This is a submittal register that details the required submittals for a Simplified Acquisition of Base Engineer Requirement (SABER) contract at March Air Reserve Base. The register provides a comprehensive listing of required documentation across multiple construction and engineering disciplines including safety plans, environmental protection, concrete work, masonry, metals, wood/plastics, thermal/moisture protection, doors/windows, finishes, specialties, plumbing, HVAC, electrical systems, and site work.

The register specifies submittal requirements for each technical specification section, including shop drawings, product data, test reports, certificates, manufacturer's instructions, and operation/maintenance manuals. Each line item indicates whether government approval is required (marked with "G") and which reviewer is responsible (e.g., "G RO" for Resident Officer review). The document serves as a tracking tool for contractors to manage submittal requirements throughout project execution, with columns for submission dates, approval status, and other administrative details. No specific submission deadlines are provided as this is a template to be used across multiple task orders under the SABER contract.

View the file

Other files for this federal contract opportunity

Other files attached to FA466425R0001 - SABER MAC IDIQ B+4 @ March ARB, newest first.
File Type Posted
Attachment 01 - SABER MAC IDIQ Master SOW v1.9 (Final) -- 20250207.pdf PDF
Attachment 12 - Environmental Protection Specs and Guidance -- 20241211.pdf PDF
Attachment 17 - SABER MAC IDIQ RFP Section L v1.7 (Final) -- 20250210.pdf PDF
Attachment 18 - SABER MAC IDIQ RFP Section M v1.5 (Final) -- 20250210.pdf PDF
Attachment 20 - Coefficient Pricing Worksheet Instructions v1.7 (Final) -- 20250210.pdf PDF
Attachment 26 - SABER MAC IDIQ RFI Answers v1.7 (Final) -- 20250210.pdf PDF
Attachment 00 - FA466425R0001-0005 - Amendment SF1442 v1.7 (conformed) -- 20250210.pdf PDF
Attachment 02 - SABER MAC IDIQ Master Specs VOL 1 v1.2 (Final) -- 20250207.pdf PDF
Attachment 11 - Environmental Protection Plan -- 20240514.pdf PDF
Attachment 13 - MARB Contractor Handout v1.1 (Final) -- 20241113.pdf PDF
Attachment 16 - DOL WD DBA CA2025-0025 Mod3 -- 20250207.pdf PDF
Attachment 19 - Coefficient Pricing Worksheet v3.3 (Final) -- 20250210.xlsx XLSX spreadsheet
Attachment 24 - Financial Institution Reference Sheet v1.1 (draft) -- 20210520.pdf PDF
Attachment 22 - Past Performance Questionaire (PPQ) v1.2 (Final) -- 20250210.docx DOCX document
Attachment 03 - SABER MAC IDIQ Master Specs VOL 2 v1.2 (Final) -- 20250207.pdf PDF
Attachment 14 - MARB Base Pass Request v1.0 (Final) -- 20240712.pdf PDF
Attachment 15 - SABER MAC IDIQ Ordering Instructions v1.4 (Final) -- 20250210.pdf PDF
Attachment 21 - Conflict of Interest Statement v1.1 (Final) -- 20250207.pdf PDF
Attachment 23 - SABER MARB Relevant Contracts v1.1 (Final) -- 20250207.pdf PDF
Attachment 25 - Past Performance Subcontractor Consent Letter v1.0 (draft) -- 20210520.pdf PDF
Attachment 03 Coefficient Pricing Worksheet updated as of Oct 4 2024.xlsx XLSX spreadsheet
Attachment 08 - Section L Instructions to Offerors_Updated Oct 4 2024.docx DOCX document
Q and A KTR RFI_Final.pdf PDF
Solicitation Amendment FA466425R00010001 SF 30.pdf PDF
Attachment 10 - Past Performance Questionaire (PPQ)_Updated Oct 4 2024.docx DOCX document
Attachment 03 - Coefficient Pricing Worksheet_Updated Oct 4 2024.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 59 PAGES

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 33 00 SD-01 Preconstruction Submittals Submittal register 1.9 G

01 35 26 SD-01 Preconstruction Submittals Accident Prevention Plan (APP) 1.9

G

Activity Hazard Analysis (AHA) 1.10 G Crane Critical Lift Plan 1.13.4 G Crane Operators 1.8.10 G

SD-06 Test Reports Notifications and Reports 1.13 Accident Reports 1.13.2 G Crane Reports 1.13.3

SD-07 Certificates Confined Space Entry Permit 1.16 Hot work permit 1.14 Contractor Safety Self-Evaluation 1.6 G Checklist

Certificate of Compliance 1.13.4 Machinery & Mechanized 3.6.3 Equipment Certification Form

01 45 00 SD-01 Preconstruction Submittals Contractor Quality Control (CQC) 1.5.2 G Plan

SD-06 Test Reports Verification Statement 1.12.3

01 45 35 SD-01 Preconstruction Submittals SIOR Letter of Acceptance 3.1.1 b G

Attachment 10 to

FA466425R0001

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 59 PAGES

CONTRACT N

O.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 45 35 Project Manual 3.1.1 h G Project Manual 3.1.1 G Written Practices 3.1.1 e NDT Procedures and Equipment 3.1.1 g Calibration Records

SD-06 Test Reports Daily Reports 3.1.1 Daily Reports 3.1.3 Biweekly Reports 3.1.1 j Biweekly Reports 3.1.2 d

SD-07 Certificates Fabrication Plant 2.1 Certificate of Compliance 2.1 Special Inspector of Record 1.5.17 G Special Inspector 1.5 G Qualification Records 3.1.1 f

SD-11 Closeout Submittals Interim Final Report 3.1.1 n Comprehensive Final Report 2.1 G Comprehensive Final Report 3.1.1 o G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 57 19 SD-01 Preconstruction Submittals Environmental Protection Plan 1.7 G RO

01 57 19 SD-06 Test Reports Erosion and Sediment Controls 3.2.2

SD-07 Certificates Mill Certificate or Affidavit 2.1.3

01 74 19 SD-01 Preconstruction Submittals Waste Management Plan 1.7 G

SD-11 Closeout Submittals Records 1.8

02 41 00 SD-01 Preconstruction Submittals Demolition Plan 1.2.1.3 G Deconstruction Plan 1.2.1.4 G Existing Conditions 1.11

SD-07 Certificates Notification 1.6 G

SD-11 Closeout Submittals Receipts 1.6

02 42 91 SD-01 Preconstruction Submittals Work Plan 1.2 G

02 82 00 SD-03 Product Data

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

02 82 00 Local exhaust equipment 3.1.7 G Vacuums 3.1.8 G Respirators 3.1.2 G Pressure differential automatic 3.1.7 G recording instrument

Amended water 1.2.2 G Glovebags 3.1.10 G Safety Data Sheets (SDS) 1.3.9 G for all materials

SD-06 Test Reports Air sampling results 1.5.5 G Pressure differential recordings 1.5.6 G for local exhaust system

Asbestos disposal quantity report 3.3.3.2 G Clearance sampling 3.2.14.5 G

SD-07 Certificates Asbestos hazard abatement plan 1.3.10 G Testing laboratory 1.3.11 G Private qualified person 1.5.1 G documentation

Contractor's license 1.5.4 G Competent person 1.5.2 G Worker's license 1.5.3 G Landfill approval 1.3.12 G Employee training 1.3.4 G Medical certification 1.3.14 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 59 PAGES

CONTRACT N

O.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

02 82 00 Waste shipment records 1.3.12 G Respiratory Protection Program 1.3.7 G Delivery tickets 1.3.12 G Vacuums 3.1.8 G Water filtration equipment 3.1.3.3 G Ventilation systems 3.1.7 G equipment used to contain 3.1 G airborne asbestos fibers

Notifications 1.3.5 SD-11 Closeout Submittals Notifications 1.3.5 G Rental equipment 1.7.1 G Respirator program records 1.3.7.1 G Permits and licenses 1.3.5 G Protective clothing 1.5.7 G decontamination quality control records

Protective clothing 1.5.8 G decontamination facility notificati n

02 83 00 SD-03 Product Data Vacuum Filters 1.6.4 G Respirators 1.6.1 G

SD-06 Test Reports sampling results 1.5.2.3 G Occupational and Environmental 1.5.2.3 G Assessment Data Report

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

02 83 00 SD-07 Certificates Qualifications of CP 1.5.1.1 G Testing Laboratory 1.5.1.3 G Training Certification 1.5.1.2 G Notification of the 3.1.1.1 G

Commencement of LBP Hazard Abatement lead-based paint/paint with lead 1.5.2.2 G removal/control plan

Rental equipment notification 1.6.3 G Respiratory Protection Program 1.5.2.6 G Hazard Communication Program 1.5.2.7 G EPA or State approved 3.5.2 G hazardous waste treatment, storage, or disposal facility

Lead Waste Management Plan 1.5.2.8 G Vacuum filters 1.6.4 G

SD-11 Closeout Submittals hazardous waste manifest 3.5.2.1 G Medical Examinations 1.5.2.4 G Training Certification 1.5.1.2 G turn-in documents or weight 3.5.2.1 G tickets

02 84 16 SD-07 Certificates Qualifications of CIH 1.8.1 G Training Certification 1.8.1 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

02 84 16 PCB and Lamp Removal Work 1.8.2 G Plan

PCB and Lamp Disposal Plan 1.8.3 G SD-11 Closeout Submittals Transporter certification 3.5.2 G Certification of Decontamination 3.2.4 Certificate of Disposal and/or 3.5.2.1 recycling

DD Form 1348-1 3.5.3.2 Testing results 3.3.1

03 01 30.72 SD-02 Shop Drawings Structural Calculations 1.5.2.1 G AE Shop Drawings 1.5.2.1 G AE

SD-03 Product Data Manufacturer's Product Data 1.5.3.2 G AE Sheets

Test Reports 1.5.1.1 G AE ICC Evaluation Service Report 1.5.3.1 G AE

03 30 00 SD-02 Shop Drawings Formwork 1.6.2.1 G Formwork 1.6.2.1 G

SD-03 Product Data Form Materials 2.1

SD-06 Test Reports Test Reports 1.6.4

03 30 00 SD-03 Product Data

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

03 30 00 Preformed Expansion Joint Filler Sealant 2.4.5

SD-07 Certificates Preformed Expansion Joint Filler 2.4.4 Sealant 2.4.5

03 30 00 SD-02 Shop Drawings Reinforcement 1.6.2.2 G

SD-03 Product Data Reinforcement 2.6 G

SD-06 Test Reports Inspection of Reinforcement 3.5.9 G

SD-07 Certificates Reinforcement 2.6

03 30 00 SD-01 Preconstruction Submittals Quality Control Program 1.6.6 G Laboratory Accreditation 1.6.9

SD-03 Product Data Recycled Content Products Part 2 Cementitious Materials 2.3.1 Vapor Retarder Vapor Barrier 2.4.6 Floor Finish 2.4.3 Floor Hardener Chemical Admixtures 2.3.4

SD-05 Design Data

2.4.4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

03 30 00 Mixture Proportions 2.5.1 G SD-06 Test Reports Mixture Proportions 2.5.1 G Testing and Inspection for CQC 3.14 G Fly Ash 1.6.4.1 Ground Granulated Blast-Furnace 1.6.4.2 (GGBF) Slag

Aggregates 1.6.4.3 Air Content

3.14.3.1 Slump

Compressive Strength 3.14.3.3 Water 2.3.2

SD-07 Certificates Contractor Quality Control 1.6.7 personnel

Ready-Mix Plant 2.5.5 03 30 00 SD-03 Product Data

Curing Materials 2.4.1 SD-06 Test Reports Testing and Inspection for CQC 3.14

SD-08 Manufacturer’s Instructions Curing Compound 2.4.1

04 20 00 SD-02 Shop Drawings Detail Drawings 3.4.1.1 G

SD-03 Product Data Cement 2.4.1.1 G

3.14.3.4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

04 20 00 Cold Weather Installation 1.5.2 G SD-04 Samples Concrete Masonry Units (CMU) 2.2.3.2 G Anchors, Ties, and Bar 2.6.2 G Positioners

Expansion-Joint Materials 2.6.6 G Joint Reinforcement 2.6.3 G

SD-05 Design Data Unit Strength Method 2.1.2 G

SD-06 Test Reports Efflorescence Test 3.6.1.3 G Field Testing of Mortar 3.6.1.1 G Field Testing of Grout 3.6.1.2 G Prism tests 3.6.1.4 G Masonry Cement 2.4.1.1 G Masonry Inspector Qualifications 1.3.2 G

SD-07 Certificates Concrete Masonry Units (CMU) 2.2.3.2 Anchors, Ties, and Bar 2.6.2 Positioners

Expansion-Joint Materials 2.6.6 Joint Reinforcement 2.6.3 Masonry Cement 2.4.1.1 Admixtures for Masonry Mortar 2.4.1.4 Admixtures for Grout 2.4.2.2

SD-08 Manufacturer’s Instructions

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

04 20 00 Masonry Cement 2.4.1.1 SD-10 Operation and Maintenance Data Plastic Identification 1.2.1 Take-Back Program 3.8

05 05 23.16 SD-01 Preconstruction Submittals Welding Quality Assurance Plan 3.2

SD-03 Product Data Welding Procedure Qualifications 1.3 G Welder, Welding Operator, and 1.3.4 Tacker Qualification

Inspector Qualification 1.3.5 Previous Qualifications 1.3.2 Pre-qualified Procedures 1.3.3 Welding Electrodes and Rods 2.2

SD-06 Test Reports Nondestructive Testing 3.3.1

05 12 00 SD-01 Preconstruction Submittals Erection Drawings 1.5.1.1 G

SD-02 Shop Drawings Fabrication drawings 1.5.2 G AE

SD-03 Product Data Shop primer 2.6.2 Welding electrodes and rods 2.4.1 Non-Shrink Grout 2.4.2

SD-06 Test Reports

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 59 PAGES

CONTRACT N

O.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

05 12 00 Class B coating 2.6.2 Bolts, nuts, and washers 2.3

SD-07 Certificates Steel 2.2 Bolts, nuts, and washers 2.3 Welding procedures and 1.5.4.1 qualifications

Welding electrodes and rods 2.4.1 05 40 00 SD-02 Shop Drawings

Framing Components 1.6.1 G SD-03 Product Data Studs, Joists 2.1

SD-07 Certificates Load-Bearing Cold-Formed Metal 1.4 Framing

Welds 3.2.1 SD-11 Closeout Submittals Recycled Content of Steel 2.1 S Products

06 10 00 SD-03 Product Data Fire-retardant treatment 1.8 Engineered wood products 2.1 Structural-use and OSB panels 1.4.4 Structural-use and OSB panels 2.3.1.2 Adhesives 2.5.11

SD-06 Test Reports

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

06 10 00 Preservative-treated 1.4.5 SD-07 Certificates Certificates of grade 1.11.1 Preservative treatment 1.7

06 41 16.00 10 SD-02 Shop Drawings Shop Drawings 2.12 G Installation 3.1 G

SD-03 Product Data Wood Materials 2.1 Wood Finishes 2.10 Finish Schedule 2.12.8.3

SD-04 Samples Plastic Laminates 2.3 G Cabinet Hardware 2.7 G

SD-07 Certificates Quality Assurance 1.5 Laminate Clad Casework 3.1

06 61 16 SD-02 Shop Drawings Detail Drawings 1.4.2 G Installation 3.1 G

SD-03 Product Data Solid polymer material 2.1 Qualifications 1.4.1 Fabrications 2.3

SD-04 Samples Material 2.1 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

06 61 16 Counter and Vanity Tops 2.3.6 G Window Stools 2.3.5 G Shower Enclosures 2.3.9 G

SD-06 Test Reports Solid polymer material 2.1

SD-07 Certificates Fabrications 2.3 Qualifications 1.4.1

SD-10 Operation and Maintenance Data Clean-up 3.2

07 21 13 SD-03 Product Data Block or board insulation 2.1 G Accessories 2.5

SD-08 Manufacturer’s Instructions Block or Board Insulation 2.1 Adhesive 2.5.1

07 21 16 SD-03 Product Data Blanket insulation 2.1 Accessories 2.6

SD-08 Manufacturer’s Instructions Insulation 3.3.1

07 84 00 SD-02 Shop Drawings Firestopping System 2.1 G

SD-03 Product Data Firestopping Materials 2.2 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

07 84 00 SD-06 Test Reports Inspection 3.3 G

SD-07 Certificates Inspector Qualifications 1.5.2 Firestopping Materials 2.2 Installer Qualifications 1.5.1 G

07 92 00 SD-03 Product Data Sealants 2.1 Primers 2.2 Bond breakers 2.3 Backstops 2.4

SD-07 Certificates Sealant 3.4.7

08 11 13 SD-02 Shop Drawings Doors 2.1 G Frames 2.6 G Accessories 2.4 Schedule of doors 2.1 G Schedule of frames 2.6 G

SD-03 Product Data Doors 2.1 G Frames 2.6 G Accessories 2.5

08 11 16 SD-02 Shop Drawings Doors and frames 1.5.1 G Doors and frames 2.1 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

08 11 16 SD-04 Samples Finish sample 1.5.2

SD-05 Design Data calculations 1.2.1 G

SD-08 Manufacturer’s Instructions Doors and frames 1.5.1 Doors and frames 2.1

08 14 00 SD-02 Shop Drawings Doors 2.1 G

SD-03 Product Data Doors 2.1 G Accessories 2.2 Water-resistant sealer 2.3.7 warranty 1.5 Fire resistance rating 2.1.7 G Certification 1.3

SD-04 Samples Doors 2.1 Door finish colors 2.3.6.4 G

SD-06 Test Reports Cycle-slam 2.4 Hinge loading resistance 2.4

08 33 13 SD-02 Shop Drawings Detail Drawings 1.3 G

SD-03 Product Data Warranty 1.5

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 59 PAGES

CONTRACT N

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

08 33 13 Rolling Counter Doors 2.3 Installation 3.1 Cleaning 3.4

SD-06 Test Reports Drop-test 3.3

08 33 23 SD-02 Shop Drawings Overhead Coiling Doors 2.2.1 G Counterbalancing Mechanism 1.3.2 G Counterbalancing Mechanism 2.2.3 G Electric Door Operators 1.3.2 G Electric Door Operators 2.2.5 G Bottom Bars 2.2.1.4 Guides 2.1.1.1 Mounting Brackets 2.2.3.1 Overhead Drum 2.2.5.11 Hood 1.3.2 Painting 1.3.2 Installation Drawings 2.1.1.1

SD-03 Product Data Overhead Coiling Doors 2.2.1 G Hardware 2.2.2 G Counterbalancing Mechanism 1.3.2 Counterbalancing Mechanism 2.2.3 Electric Door Operators 1.3.2 G Electric Door Operators 2.2.5 G

SD-05 Design Data

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

08 33 23 Overhead Coiling Doors 2.2.1 G Hardware 2.2.2 G Counterbalancing Mechanism 1.3.2 Counterbalancing Mechanism 2.2.3 Electric Door Operators 1.3.2 G Electric Door Operators 2.2.5 G

SD-10 Operation and Maintenance Data Operation and Maintenance 1.3.2 Manuals

Materials 1.3.2 Devices 1.3.2 Procedures 1.3.2 Manufacture's Brochures 1.3.2 Parts Lists 1.3.2 Cleaning 3.2.1.2

08 34 02 SD-02 Shop Drawings Installation 3.3 G

SD-03 Product Data Bullet Resistant Components 1.4

SD-07 Certificates Bullet Resistant Components 1.4

SD-10 Operation and Maintenance Data Bullet Resistant Components 1.4 G

08 34 59 SD-02 Shop Drawings

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

08 34 59 Vault door Unit 2.1 G SD-03 Product Data Vault Door and Frame 2.2

SD-07 Certificates Vault Door and Frame 2.2

SD-08 Manufacturer’s Instructions Installation 3.1

08 51 13 SD-02 Shop Drawings Windows 2.1 G Fabrication Drawings 1.9

SD-03 Product Data Windows 2.1 G Hardware 2.2.7.1 G Fasteners 2.2.2 G Window performance 1.8 G Thermal-Barrier Windows 2.4 G Weatherstripping 2.1.12 G Accessories 2.2.7 G Thermal performance 1.8.5

SD-04 Samples Finish Sample 1.3.4.1 G Window Sample 1.3.4.2

SD-05 Design Data Structural calculations for 2.1 G deflection

Design Analysis 1.3.5 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 59 PAGES

CONTRACT N

O.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

08 51 13 SD-06 Test Reports Minimum condensation 1.3.6 resistance factor

Standard Airblast Test 1.8.2.3 SD-10 Operation and Maintenance Data Windows 2.1 G

08 71 00 SD-02 Shop Drawings Hardware schedule 1.5 G

SD-03 Product Data Hardware items 2.3 G

SD-08 Manufacturer’s Instructions Installation 3.1

SD-10 Operation and Maintenance Data Hardware Schedule 1.5 G

08 81 00 SD-02 Shop Drawings Installation 3.2.6

SD-03 Product Data Insulating Glass 1.7.1 Glazing Accessories 1.3

SD-04 Samples Insulating Glass 1.4 G Glazing Compound 2.5.2 Tape 2.5.5 Sealant 2.5.3

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

08 81 00 SD-08 Manufacturer’s Instructions Setting and sealing materials 2.5 Glass setting 3.2

08 91 00 SD-02 Shop Drawings Wall louvers 1.4 Wall louvers 1.5

SD-03 Product Data Metal Wall Louvers 2.2

SD-04 Samples Wall louvers 1.4 G Wall louvers 1.5 G

09 22 00 SD-02 Shop Drawings Metal support systems 2.1 G

09 29 00 SD-03 Product Data Cementitious backer units 2.1.9 Water-Resistant Gypsum Backing 2.1.3 Board

Impact Resistant Gypsum Board 2.1.6 Accessories 2.1.15 Gypsum Board 2.1.1 Adhesives 2.1.12 Joint Treatment Materials 2.1.10

SD-07 Certificates Asbestos Free Materials 2.1 G

SD-08 Manufacturer’s Instructions Material Safety Data Sheets 2.1

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

09 29 00 SD-10 Operation and Maintenance Data Manufacturer maintenance 2.1 instructions

Waste Management 3.9 09 30 10 SD-02 Shop Drawings

Detail Drawings 3.2 G SD-03 Product Data Tile 2.1 G Tile 2.1 G Setting-Bed 2.2 G Mortar, Grout, and Adhesive 2.4 G

SD-04 Samples Tile 2.1 G Accessories 2.1.7 G Transition Strips 2.1 G Transition Strips 2.6.1 G Grout 2.4 G

SD-07 Certificates Tile 2.1 Mortar, Grout, and Adhesive 2.4

SD-08 Manufacturer’s Instructions Maintenance Instructions 3.8

SD-10 Operation and Maintenance Data Installation 3.2 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

09 51 00 SD-02 Shop Drawings Approved Detail Drawings 1.2

SD-03 Product Data Certification 1.3

SD-04 Samples Acoustical Units 2.2 Acoustic Ceiling Tiles 2.2

SD-06 Test Reports Ceiling Attenuation Class and 2.1.2.1 Test

SD-07 Certificates Acoustical Units 2.2 Acoustic Ceiling Tiles 2.2

09 62 38 SD-03 Product Data Static-Control Flooring 2.1 G Accessories 2.1 G Environmental Data 1.4 G Adhesives 1.4.1.2 G Adhesives 2.4 G Warranty 1.9

SD-04 Samples Static-Control Flooring 2.1 G Accessories 2.6 G

SD-06 Test Reports Fire Resistance 2.9 Moisture, Alkalinity and Bond 3.2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

09 62 38 Testing 3.9 SD-07 Certificates Static-Control Flooring 2.1 Accessories 2.6 Adhesives 1.4.1.2 Adhesives 2.4 Qualifications of Applicator 1.6

SD-08 Manufacturer’s Instructions Static-Control Flooring 2.1 G Accessories 2.6 G

SD-10 Operation and Maintenance Data Static-Control Flooring 2.1 G Accessories 2.6 G

09 65 00 SD-03 Product Data Adhesives 2.14 Wall Base 2.10

SD-04 Samples Wall Base 2.10 G Stair Nosing 2.12 G

SD-08 Manufacturer’s Instructions Surface Preparation 3.2 G Installation 3.1 G

SD-10 Operation and Maintenance Data

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

09 65 00 Resilient Flooring and 2.18 G Accessories

09 67 23.13 SD-03 Product Data Products Part 2 G

SD-04 Samples Mockups 1.5.1 G

SD-05 Design Data Curing 3.1.3.1 G

SD-07 Certificates Installer 1.5.2 G

SD-10 Operation and Maintenance Data Cleaning, Protecting, and Curing 3.6 G

09 68 00 SD-02 Shop Drawings Installation Drawings 3.4 G Moldings 2.5 G

SD-03 Product Data Carpet 2.1 G Moldings 2.5 G

SD-04 Samples Carpet 2.1 G Moldings 2.5 G

SD-06 Test Reports Moisture and Alkalinity Tests 3.2 G

SD-07 Certificates Carpet 2.1

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

09 68 00 Regulatory Requirements 1.3 SD-08 Manufacturer’s Instructions Surface Preparation 3.1 Installation 3.4

SD-10 Operation and Maintenance Data Carpet 2.1 G Cleaning and Protection 3.5 G Maintenance Service 3.7.2

09 69 13 SD-02 Shop Drawings Detailed Installation Drawings 2.2.2 G

SD-03 Product Data Access Flooring System 2.1 Access Flooring System 2.5

SD-04 Samples Floor Panels 2.2 Finish Flooring 2.2.4 Panel Support System 2.3 Accessories 1.5.1

SD-05 Design Data Compliance with ICC-ES AC300 2.1 Seismic Calculations 2.1.7

SD-06 Test Reports Factory Tests 2.7 Electrical Resistance 3.2.4 Field Tests 3.2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

09 69 13 SD-07 Certificates Access Flooring System 2.1 Access Flooring System 2.5

09 90 00 SD-03 Product Data Coating 2.1 G DA Manufacturer's Technical Data 2.1 Sheets

SD-04 Samples Color 2.3 G DA

SD-07 Certificates Applicator's qualifications 1.6.2

SD-08 Manufacturer’s Instructions Application instructions 3.4.1 Mixing 3.8.2 Manufacturer's Material Safety 1.8.1 Data Sheets

SD-10 Operation and Maintenance Data Coatings: 2.1 G DA

09 97 23.01 SD-03 Product Data Manufacturer's Product Data G

SD-04 Samples Samples for Verification G

SD-05 Design Data Product Schedule G

SD-07 Certificates

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

09 97 23.01 Installer Certificates G SD-10 Operation and Maintenance Data Maintenance Data G

09 97 37 SD-03 Product Data preparation 3.2 storage and handling 1.4 installation 3.3 G

SD-04 Samples color 1.3 G

SD-10 Operation and Maintenance Data cleaning 3.4 G

10 11 00 SD-03 Product Data Visual Display Board 1.2 G

SD-04 Samples Aluminum 2.1.6 G Porcelain Enamel 2.1.1 G Materials 2.1 G

SD-07 Certificates Visual Display Board 1.2

10 14 00.20 SD-02 Shop Drawings Detail Drawings 1.4.2 G

SD-03 Product Data Installation 3.2 G Warranty 1.6 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

10 14 00.20 SD-04 Samples Interior Signage 1.4.1 G Software 1.3 G

SD-10 Operation and Maintenance Data Approved Manufacturer's 3.2 G Instructions

Protection and Cleaning 3.2.2 G 10 14 00.10 SD-02 Shop Drawings

Approved Detail Drawings 3.1 G SD-03 Product Data Installation 3.1 Exterior Signage 1.2 G Wind Load Requirements 1.2.1

SD-04 Samples Exterior Signage 1.2 G

SD-10 Operation and Maintenance Data Protection and Cleaning 3.1.2

10 21 13 SD-02 Shop Drawings Fabrication Drawings 2.1 Installation Drawings 3.3 G

SD-03 Product Data Cleaning and Maintenance 2.1 Instructions

Colors And Finishes 2.9

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

10 21 13 Anchoring Devices and Fasteners 2.2.8 Hardware and Fittings 2.2.10 Brackets 2.2.9 Door Hardware 2.2.11 Toilet Enclosures 2.3.1 Urinal Screens 2.3.3 Pilaster Shoes 2.7

SD-04 Samples Colors and Finishes 2.9 G Hardware and Fittings 2.2.10 Anchoring Devices and Fasteners 2.2.8

SD-07 Certificates Warranty 1.6

SD-10 Operation and Maintenance Data Plastic Identification 2.1.1 G

10 22 39 SD-01 Preconstruction Submittals Manufacturer's Qualifications 1.4.3 G Manufacturer's Sample Warranty 1.6 Statement of Code Compliance 1.2 G Statement of Standards 1.2 G Conformity

Verification of Field 1.4.1 G Measurements

SD-02 Shop Drawings Installation 3.1 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

10 22 39 Layouts 3.1.1 G Fabrication Drawings 1.4.1 G

SD-03 Product Data Folding Panel Partitions 2.3 G Installation Instructions 3.1 G

SD-04 Samples Folding Panel Partitions 2.3 G

SD-06 Test Reports Acoustical Test 3.2.3 G Flame and Smoke Development 2.1.3.1 G Tests

SD-07 Certificates Materials 2.2 G Folding Panel Partitions 2.3 G

SD-10 Operation and Maintenance Data Folding Panel Partitions 2.3

10 26 00 SD-02 Shop Drawings Corner Guards 2.2 G Wall Guards (Bumper Guards) 2.3 G

SD-03 Product Data Corner Guards 2.2 G Wall Guards (Bumper Guards) 2.3 G

SD-04 Samples Finish 2.7 G

SD-06 Test Reports

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

10 26 00 Corner Guards 2.2 Wall Guards (Bumper Guards) 2.3

SD-07 Certificates Corner Guards 2.2 Wall Guards (Bumper Guards) 2.3

10 28 13 SD-03 Product Data Finishes 2.1.2 G Accessory Items 2.2 G

SD-04 Samples Finishes 2.1.2 G Accessory Items 2.1

SD-07 Certificates Accessory Items 2.1

SD-10 Operation and Maintenance Data Electric Hand Dryer G

10 44 16 SD-01 Preconstruction Submittals Manufacturer's Data 2.1.1 G

SD-02 Shop Drawings Fire Extinguishers 2.1.1 G Accessories 2.1.4 G Accessories 2.1.4 G Cabinets 2.2.1 G Wall Brackets 2.2.2 G

SD-03 Product Data Fire Extinguishers 2.1.1 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

10 44 16 Accessories 2.1.4 G Accessories 2.1.4 G Cabinets 2.2.1 G Wall Brackets 2.2.2 G Replacement Parts List 3.2.1 G

SD-07 Certificates Fire Extinguishers 2.1.1 G Manufacturer's Warranty with 2.1.1 G Inspection Tag

10 51 26 SD-02 Shop Drawings Shop Drawings 1.3 G

SD-03 Product Data Lockers 2.2.1 G Bench Seat G

SD-04 Samples Samples 2.1 G

10 56 13 SD-01 Preconstruction Submittals Shelving Units 2.1

SD-03 Product Data Shelving Units 2.1 Installation instructions 3.2

SD-04 Samples Finish 2.2

SD-06 Test Reports Shelving Units 2.1 Finish 2.2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

12 24 13 SD-02 Shop Drawings Installation 3.3 G

SD-03 Product Data Window Shades 2.1 G

SD-04 Samples Window Shades 2.1 G

SD-06 Test Reports Window Shades 2.1

SD-08 Manufacturer’s Instructions Window Shades 2.1

SD-10 Operation and Maintenance Data Window Shades 2.1

12 48 13 SD-02 Shop Drawings Installation Drawings 3.2 G Detail Drawings 3.2 G Custom Graphics Drawings 3.2 G

SD-03 Product Data Entrance Floor Mats and Frames 2.1.1 G Adhesives and Concrete Primers 2.1.2 G

SD-04 Samples Entrance Floor Mats and Frames 2.1.1 G

SD-08 Manufacturer’s Instructions Manufacturer's Instructions 3.2 G

SD-10 Operation and Maintenance Data

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

12 48 13 Protection, Maintenance, and 3.2 G Repair Information

13 48 73 SD-02 Shop Drawings Bracing 3.1 G Resilient Vibration Isolation 3.4 G Devices

Equipment Requirements 2.1 G SD-03 Product Data Bracing 3.1 G Equipment Requirements 2.1 G

SD-06 Test Reports Anchor Bolts 3.3 G

23 05 48.19 SD-02 Shop Drawings Coupling and Bracing 3.1 Flexible Couplings or Joints 3.3 Equipment Requirements 2.1 Contractor Designed Bracing 1.2.4 G

SD-03 Product Data Coupling and Bracing 3.1 G Equipment Requirements 2.1 G Contractor Designed Bracing 1.2.4 G

SD-07 Certificates Flexible Ball Joints 2.3

21 13 13 SD-02 Shop Drawings Shop Drawings 1.4.1.1 G AE As-Built Drawings 3.9

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

21 13 13 SD-03 Product Data Fire Protection Related 1.2.3 Submittals

Materials and Equipment 2.1 G AE Spare Parts 1.6 Preliminary Tests 3.8 G Final Acceptance Test 3.9 G Onsite Training 3.10 G Fire Protection Specialist 1.2.3 G Sprinkler System Installer 1.4.2.2 G

SD-05 Design Data Sway Bracing 1.4.1.1 G AE Hydraulic Calculations 1.2.1.2 G AE

SD-06 Test Reports Preliminary Test Report 3.8 Final Acceptance Test Report 3.9

SD-07 Certificates Inspection by Fire Protection 3.7.2.1 Specialist

SD-10 Operation and Maintenance Data Operating and Maintenance 3.9 G Manuals

22 00 00 SD-03 Product Data Fixtures 2.4 Flush valve water closets 2.4.3

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

22 00 00 Flush valve urinals 2.4.4 Countertop lavatories 2.4.11 Kitchen sinks 2.4.14 Drinking-water coolers 2.4.16 G Water heaters 2.10 G Pumps 2.12 G Backflow prevention assemblies 3.9.1.1 G Shower Faucets 2.6.2 G

SD-06 Test Reports Tests, Flushing and Disinfection 3.9 Test of Backflow Prevention 3.9.1.1 G Assemblies

SD-07 Certificates Materials and Equipment 1.4

23 30 00 SD-02 Shop Drawings Detail Drawings 1.4.4 G

SD-03 Product Data Metallic Flexible Duct 2.10.1.1 Insulated Nonmetallic Flexible 2.10.1.2 Duct Runouts

Duct Connectors 2.10.1.3 Duct Access Doors 2.10.2 G Fire Dampers 2.10.3 Manual Balancing Dampers 2.10.4 G Diffusers 2.10.13.1 Registers and Grilles 2.10.13.5

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

23 30 00 Louvers 2.10.14 Air Vents, Penthouses, and 2.10.15 Goosenecks

Centrifugal Fans 2.11.1.1 In-Line Centrifugal Fans 2.11.1.2 Air Handling Units 2.12 G Reheat Units 2.13.3.7 G Unit Ventilators 2.13.4 Energy Recovery Devices 2.14 G Test Procedures 1.4.5

SD-06 Test Reports Performance Tests 3.13 G Damper Acceptance Test 3.11 G

SD-08 Manufacturer’s Instructions Manufacturer's Installation 3.2 Instructions

Operation and Maintenance 3.16.2 Training

SD-10 Operation and Maintenance Data Operation and Maintenance 3.16.1 G Manuals

Fire Dampers 2.10.3 G Manual Balancing Dampers 2.10.4 G Centrifugal Fans 2.11.1.1 G In-Line Centrifugal Fans 2.11.1.2 G

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

23 30 00 Air Handling Units 2.12 G Variable Volume, Single Duct 2.13.3.2 G Terminal Units

Reheat Units 2.13.3.7 G Unit Ventilators 2.13.4 G Energy Recovery Devices 2.14 G

23 05 48.00 40 SD-02 Shop Drawings Installation Drawings 1.2 G Outline Drawings 1.2 G

SD-03 Product Data Equipment and Performance 1.2 G Data

Isolators 2.2.14 G SD-06 Test Reports Type of Isolator 2.4 G Type of Base 2.4 G Allowable Deflection 2.4 G Measured Deflection 2.4 G

23 05 93 SD-02 Shop Drawings TAB Schematic Drawings and 1.3 G Report Forms

SD-03 Product Data TAB Related HVAC Submittals 1.5.1.3 TAB Procedures 3.4 G Calibration 1.5.7 Systems Readiness Check 1.5.1.1

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 59 PAGES

CONTRACT NO.

TITLE AND LOCATION

March ARB - SABER

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G # R A P H

G O V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

23 05 93 TAB Execution 3.4 G TAB Verification 3.4.11.1 G

SD-06 Test Reports Design Review Report 1.7.2.1 G Systems Readiness Check 1.5.1.1 G TAB Report 3.4.10 G TAB Verification Report 3.4.11.1 G

SD-07 Certificates Ductwork Leak Testing 3.3.4 TAB Firm 1.5.8.1 G TAB Specialist 1.5.8.2 G

23 07 00 SD-02 Shop Drawings Pipe Insulation Systems 2.3 Pipe Insulation Systems 3.2 Duct Insulation Systems 3.3

SD-03 Product Data Pipe Insulation Systems 2.3 G Pipe Insulation Systems 3.2 G Duct Insulation…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .