Attachment 6. AF 3064 Progress Schedule.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Cummins Generator Installation (B810 & B845)
Solicitation number
FA4686R0025
Issued by

About this file

This document is an AF 3064 Progress Schedule form for a federal contract opportunity. The key details are:

The contract opportunity is for the Cummins Generator Installation (B810 & B845) project, solicitation number FA4686R0025, with an estimated value between $500k to $1M. The contract requires removing and disposing of existing standby diesel generator systems and installing new Cummins 20kW generator systems, including fuel tanks, bypass automatic transfer switches, and other required appurtenances. The work must comply with specified UFC, NFPA, and other codes and regulations. A site visit is scheduled for July 22, 2024, with a proposal deadline of July 26, 2024. The contracting agency is the Department of the Air Force Air Combat Command.

View the file

Other files

File Type Posted
Solicitation Amendment FA468624R00250004 SF 30.pdf PDF
Solicitation Amendment - FA468624R00250004.pdf PDF
Attachment 7.docx DOCX document
Solicitation Amendment - FA468624R00250003.pdf PDF
Solicitation Amendment FA468624R00250003 SF 30.pdf PDF
Solicitation Amendment - FA468624R00250001.pdf PDF
Attachment 5. FA468624R0025 Section M (25Jul24).docx DOCX document
Attachment 7. Resp_RFIs for Cummins Generator Installation (B810, B845) Version 2.pdf PDF
Solicitation Amendment FA468624R00250002 SF 30.pdf PDF
Attachment 4. FA468624R0025 Section L (25Jul24).docx DOCX document
Solicitation Amendment - FA468624R00250001.pdf PDF
Attachment 7. Responses_RFIs for Cummins Generator Installation (B810 B845).pdf PDF
Solicitation Amendment FA468624R00250001 SF 30.pdf PDF
Attachment 1. FA468624R0025 - B810 and B845 SON Version 2 (24 July 24).pdf PDF
Attachment 2. BAEY 240021 - Site Plan Version 2 (24Jul24).pdf PDF
Attachment 8. B845 - Site Pictures, Combined.pdf PDF
Attachment 5. FA468624R0025 Section M.docx DOCX document
Solicitation - FA468624R0025.pdf PDF
Attachment 1. FA468624R0025 - B810 and B845 SON.docx DOCX document
Attachment 3. BAEY 240021 - AF 66.xls XLS spreadsheet
Attachment 4. FA468624R0025 Section L.docx DOCX document
Attachment 2. BAEY 240021 - Site Plan.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

0
CONTRACT PROGRESS SCHEDULEForm Approved OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintianing the data needed, and completing and reviewing the collection of information. Send comments regarding this burden or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Heaquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No. 9000-0058, Washington DC 20503. Please DO NOT RETURN your form to either of thes addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
1. CONTRACT NO.8. PROJECT TITLE10. APPROVAL RECOMMENDED BY:
DATE SIGNEDINSTALLATION ENGINEER'S SIGNATURE
2. START DATE
3. COMPLETION DATE9. SUBMITTED BY:
4. PURCHASE REQUEST NO.DATE SIGNEDCONTRACTOR'S NAME (Last, First, Middle Initial) Address (Street, City, State, Zip Code)CONTRACTOR'S SIGNATURE11. APPROVED BY:
5. PROJECT NO.DATE SIGNEDCONTRACTING OFFICER'S SIGNATURE
6. ACTUAL START DATE
7. ACTUAL COMPLETION DATE
LINE NO.WORK ELEMENTS%WEEKS

1 SUBCONTRACTOR SELECTION MATERIAL SUBMITTAL

8 FINAL CLEANUP AND PROJECT CLOSEOUT

100% 100%

90% 90%

80% 80%

70% 70%

60% 60%

50% 50%

40% 40%

30% 30%

20% 20%

10% 10%

0% 0%

SCHEDULED PROGRESS COMPLETED THIS PERIOD: SCHEDULED PROGRESS COMPLETED CUMULATIVE:100%0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0
0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0
ACTUAL PROGRESS COMPLETED:

&"Arial,Bold"&14AF FORM 3064, JUN 90

Sheet2

Sheet3

File details come from the government source that posted it. Updated .