This document contains questions and answers regarding a multiple award construction contract solicitation for Holloman Air Force Base. Key details include: the solicitation is for general construction categories under NAICS Code 23 with a size standard of $36.5 million; the scope of work includes projects at Holloman AFB and other federal properties within 100 miles and has a maximum value of $90 million over a five-year period with individual task orders estimated between $2-5.75 million; the government intends to award between four to six contracts using lowest price technically acceptable procedures; successful offerors must be registered in SAM and have an ORCA record; small businesses, 8(a), SDVOSB, HUBZone, SDB and WOSB are encouraged to submit one-page capability statements to assist in determining any set-asides.

View the file

Other files for this federal contract opportunity

Other files attached to Holloman AFB MACC, newest first.
File Type Posted
Amd_0006.pdf PDF
Amend_0005.pdf PDF
Atch_21_Bonding_Information_Request.pdf PDF
Atch_20_Financial_Information_Request.pdf PDF
MACC_Q&As.pdf PDF
Pre-Proposal_Meeting_Minutes_and_Sign_In_Sheets.pdf PDF
Atch_21_Bonding_Information_Request.pdf PDF
SF_30.pdf PDF
Atch_20_Financial_Information_Request.pdf PDF
Atch_22_La_Luz_Gate_Hours_of_Operation.pdf PDF
Extend_RFP_due_date.pdf PDF
Atch_18_Past_Performance_Sheet.pdf PDF
SF_30.pdf PDF
Attch_19_Client_Authorization_Letter.pdf PDF
Amendment_Solicitation.pdf PDF
Final_Solicitation_Rev_3.pdf PDF
Solicitation_rev_2.pdf PDF
Atch_17_Demonstration_Project_Statement_of_Work.pdf PDF
Atch_14_MACC_Demostration_Project_Bid_Schedule.pdf PDF
Atch_16_Site_Visit_Instructions.pdf PDF
Atch_2_-_5_Wage_Determination.pdf PDF
Atch_11_HAFB_Standard_Design.pdf PDF
Atch_8_2018_Holloman_AFB_Design_Compatibility_Standards.pdf PDF
Atch_16_Site_Visit_Instructions.pdf PDF
Atch_15_AF_3052_Construction_Cost_Estimate_Breakdown.pdf PDF
Solicitation.pdf PDF
Atch_10__NCIC_Base_Access.pdf PDF
Atch_12_Form_1354.pdf PDF
Atch_7_Visitor_Access_Request_Form_and_Consent_Form.pdf PDF
Atch_6_AF_From_66_Sample.pdf PDF
Atch_14_MACC_Demostration_Project_Bid_Schedule.pdf PDF
Atch_13_DD_1354_Quick_Notes.pdf PDF
Atch_1_MACC_Statement_of_Work_10_Jul_18_-_Final.pdf PDF
Atch_9_AF_3064_Construction_Progress_Schedule.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sol# FA480118R1004 MACC Q&As #2 25 September 2018

TECHNICAL

1. Is the contractor to assume the design portion of the demonstration project will continue up to 100%?

- Yes. Even though the demonstration project, for the MACC solicitation, ask for a 65% design effort. It is the intent of the government to proceed to 100% after the contract award if and when funding is available.

2. Will the government establish and provide the contractor with an order of precedence in regard to the three documents listed in the initial government response (TO SOW, Holloman Design Standards, UFC)?

- If the specific project does not call out specific material, the Holloman Design guide (HDG) will be the precedence and if it is not called out in the HDG, then the UFC will take precedence.

3. Please reference attachment 17, DEMONSTRATION PROJECT TASK ORDER STATEMENT OF WORK, on p. 4 of 9, under the heading Interior Floor Finishes. This section of the TO SOW specifies both VCT and ceramic tile are required for floor finishes in the restrooms. It also specifies both vinyl cove base as well as ceramic tile cove base are required for the restrooms. Also, after specifying that all areas are to receive, vinyl tile and vinyl cove base, this section also states that the mechanical room floor shall remain exposed concrete.

- Interior Floor Finishes

• Finish floors in all areas (restrooms and mechanical room) with 12” X 12” vinyl composition tile (1/8” thick) and 4” vinyl cove base.

Should read:

• Finish floors in all areas, except restrooms and mechanical room, with 12” X 12” vinyl composition tile (1/8” thick) and 4” vinyl cove base.

Proposal

1. Proposal Adequacy Checklist is required?

- The Government is removing Clause 252.215-7009 so the Proposal Adequacy Checklist is not required.

2. Is Table 15-2 required?

- The Government is removing Clause 252.215-7009 so table 15-2 is not required.

3. I just noticed that new Financial and Bonding Information Forms were added on FBO. We have already requested the forms and received them back. Do we need to request them again on the new forms, or will the forms originally posted on September 19th suffice?

- No, the forms originally posted on September 19th will suffice.

Sol# FA480118R1004 MACC Q&As #2 25 September 2018

4. The solicitation states in Section L-6 Factor 2 Technical 3. Subfactor 1 a and b, that the financial information request and the bonding information request be returned to the contracting office by the financial institution and surety. The new forms that were provided via amendment 11 and 12 on FBO state that they should be returned with our proposal.

- Section L-6 factor 2 (3) (a) and (b)

a. Bank Reference: In order to assist in determining the offerors’ responsibility, offerors shall complete the Financial Information Request, provide it to their financial institution, and instruct them to complete and return it to the Contracting Office not later than the required proposal submission date.

b. Bonding: In order to assist in determining the offerors’ responsibility, offerors shall complete the Bonding Information Request, provide it to their surety, and instruct them to complete and return it to the Contracting Office not later than the required proposal submission date.

Should read:

a. Bank Reference: In order to assist in determining the offerors’ responsibility, offerors shall complete the Financial Information Request, provide it to their financial institution, and submit with your proposal.

b. Bonding: In order to assist in determining the offerors’ responsibility, offerors shall complete the Bonding Information Request, provide it to their surety, and submit with your proposal.

File details come from the government source that posted it. Updated .