Attachment 7. Responses_RFIs for Cummins Generator Installation (B810 B845).pdf

PDF 204 KB Posted

Attached to
Cummins Generator Installation (B810 & B845)
Solicitation number
FA4686R0025
Issued by

About this file

This document contains Responses to Requests for Information (RFIs) for a federal contract opportunity titled "Cummins Generator Installation (B810 & B845)". The key details are:

The contract is for the repair and replacement of two standby diesel generator systems located at Facilities B810 and B845. The contractor will be responsible for removing and disposing of the existing generator systems and Automatic Transfer Switches (ATS), and installing new Cummins 20kW generator systems, fuel tanks, Cummins Diesel compatible Bypass ATS, and other specified appurtenances. The work must comply with various codes and regulations. The government will not accept requests for additional funds unless approved in writing by the Contracting Officer. The contract value is between $500k to $1M. A site visit is scheduled for July 22, 2024, and proposals are due by July 26, 2024. The contracting agency is the Department of the Air Force Air Combat Command.

View the file

Other files

File Type Posted
Solicitation Amendment FA468624R00250004 SF 30.pdf PDF
Solicitation Amendment - FA468624R00250004.pdf PDF
Attachment 7.docx DOCX document
Solicitation Amendment - FA468624R00250003.pdf PDF
Solicitation Amendment FA468624R00250003 SF 30.pdf PDF
Solicitation Amendment - FA468624R00250001.pdf PDF
Attachment 5. FA468624R0025 Section M (25Jul24).docx DOCX document
Attachment 7. Resp_RFIs for Cummins Generator Installation (B810, B845) Version 2.pdf PDF
Solicitation Amendment FA468624R00250002 SF 30.pdf PDF
Attachment 4. FA468624R0025 Section L (25Jul24).docx DOCX document
Solicitation Amendment - FA468624R00250001.pdf PDF
Solicitation Amendment FA468624R00250001 SF 30.pdf PDF
Attachment 1. FA468624R0025 - B810 and B845 SON Version 2 (24 July 24).pdf PDF
Attachment 2. BAEY 240021 - Site Plan Version 2 (24Jul24).pdf PDF
Attachment 8. B845 - Site Pictures, Combined.pdf PDF
Attachment 5. FA468624R0025 Section M.docx DOCX document
Attachment 6. AF 3064 Progress Schedule.xlsx XLSX spreadsheet
Solicitation - FA468624R0025.pdf PDF
Attachment 1. FA468624R0025 - B810 and B845 SON.docx DOCX document
Attachment 3. BAEY 240021 - AF 66.xls XLS spreadsheet
Attachment 4. FA468624R0025 Section L.docx DOCX document
Attachment 2. BAEY 240021 - Site Plan.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFIs for Cummins Generator Installation (B810 & B845)

1. Can you provide the required run time for the new generator? (24hrs, 48hrs, 72hrs, etc.)

Resp: It is a 24-hours requirement.

2. Can you confirm if permits will be required?

Resp: Yes, permits will be required as indicated in the SON.

3. Can you confirm if stamped architectural drawings are required? (Structural, electrical, etc.)

Resp: Stamped drawings are not needed.

4. Can you confirm if the contractor is responsible for fuel costs for the new generator(s)?

Resp: Yes, contractor is responsible for fuel cost for the new generator (s)

5. Can you provide pictures of the two existing generator(s) and ats(s) being replaced?

Resp: Pictures and drawings have been provided.

6. “In the solicitation I noticed this "rental"..but in Section C - Requirements. There is not mention of "rental" just New. Please help!

Can you help so we can organize this project properly?”

Resp: Rental is required to keep the unit the current system supports operational while this project is on-going. The contractor will relocate the existing generator and associated equipment to the 9th Civil Engineer Squadron Compound upon coordination with the Base Project Manager.

7. Are there any photos that show the actual equipment being removed?

Resp: Photos and drawings have been provided.

8. Is there any information or documentation showing the locations of the ATS in relation to the existing generator?

9. Is there any information or documentation showing the location of the 100A main disconnect switch in relation to the existing ATS?

10. Are there existing pads (concrete) for the generators to sit on?

Resp: Yes, the existing generators and ATS sit on concrete pads.

11. Will new concrete pads be needed?

Resp: Yes, new concrete pads are required. Refer to Addendum and Site Plan.

12. Do you know the distance between the transfer switch to the new generators? and distance to the main panel?

Resp: Refer to Addendum for drawing details.

13. Will the site require any excavation? power lines?

Resp: Excavation is needed to construct and raise concrete pads to required height.

Refer to Addendum.

14. Are “As-Equals” acceptable for these generators? There are excessive lead times with the delivery of Cummins generators.

Resp: As equals will not be accepted. The generators specified by the SON will be the only generators that are acceptable for this project. Excessive lead times are acknowledged for the delivery of these generators.

File details come from the government source that posted it. Updated .