TX100028 3-12-2010 TX28 Heavy and Highway.pdf

PDF 95 KB Posted

Attached to
Simplified Acquisition of Base Engineer Requirements (SABER)
Solicitation number
FA4661-10-R-0002
Issued by

About this file

Attachment 2 (Part 1 of 3) of SABER Solicitation FA4661-10-R-0002 Wage Determination TX100028 3-12-2010 TX28 Heavy and Highway

View the file

Other files

File Type Posted
08-0082 SOW —
05-0032 - Concept Drawing —
05-0032 - Concept Drawing —
DYESS SABER SOLICITATION FA4661-10-R-0002.pdf PDF
UFC 4-010-01 - DoD Minimum Aniterrorism Standards for Buildings.pdf PDF
05-0032 - Concept Drawing —
05-0032 09-0106 SOO —
SABER Q A.pdf PDF
basewallmap2007image.pdf PDF
TE-08 - Work Clearance Request.pdf PDF
08-0082 SOW.pdf PDF
TX Demo Reno Notification Form.pdf PDF
TE-10 - DAFB Technical Specifications.pdf PDF
Asbestos Survey 7422 - 31 Aug 09.pdf PDF
DYS-W-1201 - Sheet 2 of 5.PDF PDF
AF Form 66 Submittal Requirements.pdf PDF
05-0032 - Concept Drawing-Final-10.pdf PDF
05-0032 09-0106 SOO.pdf PDF
05-0032 - Concept Drawing-Kitch-4.pdf PDF
05-0032 - Concept Drawing-Arch-3.pdf PDF
TX100300 03-19-2010 TX300 Building.pdf PDF
TE-05 - Applicable Codes Regulations and Standards.pdf PDF
TE-07 - Contractor Drawing and GIS Data Standards.pdf PDF
TE-02 - Construction Data Worksheet.pdf PDF
05-0032 - Concept Drawing-Built-In Cab-5.pdf PDF
Attach 3 - Question Form.pdf PDF
TE-06 - SABER SOW Package Format.pdf PDF
TX Demo Reno Notification Form Instructions.pdf PDF
Attach 5 - Reservation Form.pdf PDF
TX100307 03-12-2010 TX307 Residential.pdf PDF
05-0032 - Concept Drawing-Floor-7.pdf PDF
TE-01 - Applicable Contractor Coefficient Requirements.pdf PDF
DYS-W-1201 - Sheet 1 of 5.PDF PDF
05-0032 - Concept Drawing-Fire CO Det-8.pdf PDF
Attach 4 - Past Performance Questionnaire —
DYS-W-1201 - Sheet 4 of 5.PDF PDF
05-0032 - Concept Drawing-Cover-1.pdf PDF
SOW-SABER Statement of Work FA4661-10-R-0002.pdf PDF
05-0032 - Concept Drawing-Bath-6.pdf PDF
DYS-W-1201 - Sheet 5 of 5.PDF PDF
05-0032 - Concept Drawing-Comm-9.pdf PDF
08-0082 AF Form 66.pdf PDF
DYS-W-1201 - Sheet 3 of 5.PDF PDF
UFC 3-600-01 - DESIGN-FIRE PROTECTION.pdf PDF
08-0082 SOO Atch 1.pdf PDF
FA4661-10-R-0002 SOLICITATION.pdf PDF
TE-03 - Equipment Warranty-Guarantee Record.pdf PDF
TE-04 - List of Acronyms.pdf PDF
TE-09 - Definitions.pdf PDF
05-0032 - Concept Drawing-Demo-2.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: TX100028 03/12/2010 TX28

Superseded General Decision Number: TX20080028

State: Texas

Construction Types: Heavy and Highway

Counties: Ector, Lubbock, Midland, Potter, Randall, Taylor and Tom Green Counties in Texas.

HEAVY (excluding tunnels & dams) and HIGHWAY PROJECTS (does not include building structures in rest area projects).

Modification Number Publication Date

0 03/12/2010

* SUTX2004-001 11/09/2004

Rates Fringes

Asphalt Distributor Operator...$ 9.25 0.00

Asphalt Heater Operator........$ 11.21 0.00

Asphalt paving machine operator$ 11.16 0.00

Asphalt Raker..................$ 9.51 0.00

Broom or Sweeper Operator......$ 8.57 0.00

Bulldozer operator ...........$ 9.76 0.00

Carpenter......................$ 12.61 0.00

Concrete Finisher, Paving......$ 13.26 0.00

Concrete Finisher, Structures..$ 11.20 0.00

Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel

Operator.......................$ 11.00 0.00

Electrician....................$ 17.00 0.00

Form Builder/Setter, Structures$ 9.26 0.00

Form Setter, Paving & Curb.....$ 9.82 0.00

Front End Loader Operator......$ 10.52 0.00

Laborer, common................$ 8.51 0.00

Laborer, Utility...............$ 10.46 0.00

Mechanic.......................$ 16.85 0.00

Motor Grader Operator Rough....$ 11.75 0.00

Motor Grader Operator, Fine

Grade..........................$ 13.50 0.00

Planer Operator................$ 13.36 0.00

Roller Operator, Pneumatic, Self-Propelled.................$ 7.67 0.00

Roller Operator, Steel Wheel, Flat Wheel/Tamping.............$ 8.06 0.00

Roller Operator, Steel Wheel, Plant Mix Pavement.............$ 7.50 0.00

Scraper Operator...............$ 8.50 0.00

Servicer.......................$ 8.98 0.00

Slip Form Machine Operator.....$ 13.64 0.00

Tractor operator, Pneumatic....$ 12.00 0.00

Traveling Mixer Operator.......$ 12.00 0.00

Truck driver, lowboy-Float.....$ 12.67 0.00

Truck driver, Single Axle, Heavy..........................$ 8.50 0.00

Truck driver, Single Axle, Light..........................$ 8.08 0.00

Truck Driver, Tandem Axle, Semi-Trailer...................$ 8.66 0.00

Welder.........................$ 15.25 0.00

Work Zone Barricade Servicer...$ 8.28 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION