FA4819-10-R-0006 Attachment 6 DB General Decision Number FL 305 Highway.docx

DOCX document 19 KB Posted

Attached to
Tyndall AFB SABER
Solicitation number
FA4819-10-R-0006
Issued by

About this file

FA4819-10-R-0006 Attachment 6 DB Wage Determination FL305 Highway

View the file

Other files

File Type Posted
FA4819-10-R-0006 Amendment 4.pdf PDF
FA481910R00060003.pdf PDF
FA4819-10-R-0006 A00002 Tyndall AFB SABER SF30.doc DOC document
FA4819-10-R-0006 Attachment 9 Coefficient Breakdown Revised 21 Mar 11.docx DOCX document
17 Mar 11 FA4819-10-R-0006 Tyndall AFB SABER.docx DOCX document
FA4819-10-R-0006 Attachment 3 SABER SOW Revised 17 Mar 2011.doc DOC document
FA4819-10-R-0006 Attachment 9 Coefficient Breakdown Revised 17 Mar 11.docx DOCX document
Facility Excellence Plan_08.pdf PDF
8 Mar 11 FA4819-10-R-0006 Tyndall AFB SABER.docx DOCX document
FA4819-10-R-0006 Site Visit.pptx PPTX presentation
FA4819-10-R-0006 Tyndall SABER Actual Site Visit Attendees.pdf PDF
1 Mar 11 FA4819-10-R-0006 Tyndall AFB SABER.docx DOCX document
25 Feb 11 FA4819-10-R-0006 Tyndall AFB SABER.docx DOCX document
FA4819-10-R-0006 Tyndall AFB SABER 22 Feb 11.docx DOCX document
FA4819-10-R-0006 SF 1442 Tyndall AFB SABER.doc DOC document
FA4819-10-R-0006 Attachment 4 DB General Decision Number FL106 Bldg.docx DOCX document
FA4819-10-R-0006 Attachment 5 DB General Decision FL247 Heavy.docx DOCX document
FA4819-10-R-0006 Attachment 11 L-2 Consent Release.docx DOCX document
FA4819-10-R-0006 Attachment 9 Coefficient Breakdown.docx DOCX document
FA4819-10-R-0006 SF 1442 Tyndall AFB SABER.doc DOC document
FA4819-10-R-0006 Attachment 10 L-1 Past Performance Information.docx DOCX document
FA4819-10-R-0006 Attachment 7 DB Decision Number FL 196 Residential.docx DOCX document
FA4819-10-R-0006 Attachment 8 General Financial Information.docx DOCX document
FA4819-10-R-0006 Attachment 12 L-3 Memorandum for Questionnaire.docx DOCX document
FA4819-10-R-0006 Attachment 3 SABER SOW 17 Feb 2011.doc DOC document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4819-10-R-0006/Tyndall AFB SABER/Attachment 6/27 Jan 11 General Decision Number: FL100305 03/12/2010 FL305

Superseded General Decision Number: FL20080305

State: Florida

Construction Type: Highway

County: Bay County in Florida.

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 03/12/2010

SUFL2009-202 08/05/2009

Rates Fringes

CARPENTER........................$ 13.03 1.05

CEMENT MASON/CONCRETE FINISHER...$ 10.06 0.00

ELECTRICIAN......................$ 17.12 0.00

FORM WORKER......................$ 12.29 0.00

HIGHWAY/PARKING LOT STRIPING:

Operator (Striping Machine).....$ 11.97 2.23

HIGHWAY/PARKING LOT STRIPING:

Painter.........................$ 13.31 0.00

IRONWORKER, REINFORCING..........$ 14.50 1.37

IRONWORKER, STRUCTURAL...........$ 16.75 3.88

LABORER: Asphalt Shoveler.......$ 10.70 0.00

LABORER: Common or General......$ 8.30 0.00

LABORER: Flagger................$ 10.10 3.37

LABORER: Grade Checker..........$ 10.50 0.55

LABORER: Landscape and Irrigation.......................$ 8.77 0.00

LABORER: Luteman................$ 10.32 0.00

LABORER: Mason Tender - Cement/Concrete..................$ 12.00 1.80

LABORER: Pipelayer..............$ 12.13 2.59

LABORER: Power Tool Operator (Hand Held Drills/Saws, Jackhammer and Power Saws........$ 11.23 1.96

OPERATOR: Asphalt Plant.........$ 12.20 0.00

OPERATOR: Asphalt Spreader......$ 10.76 0.00

OPERATOR: Auger.................$ 19.40 0.44

OPERATOR: Backhoe Loader Combo............................$ 15.33 0.97

OPERATOR: Backhoe/Excavator.....$ 10.70 0.00

OPERATOR: Boom..................$ 16.61 0.00

OPERATOR: Bulldozer.............$ 14.18 2.56

OPERATOR: Crane.................$ 15.50 1.86

OPERATOR: Distributor...........$ 11.47 0.00

OPERATOR: Drill.................$ 13.00 1.59

OPERATOR: Grader/Blade..........$ 15.41 3.60

OPERATOR: Loader................$ 9.66 0.00

OPERATOR: Mechanic..............$ 16.20 3.25

OPERATOR: Milling Machine.......$ 11.91 1.96

OPERATOR: Oiler.................$ 13.08 2.27

OPERATOR: Paver.................$ 9.78 0.00

OPERATOR: Piledriver............$ 15.59 4.00

OPERATOR: Roller................$ 8.82 0.00

OPERATOR: Scraper...............$ 10.70 1.60

OPERATOR: Screed................$ 11.59 0.00

OPERATOR: Tractor...............$ 9.05 0.00

OPERATOR: Trencher..............$ 13.41 0.49

PAINTER: Spray and Steel.........$ 16.62 0.00

TRUCK DRIVER: Distributor.......$ 11.30 2.26

TRUCK DRIVER: Dump Truck........$ 8.66 0.00

TRUCK DRIVER: Lowboy Truck......$ 12.19 0.00

TRUCK DRIVER: Material Truck....$ 12.76 9.80

TRUCK DRIVER: Tractor Haul Truck............................$ 10.64 0.00

TRUCK DRIVER: Water Truck.......$ 10.50 0.00

TRUCK DRIVER: 10 Yard Haul Away.............................$ 12.50 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION