Atch 23 NV100004.docx

DOCX document 25 KB Posted

Attached to
NELLIS AFB SABER Federal contract opportunity
Solicitation number
FA4861-11-R-A300
Issued by
Department of the Air Force Air Combat Command

About this file

NELLIS AFB SABER

View the file

Other files for this federal contract opportunity

Other files attached to NELLIS AFB SABER, newest first.
File Type Posted
Atch 32a Bldg. 10566 Utility Layout.pdf PDF
Amend 2 Nellis SABER.pdf PDF
Atch 32a Bldg10566 Utility Layout.pdf PDF
Atch 33 Performance Information Form.pdf PDF
Nellis SABER RFP Conformed.pdf PDF
Nellis SF30 Amendment.pdf PDF
Atch 26 Floor Plan Layout B10566.pdf PDF
Atch 25 SOO Demo Project Bldg 10566.pdf PDF
Nellis SABER Questions FINAL 8 Aug 11.pdf PDF
Nellis PPQ Question and Answer 1.docx DOCX document
Atch 24 Past Performance Questionnaire.pdf PDF
Atch 28 Bonding Information Request.pdf PDF
Atch 27 Nellis Financial Information Request.pdf PDF
Atch 15 AF Form 1477 Inspection Record.pdf PDF
Atch 16 AF Form 103 Dig Outage and Location Request.pdf PDF
Atch 11 AF Form 3064 Progress Schedule.pdf PDF
Atch 12 AF Form 3000 Material Approval Submittal.pdf PDF
Atch 2 NAFB Design Stds.pdf PDF
Atch 5 Tech Spec SCIF May 5 2011.pdf PDF
Atch 17 ID Warranty.Guarantee Items.doc DOC document
Atch 19 UFC 1-300-08 How To DD1354.pdf PDF
Atch 4 ETL —
Atch 26 Floor Plan Layout B10566.pdf PDF
Atch 29 Map of Nellis to Bldg. 588.docx DOCX document
Atch 8 38EIGHTB33-01 Comm Infor 1st 400 Ft.doc DOC document
Atch 28 Bonding Information Request.pdf PDF
Atch 7 UFC 3-580-01.pdf PDF
Atch 9 ETL 93-5 Fire Protect.pdf PDF
Atch 3 Comm Standards dtd May 2010.pdf PDF
Atch 20 AF Form 3052 Cost Estimate Breakdown.xls XLS spreadsheet
NELLIS SABER RFP.pdf PDF
Atch 30 Consent Letter dtd 15 Feb 10.doc DOC document
Atch 27 Financial Information Request NELLIS.pdf PDF
Atch 6 ACC Arch Interior Design Stand.pdf PDF
Atch 25 SOO Demo Project B10566.doc DOC document
Atch 21 NV100064.docx DOCX document
Atch 16 AF Form 103.xfdl XFDL file
Atch 1 NELLIS SABER Rev 12 23 June 2011--JBP.docx DOCX document
Atch 12 AF Form 3000.xfdl XFDL file
Atch 14 Range Pass NAFB 0-74.doc DOC document
Atch 31 Client Authorization Letter dtd 15 Feb 10.doc DOC document
Atch 13 AF Form 3065 ProgRpt.xls XLS spreadsheet
Atch 18 Sample of DD1354.pdf PDF
Atch 15 AF FORM 1477.xfdl XFDL file
Atch 24 Past Performance Questionnaire.pdf PDF
Atch 22 NV100022.docx DOCX document
Atch 10 AF Form 66.doc DOC document
Atch 11 AF Form 3064.xfdl XFDL file
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION FA4861-11-R-A300

ATTACHMENT # 23

General Decision Number: NV100004 02/11/2011 NV4 Superseded General Decision Number: NV20080004

State: Nevada

Construction Type: Building

Counties: Clark County in Nevada.

EXCLUDES NEVADA TEST SITE (NTS), NATIONAL TEST AND TRAINING

RANGE (NTTR) AND TONOPAH TEST RANGE (TTR)

Modification Number
Publication Date
0
03/12/2010
1
03/19/2010
2
06/04/2010
3
07/09/2010
4
09/10/2010
5
10/01/2010
6
10/22/2010

10/29/2010 01/28/2011 02/11/2011 03/11/2011 04/22/2011 05/13/2011 05/20/2011

BRNV0013-004 03/01/2009

Rates Fringes

BRICKLAYER.......................$ 34.02 10.20

BRNV0013-005 03/01/2009

Rates Fringes

TILE FINISHER....................$ 26.07 8.32

BRNV0013-006 03/01/2009

Rates Fringes

MARBLE SETTER....................$ 38.28 10.77

TILE SETTER......................$ 35.65 10.77

CARP1780-002 07/01/2010

Rates Fringes CARPENTER (Including Cabinet making and installation, Accoustical Ceiling Installation, Batt Insulation, Drywall Hanging, Form Work, Hardwood Floor Layer and Metal Stud Installation.).................$ 37.76 11.10 Zone Pay:

0 to 40 miles radius from intersection of Maryland Parkway and Charleston Blvd in Las Vegas: Free Zone 40 to 60 miles radius: $2.50 additional per hour Over 60 miles radius: $4.25 additional per hour Laughlin Area: $2.00 additional per hour

ELEC0357-001 01/01/2010

Rates Fringes

ELECTRICIAN......................$ 39.99 15.12+3%

SOUND AND COMMUNICATION

TECHNICIAN (Alarm installation & Low Voltage Wiring)........................$ 39.64 15.12+3%

ZONE PAY:

(A) Free Zone: The area bound by a 25 mile radius from the intersection of Main Street and Fremont Street in Las Vegas.

(B) Add $2.50 per hour: The area bound by a 25-55 mile radius from the intersection of Main and Fremont Street.

(C) Add $3.50 per hour: The area outside of a 55 mile radius from Main Street and Fremont Street.

ENGI0012-008 08/01/2010

Rates Fringes OPERATOR: Power Equipment

(03) Skid Loader/Bobcat.........$ 34.41 20.67

(04) Base Roller (Ride Along).....................$ 35.90 20.67

(06) Bulldozer, Forklift and Scraper................$ 36.12 20.67

(08) Mechanic, Paver (Including Asphalt)........$ 36.23 20.67

(10) Grader (Finishing and Non-Finishing)..............$ 36.35 20.67 Add $2.00 per hour to wage rates:

20 miles to 40 miles from the City Hall of Las Vegas Add $3.00 per hour to wage rates:

40 Miles to 60 Miles from the City Hall of Las Vegas Add $3.50 per hour:

Over 60 Miles from the City Hall of Las Vegas

* IRON0118-002 01/03/2011

Rates Fringes IRONWORKER (Ornamental, Reinforcing, and Structural)...$ 31.96 26.13

LABO0872-004 07/01/2009

Rates Fringes

LABORER

(1) Form Stripping.............$ 25.31 17.63

(2) Asphalt Dumpman, Asphalt Shoveler, Cone Setter, Trencher-Hand guided......................$ 25.52 17.63

(3) Concrete Saw, Jackhammer, Mason Tender - Brick, Mason Tender - Cement/Concrete, Pipelayer..$ 25.62 17.63 (3A)Concrete Vibrator...........$ 26.12 17.63

(7) Asbestos Removal (Floor, Wall, Ceiling)......$ 25.62 17.63

(8) Flagger....................$ 26.71 17.63

LABO0872-005 07/01/2009

Rates Fringes

PLASTER TENDER...................$ 25.62 17.83

PAIN0159-007 07/01/2009

Rates Fringes PAINTER (Including Prep, Brush, Roller, Spray & Drywall Finishing).............$ 34.63 11.87

PAIN2001-001 01/01/2010

Rates Fringes

GLAZIER..........................$ 42.45 18.09

PLAS0797-001 07/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 34.17 12.11

PLASTERER........................$ 32.38 12.31

PLUM0525-001 08/01/2010

Rates Fringes PIPEFITTER, Including HVAC Pipe Installation................$ 38.57 17.70

ZONE PAY:

Zone 1 (0-20 miles)-No Zone Pay Zone 2 (20-45 miles)-Add $3.75/hour Zone 3 (45-75 miles)-Add $7.50/hour Zone 4 (over75 miles)-Add $11.25/hour

SHEE0088-003 01/01/2011

Rates Fringes SHEETMETAL WORKER (Including HVAC Duct Installation and Metal Roof)....................$ 43.99 15.96

Zone 1: 0 to 30 miles $0.00 Zone 2: 30 to 50 miles $2.50 Zone 3: 50 to 100 miles (including Laughlin) $3.50 Zone 4: over 100 miles $5.00

SUNV2007-002 08/01/2007

Rates Fringes LABORER: Common or General......$ 16.49 0.00 LABORER: Landscape..............$ 9.85 0.00 OPERATOR: Backhoe...............$ 16.02 0.00 OPERATOR: Excavator.............$ 17.64 1.45 OPERATOR: Loader................$ 23.62 5.10 OPERATOR: Trencher, Excluding Hand Guided Trencher.$ 27.96 0.00 PLUMBER, Excluding HVAC Pipe.....$ 23.11 0.00 ROOFER, Excluding Metal Roofs....$ 12.73 3.56 SOFT FLOOR LAYER, Includes Carpet & Vinyl.................$ 16.12 1.66 SPRINKLER FITTER (Fire Sprinklers)....................$ 24.38 0.00 TRUCK DRIVER: Dump Truck........$ 16.57 0.00 TRUCK DRIVER: Water Truck.......$ 17.11 2.16

TEAM0631-003 07/01/2009

Rates Fringes TRUCK DRIVER (Flatbed)...........$ 27.19 18.89

ZONE PAY:

ZONE 1: All work within 30 road miles of City Hall in Las Vegas shall be considerered a Free Zone.

ZONE 2: All work 30 to 50 road miles from City Hall in Las Vegas shall receive $1.50 additional per hour.

ZONE 3: All work 50 to 70 road miles from City Hall in Las Vegas shall receive $2.50 additional per hour.

ZONE 4: ALL work over 70 road miles from City Hall in Las Vegas shall receive $3.50 additional per hour.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal Process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the Interested party's position and by any information (wage payment data, Project description, area practice material, etc.) that the requestor Considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an Interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Page A23-1 of 6

File details come from the government source that posted it. Updated .