Atch 4A (Rev1) - B565 1st Floor PWS.pdf
PDF 759 KB Posted
- Solicitation number
- FA481426Q0014
About this file
This is a Statement of Work (Revision 1) for carpet tile replacement at Building #565, 1st Floor, MacDill Air Force Base, dated 16 December 2025.
The contractor shall remove existing glue-down carpet, wall base, stair nosing, and transitions from designated areas on the 1st floor of Building 565, with total project scope of 22,773 square feet. The contractor is responsible for all necessary labor, equipment, transportation, materials, and support accessories, including lifting or moving furniture as required. The work includes furnishing and installing 24"x24" carpet tiles with "Tile Tabs" adhesive tabs, 4-inch rubber base, and transitions to match existing conditions. All existing building materials shall be disposed of off MacDill AFB. The contractor must perform floor preparation including mechanical removal of flooring material and non-water-based adhesives, with any unforeseen conditions reported to the Contracting Officer Representative (COR). If Asbestos Containing Material (ACM) is encountered, the contractor shall immediately cease work and notify the COR. Daily site maintenance and cleanup are required, including protection of adjacent property from dust and debris, and collection of all trash in appropriate lidded containers. Work must be started within 30 days of purchase order award and completed within 60 days of award. The contractor shall immediately notify the COR of any delays caused by mandated carpet goods suppliers. The contractor may be required to man the job to support an elevated work schedule for one-month completion from start date.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (Revision 1)
BLDG #565 Carpet Tile 1st Floor
16 Dec. 2025
1. SCOPE OF WORK
The work will include providing all necessary labor, equipment, transportation, materials, and support accessories, to remove existing glue down carpet, wall base, stair nosing and transitions. Contractor will be responsible for lifting or moving any furniture required for proper removal and installation of carpet.
Furnish and install selected 24”x24” carpet tiles with “Tile Tabs” adhesive tabs, 4 inch rubber base and transitions to match existing. Contractor may be required to man the job to support an elevated work schedule for completion 1 month from start date.
2. DEMOLITION
The contractor shall demo existing flooring material, all transition and all wall base in designated areas.
All building material shall be disposed of off MacDill AFB.
3. FLOOR PREPARATION
Anything other than mechanical removal of flooring material and non-water base adhesives and any additional floor preparation that may be required as a result of unforeseen conditions shall be brought to the attention to the Contracting Officer Representative (COR).
4. ASBESTOS ABATEMENT
Should the Contractor encounter Asbestos Containing Material (ACM) which must be disturbed, the Contractor shall cease all work that would disturb the ACM and shall immediately notify the COR.
5. SITE MAINTENANCE AND CLEANUP
a. SITE MAINTENANCE – The Contractor shall protect adjacent property, building, and their contents from dust, dirt, or other materials.
b. CLEANUP – Daily, the Contractor shall collect all trash, debris, refuse, garbage, etc., which is generated and place it in the appropriate containers with lids or approved covers.
6. LOCATION OF WORK
Work is located at building 565 1st floor
7. PERIOD OF PERFORMANCE
All work is to be started within 30 days and completed within 60 days of purchase order award.
Contractor will immediately notify COR of delays due to mandated carpet goods suppliers.
File details come from the government source that posted it. Updated .