updated_Docs_Technical_QnA.pdf PDF
Atch_53_Statement_of_Work _RKMF_16-0062_Rpr_Courtroom _Bldg_16_Revision_2.pdf PDF
Atch_43_Schedule_of_Values_Template_UNLOCKED.xlsx XLSX spreadsheet
16RA100SignInRosters.pdf PDF
Atch_54_Demolition_Plan _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
16RA100_General_Q As_(Part_2).pdf PDF
Atch_48_Teaming_List.doc DOC document
Atch_53_Statement_of_Work _RKMF_16-0062_Rpr_Courtroom _Bldg_16_Revision1.pdf PDF
FA4861-16-R-A100-0004_Amend_Demo_SOW_QnA.pdf PDF
16RA100_Q A_(Part_1).pdf PDF
FA4861-16-R-A100-0003_Amendment.pdf PDF
Atch_25_3PH__CJE_CREECH_4in-Profile_A-size.pdf PDF
Atch_29_Trench_Sand.pdf PDF
Atch_46_WD_NV160022_201600603.pdf PDF
Atch_50_Subcontractor_Teaming_Partner_Consent_Form.doc DOC document
Atch_19_AFI_33-580_Spectrum_Management.pdf PDF
Atch_31_UM3-14-Profile_A-size.pdf PDF
Atch_45_WD_NV160004_20160603.pdf PDF
Atch_06_Engineering_Technical_Letter_20020627.pdf PDF
Atch_52_Past_Performance_Questionnaire.doc DOC document
Atch_41_AF_3064_Progress_Schedule.xfdl XFDL file
Atch_11_AFI_23-204_Material_Management.pdf PDF
Atch_20_AFI_40-201_Radioactive_Materials_Management.pdf PDF
Atch_14_AFI_32-1044_Visual_Air_Navigation_Systems.pdf PDF
Atch_15_AFI_32-7044_Storage_Tank.pdf PDF
Atch_07_Communication_Installation_Stds_20140320.pdf PDF
Atch_03_Nellis_Creech_AFB_Lighting_Fixture_Req_20150528.pdf PDF
Atch_47_WD_NV160034_20160108.pdf PDF
Atch_26_3PH__CJE-Profile_A-size.pdf PDF
Atch_27_1728F-806_UG__Main_VEA_standard.pdf PDF
Atch_53_Statement_of_Work _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_04_Nellis_Creech_AFB_Fire_Protection_Stds.pdf PDF
Atch_35_VEA_Connection_Charge_Agreement.docx DOCX document
Atch_09_Energy_Mgmt_and_Control_System_Sole_Source_Letter.pdf PDF
Atch_01_MACC_SOW_20160505.pdf PDF
Atch_43_Schedule_of_Values_Template.xlsx XLSX spreadsheet
Atch_37_Nuclear_Gauge_Form_1.xlsx XLSX spreadsheet
Atch_40_AF_3052_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Atch_42_Contract_Progress_Report_Template.xfdl XFDL file
Atch_24_1PH_CJE-Profile_A-size.pdf PDF
Atch_55_Facility_Photos _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_16_AFI_32-7042_Waste_Management.pdf PDF
Atch_10_ACCMAN32-7051_hollomanafbsup_1.pdf PDF
Atch_02_Nellis_Creech_ID2_Handbook_201108.pdf PDF
Show all 50

Nellis AFB Multiple Award Construction Contract (MACC) Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BY ORDER OF THE

SECRETARY OF THE AIR FORCE

AIR FORCE INSTRUCTION 32-1024

14 JULY 2011

Incorporating Change 1, 19 December 2014

Civil Engineering

STANDARD FACILITY REQUIREMENTS

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

ACCESSIBILITY: Publications and forms are available on the e-publishing website at www.e-Publishing.af.mil for downloading and ordering.

RELEASABILITY: There are no releasability restrictions on this publication.

OPR: AFCEE/TDB

Supersedes: AFI32-1024, 31 May 1994

Certified by: AF/A7CP

(Lt Col John J. Allen, Jr.)

Pages: 8

This Instruction implements AFPD 32-10, Installations and Facilities, and Department of

Defense Instruction (DoDI) 4165.3, Department of Defense Facility Classes and Construction

Categories. This Instruction is applicable to all Air Force active duty, civilian, Reserve (AFR) and Air National Guard (ANG) personnel and unit facilities. Air National Guard facility requirements are defined in ANGH 32-1084, ANG Standard Facility Requirements. Civil Air

Patrol may adopt this guidance at the discretion of the applicable installation commander, per

AFI 10-2701. It provides general guidance for developing standard facility requirements. It describes the facility requirements system, assigns responsibilities, and explains how to initiate and process new and revised standards for publication in AFMAN 32-1084, Facility

Requirements. Civil engineers should use the facility space allowances listed by category code in

AFMAN 32-1084 to assign occupancy and to program new facilities. Refer recommended changes and questions about this publication to the Office of Primary Responsibility (OPR) using the AF Form 847, Recommendation for Change of Publication; route AF Forms 847 from the field through appropriate functional chain of command. Ensure that all records created as a result of processes prescribed in this publication are maintained in accordance with

AFMAN 33-363, Management of Records, and disposed of in accordance with the Air Force

Records Disposition Schedule (RDS) located at https://www.my.af.mil/afrims/afrims/afrims/rims.cfm. The use of the name or mark of any specific manufacturer, commercial product, commodity, or service in this publication does not imply endorsement by the Air Force.

http://www.e-publishing.af.mil/ https://www.my.af.mil/afrims/afrims/afrims/rims.cfm

2 AFI32-1024 14 JULY 2011

SUMMARY OF CHANGES

The authorities to waive wing/unit level requirements in this publication are identified with a

Tier (“T-0, T-1, T-2, T-3”) number following the compliance statement. See AFI 33-360, Publications and Forms Management, for a description of the authorities associated with the Tier numbers. Submit requests for waivers through the chain of command to the appropriate Tier waiver approval authority, or alternately, to the Publication OPR for non-tiered compliance items. An asterisk (*) indicates newly revised material. Due to Air Force restructuring effective

1 October 2012, Air Force Center for Engineering and the Environment (AFCEE) and Air Force

Civil Engineer Support Agency (AFCESA) were changed to Air Force Civil Engineer Center

(AFCEC) throughout the document. Any name change resulting from creation of the Air Force

Installation and Mission Support Center (Provisional) on 1 October, 2014 will be incorporated into the next revision.

1. Facility Requirements System:

1.1. The Facility Requirements System develops and approves standards that define the type, number, and size of facilities. The system promotes economy and efficiency in using and developing facilities and helps realize the following goals:

1.1.1. Design standards for new and revised functional requirements.

1.1.2. Maximum use of existing facilities.

1.1.3. Standards of use to justify new facilities and occupy existing facilities.

1.1.4. Comprehensive programming for the construction, operation, and maintenance of needed facilities.

1.2. The organization of the Facility Requirements System is based on the DoD Real

Property Classification System (RPCS). RPCS is a hierarchical scheme of real property types and functions that forms the framework for identifying, categorizing, and analyzing

DoD’s inventory of land and facilities. The scheme is a tiered structure represented by numerical codes, with one-digit codes being the most general and five- or six-digit codes representing the most specific types of facilities.

1.2.1. Each Military Service has established its own set of numerical codes, commonly known as facility Category Codes, to represent each type of facility in its inventory. The

Air Force uses a six-digit hierarchy.

1.2.2. Category Codes (CATCODE) are generally similar but not identical between

Military Services. However, DoD established a higher-level facility classification that groups facilities with similar functions and units of measure from the Military Services into common Facility Analysis Categories (FAC) at the four-digit level. These FACs allow consistent macro-level analysis and planning across DoD. Successively smaller groupings of facility types are represented by three-, two-, and one-digit numerical classifications. The RPCS structure is numerically consistent between the one-digit and four-digit levels, but it is not always consistent across the Military Services at the five-and six-digit level. Further information on the DoD Real Property Classification System can be viewed on the Office of the Deputy Under Secretary of Defense, Installations and

Environment Web site:

http://www.acq.osd.mil/ie/fim/programanalysis_budget/tool_metrics/RPCS/rpcs.shtml.

http://www.acq.osd.mil/ie/fim/programanalysis_budget/tool_metrics/RPCS/rpcs.shtml 1024710587C Highlight

AFI32-1024 14 JULY 2011 3

1.3. The Facility Requirements System is further defined in AFMAN 32-1084, Facility

Requirements, which provides guidance and standards for the type, number, and size of facilities the Air Force can use, occupy, or build to support its mission. Air National Guard facility requirements are defined in ANGH 32-1084, ANG Standard Facility Requirements.

A listing in the handbook does not provide automatic justification for programming a facility or for including it in the base comprehensive plan. All available space must be considered when establishing a space deficiency and when justifying programming action. Approved standards published in AFMAN 32-1084 contribute to:

1.3.1. Timely acquisition of facilities.

1.3.2. Expedited construction program reviews and approvals.

1.3.3. Expedited project design.

1.3.4. Equitable space allocation in existing facilities; the published standards help divide limited assets among competing functions.

1.3.5. Standardization of facility design; the Air Force realizes benefits not only in design and construction but also in program management and functional operations.

2. Responsibilities:

2.1. The Deputy Assistant Secretary of the Air Force for Environment, Safety and

Infrastructure (SAF/IEE) establishes Air Force facility requirements policy consistent with

DoD policy and standards for facility requirements.

2.2. The Director of Civil Engineer (AF/A4C):

2.2.1. Implements policies and establishes procedures for the Facility Requirements

System.

2.2.2. Monitors Air Force-wide programs leading to new or revised facility standards to ensure all functional requirements are satisfied.

2.2.3. Consults on architectural, engineering, and other design aspects of proposed facility requirements.

2.2.4. Approves standard facility requirements.

2.2.5. Prepares AFMAN 32-1084 and ensures it is current.

2.3. AFMAN32-1084, Table A2.2, lists the facility OPRs for each Facility Category Code;

these OPRs are the primary action offices for developing facility requirements. Facility OPRs must ensure facility requirements supporting new and changing functions are identified early and timely action is taken to develop new standards for approval and publishing.

2.4. Major commands (MAJCOM), field operating agencies (FOA), and the Air National

Guard establish active programs to:

2.4.1. Keep abreast of new missions, programs, or concepts that may generate new facility requirements and initiate basing action, as appropriate, for new or modified missions in accordance with AFI 10-503, Base Unit Beddown Program.

2.4.2. Develop or refine functional standards for the type, number, and size of facilities needed for mission support.

4 AFI32-1024 14 JULY 2011

2.4.3. Investigate current facility operations to determine if existing standards are adequate.

2.4.4. Obtain approval of new or revised standard facility requirements for publication in

AFMAN 32-1084 using the procedure outlined in paragraph 4 of this Instruction.

2.4.5. Initiate the Environmental Impact Analysis Process (EIAP) in accordance with 32

CFR §989

2.4.5.1. The Air Force’s EIAP (32 CFR §989) shall be accomplished consistent with the National Environmental Policy Act (NEPA) (Pub. L. 91-190, 42 U.S.C. 4321-

4347) and the Presidents’ Council on Environmental Quality (CEQ) Regulations for

Implementing the Procedural Provisions of NEPA (40 CFR §§1500-1508) prior to implementing any irrevocable actions and/or committing irretrievable resources.

2.4.5.2. The proponent of the action (32 CFR §989.3(d)) is the person or organization that is responsible for initiating action and is responsible for complying with the

EIAP and ensuring integration of the EIAP during the initial planning stages of proposed actions so that planning and decisions reflect environmental values, delays are avoided later in the process, and potential conflicts are precluded.

2.4.5.3. The Environmental Planning Function (EPF) (32 CFR §989.3(e)) supports the proponent. The proponent is responsible for notifying the EPF of its pending action and completing Section I of AF Form 813, Request for Environmental Impact

Analysis.

2.5. Other echelons develop and submit proposals to facility OPRs to improve facility requirements standards and use facilities more efficiently.

2.6. Installation commanders shall determine the requirements for a specific facility based on standards published in AFMAN32-1084 according to AFI32-1021, Planning and

Programming Military Construction (MILCON) Projects. (T-1)

2.7. New systems or major modifications to existing systems often generate facility requirements. Program managers for these systems submit requirements to OPRs listed in

AFMAN32-1084. OPRs submit approved requirements via AF Form 847 to AF/A4CF for publication in AFMAN32-1084.

3. Developing Standard Facility Requirements. Facility OPRs will coordinate with command headquarters for facilities in which they have a primary interest to:

3.1. Acquire a good understanding of the function.

3.2. Explore combining or integrating the proposed facility requirement with other requirements.

3.3. Help civil engineers turn functional requirements into design and planning standards by investigating:

3.3.1. The number of personnel and types of organizations using the facility.

3.3.2. Time and scheduling of assigned workload.

3.3.3. Environmental control.

1024710587C Highlight

AFI32-1024 14 JULY 2011 5

3.3.4. Major equipment or material used in the facility.

3.3.5. Site location or base comprehensive plan.

3.3.6. Safety considerations.

3.3.7. Cost considerations to achieve functional requirements.

3.3.8. Standards used by other government organizations for comparable facilities.

3.3.9. Environmental protection requirements.

3.3.10. Energy and sustainability features.

3.4. Establish the most accurate means of measuring and expressing the requirements to support the function; for example, square feet per person, per vehicle, per aircraft; one each per organizational unit; square yard per total factors.

3.5. Obtain AFCEC’s help with facility requirements, layout, and functional relationships.

4. Procedures for Submitting Proposed New Standards or Changes to Existing Standards:

4.1. The Office of the Secretary of Defense (OSD) has established maximum space allowances for certain facilities (primarily administrative, community, and personnel support) which by new construction or changed use may not be exceeded without advance approval. AFMAN32-1084 indicates which category code facility standards are OSD controlled. OSD also approves or implements standards developed through interagency action to standardize certain facilities (such as NAVAIDs). Facility requirements OPRs listed in AFMAN32-1084 and facility requirements OPRs in the ANG and the Air Force Reserve are responsible for obtaining desired changes to standards under OSD control. Facility OPRs will:

4.1.1. Coordinate proposals with AF/A4CF before submitting them to OSD or other

Services. ANG and AFR OPRs will also cross-coordinate proposals of mutual interest before coordinating them with AF/A4CF. Send proposals using the AF Form 847, Recommendation for Change of Publication, to AF/A4CF for processing through

AF/A4C to OSD.

4.1.2. Keep detailed records on the development and approval of the revised standards.

4.1.3. Notify AF/A4CF when OSD approves revised standards.

4.2. For standards that are not established by OSD, MAJCOM headquarters OPRs submit proposed standards and changes to standards to the appropriate Air Staff OPR listed in

AFMAN32-1084. The Air Staff facility OPR then evaluates the proposed standards for implementation, and preparation for publication. The Air Staff OPR submission must include a draft text, in the same format as those contained in AFMAN32-1084, and supporting documentation.

4.2.1. The draft handbook text of the proposed standards must include the preferred facility nomenclature, proposed space allowances or other quantitative facility requirement, and explain:

4.2.1.1. Why the facility is required to support Air Force missions, programs, responsibilities, or activities. (Reference basic publications.)

6 AFI32-1024 14 JULY 2011

4.2.1.2. The principal activities or tasks supported by the facility. (Identify the type of organization performing the work.)

4.2.1.3. The facility's major physical components and special features influencing space, cost, or other quantitative requirements.

4.2.1.4. Other important features.

4.2.2. The supporting documentation must explain in detail the descriptions and standards expressed in condensed form in the handbook text and how facility space requirements, or other quantitative limits, were derived.

5. Space Allowances. Except for those facilities covered by paragraph 4.1, the sizes and scopes in AFMAN32-1084 are guidance and may be increased or decreased. When the projects or actions require construction or change in use and require AF/A4CF approval under 32-series policy directives, the writer of the project documents must explain and justify the need to exceed published allowances. When the projects or actions do not require AF/A4CF approval, increases beyond the scopes shown may be made when approved by the MAJCOMs and Air National

Guard. AFI32-1021, Planning and Programming Military Construction (MILCON) Projects, and

AFI32-9002, Use of Real Property Facilities, provide guidance to the MAJCOMs and Air

National Guard. See also DODI 5305.5, Space Management Procedures, National Capital

Region, and AFI32-9010, Management and Reporting of Air Force Space and Building Services in OSD Assigned Facilities and in the Washington DC Area.

LOREN M. RENO, Lt Gen, USAF

DCS/Logistics, Installations & Mission Support

AFI32-1024 14 JULY 2011 7

Attachment 1

GLOSSARY OF REFERENCES AND SUPPORTING INFORMATION

References

AFI 10-503, Base Unit Beddown Program, May 29, 2003

AFI 10-2701, Organization and Function of the Civil Air Patrol, July 29, 2005

AFI 32-10, Installations and Facilities, March 4, 2010

AFI 32-1021, Planning and Programming Military Construction (MILCON) Projects, January 24, 2003

AFI 32-9002, Use of Real Property Facilities, November 22, 1993

AFI 32-9010, Management and Reporting of Air Force Space and Building Services in OSD

Assigned Facilities and in the Washington DC Area, January 27, 2011

AFMAN 32-1084, Facility Requirements, (New Date TBD)

AFMAN 33-363, Management of Records, March 1, 2008

32 CFR § 989, Environmental Impact Analysis Process, March 19, 2009

40 CFR §§1500-1508, Council on Environmental Quality, 42 USC §§ 4321-4347, National Environmental Policy Act

DoDI 5305.5, Space Management Procedures, National Capital Region, June 14, 1999

Prescribed Forms

No forms are prescribed by this publication.

Adopted Forms

AF Form 813, Request for Environmental Impact Analysis

AF Form 847, Recommendation for Change of Publication

Abbreviations and Acronyms

AFCEC—Air Force Civil Engineer Center

AFCEE—Air Force Center for Engineering and the Environment

AFCESA—Air Force Civil Engineer Support Agency

AFI—Air Force Instruction

AFMAN—Air Force Manual

ANG—Air National Guard

CATCODE—Category Code

CFR—Code of Federal Regulations

DoD—Department of Defense

8 AFI32-1024 14 JULY 2011

DRU—Direct Reporting Unit

EA—Environmental Assessment

EIAP—Environmental Impact Analysis Process

EPF—Environmental Planning Function

FOA—Field Operating Agency

MAJCOM—Major Command

MILCON—Military Construction

NEPA—National Environmental Policy Act

OPR—Office of Primary Responsibility

OCR—Office of Concurrent Responsibility

OSD—Office of the Secretary of Defense

RPCS—Real Property Classification System

UFC—Unified Facilities Criteria

USAF—United States Air Force

USAFR—United States Air Force Reserve

File details come from the government source that posted it. Updated .