Statement of Objectives

Revised 21 April 2010

Project #: FNWZ 08-0082 – Alter Sanitary Sewer Bulk Fuel Storeyard

Location: South-West Corner North POL, Dyess AFB, 79607

Project Manager: Mr. Mike Shafer, 7 CES/CEPM, (325) 696-4211

Prepared by: 7 CES/CEPM, Michael J. Shafer Page 1 of 2

1. Project Summary: Demo/collapse septic tank in accordance with Texas State requirements as specified/regulated under the TAC on Environmental Quality and re-route inlet piping of septic tank via new 4 inch underground sewer line to nearest sanitary sewer manhole with sufficient fall as required.

a. Clear, grub and remove stumps as required from septic tank location to nearest sanitary sewer manhole with sufficient fall to allow for installation of new underground sewer line.

b. Trench and install new 4 inch sewer line, to include cleanouts (bronze caps with 1 inch square head) and concrete skirting at ground level every 100 LF, connecting septic tank inlet piping to nearest sanitary sewer manhole with sufficient drop. Install hard copper signal tracing wire at new sewer pipe

(with appearances at manhole and each cleanout) and metallic backed plastic marking tape at 18 inch intervals above new sewer pipe during backfilling of trench.

c. Pump out septic tank and demo in accordance with applicable Texas state rules and regulations. Backfill and seed.

2. Project Details:

a. Concept is to route from septic tank inlet piping (elevation 1768.5’) to

Manhole 6-13I (invert elevation 1754.0’ [bottom of manhole]), see attached concept illustrations.

b. Excavated soil can be used for backfill (not pipe bedding), excess shall be spread/leveled along sewer line trench.

c. Project drawings, DYS-W-1201 (5 sheets), of septic tank installation are shown as attachment 2 to this SOO.

d. New sewer line shall be installed and connected prior to demolition of septic tank to prevent interruption of service.

e. Proposal Drawings:

1) Should show proposed sewer line route and cleanout locations.

2) Should show a cross section of the trench with proposed sewer pipe/size/material, pipe bedding material, and fill material.

3) Should illustrate construction of proposed cleanouts/materials.

4) Should indicate where GIS data points are to be taken and anticipated vertical height of new sewer line relative to start and stop.

3. Bid Schedule: Project complete.

Prepared by: 7 CES/CEPM, Michael J. Shafer Page 2 of 2

4. Work Description: The contractor shall furnish all plant, labor, materials, equipment and performance of operations required for design, construction/installation, testing, training, manuals, and drawings in accordance with this Statement of Objectives.

5. Conditions of Work:

a. The building(s) service by existing septic tank cannot be shut down during normal duty hours (07:30 - 16:30 hours Monday through Friday) for any significant periods of time. Any construction activities requiring shutdown of sewer service should be planned and scheduled to occur outside normal duty hours.

b. Contractor shall conduct the work in a manner to keep to a minimum the disruption of normal operations.

6. Specifications:

a. The contractor shall comply with all specifications incorporated in the baseline

SABER contract.

b. All work must be accomplished in accordance with manufacturer’s specifications.

c. If manufacturer’s specifications deviate from any baseline contract specifications then the discrepancy shall be forwarded to the 7 CES/CEPM office via 7 CONS/

LGCC for review and resolution (to avoid any construction delays, all manufacturer’s installation instructions, guidelines, and specifications shall be provided to the government prior to the start of construction with any conflict in specifications noted).

7. Remarks/Notes: SABER contractor shall be responsible for coordinating, scheduling and notifying building occupants of utility and alarm system outages.

8. Submittals (via AF Form 3000):

a. PRIOR TO START OF CONSTRUCTION: Work designs/plans and schedules will be submitted as necessary in accordance with the baseline contract specifications.

b. PRIOR TO FINAL PROJECT CLOSE-OUT, “RED-LINED” as-Built drawing(s) shall be submitted complete. As-built drawings shall be neat, clear, legible in all respects and suitable for photocopying (adequate for black and white photocopy reproduction).

5 Attachments:

1. Concept Illustrations (hardcopy and electronic file on CD)

2. DYS-W-1201 (Septic 5 scanned hardcopy and electronic files on CD)

3. Base AutoCAD Drawings (electronic file on CD only)

Prepared by: 7 CES/CEPM, Michael J. Shafer Page 3 of 2

4. AF Form 66 (hardcopy and electronic file on CD)

5. CD

Other files

File Type Posted
05-0032 - Concept Drawing —
05-0032 - Concept Drawing —
DYESS SABER SOLICITATION FA4661-10-R-0002.pdf PDF
UFC 4-010-01 - DoD Minimum Aniterrorism Standards for Buildings.pdf PDF
05-0032 - Concept Drawing —
05-0032 09-0106 SOO —
SABER Q A.pdf PDF
basewallmap2007image.pdf PDF
TE-08 - Work Clearance Request.pdf PDF
08-0082 SOW.pdf PDF
TX Demo Reno Notification Form.pdf PDF
TE-10 - DAFB Technical Specifications.pdf PDF
Asbestos Survey 7422 - 31 Aug 09.pdf PDF
DYS-W-1201 - Sheet 2 of 5.PDF PDF
AF Form 66 Submittal Requirements.pdf PDF
05-0032 - Concept Drawing-Final-10.pdf PDF
05-0032 09-0106 SOO.pdf PDF
05-0032 - Concept Drawing-Kitch-4.pdf PDF
05-0032 - Concept Drawing-Arch-3.pdf PDF
TX100300 03-19-2010 TX300 Building.pdf PDF
TE-05 - Applicable Codes Regulations and Standards.pdf PDF
TE-07 - Contractor Drawing and GIS Data Standards.pdf PDF
TE-02 - Construction Data Worksheet.pdf PDF
05-0032 - Concept Drawing-Built-In Cab-5.pdf PDF
Attach 3 - Question Form.pdf PDF
TE-06 - SABER SOW Package Format.pdf PDF
TX100028 3-12-2010 TX28 Heavy and Highway.pdf PDF
TX Demo Reno Notification Form Instructions.pdf PDF
Attach 5 - Reservation Form.pdf PDF
TX100307 03-12-2010 TX307 Residential.pdf PDF
05-0032 - Concept Drawing-Floor-7.pdf PDF
TE-01 - Applicable Contractor Coefficient Requirements.pdf PDF
DYS-W-1201 - Sheet 1 of 5.PDF PDF
05-0032 - Concept Drawing-Fire CO Det-8.pdf PDF
Attach 4 - Past Performance Questionnaire —
DYS-W-1201 - Sheet 4 of 5.PDF PDF
05-0032 - Concept Drawing-Cover-1.pdf PDF
SOW-SABER Statement of Work FA4661-10-R-0002.pdf PDF
05-0032 - Concept Drawing-Bath-6.pdf PDF
DYS-W-1201 - Sheet 5 of 5.PDF PDF
05-0032 - Concept Drawing-Comm-9.pdf PDF
08-0082 AF Form 66.pdf PDF
DYS-W-1201 - Sheet 3 of 5.PDF PDF
UFC 3-600-01 - DESIGN-FIRE PROTECTION.pdf PDF
08-0082 SOO Atch 1.pdf PDF
FA4661-10-R-0002 SOLICITATION.pdf PDF
TE-03 - Equipment Warranty-Guarantee Record.pdf PDF
TE-04 - List of Acronyms.pdf PDF
TE-09 - Definitions.pdf PDF
05-0032 - Concept Drawing-Demo-2.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .