Atch_15_AF_3052_Construction_Cost_Estimate_Breakdown.pdf

PDF 86 KB Posted

Attached to
Holloman AFB MACC Federal contract opportunity
Solicitation number
FA480118R1004
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains a construction cost estimate breakdown template and instructions for its completion. The template is to be used by contractors to provide a standardized format for submitting an itemized summary of estimated direct costs, labor hours, material quantities and unit pricing for a construction project. Contractors are to include supporting documentation for subcontractor costs and be prepared to submit certified cost or pricing data if required. Key details include breaking the project down into line items with descriptions, units of measure, quantities, material and labor unit costs and totals. Overhead, profit and bond percentages are calculated based on the direct cost subtotals.

Atch 15 AF 3052 Construction Cost Estimate Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to Holloman AFB MACC, newest first.
File Type Posted
Amd_0006.pdf PDF
Amend_0005.pdf PDF
Combine_Questions_2.pdf PDF
Atch_21_Bonding_Information_Request.pdf PDF
Atch_20_Financial_Information_Request.pdf PDF
Pre-Proposal_Meeting_Minutes_and_Sign_In_Sheets.pdf PDF
MACC_Q&As.pdf PDF
Atch_21_Bonding_Information_Request.pdf PDF
SF_30.pdf PDF
Atch_20_Financial_Information_Request.pdf PDF
Atch_22_La_Luz_Gate_Hours_of_Operation.pdf PDF
Extend_RFP_due_date.pdf PDF
Attch_19_Client_Authorization_Letter.pdf PDF
Atch_18_Past_Performance_Sheet.pdf PDF
SF_30.pdf PDF
Amendment_Solicitation.pdf PDF
Final_Solicitation_Rev_3.pdf PDF
Solicitation_rev_2.pdf PDF
Atch_14_MACC_Demostration_Project_Bid_Schedule.pdf PDF
Atch_17_Demonstration_Project_Statement_of_Work.pdf PDF
Atch_16_Site_Visit_Instructions.pdf PDF
Atch_2_-_5_Wage_Determination.pdf PDF
Atch_11_HAFB_Standard_Design.pdf PDF
Atch_8_2018_Holloman_AFB_Design_Compatibility_Standards.pdf PDF
Atch_16_Site_Visit_Instructions.pdf PDF
Solicitation.pdf PDF
Atch_6_AF_From_66_Sample.pdf PDF
Atch_14_MACC_Demostration_Project_Bid_Schedule.pdf PDF
Atch_13_DD_1354_Quick_Notes.pdf PDF
Atch_1_MACC_Statement_of_Work_10_Jul_18_-_Final.pdf PDF
Atch_9_AF_3064_Construction_Progress_Schedule.pdf PDF
Atch_10__NCIC_Base_Access.pdf PDF
Atch_12_Form_1354.pdf PDF
Atch_7_Visitor_Access_Request_Form_and_Consent_Form.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION: FA480118R1004

ATTACHMENT #15

DATE

ADDRESS

LINE

NO.

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5)

MANHOURS

MANDAYS

(6)

AVERAGE

RATE

(7)

TOTAL

(8)

OTHER

DIRECT

COSTS

(9)

LINE TOTAL

(10)

CONTRACTOR

PROPOSED TOTAL CONTRACT PRICECONTRACT FOR (Work to be performed)

LABOR COSTS MATERIAL COST

WORK LOCATIONPROJECT NUMBERPURCHASE REQUEST NUMBER

CONSTRUCTION COST ESTIMATE BREAKDOWN

AF 3052

SOLICITATION: FA4686-15-R-0008

ATTACHMENT #2

INSTRUCTIONS FOR COMPLETING AF FORM 3052

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples -- square yards -- SY, cubic yards -- CY, square feet -- SF, linear feet -- LF, board feet -- BF, each -- EA, pound -- LB).

Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2 ). Items and units of measure will be fur--nished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5 ) for item listed in column 1.

Col 6. 7, and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.

Enter in Col 7 the average rate per mahour (manday ) and in Col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in Col 1 ) which are special to the contract and of significant dollar value. Identify Subcontractor costs here and include back-up documentation on how these costs were derived.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

1 TOTAL MATERIAL COSTS: $ _________________________ (Column 5 Total)

2 TOTAL LABOR COSTS: $ _________________________ (Column 8 Total)

3 TOTAL OTHER DIRECT COSTS: $ _________________________ (Column 9 Total)

4 TOTAL DIRECT COSTS: $ _________________________ (Column 10 Total, = Items 1 + 2 + 3)

5 OVERHEAD @ ____________% $ _________________________ (Item 4 x Item 5 %)

6 PROFIT @ ____________% $ _________________________ (Item 4 x Item 6 %)

7 SUBTOTAL: $ _________________________ (Item 4 + 5 + 6)

8 BOND @ ____________% $ _________________________ (Item 7 x Item 8 %)

9 TOTAL PRICE: $ _________________________ (Item 7 + 8))

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information ) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror shall, under the conditions stated in FAR 15.804-2, be required to submit a certificate of current cost or pricing data (see FAR 15.804 ).

2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from known data to the estimate, and

c. The contingencies used by the offeror in their proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate ), and made available to the contracting officer or his authorized representative upon request.

4. Submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such negotiations prior to contract award.

(Reverse of AF Form 3052, Jan 88) *U.S. GOVERNMENT PRINTING OFFICE: 1988-240-979:51349