This is a Statement of Work (SOW) for carpet tile replacement at Building 565, 1st Floor, MacDill Air Force Base, dated December 16, 2025.

The contractor shall remove existing glue-down carpet, wall base, stair nosing, and transitions from the main building (22,773 sq ft) and auditorium (10,757 sq ft), with total stair nosing of 888 linear feet. The contractor is responsible for furnishing and installing 24"x24" carpet tiles with "Tile Tabs" adhesive tabs, 4-inch rubber base, transitions, and stair nosing that match existing materials in color and quality. The contractor must also handle all furniture moving, debris disposal off-base, and daily cleanup operations. Work must begin within 30 days of purchase order award and be completed within 60 days. The contractor is required to provide all necessary labor, equipment, transportation, and materials. The scope includes mechanical floor preparation only; any additional floor preparation resulting from unforeseen conditions requires Contracting Officer Representative (COR) approval. If asbestos-containing materials are encountered, work must cease immediately and the COR must be notified. Site protection and daily cleanup are mandatory. The auditorium area work is conditional on approval under the contract. The contractor may be required to staff the job to support an elevated work schedule for completion within one month from start date, and must notify the COR immediately of delays caused by mandatory carpet goods suppliers.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4A

STATEMENT OF WORK

BLDG #565 Carpet Tile 1st Floor

16 Dec. 2025

1. SCOPE OF WORK

The work will include providing all necessary labor, equipment, transportation, materials, and support accessories, to remove existing glue down carpet, wall base, stair nosing and transitions. Contractor will be responsible for lifting or moving any furniture required for proper removal and installation of carpet.

Furnish and install selected 24”x24” carpet tiles with “Tile Tabs” adhesive tabs, 4 inch rubber base and transitions to match existing. Stair nosing, riser and treads will match existing in color and quality.

Contractor may be required to man the job to support an elevated work schedule for completion 1 month from start date.

For the auditorium area, if approved under this contract, stair nosing, riser and treads will match existing in color and quality.

2. DEMOLITION

The contractor shall demo existing flooring material, all transition and all wall base and stair nosing in designated areas. All building material shall be disposed of off MacDill AFB.

3. FLOOR PREPARATION

Anything other than mechanical removal of flooring material and non-water base adhesives and any additional floor preparation that may be required as a result of unforeseen conditions shall be brought to the attention to the Contracting Officer Representative (COR).

4. ASBESTOS ABATEMENT

Should the Contractor encounter Asbestos Containing Material (ACM) which must be disturbed, the Contractor shall cease all work that would disturb the ACM and shall immediately notify the COR.

5. SITE MAINTENANCE AND CLEANUP

a. SITE MAINTENANCE – The Contractor shall protect adjacent property, building, and their contents from dust, dirt, or other materials.

b. CLEANUP – Daily, the Contractor shall collect all trash, debris, refuse, garbage, etc., which is generated and place it in the appropriate containers with lids or approved covers.

6. LOCATION OF WORK

Work is located at building 565 1st floor

7. PERIOD OF PERFORMANCE

All work is to be started within 30 days and completed within 60 days of purchase order award.

Contractor will immediately notify COR of delays due to mandated carpet goods suppliers.

Main Building

TOTAL SQ.FT.= 22,773

Auditorium

TOTAL SQ.FT.= 10,757

Total Stair Nosing 888 LF.

Bldg. 565 1st Floor Carpet Replacement Project