Building 645 - Floor Plan - Demolition

View the file

Other files

File Type Posted
Amendment_0001.pdf PDF
758_Asbestos.pdf PDF
785asbestos.pdf PDF
01_57_20.00_ENVIRONMENTAL_PROTECTION_26_Mar_13_corrected.pdf PDF
01_00_00_GENERAL_REQUIREMENTS_9003_26_Mar_13correted.pdf PDF
Infrared_Heaters_Repair_Questions_(3).pdf PDF
02_41_00__DEMOLITION_AND_RECONSTRUCTION.pdf PDF
23_11_23.00_10_GAS_PIPING_SYSTEMS.pdf PDF
Bidders_Checklist.doc DOC document
m-3.pdf PDF
e-3.pdf PDF
m-2.pdf PDF
SITE_VISIT_CONFERENCE_RESERVATION_FORM.docx DOCX document
Lobby_Activities_Form.pdf PDF
01_45_01_CONTRACTORS_QUALITY_CONTROL.pdf PDF
01_00_01_SPECIFIC_REQUIREMENTS__MAFB.pdf PDF
01_00_00_GENERAL_REQUIREMENTS.pdf PDF
e-2.pdf PDF
23_52_00_HEATING_BOILERS.pdf PDF
Title_Page TOC_ _COVER_SHT.pdf PDF
01_62_35_RECYCLED__RECOVERED_MATERIALS.pdf PDF
01_31_01_PROJECT_MANAGEMENT.pdf PDF
e-1.pdf PDF
m-5.pdf PDF
Architectural_electrical_Design_Analysis.docx DOCX document
23_07_00_THERMAL_INSULATION_FOR_MECHANICAL_SYSTEMS.pdf PDF
01_78_23_OPERATION_AND_MAINTENANCE_DATA.pdf PDF
01_35_29_SAFETY_AND_OCCUPATIONAL_HEALTH_REQUIREMENTS.pdf PDF
Contractor_Information.rtf RTF text file
IFB_solicitation.doc DOC document
m-7.pdf PDF
01_35_00_SPECIAL_PROVISIONS_FOR_WORKING_ON_OR_NEAR_THE_AIRFI.pdf PDF
X-1_VICINITY_MAP _INDEX_OF_DRAWINGS.pdf PDF
01_57_20.00_ENVIRONMENTAL_PROTECTION_.pdf PDF
m-4.pdf PDF
m-6.pdf PDF
Question_Form.docx DOCX document
AF_Form_66.xls XLS spreadsheet
01_78_00_TASK_ORDER_CLOSE_OUT_REQUIREMENTS.pdf PDF
23_54_16.00_10_HEATING_SYSTEM__GAS-FIRED_HEATERS.pdf PDF
01_33_00_SUBMITTAL_PROCEDURES.pdf PDF
01_55_01__SECURITY_REQUIREMENTS.pdf PDF
Wage_Determination.docx DOCX document
01_04_00_Unit_Price_Book_and_Software_Requirments.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 645 - FLOOR PLAN - DEMOLITION

1/8" = 1' - 0"

EXISTING INFRA-RED

HEATER (SEE NOTE 1)

EXISTING INFRA-RED

HEATER (SEE NOTE 1)

EXISTING INFRA-RED

HEATER (SEE NOTE 1)

EXISTING INFRA-RED

HEATER (SEE NOTE 1)

EXISTING INFRA-RED

HEATER (SEE NOTE 1)

EXISTING INFRA-RED

HEATER (SEE NOTE 1)

EXISTING INFRA-RED

HEATER (SEE NOTE 1)

EXISTING INFRA-RED

HEATER (SEE NOTE 1)

EXISTING INFRA-RED

HEATER (SEE NOTE 1)

EXISTING INFRA-RED

HEATER (SEE NOTE 1)

EXISTING INFRA-RED

HEATER (SEE NOTE 1)

EXISTING INFRA-RED

HEATER (SEE NOTE 1)

NOTES:

1. MECHANICAL CONTRACTOR SHALL REMOVE EXISTING INFRA-RED HEATER, HANGERS,

CONTROLS, AND PIPING AS REQUIRED FOR NEW WORK.

EXIST. 3/4"GAS (2 PSIG)

EXIST. 1"GAS (2 PSIG)

EXIST. 1 "GAS (2 PSIG)4/

EXISTING 2"GAS(2 PSIG)

EXISTING 2"GAS(2 PSIG)

EXISTING 1"GAS(2 PSIG)

G

G P

S

IG

G 2 PSIG G 2 PSIG G

P

S

IG

G

G P

S

IG

EXIST. 1"GAS (2 PSIG)

P

S

IG

P

S

IG

G

CAPE

1674 Headland Avenue

Dothan, AL 36303

(334) 793-2790

Fax: (334) 671-7157

Engineering H 1214 1st Avenue Suite 210

Columbus, GA 31901

(706) 596-1840

Fax: (706) 596-9233

File details come from the government source that posted it. Updated .