Attachment 02 - SABER MAC IDIQ Master Specs VOL 1 v1.2 (Final) -- 20250207.pdf
PDF 1 MB Posted
- Attached to
- FA466425R0001 - SABER MAC IDIQ B+4 @ March ARB Federal contract opportunity
- Solicitation number
- FA466424R0004
About this file
This is an attachment file containing SABER (Simplified Acquisition of Base Engineer Requirements) Master Specifications Volume 1 for March Air Reserve Base in Riverside County, California. The document outlines detailed requirements for construction, maintenance, repair and minor construction work under the SABER IDIQ contract.
The specifications cover general requirements including project documentation, coordination procedures, environmental protection, safety protocols, and quality control measures. Key requirements include: contractors must use RSMeans CostWorks software for cost estimation and provide three copies of RSMeans Facilities Construction Cost Data books; contractors must provide training for 9 government employees on the RSMeans software; all task orders require performance and payment bonds regardless of dollar value; contractors must submit detailed proposals within 14 days of site visits (5 days for urgent requirements); as-built drawings must be provided in both AutoCAD and PDF formats meeting specific standards; and strict environmental protection measures must be followed including stormwater control, hazardous materials handling, and waste management. The document provides comprehensive technical specifications organized by CSI divisions covering everything from demolition to finishes, with particular emphasis on working safely near airfield areas and coordinating with base operations.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March Air Reserve Base
Riverside County California SABER Vol 1
ATTACHMENT 02 for FA466425R0001
MASTER SPECIFICATIONS FOR SIMPLIFIED ACQUISITION OF
BASE ENGINEER (SABER) REQUIREMENTS VOL I
ATTACHMENT 02 for FA466425R0001
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
DIVISION 02 – EXISTING CONDITIONS
DIVISION 03 – CONCRETE
DIVISION 04 – MASONRY
Construction General Requirements
Environmental General Requirements (See 01 57 19)
Unit Price Book and Software Requirements
Project Management
Submittal Procedures
Special Provisions For Working on or Near the Airfield or
Airfield Hangers
Safety and Occupational Health Requirements
Contractor’s Quality Control
Special Inspections
Security Requirements (March Air Force Base)
Environmental Protection (See Environmental Protection
Specification and Guidance for March ARB dated 6/2019)
Construction Waste Management and Disposal
Delivery Order Close-out Requirements
Operation and Maintenance Data
01 00 00
01 01 00
01 04 00
01 31 01
01 33 00
01 35 00
01 35 26
01 45 00
01 45 35
01 55 01
01 57 19
01 74 19
01 78 00
01 78 23
Demolition and Deconstruction
Carpet Removal and Reclamation
Removal and Salvage of Historic Building Materials
Asbestos Remediation
Lead Remediation
Handling of Lighting Ballasts and Lamps containing PCBs and
Mercury
02 41 00
02 42 51
02 42 91
02 82 00
02 83 00
02 84 16
03 01 30.72
03 30 00
Strengthening of Cast-In-Place Concrete
Cast-In-Place Concrete
04 20 00 Masonry
ATTACHMENT 02 for FA466425R0001
PROJECT TABLE OF CONTENTS Page 2
DIVISION 05 – METALS
DIVISION 06 – WOOD, PLASTIC, and COMPOSITES
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
DIVISION 08 – OPENINGS
05 05 23.16
05 12 00
05 40 00
Structural Welding
Structural Steel
Cold-Formed Metal Framing
06 10 00
06 41 16.00 10
06 61 16
Rough Carpentry
Laminate Clad Architectural Casework
Solid Polymer (Solid Surfacing) Fabrications
07 14 00
07 21 13
07 21 16
07 22 00
07 60 00
07 61 14.00
07 84 00
07 92 00
Fluid-Applied Waterproofing
Board and Block Insulation
Mineral Fiber Blanket Insulation
Roof and Deck Insulation
Flashing and Sheet Metal
Steel Standing Seem Roofing
Firestopping
Joint Sealants
08 11 63
08 11 16
08 14 00
08 33 13
08 33 23
08 34 02
08 34 59
08 51 13
08 71 00
08 81 00
08 91 00
Steel Doors and Frames
Aluminum Doors and Frames
Wood Doors
Metal Rolling Counter Doors
Overhead Coiling Doors
Bullet-Resistant Components
Vault Doors and Day Gates
Aluminum Windows
Door Hardware
Glazing
Metal Wall Louvers
ATTACHMENT 02 for FA466425R0001
PROJECT TABLE OF CONTENTS Page 3
DIVISION 09 – FINISHES
09 22 00
09 29 00
09 30 10
09 51 00
09 62 38
09 65 00
09 67 23.13 01
09 68 00
09 69 13
09 90 00
09 97 23.01
09 97 37
Supports for Plaster and Gypsum Board
Gypsum Board
Ceramic, Quarry, and Glass Tiling
Acoustical Ceilings
Static-Control Flooring
Resilient Flooring
Resinous Flooring
Carpeting
Rigid Grid Access Flooring
Paints and Coatings
Concrete & Masonry Coatings
Dry-Erase Coating
ACRONYM LIST
AF
AFCEC
AFI
AFS
AFSPC
APCD
APEN
APP
ARB
BCE
CAD
CCI
CCTV
CD
CE
CFC
CNG
CO
COMSEC
COR
CPG
CQCM
CSI
CSO
DBA
DISCO
DOD
DODI
DPW
DV
EMSEC
EPA
Air Force
Air Force Civil Engineering Center
Air Force Instruction
Air Force Station
Air Force Space Command
Air Pollution Control Division
Air Pollutant Emission Notice
Affirmative Procurement Program
Air Reserve Base
Base Civil Engineer
Computer Aided Drafting
City Cost Index
Closed-Circuit Television
Compact Disk
Civil Engineering
Chlorofluorocarbon
Compressed Natural Gas
Contracting Officer
Communications
Contracting Officer’s Representative
Comprehensive Procurement Guidelines
Contractor Quality Control Manager
Construction Specification Institute
Contractor Security Officer
“A” Weighted Decibels
Defense Investigative Service Cognizant Security Office
Department of Defense
Department of Defense Instruction
Director of Public Works
Distinguished Visitor
Emission Security
Environmental Protection Agency
EPDM
ETL
FAA
FOD
FOPR
FOUO
GFE
GFM
HAZMAT
HAZWASTE
HCFC
HMA
HQ
HVAC
IAW
IBC
LAN
LBP
MARB
MR
MSDS
MSG
MVACIS
NAC
NFPA
NORAD
NPDES
NPI
NRC
O&M
ODS
PC
PCB
Elastomeric Roofing
Engineering Technical Letter
Federal Aviation Agency
Foreign Object Damage
Fair Opportunity Proposal Request
For Official Use Only
Government Furnished Equipment
Government Furnished Materials
Hazardous Materials
Hazardous Waste
Hydrochlorofluorocarbon
Hot-Mixed Asphalt
Head Quarters
Heating, Ventilating, and Air Conditioning
In Accordance With
International Building Code
Local Area Network
Lead-Based Paint
March Air Reserve Base
Mechanical Room
Material Safety Data Sheet
Mission Support Group
Mobile Vehicle and Cargo Inspection System
National Agency Check
National Fire Protection Agency
North American Aerospace Defense Command
National Pollutant Discharge Elimination System
Non Pre-priced Item
Nuclear Regulatory Commission
Operation and Maintenance
Ozone Depleting Substances
Power Center
Polychlorinated Biphenyls
PEL
POV
QC
RMAN
ROM
RFP
SABER
SFS
SOW
SSSMR
TO
UFC
UFGS
UPB
US
USAF
VIN
Permissible Exposure Limit
Personally Owned Vehicle
Quality Control
Recovered Material Advisory
Read Only Memory
Request For Proposal
Simplified Acquisition of Base Engineering Requirements
Security Forces Squadron
Statement of Work
Structural Standing Seam Metal Roof
Task Order
Unified Facilities Criteria
Unified Facilities Guide Specifications
Unit Price Book
United States
United States Air Force
Vehicle Identification Number
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 1
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 DEFINITION OF INSTALLATION
1.1.1 Installation will be defined as the property and facilities located within the jurisdiction of the particular base, post, air station, or compound where work is being accomplished. Work performed under this contract shall be bound by rules, laws, and regulations of each particular installation as well as local, state, federal, and Air Force regulations. This contract covers Air Force construction efforts at
March Air Reserve Base (ARB) to include all real property assigned to the 452nd Air Mobility Wing (AMW) and its tenants
1.2 PROJECT DESCRIPTION
1.2.1 The Contractor shall furnish all management, supervision, labor, materials, equipment, and incidentals required for a broad range of maintenance, repair, and minor construction work on various real property facilities at installations covered under this contract, including design environmental and engineering services incidental to construction. The Contracting Officer (CO) will conduct negotiations with the Contractor and issue individual Task Orders (TO) for maintenance, repair and minor construction projects identified by the
Base Civil Engineer (BCE) as part of this Simplified Acquisition of
Base Engineering Requirements (SABER) program. Individual TO projects will vary in size, with the majority expected to be less than $750,000.
The work to be performed will require the use of multiple trades including, but not limited to trades such as carpentry, plumbing, electrical, mechanical, painting, pipe fitting, sheet metal, welding, roofing, site work, site utilities, excavation, concrete, masonry, pavement repair, asbestos abatement, lead paint removal, security hardware installation, environmental protection specialties, hazardous waste and spill response and demolition.
1.3 CONTRACT DOCUMENTS, REFERENCE STANDARDS, AND PUBLICATIONS
1.3.1 The following documents are part of the solicitation and resultant contract. The Contractor shall utilize the referenced documents in the accomplishment of task prescribed in TOs. The standards and publications listed in each section of the specifications form part of these specifications to the extent referenced. The Contractor shall conform to the provisions of the most recent issue of the all standards or publications.
1.3.1.1 SABER Master Specifications
a. Unified Facilities Guide Specifications (UFGS). UFGS standard specifications can be obtained from the Whole Building Design Guide website: (http://www.wbdg.org/ffc/DOD/unified- facilities-guide-specifications-ufgs). The Unified Facilities Guide Specifications (UFGS) and the following documents are hereby incorporated into the solicitation and any resultant contract.
SECTION 01 00 00 – Page 2
Division 2 through 48
b. These SABER Master Specifications are numbered and organized in accordance with the Construction Specification Institute’s (CSI) Master Format. All specifications are filed in Division 2 through 48 per CSI guidelines. The specifications are taken from the Unified Facilities Guide Specifications
(UFGS).
1.3.1.2 Unit Price Book
a. The Unit Price Book (UPB) is described in Section 01 04 00. The UPB shall be furnished with each of the awarded TOs Contractors.
1.3.1.3 Unified Facilities Criteria (UFC)
a. The UFC shall be used as the standard building code for all construction under this contract. The UFC website is http://www.wbdg.org/ffc/DOD/unified-facilities-criteria-ufc. Any and all changes to the UFC will immediately become requirements of this contract. The UFC references the International
Building Code (IBC) as the basic requirement. However, the current adopted version of the IBC shall be used as the minimum standard. The UFC modifies those basic requirements in UFC 01-200-01.
Construction General Requirements*
Environmental General Requirements (See 01 57 19)
Unit Price Book and Software Requirements*
Project Management*
Submittal Procedures
Special Provisions For Working on or Near the Airfield or
Airfield Hangers*
Safety and Occupational Health Requirements*
Contractor’s Quality Control
Special Inspections
Security Requirements* (March Air Force Base)
Environmental Protection* (See Environmental Protection
Specification and Guidance for March ARB dated 6/2019)
Construction Waste Management and Disposal
Delivery Order Close-out Requirements*
Operation and Maintenance Data
01 00 00
01 01 00
01 04 00
01 31 01
01 33 00
01 35 00
01 35 29
01 45 00
01 45 35
01 55 01
01 57 19
01 74 19
01 78 00
01 78 23
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 3
1.3.1.4 Building Codes
a. As a minimum, the following Building Codes shall be used for all construction under this contract. The most current editions and supplements of these standards shall apply. The contractor shall have a copy of each of these documents available for use during the term of this contract. If there is a conflict between these codes and regulations, the most stringent requirements apply at all times.
(1) California Building Code
(2) California Mechanical Code
(3) California Plumbing Code
(4) National Electrical Code
(5) Life Safety Code
(5) National Fire Code
1.3.1.5 Installation Design Standards
1.3.1.6 The most current and latest Facilities Excellence Plan and Standards for March ARB shall be adhered to on all construction projects. Any possible deviations from these standards shall be brought to the
Contracting Officer before implementation. March ARB Environmental
Guide Specifications 01 57 19 Provides Federal, State, DoD and Air
Force governing laws, regulations, and codes as well as specific requirements to be followed at March ARB.
1.4 EXECUTION
1.4.1 Pre-Performance Construction Meeting
1.4.1.1 Before work begins on this contract, the Contracting Officer will arrange for a meeting with the Contractor to discuss the contract in general, including administrative matters, performance requirements, submittal procedures, approval and payment schedule, quality control expectations, Request for Proposal (RFP)/Fair-Opportunity Proposal
Request(FOPR) and task order procedures, traffic control, construction access requirements, as-built criteria, performance requirements, security procedures, accident prevention, safety, and fire prevention briefings. The Contracting Officer may issue a letter to the Contractor in-lieu of holding a face-to-face Pre-Performance
Construction Meeting for individual task orders.
1.4.2 Business Telephone
1.4.2.1 At the beginning of this contract, the Contractor shall provide the applicable Contracting Officers a contractor personnel telephone number, e-mail, and website for regular working hours. The Contractor shall also provide after hours (emergency) telephone numbers for
Contractor’s Program Manager and Project Manager(s) as a minimum. The
Contractor shall provide the Contracting Officer with an updated
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 4 phone list whenever changes in personnel or phone numbers occur. The
Contractor is required to provide a means of mobile communications
(i.e., cellular phone and/or pager) for Contractor’s Program Manager, Project Manager(s), Superintendent, CQCM, and their respective
Alternates for the life of the contract. Communications equipment, to include but not limited to landline telephones and land mobile radios, will require special coordination and clearance with installation communications authorities.
1.4.3 Work Hours
1.4.3.1 The Contractor shall complete the work of this project between the hours of 7:00 a.m. and 4:30 p.m. Pacific Standard Time (PST), excluding Saturdays, Sundays, and Federal Holidays. Access to work sites may be restricted to these hours and days. All other times shall be considered non-standard hours. Unless required by the
Contracting Officer in writing or Statement of Objectives (SOO), the
Government will not pay additional costs for non-standard hours. The
Contractor may not work during non-standard hours unless the request and justification is approved by the Contracting Officer. The
Contractor must submit a request and justification for working non-standard hours to the Contracting Officer at least three (3) working days prior to working non-standard hours. Work that requires inspection during accomplishment or that prevents inspection of other work after accomplishment must be coordinated with and approved in advance by the Contracting Officer. Inclement weather, operational delays, and security related delays might affect the contractor’s work periods. The Contractor must make allowances for these events, as resulting lost time will not be reimbursable.
1.4.4 Federal Holidays
1.4.4.1 The Government only recognizes the following legal holidays established by federal statue:
a. New Year's Day, 1 January
b. Martin Luther King Day, third Monday in January
c. President’s Day, third Monday in February
d. Memorial Day, last Monday in May
e. Juneteenth National Independence Day, 19 June
f. Independence Day, 4 July
g. Labor Day, first Monday in September
h. Columbus Day, second Monday in October
i. Veteran's Day, 11 November
j. Thanksgiving Day, fourth Thursday in November
k. Christmas Day, 25 December
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 5
1.4.4.2 Any of the legal holidays falling on Saturday will be observed on the preceding Friday; legal holidays falling on Sunday will be observed on the following Monday. In addition, the Government may dictate the work day before or the work day after an observed holiday as a
“Family Day.” and/or liberal leave day.
1.4.4.3 The Contractor should not perform work on observed legal holidays or
Family Days and/or liberal leave days unless authorized by the
Contracting Officer. In the event work is authorized on observed legal holidays, the Contractor shall pay all applicable overtime and/or holiday pay rates required by law.
1.4.5 Work Interruptions and Delays
1.4.5.1 The Contractor may be required to temporarily stop work for operational requirements, special events, installation exercises, or while Distinguished Visitor (DV) familiarization visits/tours are conducted. The Contractor must make allowances for these events and resulting lost time will not be reimbursable. Notification to the
Contractor shall be provided by the applicable Contracting Officer.
1.4.6 Construction Wage Rate Requirements Statute
1.4.6.1 The most current Construction Wage Rate Requirements Statute wage determination will be incorporated into the contract at the time of award. This wage determination will be effective for all task orders issued during the base contract period. Concurrent with the exercise of each option, the current wage determination will be incorporated and shall be effective for all task orders issued during the option.
If a Fair Opportunity Proposal Request (FOPR) is issued prior to the exercise of an option, but not awarded until after the option is exercised, the Contractor will be given the opportunity to update its proposal to incorporate any changes caused by the update to the wage determination.
1.4.7 Performance and Payment Bonds – Applicable to Individual TOs
1.4.7.1 Contractors shall furnish Performance and Payment Bonds (Standard
Form 25/25A) with good and sufficient surety or sureties, acceptable to the Government on all TOs regardless of dollar value. The penal sums of the bonds, as shown below, shall be provided to the
Contracting Officer for their acceptance.
a. Performance Bond: Unless the Contracting Officer determines that a lesser amount is adequate for the protection of the Government, the penal sum of the performance bonds (Standard Form 25) shall equal one hundred percent (100%) of the contract price for each TO.
b. Payment Bond:
(1) Shall equal 100% of the contract price for each TO
(2) One of the following is required:
• A payment bond
• An irrevocable letter of credit (ILC)
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 6
• A tripartite escrow agreement. The prime contractor establishes an escrow account in a federally insured financial institution and enters into a tripartite escrow agreement with the financial institution, an escrow agent, and all of the suppliers of labor and material. The escrow agreement shall establish the terms of payment under the contractor’s escrow account, and the escrow agent distributes the payments in accordance with the agreement, or triggers the disputes resolution procedures if required
• Certificates of deposit. The contractor deposits certificates of deposit from a federally insured financial institution with the
Contracting Officer, in an acceptable form, executable by the
Contracting Officer
• A deposit of the types of security listed in FAR 28.204-1 and
28.204-2
c. Bonds are due within 10 days of the receipt of the TO.
1.4.8 Safety Requirements
1.4.8.1 See Section 01 35 29
1.4.9 Fire Protection
1.4.9.1 The Contractor shall be responsible for furnishing adequate and proper fire protection for all phases of the contract work in accordance with the latest and most current UFCs and National Fire
Protection Agency (NFPA) standards.
1.4.10 General Environmental Requirements
1.4.10.1 Contractor shall provide an Environmental Protection Plan consistent with the requirements of the March Environmental Guide
Specification. The plan will serve as an over-riding plan to be followed during the course of the project for all work covered by the contract.
1.4.10.2 All TOs shall be required to supplement the EPP with TO specific information.
1.4.10.3 Contractor shall complete the Proponent information on AF form 813
March ARB Template or provide supplemental information with the original supplied with the request for proposal and submit the information with the TO proposal. Contractor shall provide supplemental information in Section 2 of the second page for each TO to describe environmental concerns from the project, mitigation measures that may be taken to minimize adverse impacts and permits that may be applied in the course of the project. The government will complete the form AF 813 as required and provide contractor a copy of the signed AF 813 approving the document as NEPA complete.
The contractor shall not perform work that is outside the work described on the AF 813 and shall not perform work without having obtained a copy of the signed AF 813. This signed form shall be kept in the TO files for each project.
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 7
1.4.10.4 Contractor shall adjust UPG to accommodate any March ARB peculiar environmental rules or requirements such as necessary best management practices to meet the MS4 General Storm Water permit, permit application and fees or best available control technology requirements of the South Coast Air Quality Management District.
1.4.10.5 Before any ground may be disturbed under any TO awarded, a March ARB
Storm Water Control Certificate must be completed by the contractor;
signed by a State of California qualified person or Government professional engineer, if a SWPPP is not required; and submitted and attached to the March form 103 Base Work/Dig Permit.
1.4.10.6 Contractor must inspect all work and ensure that the requirements of the March ARB Environmental Guide Specification, Federal and State requirements referenced in the guide specification are being met to include considerations for permit applications, notices and fees related to the work of each task order. All fees for permits etc.
will be paid by the contractor after receiving the signature of the
March ARB Government responsible official on the permit applications or notices.
1.4.10.7 Contractor must make the following environmental submittals in advance of receiving the first TO:
• Environmental Protection Plan (EPP) The Contractor shall provide their EPP for approval to 452 MSG/CEV, 10 days prior to the start of any activities on March ARB. An EPP template will be provided to the contractor and must be followed. EPP shall include:
o Dirt and Dust Control Plan;
o Employee Environmental Training Records;
o Environmental Manager Qualifications;
o Solid Waste Management Plan;
o ECATTS Certificate Of Completion;
o Erosion and Sediment Control Inspector Qualification o Solid Waste Management Plan G [, [CEV_____]]
Contractor must make the following environmental submittals:
• Monthly Hazardous Material (HAZMAT) usage totals (paragraph
1.08.C).
• HAZMAT Business Plan or HAZMAT Disclaimer, (paragraph 1.08.D).
• The contractor shall provide weigh tickets to the CO monthly, copy to CEV, for disposal of construction debris and/or recycled materials (i.e. metal doors, aluminum frames, wood doors, etc.) per UFGS Section 01 74 19, specifically for C&D
Waste Management (Section 01 74 19) in the Whole Building
Design Guide: http://www.wbdg.org/ for additional information.
Click on the UFGS tab on the right side for requirements.
• Any logs or records required by SCAQMD for ATCs and/or PTOs as applicable
• HAZMAT Business Response Plan or if no Business Response Plan threshold is exceeded, then the Contractor shall provide a completed and signed Business Activities doc Rev 09-2009 UPCF
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 8 to 452 MSG/CEV, Hazardous Material Program Manager. Waste
Management Plan.
• March ARB Air Quality Recordkeeping Form
• A Recovered Materials Determination Form (RMDF) (paragraph B).
• An Estimate of Percentage of Recovered Material Content for
EPA-Designated Products (paragraph D
Contractor must make the following submittal for each TO:
Regulatory Notifications;
Environmental Protection Plan (EPP) Update
Stormwater Notice of Intent (for NPDES coverage under the general permit for construction activities);
Laboratory Analysis
Inspection Reports
Solid Waste Management Report;
Stormwater Notice of Termination (for NPDES coverage under the general permit for construction activities);
Waste Determination Documentation;
Disposal Documentation for Hazardous and Regulated Waste;
Assembled Employee Training Records;
Solid Waste Management Report;
Contractor Hazardous Material Inventory Log;
Hazardous Waste/Debris Management;
Regulatory Notifications;
As-Built Topographic Survey
Form for installation of an internal combustion engine, or fuel storage tank.
Any logs or records required by SCAQMD for ATCs and/or PTOs as applicable
AST technical information
March ARB Air Quality Recordkeeping Form
A Recovered Materials Determination Form (RMDF) (paragraph B).
An Estimate of Percentage of Recovered Material Content for EPA-
Designated Products (paragraph D)
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 9
1.4.10.8 Conformance with the Environmental Management System.
Contractor shall be required to participate in the installation's
Environmental Management System (EMS). Work may include participation in meetings, cross functional teams and other activities required to ensure that work by the contractor is fully integrated into the EMS. Perform work in a manner that conforms to objectives and targets of the environmental programs and operational controls identified by the EMS. Support Government personnel when environmental compliance and EMS audits are conducted by escorting auditors at the Project site, answering questions, and providing proof of records being maintained. Provide monitoring and measurement information as necessary to address environmental performance relative to environmental, energy, and transportation management goals. In the event an EMS nonconformance or environmental noncompliance associated with the contracted services, tasks, or actions occurs, take corrective and preventative actions.
In addition, employees must be aware of their roles and responsibilities under the installation EMS and of how these EMS roles and responsibilities affect work performed under the contract.
Coordinate with the installation's EMS coordinator to identify training needs associated with environmental aspects and the EMS, and arrange training or take other action to meet these needs.
Provide training documentation to the Contracting Officer. The
Installation Environmental Office (CEV) will retain associated environmental compliance records. Make EMS Awareness training completion certificates available to Government auditors during EMS audits and include the certificates in the Employee Training
Records.
1.4.10.9 Environmental Coordination: The 452nd Mission Support Group, Base
Civil Engineer, Environmental Flight (/CEV) is the single point of contact for coordination with all environmental regulatory agencies.
Prior to coordinating with any environmental regulatory agency, the contractor shall obtain approval from CEV. The Contractor shall provide copies of any regulatory agency notification, report, consultation, permit, and/or regulatory document to CEV.
• The Contractor shall comply with all permit conditions and consultation requirements.
• The Contractor shall provide all required testing analysis and monitoring.
1.5.27 Notices of Violations (NOV):
The Contractor shall be liable for any Notices of Violation (NOV), enforcement action, fine, penalty, and/or corrective action imposed by federal, state, or local environmental regulatory agencies for activities under the Contractor’s control. The Contractor shall provide verbal notification to 452 MSG/CEV and the Contracting Officer within 24-hours of receiving an NOV followed by written notification within three (3) working days.
1.4.10 Fair Opportunity Proposal Request (FOPR)
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 10
1.4.10.1 For each project or solicitation, the Contractor will be furnished with one (1) copy of the Government’s Statement of Objectives (SOO) from the Contracting Officer or his/her designated Contracting
Specialist. The Contractor may be provided with one (1) set of drawings and specifications as required or applicable. The level of the design provided to the Contractor may be a 35% design (basic concept) which requires the Contractor to verify actual conditions and make any necessary corrections. Although the Contractor is given a design package, it is still the Contractor’s responsibility to verify/validate existing site conditions prior to submitting their proposal package to the Government. The Contractor may reproduce the drawings and specifications at the Contractor’s own expense if additional copies are needed. The Contractor shall check all drawings and specifications immediately upon receipt for discrepancies and notify the Contracting Officer or his/her designated representative immediately of any and all discrepancies found in the form of a Request for Information (RFI). The RFI shall be forwarded to the Contracting Officer for review and in-turn forwarded to the assigned SABER Project Manager(s) for review, clarification, and response. Enlarged plans and details shall govern where the same work is shown at smaller scales. The Contractor shall compare all drawings and verify the installation before laying out the work and shall be responsible for any errors which might have been avoided thereby. Where drawings are not provided as part of the
FOPR, the Contractor shall provide the field investigation, historical record research, design including construction drawings, engineering and constructability review necessary to ensure the drawings are complete.
1.4.10.2 The design and engineering required for this contract is at the level normally expected of a general construction contractor and considered incidental to the accomplishment of the scope of work provided by the Government. Examples of services required from the contractor include: sizing and selection of electrical and mechanical equipment and systems; sizing of electrical circuits
(i.e., wiring and cable sizing; to include pole mount and pad mount transformers sizing), electrical devices, heating and ventilating air ducts, fluid piping systems and light structural framing members; lighting layout; fire detection systems; surveying;
computer aided drafting, etc. If the design requires the services of a registered architect or professional engineer, it should be considered outside the parameters of the SABER program and the
Contractor shall notify the Contracting Officer immediately.
1.4.11 Project Site Visit
1.4.11.1 After the release of an FOPR, the Government and the Contractor will schedule and conduct a pre-proposal site visit for project.
Discussions held during the site visit may include, but are not limited to: scope of work, method of construction, sequence of operations, progress schedule, means of access to project site, delivery and storage of materials and equipment, work restrictions, coordination requirements, project goals, liquidated damages and potential difficulties/problems. The Contractor shall email detailed
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 11 site visit minutes to the Contracting Officer within one (1) business day following the day of the site visit. The Contracting
Officer or designated Contracting Specialist shall provide consolidated site visit minutes to all Contractors and the Civil
Engineer Squadron (CES) SABER Project Manager(s) within two (2) business days following the site visit. The Contractor shall comply with the requirements of the clause at FAR 52.236-3, Site
Investigation and Conditions Affecting the Work.
1.4.11.2 As part of meeting the requirements of this clause, the Contractor shall research all historical drawings related to the project site or facility. Historical records and drawings (if they are available) are located in the 452nd Civil Engineer, Bldg. 2403.
1.4.11.3 Any questions asked during the site visit or identified after the site visit should be submitted as a Request for Information (RFI) to the Contracting Officer and designated Contract Specialist within seven (7) calendar days after the site visit.
1.4.12 On-Site Conditions
1.4.12.1 Drawings may not be available or provided. Drawings showing the location of equipment, piping, ducts, and conduit, are diagrammatic and may not show every detail required. In addition, site conditions will not always permit installation in the locations shown on the concept drawings. Drawings showing equipment, piping, ducts, conduit, etc. to be removed, altered, or installed may require deviation from the configuration of the demolition or installation drawings due to existence of conflicting ducts, conduits, hangers, light fixtures, structural items, and temporary walls, etc. All such minor details of work which are not shown on the drawings, as well as such items not specifically mentioned in the specifications, but which are essential and necessary for the completion of the work, and to make all systems or equipment operational, shall be considered as incidental and shall be included as part of the work.
When this situation occurs, the final placement of permanently installed items shall be subject to approval by the Contracting
Officer. The Contractor shall be responsible for inspecting to his satisfaction all areas/items of possible conflict. Failure to verify the dimensions and locations will be at the contractor's risk and shall not relieve the Contractor from accomplishing the work required by the task order.
1.4.13 Project Proposal
1.4.13.1 For every Fair Opportunity Proposal Request (FOPR) associated with a new task order, the Contractor shall provide a written proposal describing the Contractor’s approach to the proposed project work described in the Government’s Statement of Objectives (SOO) and project drawings, if any. The proposal shall include at a minimum: a
Cover Letter, a Statement of Work narrative describing their approach to the proposed project work as described in the
Government’s Statement of Objectives (SOO) to include all major components of the project; a detailed cost estimate for all work to be performed and all major components of the project; an AF Form 66, ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 12
Schedule of Material Submittals; a detailed project schedule in
Microsoft Project, or equivalent, that includes all major components of the project, their associated costs and percentage of effort; an
AF Form 3065 detailing the major components and the associated percentage of the construction effort; and any other information as needed to demonstrate a complete and thorough understanding of construction effort. The Contractor shall submit the proposal within
14 calendar days of the site visit. If the requirement is determined to be a quick response requirement by the Contracting Officer, the
Contractor shall submit a Task Order Proposal to fulfill the requirement within a maximum of five (5) calendar days from written notification.
A. Cover Page. The cover page or pages shall include project title, total project cost, list of assumptions, and list of requirements, performance period, material lead times, and any special considerations such as phasing of construction. The contractor’s proposals shall be complete and concise.
B. Statement of Work (SOW). The Contractor shall provide, as part of the proposal, a SOW. The SOW shall provide a written narrative describing the Contractor’s approach and shall document the Contractor’s basic design solution to the subject project. The Contractor shall not simply re-state the goals of the Government Statement of Objectives (SOO) but provide sufficient information to demonstrate to the Government a complete and thorough understanding of the requirement and all applicable codes and regulations.
C. Design Documentation. Design incidental to accomplishing the required tasks outlined in each task order project may be required. The extent of these designs will depend upon the complexity of each task order project. Under the scope of this contract, the complexity will not require the services of a registered architect or engineer. However, the Contractor shall provide sufficient design documentation to substantiate the proposed approach for the task. Design documentation shall provide enough detail to verify line-item quantities in the cost proposal are accurate and enough detail to clearly convey to the
Government what the Government will be receiving. All designs shall clearly illustrate compliance with local, state, and federal building and construction codes. After the site validation visit, the Contractor shall begin preparation of design documentation that clearly illustrates the proposed design solution, quantities, dimensions, materials etc. This documentation may include any or all of the following, but is not limited to the following:
a. Drawings. When required, design drawings submitted by the
Contractor shall show the basic layout and planning of work. Shop drawings shall show in detail the proposed fabrication and assembly of structural elements and/or the installation (i.e., form fit, and attachment details) of materials or equipment.
Drawings must have sufficient detail to enable both the
Contractor and the Government to understand the work to be accomplished.
i. For the purpose of this requirement, the term drawings includes actual construction drawings, shop drawings, fabrication drawings, erection drawings, diagrams, layouts, ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 13 schematics, descriptive literature, illustrations, room finish schedules, lighting/panel schedules, lighting level analysis plans, load/distribution schedules/calculations, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions as may be required by an individual task order.
The Government may indicate minimum drawings that are necessary for each individual task order project. Typical types of drawings required on task orders include the following: Title/Location/Legend/Index Sheets, Site Plans, Grading/Landscaping Plans, Underground Utility Plan and
Profiles, Demolition Floor Plans, New Work Floor Plans, Wall Sections, Building Section, Finish Schedules, Window and Door Schedules, Mechanical Plans and Equipment
Schedules, Plumbing Plans and HVAC Riser Diagrams, Electrical Plans and Wiring Diagrams, Electrical Equipment and Panel Schedules, Lighting Plans and Schedules, Communications Plans, Fire Protection Plans, Structural
Plans, Roofing Plans, Wall and Roof Sections, Reflected
Ceiling Plans, Elevations (Interior and Exterior), and
Associated details.
b. Design Calculations. The Contractor shall provide, as part of the proposal, design calculations to substantiate appropriate equipment or material selection/sizing, component assembly, proposed layout and sizing of utilities and structural elements
(i.e. HVAC Loads, Lighting, Platform Supports, etc.). The
Contractor shall supply the following calculations per each task order project, as applicable:
i. Mechanical: HVAC load analysis and unit sizing, pipe sizing and duct sizing.
ii. Electrical: Electrical system capacity, conductor, conduit, protective devices and other equipment sizing.
iii. Structural: Structural system and foundation sizing.
iv. Pavement/Site Work: Area run-off quantities, drainage capacities and grading slopes.
v. Lighting: Lighting level analysis and lumen/foot-candle levels for each room or area.
vi. Energy: Provide energy savings and Return on Investment
(ROI).
vii. Environmental: Provide an Erosion and Sediment Control plan to include all calculations required to show the total area disturbed, before and after flow rates and velocities IAW the requirements of the Stormwater Control Certificate or complete a SWPPP if required and submit online in the State
Water Boards online system, STORM.
D. Cost Estimates
a. All task orders shall be estimated, negotiated, and awarded based upon prices in the Unit Price Book (UPB, see Section 01 04 00).
The cost estimate portion of the Contractor’s proposals shall be prepared and produced using the cost estimating software described in Cost Estimating Software Requirements (Section 01 04
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 13
00 paragraph 1.1). This applies to all work done on SABER task orders, even if work is done by subcontractors.
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 14
b. Items not in the UPB, known as Non-Priced Items (NPI), may be proposed in accordance with the policy outlined below. The cost estimate portion of the Contractor’s proposals shall be in CSI format and shall be prepared and produced using the cost estimating software described in Unit Price Book and Software
Requirements (UPB, see Section 01 04 00). Cost estimates must be logical, demonstrating a reasonable approach in construction methodology in both line items and quantities proposed. The elements of the cost estimate should correlate to the construction elements identified in the Statement of Work. Only authorized cost adjustment factors identified in Section 01 04 00 and included in the UPB shall be utilized to adjust line-item costs. The Contractor shall not utilize any other cost adjustment factors.
c. The use of an NPI should be kept to a minimum; use will be determined on a case-by-case basis by the Contracting Officer and
SABER Management. For negotiating and determining the price reasonableness for the NPI, the Contractor will submit at least three (3) quotes from suppliers with their proposal for review.
The Government (assigned SABER Project Managers or SABER
Management) will then select one of the suppliers from which the
Contractor will be authorized to purchase the NPI. The Contractor and the Government will negotiate the labor hours required to install the NPI and any other appropriate mark-ups and the fixed co- efficient. If three (3) suppliers cannot be found, the
Contractor shall submit at least one invoice with their proposal.
If the NPI has a commercially available price list, the
Contractor shall submit that with the proposal. The Contracting
Officer will conduct market research to determine price reasonableness. Once price reasonableness has been determined, the Contractor and the Government (to include SABER Project
Managers) will negotiate the labor hours to install the NPI and any other appropriate mark-ups and the fixed co-efficient. If price reasonableness cannot be determined and the material cost is significant, the Contractor will have to break down each unit of cost the Contractor will pay for the NPI to facilitate the price reasonableness determination. If the NPI is a custom made item, the manufacturer will have to submit their itemized costs.
E. Schedule of Material Submittals
a. The Contractor shall prepare and provide as part of the proposal package an AF Form 66, Schedule of Material Submittals, or equivalent. The AF Form 66 shall include all reports, construction materials, and documentation that have a material effect on the construction effort including, but not limited to:
large purchase items; long-lead items; required reports; and as-built drawings. Submittal requirements are identified in specification Section 01 33 00.
F. Construction Schedule
a. The Contractor shall submit the construction schedule in two (2) formats. In accordance with FAR 36.515 and the clause at FAR
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 14
52.236-15, a progress schedule (construction schedule) is required for task order projects exceeding the simplified
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 15 acquisition threshold and with a performance period greater than
60 days or more unless the Contracting Officer requests otherwise. The progress schedule shall be submitted on an AF Form
3064, Progress Schedule, and completed in accordance with the instructions on the reverse side of the form, or as directed by the Contracting Officer. In addition to the progress schedule, the Contractor shall submit a critical path Gantt chart schedule in Microsoft Project or an equivalent format, with milestones, for all projects with a performance period of 90 days or more unless the Contracting Officer requests otherwise. After task order award, the Contractor shall provide bi-weekly construction updates on an AF Form 3065, Progress Report.
b. The construction schedule shall identify all major tasks of construction effort, their associated cost, and associated percentage of the work effort. The construction schedule should demonstrate a logical progression of the work effort from award to close-out.
1.5 TASK ORDER SELECTION PROCESS
1.5.1 The Government anticipates awarding one (1) SABER IDIQ contract. Task orders issued under the contract award are subject to the requirements of Federal Acquisition Regulation (FAR) 16.505, The contractors will be required to submit proposals for evaluation on every task order.
1.5.2 The selection for task order award will either be based on Lowest Price
Technically Acceptable (LPTA) or Best Value (BV) at the discretion of the Contracting Officer with CONCURRENCE of the 452nd Civil Engineer.
Under LPTA, task order awards will be made to the lowest priced proposal determined technically acceptable. Proposals will be determined technical acceptable when they demonstrate a complete understanding of the task order requirement based upon a review of each of the submitted documents. Inconsistencies and/or a lack of sufficient detail may cause task order proposals to be determined technically unacceptable. Under BV, task order awards will be made to the task order proposal which is determined to be the best value to the
Government considering price and other factor. The factors used in the best value determination will be identified on the FOPR. The following factors may be considered when making a decision in the selection and may include other factors the Contracting Officer determines relevant or in the best interest of the government in selecting an awardee. All factors are considered equal, except price, with no order of precedence. Price will be considered slightly less important than all other factors. The contracting officer shall exercise broad discretion in selecting the Contractor.
1.5.2.1 Completeness of proposal
1.5.2.2 Design
1.5.2.3 Construction methodology
1.5.2.4 Scheduling
1.5.2.5 Past performance
ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 16
1.5.2.6 Quality of deliverables
1.5.3 After considering the above factors, and before or after selection of the contractor, the contracting officer may require further evaluation or negotiations of the proposal.
1.5.4 The Contracting Officer using a DD Form 1155 will then issue task orders. Each task order will include the following information:
1.5.4.1 Date of the delivery order
1.5.4.2 Contract number and task order number
1.5.4.3 Item number and description, quantity, and unit prices for pre-priced and non-pre-priced items and total
1.5.4.4 Task order price, delivery, or performance data
1.5.4.5 Accounting and appropriation data
1.5.4.6 Liquidated Damages, if applicable
1.5.4.7 Design, if applicable
1.5.4.8 Sketches/Drawings, if applicable
1.5.4.9 Contractor’s Statement of Work
1.5.4.10 Construction Schedule
1.6 TASK ORDER FUNDING
1.6.1 Proposals may be requested and processed up to the point of award, in advance of funding. Proposals processed up to award may remain on hold, pending funding, for a period of one year, or until the exercise of the next option period. It is the government’s intent to award a task order for each proposal processed up to the point of award; however, due to changes in the construction program, congressional budget changes or world events, some projects may be canceled. No compensation for cancelled projects will be granted to the contractor.
1.7 WORK CLEARANCE REQUEST
1.7.1 Upon task order award and prior to start of the project the Contractor shall obtain and process March Form 103, Base Civil Engineer Work/Dig
Request for each project. The Contractor shall go to the 452nd Civil
Engineer located in Bldg. 2403 in order to start the AF Form 103 process and then shall coordinate with appropriate Government agencies for review and coordination to properly complete the form. Electronic signatures are acceptable showing clearance by all entities. Once all coordination is completed, the Contractor shall return the AF Form 103 to the 452 MSG/CE Workflow desk to receive approval signature.
Government agencies will annotate the form with special instructions or requirements. The AF Form 103 with sketches shall be submitted a minimum of 10 workdays prior to construction start date. Work shall not begin until the AF Form 103 is fully approved and, if applicable, ATTACHMENT 02 for FA466425R0001
SECTION 01 00 00 – Page 17 coordination is received from each of the coordination agencies which noted “Monitor required” on the AF Form 103.
1.7.1.1 A Stormwater Control Certificate properly completed and signed with accompanying calculations and documents must be attached to the March
Form 103 to receive environmental approval.
1.7.1.2 When any digging is performed in the vicinity of utilities or communication cables, Civil Engineer and/or Communications Squadron monitors will be present, as required. No mechanical digging shall be performed within 15 feet of utilities or communication cables until they are physically exposed by hand digging. If a utility or communication cable is damaged, notify the Contracting Officer immediately. A minimum of 72 hours advance notice for CE monitors and
CS monitors as indicated on AF Form 103 is required. Work shall not begin until the monitors are notified and present.
1.7.1.3 Any welding or torching on March ARB requires a welding permit. The
Contractor shall obtain a welding permit from the 452nd Civil
Engineer, Fire Protection Flight. A permit will be issued within 5 work days with instructions for welding fire prevention. Refer to
Section 01 35 29 Safety and Occupational Health Requirements for additional information.
1.7.1.4 In all cases the Contractor shall have contingency plans for continuing work during utility outages caused by the Contractor or outside forces. The plan must also include procedures for promptly repairing utility breaks/interruptions made or caused by the
Contractor.
1.7.1.5 Contractor shall be responsible for contacting utility owners to coordinate work, identify, locate, and mark all utility lines in the vicinity of the project work site (commercial and military utility lines). The Contractor will be required to mark the limits of site work/excavation to indicate location, direction, length, and depth of site work/excavation in order to facilitate the utility owner’s field marking of existing utilities.
1.7.1.6 The Contractor shall provide, as attachment to the AF Form 103, drawings showing exact location and description of the work to be accomplished. Should any of the coordination points indicate additional utility lines or structures to those already shown on the drawings, by sketch on the Contractor's drawing or by field location marking, the Contractor shall be responsible for the protection of each of the indicated items. It is the responsibility of the
Contractor to verify the exact location of all…
This is the start of the file's text. The full file is on GovTribe.