01_35_00_SPECIAL_PROVISIONS_FOR_WORKING_ON_OR_NEAR_THE_AIRFI.pdf

PDF 16 KB Posted

Attached to
QSEU 12-2002, Repair Infrared Heaters
Solicitation number
FA4830-13-B-0002
Issued by

About this file

Special Provisions

View the file

Other files

File Type Posted
Amendment_0001.pdf PDF
758_Asbestos.pdf PDF
785asbestos.pdf PDF
01_57_20.00_ENVIRONMENTAL_PROTECTION_26_Mar_13_corrected.pdf PDF
01_00_00_GENERAL_REQUIREMENTS_9003_26_Mar_13correted.pdf PDF
Infrared_Heaters_Repair_Questions_(3).pdf PDF
02_41_00__DEMOLITION_AND_RECONSTRUCTION.pdf PDF
m-1.pdf PDF
23_11_23.00_10_GAS_PIPING_SYSTEMS.pdf PDF
Bidders_Checklist.doc DOC document
m-3.pdf PDF
e-3.pdf PDF
m-2.pdf PDF
SITE_VISIT_CONFERENCE_RESERVATION_FORM.docx DOCX document
Lobby_Activities_Form.pdf PDF
01_45_01_CONTRACTORS_QUALITY_CONTROL.pdf PDF
01_00_01_SPECIFIC_REQUIREMENTS__MAFB.pdf PDF
01_00_00_GENERAL_REQUIREMENTS.pdf PDF
e-2.pdf PDF
23_52_00_HEATING_BOILERS.pdf PDF
Title_Page TOC_ _COVER_SHT.pdf PDF
01_62_35_RECYCLED__RECOVERED_MATERIALS.pdf PDF
01_31_01_PROJECT_MANAGEMENT.pdf PDF
e-1.pdf PDF
m-5.pdf PDF
Architectural_electrical_Design_Analysis.docx DOCX document
23_07_00_THERMAL_INSULATION_FOR_MECHANICAL_SYSTEMS.pdf PDF
01_78_23_OPERATION_AND_MAINTENANCE_DATA.pdf PDF
01_35_29_SAFETY_AND_OCCUPATIONAL_HEALTH_REQUIREMENTS.pdf PDF
Contractor_Information.rtf RTF text file
IFB_solicitation.doc DOC document
m-7.pdf PDF
X-1_VICINITY_MAP _INDEX_OF_DRAWINGS.pdf PDF
01_57_20.00_ENVIRONMENTAL_PROTECTION_.pdf PDF
m-4.pdf PDF
m-6.pdf PDF
Question_Form.docx DOCX document
AF_Form_66.xls XLS spreadsheet
01_78_00_TASK_ORDER_CLOSE_OUT_REQUIREMENTS.pdf PDF
23_54_16.00_10_HEATING_SYSTEM__GAS-FIRED_HEATERS.pdf PDF
01_33_00_SUBMITTAL_PROCEDURES.pdf PDF
01_55_01__SECURITY_REQUIREMENTS.pdf PDF
Wage_Determination.docx DOCX document
01_04_00_Unit_Price_Book_and_Software_Requirments.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 35 00

SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE

AIRFIELD OR AIRFIELD HANGARS

PART 1 GENERAL

1.1 The following provisions apply when work is required to take place on the active airfield/hangar, or within the clear zones or primary surfaces.

1.2 CLOSURES

1.2.1 All runway, taxiway or hangar closures will require the coordination of Base Operations through the Contracting Officer not less than 14 calendar days prior to the requested closure, unless otherwise provided for in these specifications. The Contractor will make the maximum utilization of time during the requested closure period. The Contractor will notify the Contracting Officer when he is finished with the work requiring the closure.

The Contractor will schedule his operations in phases if necessary so as to minimize the effect of his construction closures on normal airfield operations.

1.3 COORDINATION OF WORK

1.3.1 The Contractor shall coordinate with the Contracting Officer before initiating any work and will notify them of the proposed location of work and time of operation.

1.4 PERSONNEL SAFETY PRECAUTIONS

1.4.1 Aircraft and support equipment operating in/near hangars, on/near the runways, taxiways, and aprons make the area of construction a zone of high level noise. The Contractor shall take the necessary precautions, such as the use of earplugs or muffs to prevent injury to the auditory systems of all personnel working in the area.

1.5 RESTRICTIONS

1.5.1 No Contractor vehicles, equipment, or personnel shall be on or crossing any active runway or taxiway, except during construction period closures as outlined herein or when clearance is requested from and granted by the control tower. All Contractor vehicles operating on the landing areas (1,000 feet on either side of the runway center line) during the period from dawn to dusk will be identified by mounted electric battery operated low intensity, yellow or amber flashing lights. When Contractor operations require them to cross an active runway or other controlled area on a regular basis, they shall furnish a two-way radio in order to maintain contact with the control tower. The Government will provide the Contractor with the correct frequency. Use of the government provided radio frequency for other purposes will be strictly prohibited.

1.6 CLEANLINESS OF WORK AREA

1.6.1 The Contractor will be required to maintain cleanliness of all work areas at all times during progression of work in order to alleviate foreign object damage (FOD). The

QSEU 12-2002 01 35 00-1 03/16/10

QSEU 12-2002 01 35 00-2 03/16/10

PART 2

PART 3

Contractor will be required to remove all materials and equipment to a safe distance from the runway or aircraft parking area at the close of each day’s work. This distance will be determined by Base Operations. The Contractor will not be allowed to stockpile any materials or store any equipment within 1,000 feet of the runway centerline.

1.7 EMERGENCIES

1.7.1 There may be periods of time when the Contractor, due to declared aircraft emergencies, will be required to vacate the work site and move their personnel and equipment a distance of several hundred feet away from the work site. Such removals, when ordered, will be given on short notice and expeditious action will be required. Whenever the Contractor is required to clear the work area, the Contractor accompanied by the inspector or Air Force representative will make an inspection sweep of the entire area to ensure all tools, equipment, and personnel have been removed from the runway, active taxiway or hangar, and that the area is available for landings or parking.

PRODUCTS – Not Used

EXECUTION – Not Used

END OF SECTION 01 35 00