AF3052
| CONSTRUCTION COST ESTIMATE BREAKDOWN | OMB No. 0704-0193 Expires 31 October 1989 | |||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Nellis SABER | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | N/A | $ | |||||||
| WORK LOCATION | ||||||||||
| MATERIAL COST | NELLIS AFB NV | |||||||||
| LINE NO. | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | LABOR COSTS | ||||
| 1 | MANHOURS MANDAYS (6) | AVERAGE RATE (7) | TOTAL (8) | OTHER DIRECT COSTS (9) | LINE TOTAL (10) | |||||
| 2 | ||||||||||
| 3 | ||||||||||
| 4 | ||||||||||
| 5 | ||||||||||
| 6 | ||||||||||
| 7 | ||||||||||
| 8 | ||||||||||
| 9 | ||||||||||
| 10 | ||||||||||
| 11 | ||||||||||
| 12 | ||||||||||
| 13 | ||||||||||
| 14 | ||||||||||
| 15 | ||||||||||
| 16 | ||||||||||
| 17 | ||||||||||
| 18 | ||||||||||
| 19 |
&R&"Arial,Bold"&7SOLICITATION: FA4861-11-R-A300
ATTACHMENT #20
Page A4- 1 &CPage &P
AF3052R
| INSTRUCTIONS FOR COMPLETING AF FORM 3052 | |||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | |||||
| permit itemizing of all direct costs. | |||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples -- square yards -- SY, cubic yards -- CY, square | |||||
| feet -- SF, linear feet -- LF, board feet -- BF, each -- EA, pound -- LB). | |||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be fur-- | |||||
| nished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will | |||||
| be issued. Otherwise, the contractor is responsible for determining quantity estimates. | |||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | |||||
| Col 6. 7, and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | |||||
| Enter in Col 7 the average rate per mahour (manday) and in Col 8 the total labor cost. | |||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in Col 1) which are special to the contract | |||||
| and of significant dollar value. Identify Subcontractor costs here and include back-up documentation on how these costs were derived. | |||||
| Col 10 Line Total. Self-explanatory. | |||||
| NOTE: | In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | ||||
| page as follows: | |||||
| 1 | TOTAL MATERIAL COSTS: | $ _________________________ | (Column 5 Total) | ||
| 2 | TOTAL LABOR COSTS: | $ _________________________ | (Column 8 Total) | ||
| 3 | TOTAL OTHER DIRECT COSTS: | $ _________________________ | (Column 9 Total) | ||
| 4 | TOTAL DIRECT COSTS: | $ _________________________ | (Column 10 Total, = Items 1 + 2 + 3) | ||
| 5 | OVERHEAD @ ____________% | $ _________________________ | (Item 4 x Item 5 %) | ||
| 6 | PROFIT @ ____________% | $ _________________________ | (Item 4 x Item 6 %) | ||
| 7 | SUBTOTAL: | $ _________________________ | (Item 4 + 5 + 6) | ||
| 8 | BOND @ ____________% | $ _________________________ | (Item 7 x Item 8 %) | ||
| 9 | TOTAL PRICE: | $ _________________________ | (Item 7 + 8)) | ||
| INSTRUCTIONS TO OFFERORS | |||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |||||
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | |||||
| this proposal the offeror shall, under the conditions stated in FAR 15.804-2, be required to submit a certificate of current cost or pricing data | |||||
| (see FAR 15.804). | |||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit and submit with this | |||||
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | |||||
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | |||||
| a. The existing, verifiable data. | |||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | |||||
| c. The contingencies used by the offeror in their proposed price. | |||||
| In short, the offeror's estimating process itself needs to be disclosed. | |||||
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |||||
| and made available to the contracting officer or his authorized representative upon request. | |||||
| 4. Submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | |||||
| evaluation of such negotiations prior to contract award. | |||||
| (Reverse of Construction Cost Estimate Breakdown) |
&R&"Arial,Bold"&7SOLICITATION: FA4861-11-R-A300
ATTACHMENT #20
Page A4- 1 &CPage &P
Sheet 3
&A Page &P
Sheet 4
Sheet 5
Sheet 6
Sheet 7
Sheet9
Sheet10
Sheet11
Sheet12
Sheet13
Sheet14
Sheet15
Sheet16
File details come from the government source that posted it. Updated .