Amd_0006.pdf

PDF 168 KB Posted

Attached to
Holloman AFB MACC Federal contract opportunity
Solicitation number
FA480118R1004
Issued by
Department of the Air Force Air Combat Command

About this file

This document provides information on an upcoming multiple award construction contract opportunity at Holloman Air Force Base in New Mexico. The solicitation will result in the award of indefinite delivery indefinite quantity contracts for general construction work under NAICS Code Section 23 Construction with a maximum total value of $90 million over a five year period. Work will be located at Holloman Air Force Base and within a 100 mile radius and is expected to include task orders between $2,000 to $5.75 million. The government intends to award between four to six contracts and will use the lowest price technically acceptable source selection procedure. Small businesses are encouraged to submit capability statements to assist in determining any potential set-aside. Registration in the System for Award Management is required to be eligible for award.

Extend the proposal due date.

View the file

Other files for this federal contract opportunity

Other files attached to Holloman AFB MACC, newest first.
File Type Posted
Amend_0005.pdf PDF
Combine_Questions_2.pdf PDF
Atch_20_Financial_Information_Request.pdf PDF
Atch_21_Bonding_Information_Request.pdf PDF
MACC_Q&As.pdf PDF
Pre-Proposal_Meeting_Minutes_and_Sign_In_Sheets.pdf PDF
Atch_21_Bonding_Information_Request.pdf PDF
SF_30.pdf PDF
Atch_20_Financial_Information_Request.pdf PDF
Atch_22_La_Luz_Gate_Hours_of_Operation.pdf PDF
Extend_RFP_due_date.pdf PDF
Atch_18_Past_Performance_Sheet.pdf PDF
SF_30.pdf PDF
Attch_19_Client_Authorization_Letter.pdf PDF
Amendment_Solicitation.pdf PDF
Final_Solicitation_Rev_3.pdf PDF
Solicitation_rev_2.pdf PDF
Atch_17_Demonstration_Project_Statement_of_Work.pdf PDF
Atch_14_MACC_Demostration_Project_Bid_Schedule.pdf PDF
Atch_16_Site_Visit_Instructions.pdf PDF
Atch_2_-_5_Wage_Determination.pdf PDF
Atch_11_HAFB_Standard_Design.pdf PDF
Atch_8_2018_Holloman_AFB_Design_Compatibility_Standards.pdf PDF
Atch_16_Site_Visit_Instructions.pdf PDF
Atch_15_AF_3052_Construction_Cost_Estimate_Breakdown.pdf PDF
Solicitation.pdf PDF
Atch_10__NCIC_Base_Access.pdf PDF
Atch_12_Form_1354.pdf PDF
Atch_7_Visitor_Access_Request_Form_and_Consent_Form.pdf PDF
Atch_13_DD_1354_Quick_Notes.pdf PDF
Atch_1_MACC_Statement_of_Work_10_Jul_18_-_Final.pdf PDF
Atch_9_AF_3064_Construction_Progress_Schedule.pdf PDF
Atch_6_AF_From_66_Sample.pdf PDF
Atch_14_MACC_Demostration_Project_Bid_Schedule.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA480118R1004

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose for this amendment is to:

A. Incorporate the previous f ive amendments.

B. Extend the proposal due date (f ive days) from 12 October 2018 to 17 October 2018 @ 1630 Mountain Standard Time.

C. Section L, L-3, #9, removed "and (for paper copies) w ill be returned to the Offeror as soon practicable.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Oct-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA480118R1004

X 9B. DATED (SEE ITEM 11)

21-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Oct-2018

CODE

49 CONS - FA4801

490 FIRST STREET, STE 2111 (BLDG 29)

HOLLOMAN AFB NM 88330-8277

FA4801 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 12-Oct-2018 04:30 PM to 17-Oct-2018 04:30 PM.

The offeror acceptance period has decreased by 120 from 240 to 120.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

SECTION L

INSTRUCTIONS TO OFFERORS:

NOTE: Notice to Offerors: Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an Offeror for any costs.

L-1. PROGRAM STRUCTURE AND OBJECTIVE

The Government intends to award a minimum of 4 contracts for the Holloman AFB Multiple Award Construction Contract (MACC) program. The Government intends to award without discussions, however, reserves the right to enter discussions. THIS SOLICITATION IS 100% SET ASIDE FOR SMALL BUSINESS.

Award will be made on the basis of “best value” utilizing LOWEST PRICE/TECHNICALLY ACCEPTABLE source selection procedures with technical factors and past performance. It is the intent of the Government to award contracts to contractors that provide the “best value” to the Government over the entire period of performance. Each of the awarded contracts will be for five (5) year program period.

L-2. GENERAL INSTRUCTIONS

1. This section of the Instructions to Offerors (ITO) provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal. The Offeror’s proposal must include all data and information requested by the ITO and must be submitted in accordance with these instructions. Any Offeror who submits an incomplete package may be considered ineligible for award. Non-conformance with the instructions provided in the ITO may result in an unfavorable proposal evaluation.

2. The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the Offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the Offeror’s proposal.

3. Elaborate brochures or documentation, binding, detailed artwork, or other embellishments are unnecessary and are not desired.

4. Pre-Proposal Conference: A pre-proposal conference will be held on 29 August 2018 at 10:00am.

Contractors shall meet at Holloman AFB main gate no later than 15 minutes prior to pre-proposal conference. All prospective Offerors are highly encouraged to attend this conference—note: limited to four people per Offeror. In order to make the conference as productive as possible, Offerors should submit, any questions they may have in writing to Gregory Howard at gregory.howard.9@us.af.mil or Anthony Overbay at anthony.overbay.1@us.af.mil no later than 2:30pm MT on 6 September 2018. Responses to questions mailto:gregory.howard.9@us.af.mil asked during the conference shall be posted to the Federal Business Opportunities (FedBizOpps) web site at http://www.fbo.gov. Prospective Offerors are advised that the pre- proposal conference will be held solely for the purpose of explaining the concepts involved in the demonstration Project and the specifications, terms, and conditions of this solicitation. NOTE: Questions and Answers will be limited to no more than one round before and one round after the site visit. Offerors are encouraged to submit all questions and requests for clarifications no later than 6 September 2018. The decision whether to respond to questions and requests for clarification shall be at the sole discretion of the contracting officer. Failure of a prospective Offeror to submit any questions or attend the conference will mean that the prospective Offeror fully understands all requirements of the solicitation.

5. Proposal validity period: Prospective Offerors will price their proposals in such a way as to allow the

Government a minimum of 120 calendar days from the proposal due date in which to make a contract award. The Offeror shall make a clear statement in the proposal documentation volume that the proposal is valid until this date.

6. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. All extra copies will be destroyed when no longer needed.

L-3. PROPOSAL PREPARATION INSTRUCTIONS

1. Proposals must be completed and submitted prior to the time listed in Block 13 of the SF 1442. The “original” proposal shall be clearly identified, shall be addressed to the Contracting Officer, and be submitted to the following address:

CONS/PKB

ATTN: Gregory Howard 490 First St Bldg 29 Ste 2111 Holloman AFB 88330-8277

2. Compliance: To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or sub factors. Failure to meet a requirement may result in an offer being ineligible for award.

Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The proposal shall consist of three (3) separate volumes;

Volume 1 – PRICE (including SF 1442 and reps and certs) Volume 2 – TECHNICAL PROPOSAL

Volume 3 – Past Performance

3. Point of Contact: The Contracting Officer (CO) and Contract Administrator (CA) are the points of contact for this acquisition. Address any questions or concerns you may have to the CO and CA. Written requests for clarification may be sent to the CO and CA at the address located in Block 7 of the SF 1442.

4. Debriefings: The CO will promptly notify an Offeror of any decision to exclude them from the competitive range; whereupon they may request and receive a debriefing in accordance with FAR 15.505.

Offerors excluded from the competitive range my request a preaward debriefing or they may choose to wait until after the source selection decision to request a postaward debriefing. However, offerors excluded for the competitive range are entitled to no more than one debriefing for each proposal. The CO will notify all unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR 15.506.

Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.

5. Discrepancies: If an Offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the CO and CA in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussions. This reservation include matters of additional or http://www.fbo.gov/ substitute pages of the initial proposal.

6. Electronic Reference Documents: All referenced documents for this solicitation are available on the Federal Business Opportunities (FedBizOpps) web site at http://www.fbo.gov.

7. Amendments to Solicitation: Amendments and notices will be posted to FedBizOpps.gov. It is the Offeror’s responsibility to check the website periodically for any amendments to the solicitation. Please note that notices do not change the solicitation. Changes to the solicitation can only be made by the issuance of an amendment. If this solicitation is amended, all terms and conditions that are not revised remain unchanged and in full force and effect. Offerors shall acknowledge receipt of any amendment and provide confirmation upon submission of the Offeror’s proposal. Any unacknowledged amendments in the Offeror’s proposal will render the proposal ineligible for consideration and will be eliminated from the competition without further review.

8. Submission, Modification, Revision, and Withdrawal of Proposals: Proposals shall be submitted on CD/DVD-ROM in sealed envelopes and addressed to the CO and CA at the address shown in Block 7 of the SF 1442, showing the time and date specified for receipt, the solicitation number, and the name and address of the Offeror. Modifications and revisions shall be submitted in electronic format and indicate by page and paragraph of all changes. A withdrawal of proposal shall be submitted in hard copy to the CO and CA at the address located in Block 7 of the SF 1442.

9. Page Limitations: Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read nor considered in the evaluation of the proposal and (for paper copies) will be returned to the Offeror as soon as practicable. Page limitations may also be placed on responses to Evaluation Notices (ENs), if any. The specified page limits for EN responses will be identified in the letters forwarded to the Offerors. Each page shall be counted except the following: executive summary, blank pages, title pages, tables of contents, tabs, and glossaries and those parts of the Proposal noted as unlimited.

10. Page Size and Format:

a) A page is defined as each face of a sheet of paper containing information. When both sides of a sheet display printed material, it shall be counted as two pages. Page size shall be 8.5 x 11 inches, not including foldouts. Pages shall be single-spaced with 1.5 line spacing. Except for the reproduced sections of the solicitation document, the text size shall be no less than 12 points. Tracking, kerning, and leading values shall not be changed from the default values of the word processing or page layout software. Use at least 1 inch margins on the top and bottom and 3/4 inch side margins. Pages shall be numbered sequentially by volume. These page format restrictions shall also apply to responses to ENs.

b) Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated and shall not exceed 11 x 17 inches in size. Foldout pages shall fold entirely within the volume, and count as a single page.

Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics; not for pages of text.

For tables, charts, graphs and figures, the text shall be no smaller than 10 point.

11. Electronic Copies: Electronic copies/CD/DVD-ROM shall indicate on each the volume the number and title. Use separate files to permit rapid location of all portions, including required plans, exhibits, appendices and attachments, if any. Electronic copies of the proposal shall be submitted in a format readable by Microsoft (MS) Word 2013®, MS Excel 2013®, MS-Project 2013®, MS-Power Point 2013®, and Adobe Acrobat 11.0® as applicable.

12. Pricing Information: All pricing information shall be addressed ONLY in the Price Proposal and Contract Documentation volumes. Work-hour estimates and material kinds and quantities may be used in other volumes only as appropriate for presenting rationale.

13. Cross Referencing: To the greatest extent possible, each volume shall be written on a stand-alone basis so that its contents may be evaluated with a minimum of cross-referencing to other volumes of the proposal.

http://www.fbo.gov/

Information required for proposal evaluation that is not found in its designated volume will be assumed to have been omitted from the proposal. Cross-referencing within a proposal volume is permitted.

14. Indexing: Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections.

15. Glossary of Abbreviations and Acronyms: Each volume shall contain a glossary of all abbreviations and acronyms used, with an explanation for each. Glossaries do not count against the page limitations for their respective volumes.

L-4. OFFERS

1. The offer/proposal and other information shall be submitted in electronic copy (standard CD) format. The proposal shall consist of the following volumes:

Volume/Factor 1 – PRICE (including SF 1442 and reps and certs) Volume /Factor 2 – TECHNICAL

Sub Factor 1- Construction Management and Capability Sub Factor 2- Demonstration Project

Volume/Factor 3 – Past Performance

Separate CDs are not required for each volume. Offerors shall submit the SF 1442 on paper with an original signature. Offerors are advised to submit sufficient information to enable evaluators to fully ascertain the Offeror’s capability to perform the requirements contemplated by the solicitation. The data submitted with each proposal shall be complete and concise but not elaborate.

2. A list of the Offeror’s primary Points of Contact shall be submitted as part of the Technical proposal.

L-5. FACTOR 1 – PRICE (including SF 1442 and reps and certs)

1. Format and Limitations:

a. One (1) Electronic Copy

b. Page Limitation: Unlimited (except Executive Summary = 3 pages)

c. Submit completed Bid Sheet

2. These instructions are to assist Offerors in submitting information that is required to evaluate reasonableness of proposed pricing and costs. Compliance with these instructions is mandatory and failure to comply may result in rejection of an Offeror’s proposal.

a) Proposed Price: The offeror shall provide a price breakdown for the demonstration project by providing a completed Attachment #15, Construction Cost Breakdown, and demonstration Project Bid Schedules. Offers should be complete, accurate, and sufficiently detailed to demonstrate price reasonableness, reflect a clear understanding of the requirement, and be consistent with the offeror’s technical proposal.

Evaluation of this area will be addressed in Section M under the Price Factor. The burden of proof for credibility of proposed pricing rests with the offeror.

b) Contract Documents: The Offeror’s Price Volume shall include the following sections in the

Price Proposal Volume from the solicitation:

i. Section A - Solicitation/Contract Form SF 1442: Complete Form SF 1442 as applicable and sign and date. Signature by the Offeror on the SF 1442 constitutes an offer, which the Government may accept. The "original" CD should be clearly marked.

ii. Section I - Contract Clauses: Offeror shall complete and submit any applicable clause requiring information to be filled in.

iii. Section K – Representations and Certifications: Complete and submit this section in addition to completing On-Line Representations and Certifications and Application at System for Award Management (SAM) https://www.sam.gov/portal/SAM/.

c) Other Information Required in the Price Volume

i. Executive Summary: Each Offeror shall submit an Executive Summary after the cover letter of no more than 3 pages total which summarizes the key points from the Offeror’s Price, Technical, and Past Performance areas. The Executive Summary Section is not included in the Volume I page limitation.

ii. Authorized Offeror Personnel: Offerors shall provide the following information.

• The name, title and telephone number(s) of the company/division point(s) of contact regarding decisions made with respect to the proposal and who can obligate the company contractually.

• The name, title, and telephone number(s) of those individual(s) authorized to negotiate with the

Government for this solicitation.

• Company/Division Address, Identifying Codes, and Applicable Designations: Offerors shall provide company/division’s street address, county and facility code; CAGE Code; DUNS Number; TIN number; and size of business (large, small, 8(a); etc.).

L-6. FACTOR 2 – TECHNICAL

1. Format and Limitations:

a. One (1) Electronic Copy

b. Page Limitation: See sub factors below.

2. Your response will be evaluated against the Technical Factors defined in Section M, Evaluation Factors for Award. Using the instructions provided below, provide as specifically as possible the actual methodology you would use for accomplishing/satisfying these sub factors. Any assumptions made, where it is reasonable to do so, shall be clearly stated. All the requirements specified in this solicitation are mandatory. By your proposal submission, you are representing that your firm will perform all the requirements specified in the solicitation. It is neither necessary nor desirable for you to state this in your proposal. Do not merely reiterate the objectives or reformulate the requirements specified in the solicitation. Furthermore, it is neither necessary nor desirable to provide resumes for individual personnel as part of your proposal.

Note: the Offeror is responsible for obtaining any forms required for evaluation, whether or not they are provided as an attachment to the solicitation.

3. Sub Factor 1: Construction Management and Capability: (Page limitation: 20 pages).

a. Bank Reference: In order to assist in determining the offerors’ responsibility, offerors shall complete the Financial Information Request, provide it to their financial institution, and submit with your proposal.

b. Bonding: In order to assist in determining the offerors’ responsibility, offerors shall complete the

Bonding Information Request, provide it to their surety, and submit with your proposal.

c. The Offeror shall describe their overall technical capability, to include all construction disciplines, identified by NAICS code, for which they possess resources, expertise, certifications, capacity, etc., to perform under this contract.

http://www.bpn.gov/orca

d. Describe in-house or other access to program management, engineering, various trades, skilled labor and other expertise.

e. Describe management systems to include cost, schedule and quality management, procurement management, safety management, environmental management, logistics management and/or any other applicable management systems that would be utilized in performance of this contract, paying particular attention to your firm’s knowledge and capability with respect to the following risk areas:

1) performing construction on or near an airfield (in particular, address airfield access requirements and procedures).

2) Offeror’s organization and approach to ensuring timely mobilization and schedule management to avoid delays, (in particular, address your knowledge of and capability with respect to Holloman AFB visitor access requirements and background investigations to ensure timely availability of contractor personnel, craftsmen and laborers).

3) Offeror’s organizational approach to project estimating/bidding and how you identify and address potential cost risks in both the proposal and the construction phase in order to minimize requirements creep and scope/cost growth via change orders, requests for equitable adjustment, and claims.

4) Provide a narrative description of your overall Quality Control approach to the basic IDIQ MACC and how it would mitigate risks such as possible Foreign Object Damage (FOD) for projects on or near the airfield, and how it will be applied to individual projects awarded under this contract. The narrative shall address the method and frequency of inspections; names, qualifications and experience of QA personnel and the scope of their responsibilities and authority; the supervisory relationship between the contractor’s on-site managers/superintendents and its QA personnel.

4. Sub Factor 2: Demonstration Project Proposal: (Page limitation: unlimited) The Offeror shall provide a technical approach to accomplish the design-build Demonstration Project. At a minimum, the proposed approach shall include all of the following essential components:

a. Design: The contractor shall provide a complete 65% construction design which ensures the successful completion of the Demonstration Project. (Assume approval of your 35% design.)

b. Project Management: Provide a plan that describes your procedures, processes and methods for tracing the progress of the project and interface with the Government which addresses overall performance for both design phase and construction phase. Description shall include, but not be limited to, a discussion of the overall performance time for both the design and construction phases, composition of the design-build team (including any major subcontractors) and their involvement throughout the process with particular attention to quality, timeliness and cost control. Include completed AF Form 3064, Progress Schedule (attachment 9) and AF Form 66, Schedule of Material Submittals (attachment 6).

c. Estimating Capability: Include completed AF Form 3052, Construction Cost Estimate Breakdown

(attachment 15). Offers should be complete, accurate, and sufficiently detailed to demonstrate a clear understanding of the requirement. Offeror shall include narrative descriptions with the breakdowns for Direct Labor, Direct Material, and Other Direct Costs that explain the estimating methodologies/tools and assumptions used to arrive at the figures. The Government is NOT mandating use of any particular estimating tool for this contract. It is incumbent upon the offeror to describe what tools or methods will be used.

L-7. Factor 3: Past Performance: (Page limitation: unlimited)

1. Format and Limitations:

a. One (1) Electronic Copy

b. Page Limitation: 4 pages per PPIS (Past Performance Information Sheet)

2. Your response will be evaluated against the Past Performance factor defined in Section M, Evaluation Factors for Award.

a) Past Performance Information Sheet (PPIS):

i. Each Offeror shall submit a past performance volume with its proposal, containing past performance information in accordance with the format contained in the PPIS (See Attachments). Offerors are cautioned that the Government will use data provided by each Offeror in this volume and data obtained from other sources in the evaluation of past performance. All past performance information shall be evaluated in accordance with the Past Performance factor as defined in Section M, Evaluation Criteria.

ii. Offerors shall submit information on at least three (3) but no more than six (6) contracts considered most RELEVANT in demonstrating performance abilities on the proposed effort. Also, Offerors shall include information, if applicable, on up to three (3) recent contracts performed by each joint venture partner considered most relevant in demonstrating their ability to perform the proposed effort. Please refer to the Past Performance factor in Section M, Evaluation Criteria for definitions of what is considered “recent” and what is considered “relevant”. Each PPIS shall not exceed 4 pages. Offerors shall include rationale supporting the assertion of relevance. Offerors who submit less than the preferred number of PPIS forms requested are not automatically assigned an “Unknown Confidence” rating. Fewer numbers may be acceptable if the Government determines there is sufficient information to determine a confidence rating.

b) Consent and Client Authorization Letter: The Offeror shall submit, along with the information required in this paragraph, a Consent Letter (See Attachments), executed by each joint venture partner (if applicable), authorizing release of adverse past performance information to the Offeror so the Offerors can respond to such information. For each identified effort for a commercial customer, the offeror shall also submit a Client Authorization Letter, authorizing release to the Government of requested information on the Offeror’s performance.

c) Early Proposal Information: Each Offeror is requested to submit the past performance volume with past performance information for each relevant/recent contract at least fourteen (14) calendar days prior to the solicitation closing date. Failure to submit proposal information early will not result in Offeror disqualification.

d) Past Performance Questionnaire: Questionnaires will not be used in this LPTA evaluation process.

e) Specific Content: Offerors shall provide a narrative explaining what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate. This may include a discussion of efforts accomplished by the Offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to an unacceptable rating, since the problems encountered may have been on a more complex program, or an Offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror shall clearly demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified. This may allow the offeror to be considered a higher confidence candidate. For example, submittal of quality performance indicators or other management indicators that clearly support that an offeror has overcome past problems is required.

f) Organizational Structure Change History: Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. These changes may have taken place during the time of performance of relevant past efforts or between the conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevance determination, Offerors shall include a "roadmap" describing any/all such changes in their organization. A pamphlet or other commercial document describing such reorganizations may suffice. As part of this explanation, show how these changes impact the relevance of any efforts identified for past performance evaluation/ performance confidence assessment. Since the Government intends to consider past performance information provided by other sources as well as that provided by the Offeror(s), the "roadmap" should be both specifically applicable to the efforts identified, yet general enough to apply to efforts on which the Government receives information from other source.

L-8. EXCEPTIONS TO SOLICITATION REQUIREMENTS: Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements.

Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. This information shall be provided in the format and content of Table 1. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being removed from consideration for award.

Table 1—Exceptions to Solicitation Requirements

SOLICITATION

Document Paragraph/ Page Requirement/ Portion Rationale

01010, Technical Specs, etc. Applicable Page and Paragraph Numbers

Identify the requirement or portion to which exception is taken

Justify why the requirement will not be met

Alternate Proposals: Alternate proposals will not be accepted.

L-9. INCURRED EXPENSES: The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation. A minimum of four small business contractors who are awarded a contract under the MACC will be awarded a task order to meet the minimum guaranteed amount. NO OFFEROR WILL BE COMPENSATED FOR SUBMITTING A PROPOSAL.

L-10. GOVERNMENT FURNISHED PROPERTY (GFP)/EQUIPMENT (GFE): Government Furnished Property (GFP) or Equipment (GFE) to be provided will be specified in each individual Task Order (T.O.). For proposal purposes, no GFP or GFE will be provided as part of the Demonstration Project.

(End of Provision)

The following have been deleted:

52.215-20 252.215-7009

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

ATTACHMENTS

Attachment Number

Title Date Number of Pages

Attachment 1 MACC Statement of Work 08-Aug-17 23 pages

Attachment 2

General Decision Number NM180032, Building

06-Apr-18

6 Pages

Attachment 3

General Decision Number NM180008, Heavy 05-Jan-18 4 Pages

Attachment 4

General Decision Number NM180050, Highway 05-Jan-18 6 Pages

Attachment 5

General Decision Number NM180005, Residential 05-Jan-18 4 Pages

Attachment 6 AF Form 66 Sample No Date 1 Page

Attachment 7 Visitor Access Request Form & Consent Form 17-Jan-12 3 Pages

Attachment 8 2018 Holloman AFB Design Compatibility Standards No Date 92 Pages

Attachment 9 AF 3064 – Construction Progress Schedule Jun-90 1 Page

Attachment 10 Base Access 13-Jul-12 4 Pages

Attachment 11 HAFB Standard Design 20-Dec-17 3 Pages

Attachment 12 DD Form 1354 30-Jun-04 2 pages

Attachment 13 DD 1354 Quick Notes 4-Mar-14 2 Page

Attachment 14 MACC Demostration Project Bid Schedule 10-Jul-18 1 Page Attachment 15 AF 3052 Construction Cost Estimate Breakdown Jan-88 2 Pages

Attachment 16

Site Visit Instructions

18 Jul 18

1 Pages

Attachment 17 Demonstration Project Statement of Work Nov 2017 9 Pages Attachment 18 Past Performance Sheet 4 Pages Attachment 19 Client Authorization Letter 1 Page Attachment 20 Financial_Information_Request 1 Page Attachment 21 Bonding Information Request 1 Page Attachment 22 La Luz Gate Hours of Operation 1 Page

SECTION M

Section M - Evaluation Factors for Award

M-1. BASIS FOR CONTRACT AWARD

1. This is a Lowest Price Technically Acceptable (LPTA) source selection conducted in accordance with Federal Acquisition Regulation (FAR) 15, Contracting by Negotiation, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS), DoD Source Selection Procedures, Appendix A, 31 March 2016 and AFICA Mandatory Procedures 17-2, 11 August 2017. These regulations are available electronically at the Air Force (AF) FARSite, http://farsite.hill.af.mil. The Government will select the proposals with the lowest evaluated price from among those meeting the acceptability standards for non-price factors. Contract(s) may be awarded to the offeror(s) who is deemed responsible in accordance with FAR Part 9.1, as supplemented, whose proposals conforms to the solicitation's requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation) and is judged, based on the evaluation factors and subfactors, to represent the lowest price technically acceptable proposals with acceptable past performance.

http://farsite.hill.af.mil/

2. Contracts shall be awarded to the offerors who are deemed responsible in accordance with the Federal

Acquisition Regulation (FAR) Part 9, as supplemented, whose proposals conform to the solicitation requirements (to include all stated terms, conditions, representations, certifications, and all other information required by evaluation factors attached to this request for proposal) and are judged, based on the evaluation factors, to represent the Lowest Priced Technically Acceptable offers to the Government.

3. The Government will evaluate the individual line items of the demonstration project price proposal to determine whether costs are realistic for the work to be performed, reflect a clear understanding of the requirements and are consistent with the various elements of the offeror’s technical proposal. The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, including contract terms and conditions, or unrealistically high or low in cost when compared to Government estimates and comparison to competitor’s cost proposals, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program or failure to understand the requirements of the project.

4. While the Government source selection evaluation team and the Source Selection Authority (SSA) strive for maximum objectivity, the source selection process, by its nature, is subjective and, therefore, professional judgment is implicit throughout the entire process. The Government reserves the right to award without discussions. Offerors should not assume they will be contacted or afforded an opportunity to qualify, discuss or revise their proposals. Therefore, each initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary.

M-2. NUMBER OF CONTRACTS TO BE AWARDED: The Government intends to award a minimum of four (4) contracts for the Holloman Multiple Award Construction Contract (MACC).

M-3. CORRECTION POTENTIAL OF PROPOSALS: The Government will consider, throughout the evaluation, the “correction potential” of any deficiency. The judgment of such “correction potential” is within the sole discretion of the Government. If an aspect of an offeror’s proposal not meeting the Government’s requirements is not considered correctable, the offeror may be eliminated from the competition.

M-4. EVALUATION: Price will be evaluated using techniques established in FAR 15.404-1 to ensure the Government receives a fair, reasonable and balanced price. For efficiency purposes, the Government will evaluate a minimum of the 4 lowest priced offerors for technical acceptability and past performance acceptability. Should the lowest priced offerors not receive an acceptable technical and past performance rating, the process will continue in order of price until at least six offerors with acceptable technical and past performance rating are identified. If two or less proposals are received, the Government may proceed with evaluating only those proposals. The Government may determine an offer unacceptable if the proposed prices are materially unbalanced, which is defined as significantly understated or overstated in relation to the actual cost of the item or when the price is determined not to be fair and reasonable.

5. Evaluation Factors: Award will be made to the lowest priced technically acceptable offeror with acceptable past performance. This will be determined based upon evaluation of the following factors:

a. Price

b. Technical (with sub factors – see below)

c. Past Performance

Factor 1 - Price:

a. Initially, the Government shall rank offers according to their proposed price for the demonstration project, from lowest to highest price. The Government will calculate a “Total Evaluated Price” (TEP) as follows:

The TEP to the Government will be calculated for each offeror by adding the design and construction price provided on Project Bid Schedule. This TEP will determine the “Lowest Price” portion of the LPTA evaluation.

Bond and New Mexico Gross Receipts Tax will NOT be included in this calculation.

b. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, there is adequate price competition, no additional price information will be requested and certification under FAR 15.406-2 will not be required.

c. If at any time during the evaluation the contracting officer determines that adequate price competition does not exist, offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price. If requested, this cost data may require certification.

Factor 2 – Technical Acceptability:

a. Technically Acceptable/Past Performance: The evaluation team will evaluate a minimum of four (4) of the lowest priced proposals for technical acceptability and acceptable past performance. The basis for acceptable/unacceptable is established in the criteria below.

b. The government technical evaluation team will evaluate technical proposals on a acceptable/unacceptable basis, and assign one of the ratings described below based on the criteria listed.

Table A-1. Technical Acceptable/Unacceptable Ratings Rating Description

Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

c. In assigning the ratings above, the government technical evaluation team will evaluate the following technical sub factors:

1) Construction Management & Capability

2) Demonstration Project Proposal

i) Sub-Factor 1: Construction Management & Capability. To clearly meet the minimum requirements of the solicitation, the proposal must demonstrate that the offeror possesses all of the following:

1) Financial capacity, bonding, and business relationships to successfully perform two simultaneous construction projects with a combined value of $11.5M. The proposal must demonstrate access to cash and/or lines of credit totaling at least $100,000.00. The proposal must demonstrate a minimum bonding capacity of $5.75M per project/$11.5M aggregate. Also the proposal must demonstrate an established relationship with a design (A-E) firm, a construction equipment supplier, a construction material supplier and an independent testing lab for construction materials. Relationships may be demonstrated by a letter from each entity signed by a vice president or higher;

2) Capability to perform using a design/build approach. This may be demonstrated by describing a design/build construction project that you successfully performed as prime contractor within the last 3 years;

3) Capability to perform at least two or more construction disciplines under NAICS code 236220, such as construction, alteration or repair of roads, buildings, structures, utilities, plumbing, roofing, paving, grading, excavating, or demolition;.

4) A staffing plan that identifies program management, engineering, skilled labor and other necessary expertise who meet the minimum experience and qualifications in the table below, and describes how these personnel can successfully perform two or more simultaneous construction projects on Holloman AFB:

Minimum Qualifications to be technically acceptable in this area:

Qty # Years Experience Qualifications

Program Manager 1 5 Superintendent 2 5

QA 1 5

Civil Engineer 1 5 P.E.; NM State Certification Architect 1 5 P.E.;

Mechanical Engineer 1 5 P.E.;

Electrical Engineer 1 5 P.E.;

Drafting/Surveyor 2 5 Fire Protection Engineer 1 5 P.E.; NM State Certification

5) An established, systematic approach for managing the contract to include cost, schedule and quality management, procurement management, safety management, environmental management, and logistics management.

6) Capability to perform construction on or near a U.S. Air Force airfield, including airfield access requirements and airfield operations; or, the proposal must clearly state the offeror’s acknowledgement of the critical nature of this criteria and include a risk mitigation plan that identifies a senior company official, by name, who will be responsible for implementation and oversight of this risk area.

7) An established, systematic approach for mobilizing and managing a project schedule to minimize delays, including knowledge of Holloman AFB visitor access requirements and background investigations to ensure timely availability of contractor personnel, craftsmen and laborers; or, the proposal must clearly state the offeror’s acknowledgement of the critical nature of this criteria and include a risk mitigation plan that identifies a senior company official , by name, as responsible for implementation and oversight of this risk area.

8) An established, systematic approach to project estimating/bidding that identifies areas of cost risk and effectively manages or mitigates that risk to minimize requirements creep and scope/cost growth resulting from change orders, requests for equitable adjustment, and claims.

9) A two-page (maximum) narrative describing the contractor’s overall Quality Control approach to the basic IDIQ MACC and how it will be applied to individual projects; narrative includes the method and frequency of inspections, names, qualifications and experience of QA personnel, scope of their responsibilities and authority, and clearly states that QA personnel are separate and distinct from, and are not supervised by, on site project management or superintendent personnel; narrative clearly describes how the QA approach will be utilized to mitigate risks related to projects on or near the airfield.

ii) Sub-Factor 2: Demonstration Project Proposal. To clearly meet the minimum requirements of the solicitation, the proposal must include the following:

(1) Design: a 65% design that:

• Demonstrates understanding of and accounts for all the required elements listed in Attachment #1, MACC Statement of Work and Attachment# 10, Demonstration Project

Statement of Work;

• Is free of major errors or omissions;

• The following table/definitions will be used verify the design is a 65% design:

Phases of Design Reviews (Conceptual) (Materials) (Final) (Stamped)

35% 65% 95% 100%

Purpose

Ascertain that the design approach and scope conforms to the Government's intent for the project.

Establish the "Schedule of material submittals" document the contractor will comply with and submittal dates for each item listed

Solidify the final design. This submittal, built on prior work, shall be submitted to Government for review and comment anticipating a rapid turn-around to the next and final design milestone.

Forms the basis of the contractor's field performance requirements and shall be distributed to the Government, base stakeholders, and the contractor's sub-contractors

Drawings

Show all major elements of the concept

Include dimensions and details, but not final sizing

Fully developed.

Shall include all redline comments from the 65% milestone

Stamped by contractor's design associates

Specifications

Outline Specifications for most divisions, sufficiently developed to allow for materials identification for submittal purposes

Fully developed.

Shall include all redline comments from the 65% milestone

Stamped by contractor's design associates

Design Analysis Initial Full Updated from the 65% milestone

(2). Project Management: Includes a plan that:

• Describes how the contractor will manage the overall project schedule through both the design phase and the construction phase, and how the contractor will communicate/interface with the Government to ensure the Government’s concerns are addressed.

• Clearly identifies members of the design-build team by their title, to include major subcontractors, describes the roles of each in the execution of the project, and is in consonance with the management approach and staffing plan provided under sub factor 1.

• Demonstrates executable performance time for both the design and construction phases and appropriately charts the schedule on Attachment #11, AF Form 3064, Progress Schedule, and AF Form 66, Schedule of Material Submittals. The AF Form 3064 properly assigns percentages to work performed in all divisions required in the execution of the project, and accounts for long lead items, design time, Government submittal review time, and final inspection and punch list corrections within the performance period specified in the Demonstration Project SOW. The AF Form 66 is populated with appropriate items for submittal.

(3). Estimating Capability: Includes a filled out AF Form 3052, Construction Cost Estimate Breakdown, for the Demonstration Project that:

• Demonstrates the offeror’s capability to estimate project requirements and material quantities accurately.

• Breaks out Direct Material quantities, Direct Labor types and hours, Other Direct quantities/hours, and explains the estimating methodologies/tools used in sufficient detail that the Government evaluation team can clearly determine the following:

o Proposed materials and labor reflect a clear understanding of the requirement o Proposed materials and labor account for all major elements of work o And are not inconsistent with the offeror’s technical approach

Note: The offeror is responsible for obtaining any forms required for evaluation, whether or not they are provided as an attachment to the solicitation.

Note: To be found “technically acceptable” overall, a proposal must be found to be acceptable for BOTH technical sub factors described above.

Factor 3 – Past Performance:

a. Evaluation Process - The Past Performance evaluation considers the offeror’s demonstrated record of performance in providing construction services that meet the customer’s needs.

Performance confidence is assessed at the overall Past Performance factor level after evaluating aspects of the offeror’s recent past performance on individual projects, focusing on performance that is relevant to the

MACC.

b. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the offeror’s Past Performance proposal volume and information obtained from other sources, such as the Construction Contractor Appraisal Support System (CCASS) or similar systems, Defense Contract Management Agency (DCMA), and commercial sources.

c. Joint venture partners’ past performance shall be part of the aggregate performance evaluation. Past performance of other teaming partners or subcontractors shall not be considered.

d. Recency Assessment - An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must have been completed or performed during the past three (3) years from the date of issuance of this solicitation. Efforts that have not yet been completed shall have had at least six (6) months of performance prior to the date of issuance of this solicitation.

This is the start of the file's text. The full file is on GovTribe.