Attachment 19 - Coefficient Pricing Worksheet v3.3 (Final) -- 20250210.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
FA466425R0001 - SABER MAC IDIQ B+4 @ March ARB Federal contract opportunity
Solicitation number
FA466424R0004
Issued by
Department of the Air Force Reserve Command

About this file

This is a coefficient pricing worksheet template (Attachment 19) for a SABER IDIQ contract at March Air Reserve Base. The blank worksheet is designed to capture contractor pricing coefficients across base and five option periods for eight different CLINs, divided between work under and over $200,000 in bare costs. The CLINs are categorized by standard and non-standard hours, and secure versus non-secure areas, with weighted percentages assigned (75% for standard hours/non-secure area under $200,000 being the highest weight). The worksheet calculates a total evaluated price based on the weighted coefficients.

The worksheet is part of solicitation FA466425R0001, which is an 8(a) small business set-aside SABER IDIQ contract with a $7.5 million ceiling for construction, maintenance, repair, and renovation projects at March ARB, California. The contract structure aims to expedite awards through reduced design work and acquisition lead time for the 452d Mission Support Group Civil Engineers.

View the file

Other files for this federal contract opportunity

Other files attached to FA466425R0001 - SABER MAC IDIQ B+4 @ March ARB, newest first.
File Type Posted
Attachment 00 - FA466425R0001-0005 - Amendment SF1442 v1.7 (conformed) -- 20250210.pdf PDF
Attachment 02 - SABER MAC IDIQ Master Specs VOL 1 v1.2 (Final) -- 20250207.pdf PDF
Attachment 10 - SABER Submittal Register -- 20250203.pdf PDF
Attachment 11 - Environmental Protection Plan -- 20240514.pdf PDF
Attachment 13 - MARB Contractor Handout v1.1 (Final) -- 20241113.pdf PDF
Attachment 16 - DOL WD DBA CA2025-0025 Mod3 -- 20250207.pdf PDF
Attachment 24 - Financial Institution Reference Sheet v1.1 (draft) -- 20210520.pdf PDF
Attachment 03 - SABER MAC IDIQ Master Specs VOL 2 v1.2 (Final) -- 20250207.pdf PDF
Attachment 14 - MARB Base Pass Request v1.0 (Final) -- 20240712.pdf PDF
Attachment 15 - SABER MAC IDIQ Ordering Instructions v1.4 (Final) -- 20250210.pdf PDF
Attachment 21 - Conflict of Interest Statement v1.1 (Final) -- 20250207.pdf PDF
Attachment 23 - SABER MARB Relevant Contracts v1.1 (Final) -- 20250207.pdf PDF
Attachment 25 - Past Performance Subcontractor Consent Letter v1.0 (draft) -- 20210520.pdf PDF
Attachment 01 - SABER MAC IDIQ Master SOW v1.9 (Final) -- 20250207.pdf PDF
Attachment 12 - Environmental Protection Specs and Guidance -- 20241211.pdf PDF
Attachment 17 - SABER MAC IDIQ RFP Section L v1.7 (Final) -- 20250210.pdf PDF
Attachment 18 - SABER MAC IDIQ RFP Section M v1.5 (Final) -- 20250210.pdf PDF
Attachment 20 - Coefficient Pricing Worksheet Instructions v1.7 (Final) -- 20250210.pdf PDF
Attachment 26 - SABER MAC IDIQ RFI Answers v1.7 (Final) -- 20250210.pdf PDF
Attachment 22 - Past Performance Questionaire (PPQ) v1.2 (Final) -- 20250210.docx DOCX document
Attachment 03 Coefficient Pricing Worksheet updated as of Oct 4 2024.xlsx XLSX spreadsheet
Q and A KTR RFI_Final.pdf PDF
Attachment 08 - Section L Instructions to Offerors_Updated Oct 4 2024.docx DOCX document
Solicitation Amendment FA466425R00010001 SF 30.pdf PDF
Attachment 10 - Past Performance Questionaire (PPQ)_Updated Oct 4 2024.docx DOCX document
Attachment 03 - Coefficient Pricing Worksheet_Updated Oct 4 2024.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Blank

Attachment 19 to FA466425R0001
Contractor Name:Date:
Source Selection Information -- See FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY
Proposed Coefficient
CLINCLIN DescBaseOption 1Option 2Option 3Option 4Option 5AverageWeightWeighted CoefficientTotal Evaluated Price
Bare Costs under $200,000X001AAStandard Hours - Non-Secure Area000000075%0$0.00
X001ABStandard Hours - Secure Area00000003%0$0.00
X001ACNon-Standard Hours - Non-Secure Area00000001%0$0.00
X001ADNon-Standard Hours - Secure Area00000001%0$0.00
Bare Costs over $200,000X001AEStandard Hours - Non-Secure Area000000015%0$0.00
X001AFStandard Hours - Secure Area00000003%0$0.00
X001AGNon-Standard Hours - Non-Secure Area00000001%0$0.00
X001AHNon-Standard Hours - Secure Area00000001%0$0.00
Totals0$0.00

**Instructions for this document are at Attachment 20

File details come from the government source that posted it. Updated .