Atch_12_Form_1354.pdf

PDF 13 KB Posted

Attached to
Holloman AFB MACC Federal contract opportunity
Solicitation number
FA480118R1004
Issued by
Department of the Air Force Air Combat Command

About this file

This document provides instructions for completing DD Form 1354 for the transfer and acceptance of military real property. Blocks 1 through 28 of the form are to be filled out with placeholder or sample data as specified.

A related federal contract opportunity notice is for a Multiple Award Construction Contract at Holloman Air Force Base, New Mexico. The indefinite delivery indefinite quantity contract has a maximum value of $90 million over a five year period. Task orders will range from $2,000 to $5.75 million. The Air Force intends to award between four to six contracts using Lowest Price Technically Acceptable procedures. Small businesses are encouraged to submit one page capability statements to be considered for set aside determinations. Registration in the System for Award Management is required to be eligible for award.

Atch 12 Form 1354

View the file

Other files for this federal contract opportunity

Other files attached to Holloman AFB MACC, newest first.
File Type Posted
Amd_0006.pdf PDF
Amend_0005.pdf PDF
Combine_Questions_2.pdf PDF
Atch_20_Financial_Information_Request.pdf PDF
Atch_21_Bonding_Information_Request.pdf PDF
MACC_Q&As.pdf PDF
Pre-Proposal_Meeting_Minutes_and_Sign_In_Sheets.pdf PDF
Atch_21_Bonding_Information_Request.pdf PDF
SF_30.pdf PDF
Atch_20_Financial_Information_Request.pdf PDF
Atch_22_La_Luz_Gate_Hours_of_Operation.pdf PDF
Extend_RFP_due_date.pdf PDF
Atch_18_Past_Performance_Sheet.pdf PDF
SF_30.pdf PDF
Attch_19_Client_Authorization_Letter.pdf PDF
Amendment_Solicitation.pdf PDF
Final_Solicitation_Rev_3.pdf PDF
Solicitation_rev_2.pdf PDF
Atch_17_Demonstration_Project_Statement_of_Work.pdf PDF
Atch_14_MACC_Demostration_Project_Bid_Schedule.pdf PDF
Atch_16_Site_Visit_Instructions.pdf PDF
Atch_2_-_5_Wage_Determination.pdf PDF
Atch_11_HAFB_Standard_Design.pdf PDF
Atch_8_2018_Holloman_AFB_Design_Compatibility_Standards.pdf PDF
Atch_16_Site_Visit_Instructions.pdf PDF
Atch_15_AF_3052_Construction_Cost_Estimate_Breakdown.pdf PDF
Solicitation.pdf PDF
Atch_10__NCIC_Base_Access.pdf PDF
Atch_7_Visitor_Access_Request_Form_and_Consent_Form.pdf PDF
Atch_13_DD_1354_Quick_Notes.pdf PDF
Atch_1_MACC_Statement_of_Work_10_Jul_18_-_Final.pdf PDF
Atch_9_AF_3064_Construction_Progress_Schedule.pdf PDF
Atch_6_AF_From_66_Sample.pdf PDF
Atch_14_MACC_Demostration_Project_Bid_Schedule.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

FOR

PREPARATION OF DRAFT 1354 FORM

(TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY)

DD Form 1354 (Ref: UFC 1-300-08 dated 30 June 2004) will be filled in as follows:

Block 1: FROM DISTRICT ENGINEER: (District Engineer, U.S. Army Corps of Engineers, PO Box 2288, Mobile, AL, 36628-0001)

Block 2: Date: (Leave Blank)

Block 3: Project Job Number: (Leave Blank)

Block 4: Serial Number: (Leave Blank)

Block 5: To: (Leave Blank)

Block 6: Site/INSNO/Name: (Leave Blank)

Block 7: Contract Number: (Leave Blank)

Block 8: Drawing Number(s): (Leave Blank)

Block 9: Transaction Details: (Check Interim in Block C)

Block 10: Item Number: (List each item chronologically)

Block 11: Facility Number: (Leave Blank)

Block 12: Category Code: (Enter the applicable 5 or 6-digit, design use category code number, as shown in DA Pamphlet 415-28, Guide to Army Real Property Category Codes, or Air Force Handbook 32-1084, Facility Requirement for each affected facility usage itemized in block 10.

Block 13: Catcode Description: (Category Code Description. Use the service implementation of DODI 4165.3 (e.g., DA PAM 415-28, or Air Force Handbook 32-1084) to determine the correct facility category code short title as the verbatim description that corresponds to the category code entered in block 12.

Block 14: Type: (Enter the Type of Construction: "P" for Permanent, "S" for

Semipermanent; and "T" for Temporary)

Block 15: Area: Unit of Meas 1: (Unit of Measure – Enter as shown in AR 415-28 or AF Handbook 32-1084)

Block 16: Total Quantity UM 1: (Unit of Measure – Enter as shown in AR 415-28 or AF Handbook 32-1084)

Block 17: Other: Unit of Meas 2: (Unit of Measure – Enter as shown in AR- 415-28 or AF Handbook 32-1084)

Block 18: Total Quantity UM 2: (Unit of Measure – Enter as shown in AR – 415-28 or AF Handbook 32-1084)

Block 19: Cost: (Leave Blank)

Block 20: Fund Source: (Leave Blank)

Block 21: Funding Org: (Leave Blank)

Block 22: Interest Code: (Leave Blank)

Block 23: Item Remarks: (Self-Explanatory)

Block 24: Statement of Completion: (Leave Blank)

Block 25: Accepted By: (Leave Blank)

Block 26: Property Voucher Number: (Leave Blank)

Block 27: Construction Deficiencies: (Leave Blank)

Block 28: Project Remarks: (Leave Blank)