FA4661-10-R-0002 SOLICITATION.pdf

PDF 1010 KB Posted

Attached to
Simplified Acquisition of Base Engineer Requirements (SABER)
Solicitation number
FA4661-10-R-0002
Issued by

About this file

SABER Solicitation FA4661-10-R-0002

View the file

Other files

File Type Posted
08-0082 SOW —
05-0032 - Concept Drawing —
05-0032 - Concept Drawing —
DYESS SABER SOLICITATION FA4661-10-R-0002.pdf PDF
UFC 4-010-01 - DoD Minimum Aniterrorism Standards for Buildings.pdf PDF
05-0032 - Concept Drawing —
05-0032 09-0106 SOO —
SABER Q A.pdf PDF
basewallmap2007image.pdf PDF
TE-08 - Work Clearance Request.pdf PDF
08-0082 SOW.pdf PDF
TX Demo Reno Notification Form.pdf PDF
TE-10 - DAFB Technical Specifications.pdf PDF
Asbestos Survey 7422 - 31 Aug 09.pdf PDF
DYS-W-1201 - Sheet 2 of 5.PDF PDF
AF Form 66 Submittal Requirements.pdf PDF
05-0032 - Concept Drawing-Final-10.pdf PDF
05-0032 09-0106 SOO.pdf PDF
05-0032 - Concept Drawing-Kitch-4.pdf PDF
05-0032 - Concept Drawing-Arch-3.pdf PDF
TX100300 03-19-2010 TX300 Building.pdf PDF
TE-05 - Applicable Codes Regulations and Standards.pdf PDF
TE-07 - Contractor Drawing and GIS Data Standards.pdf PDF
TE-02 - Construction Data Worksheet.pdf PDF
05-0032 - Concept Drawing-Built-In Cab-5.pdf PDF
Attach 3 - Question Form.pdf PDF
TE-06 - SABER SOW Package Format.pdf PDF
TX100028 3-12-2010 TX28 Heavy and Highway.pdf PDF
TX Demo Reno Notification Form Instructions.pdf PDF
Attach 5 - Reservation Form.pdf PDF
TX100307 03-12-2010 TX307 Residential.pdf PDF
05-0032 - Concept Drawing-Floor-7.pdf PDF
TE-01 - Applicable Contractor Coefficient Requirements.pdf PDF
DYS-W-1201 - Sheet 1 of 5.PDF PDF
05-0032 - Concept Drawing-Fire CO Det-8.pdf PDF
Attach 4 - Past Performance Questionnaire —
DYS-W-1201 - Sheet 4 of 5.PDF PDF
05-0032 - Concept Drawing-Cover-1.pdf PDF
SOW-SABER Statement of Work FA4661-10-R-0002.pdf PDF
05-0032 - Concept Drawing-Bath-6.pdf PDF
DYS-W-1201 - Sheet 5 of 5.PDF PDF
05-0032 - Concept Drawing-Comm-9.pdf PDF
08-0082 AF Form 66.pdf PDF
DYS-W-1201 - Sheet 3 of 5.PDF PDF
UFC 3-600-01 - DESIGN-FIRE PROTECTION.pdf PDF
08-0082 SOO Atch 1.pdf PDF
TE-03 - Equipment Warranty-Guarantee Record.pdf PDF
TE-04 - List of Acronyms.pdf PDF
TE-09 - Definitions.pdf PDF
05-0032 - Concept Drawing-Demo-2.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Simplif ied Acquisition of Base Engineer Requirements (SABER):

NAICS 236220

This w ill be an Indefinite Delivery Indefinite Quantity f irm-fixed price contract set aside for competition restricted to SBA Certif ied HUB Zone firms.

Pre-Proposal Conference/Site Visit: 21 Apr 10 at 09:00 AM CST. Parties attending MUST FILL OUT AND SUBMIT the Site Visit RESERVATION

FORM by 19 Apr 10 at 2:00 PM CST. Contract performance is one base period (1 Jun 10 - 31 Mar 11) plus four option periods of 12 months each. The guaranteed minimum for the base period is $25,000.

Block 11 Below : A Notice to Proceed w ill be issued for each task order and the performance period shall be stated in each task order.

Sections K, L, and M w ill be removed from any resultant aw ard, but w ill be deemed to be incorporated by reference, in that aw ard.

PROPOSAL SUBMISSION: Fax or electronic proposals are not authorized and w ill not be accepted. Proposals may be sent using delivery confirmation, or hand carried to Lt Kristine Baldw in, 7 CONS/LGCA, 381 Third Street, Bldg 7238, Dyess AFB, TX 79607. Proposals w ill not be accepted after the deadline specif ied in Block 13. Lack of registration in the Central Contractor Registration (CCR) database w ill make offeror ineligible for aw ard.

KRISTINE BALDWIN 325-696-1458

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

16-Apr-2010

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________17 May 2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

7TH CONTRACTING OFFICE

381 THIRD STREET

DYESS AFB TX 79607-1581

FA4661

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

FA4661-10-R-0002 10591

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA4661-10-R-0002

THE SCHEDULE

SECTION B

SABER Coefficients and Proposal Development Fees

Schedule of Items, Base Contract Period*: 1 June 2010 – 31 March 2011

Simplified Acquisition of Base Engineering Requirements (SABER): Provide all necessary resources to perform all work required, complete and in strict compliance with the specifications and terms and conditions of the contract and any resulting task orders (TOs). All work shall conform to the requirements of the Statement of Work and all contract specifications. Provide coefficient percentage for each area described for the base year and all option years.

Description

Estimated**

Dollar Amount

Pricing****

Coefficient

Estimated**

Price

Small Projects: All task orders with a project magnitude under $200,000.

Response is 7 days.

Standard Hours $75,000.00

Non-Standard Hours $120,000.00

Restricted Area $25,000.00

Large Projects: All task orders with a project magnitude between $200,001 and

$750,000. Response is 14 days.

Standard Hours $450,000.00

Non-Standard Hours $300,000.00

Restricted Area $550,000.00

Non-Priced Items (NPI): Government will pay actual cost of NPI plus coefficient. $135,000.00

Proposal Development Fee***: Offeror shall perform all work as prescribed in this solicitation.

Estimated**

No. of Projects

Proposal***

Development

Fees

Small Projects (Less than $200,000) 8

Large Projects ($200,001 to $750,000) 4

Base Contract Period Estimated Total**:

* The definitive beginning and ending dates for the contract period will be identified on the award document based on “actual” award dates. The option year dates shall run for 12 consecutive months following the last day of the previous contract period.

** The estimated dollar amounts, price, and estimated number (No.) of projects are for Price Evaluation purposes only. The estimated price shall be based on the Estimated Dollar Amount multiplied by the coefficient for each

CLIN. These are for PRICE EVALUATION purposes ONLY. The Government does not guarantee this amount of work. The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

*** The Proposal Development Fees shall be paid to the Contractor only if the project design/proposal is complete, accepted and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the task order when awarded. Coefficients shall not be applied to this line item.

****See the attached Statement of Work (Attachment 1) for more information regarding coefficients.

Schedule of Items, Option Year One*: 1 April 2011 – 31 March 2012

Simplified Acquisition of Base Engineering Requirements (SABER): Provide all necessary resources to perform all work required, complete and in strict compliance with the specifications and terms and conditions of the contract and any resulting task orders (TOs). All work shall conform to the requirements of the Statement of Work and all contract specifications. Provide coefficient percentage for each area described for the base year and all option years.

Description

Estimated**

Dollar Amount

Response is 7 days.

Standard Hours $80,000.00

Non-Standard Hours $110,000.00

Restricted Area $30,000.00

$750,000. Response is 14 days.

Standard Hours $470,000.00

Non-Standard Hours $315,000.00

Restricted Area $590,000.00 coefficient. $60,000.00 solicitation.

Estimated**

No. of Projects

Proposal***

Development

Fees

Small Projects (Less than $200,000) 8

Large Projects ($200,001 to $750,000) 4

Option Year One Estimated Total**:

* The definitive beginning and ending dates for the contract period will be identified on the award document based on “actual” award dates. The option year dates shall run for 12 consecutive months following the last day of the previous contract period.

** The estimated dollar amounts, price, and estimated number (No.) of projects are for Price Evaluation purposes only. The estimated price shall be based on the Estimated Dollar Amount multiplied by the coefficient for each

CLIN. These are for PRICE EVALUATION purposes ONLY. The Government does not guarantee this amount of work. The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

*** The Proposal Development Fees shall be paid to the Contractor only if the project design/proposal is complete, accepted and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the task order when awarded. Coefficients shall not be

Schedule of Items, Option Year Two*: 1 April 2012 – 31 March 2013

Simplified Acquisition of Base Engineering Requirements (SABER): Provide all necessary resources to perform all work required, complete and in strict compliance with the specifications and terms and conditions of the contract and any resulting task orders (TOs). All work shall conform to the requirements of the Statement of Work and all contract specifications. Provide coefficient percentage for each area described for the base year and all option years.

Description

Estimated**

Dollar Amount

Response is 7 days.

Standard Hours $40,000.00

Non-Standard Hours $115,000.00

Restricted Area $35,000.00

$750,000. Response is 14 days.

Standard Hours $490,000.00

Non-Standard Hours $330,000.00

Restricted Area $620,000.00 coefficient. $80,000.00 solicitation.

Estimated**

No. of Projects

Proposal***

Development

Fees

Small Projects (Less than $200,000) 9

Large Projects ($200,001 to $750,000) 3

Option Year Two Estimated Total**:

* The definitive beginning and ending dates for the contract period will be identified on the award document based on “actual” award dates. The option year dates shall run for 12 consecutive months following the last day of the previous contract period.

** The estimated dollar amounts, price, and estimated number (No.) of projects are for Price Evaluation purposes.

The estimated price shall be based on the Estimated Dollar Amount multiplied by the coefficient for each CLIN.

These are for PRICE EVALUATION purposes ONLY. The Government does not guarantee this amount of work.

The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

*** The Proposal Development Fees shall be paid to the Contractor only if the project design/proposal is complete, accepted and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the task order when awarded. Coefficients shall not be

Schedule of Items, Option Year Three*: 1 April 2013 – 31 March 2014

Simplified Acquisition of Base Engineering Requirements (SABER): Provide all necessary resources to perform all work required, complete and in strict compliance with the specifications and terms and conditions of the contract and any resulting task orders (TOs). All work shall conform to the requirements of the Statement of Work and all contract specifications. Provide coefficient percentage for each area described for the base year and all option years.

Description

Dollar Amount

Response is 7 days.

Standard Hours $45,000.00

Non-Standard Hours $120,000.00

Restricted Area $45,000.00

$750,000. Response is 14 days.

Standard Hours $500,000.00

Non-Standard Hours $350,000.00

Restricted Area $620,000.00 coefficient. $85,000.00 solicitation.

Estimated**

No. of Projects

Proposal***

Development

Fees

Small Projects (Less than $200,000) 9

Large Projects ($200,001 to $750,000) 3

Option Year Three Estimated Total**:

* The definitive beginning and ending dates for the contract period will be identified on the award document based on “actual” award dates. The option year dates shall run for 12 consecutive months following the last day of the previous contract period.

** The estimated dollar amounts, price, and estimated number (No.) of projects are for Price Evaluation purposes only. The estimated price shall be based on the Estimated Dollar Amount multiplied by the coefficient for each

CLIN. These are for PRICE EVALUATION purposes ONLY. The Government does not guarantee this amount of work. The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

*** The Proposal Development Fees shall be paid to the Contractor only if the project design/proposal is complete, accepted and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the task order when awarded. Coefficients shall not be

Schedule of Items, Option Year Four*: 1 April 2014 – 31 March 2015

Simplified Acquisition of Base Engineering Requirements (SABER): Provide all necessary resources to perform all work required, complete and in strict compliance with the specifications and terms and conditions of the contract and any resulting task orders (TOs). All work shall conform to the requirements of the Statement of Work and all contract specifications. Provide coefficient percentage for each area described for the base year and all option years.

Description

Estimated**

Dollar Amount

Response is 7 days.

Standard Hours $55,000.00

Non-Standard Hours $125,000.00

Restricted Area $50,000.00

$750,000. Response is 14 days.

Standard Hours $540,000.00

Non-Standard Hours $365,000.00

Restricted Area $680,000.00 coefficient. $100,000.00 solicitation.

Estimated**

No. of Projects

Proposal***

Development

Fees

Small Projects (Less than $200,000) 6

Large Projects ($200,001 to $750,000) 5

Option Year Four Estimated Total**:

* The definitive beginning and ending dates for the contract period will be identified on the award document based on “actual” award dates. The option year dates shall run for 12 consecutive months following the last day of the previous contract period.

** The estimated dollar amounts, price, and estimated number (No.) of projects are for Price Evaluation purposes only. The estimated price shall be based on the Estimated Dollar Amount multiplied by the coefficient for each

CLIN. These are for PRICE EVALUATION purposes ONLY. The Government does not guarantee this amount of work. The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

*** The Proposal Development Fees shall be paid to the Contractor only if the project design/proposal is complete, accepted and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the task order when awarded. Coefficients shall not be

ITEM NO SUPPLIES/SERVICES EST

QUANTITY

UNIT UNIT PRICE EST AMOUNT

0001 1 Lot Base Year, SABER (1 Jun 10 - 31 Mar 11)

FFP

Base Year, SABER (1 Jun 10 - 31 Mar 11). Contractor shall provide all labor, supplies, materials, supervision, transportation and equipment necessary for estimation and construction efforts issue by individual task orders in accordance with the SABER contract and the statement of work for each task order at Dyess

Air Force Base, Texas.

FOB: Destination

SIGNAL CODE: A

EST NET AMT

UNIT UNIT PRICE EST AMOUNT

0002 8,000 Square

Foot

Asbestos Abatement No Carpet

FFP

Asbestos Abatement for no carpet areas in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic (No Carpet) for the base year of the contract (1 Jun 10 -

31 Mar 11). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (no carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (no carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (No Carpet) Base Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

101 – 1000 SF: 2,500 SF $_________

Over 1000 SF: 3,000 SF $_________

EST

NET AMT

UNIT UNIT PRICE EST AMOUNT

0003 8,000 Square

Asbestos Abatement Including Carpet

Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic

(includes Carpet Over Tile) in accordance with the Statement of Work, Attachment 1, 4.2.2.7, for the base year of the contract (1 Jun 10 - 31 Mar 11).

Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (including carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (including carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (Including Carpet) Base Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

0004 8,000 Square

Demo/Abatement Ceilings/Walls up to 15'

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls up to

15 feet high for the Base Year of the contract (1 Jun 10 - 31 Mar 11). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for

Ceilings and Walls up to 15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement Ceilings and Walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls up to 15' high Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

0005 8,000 Square

Demo/Asbestos Abate. Ceilings 15' - 30'

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls (15 to

30 feet high) for the Base Year of the contract (1 Jun 10 - 31 Mar 11). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for

Ceilings and Walls 15' to 30' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement Ceilings and Walls 15' - 30' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls 15' to 30' high, Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

0006 8,000 Square

Demo/Asbestos Abatement Drywall to 15'

Demo and perform Asbestos Abatement of Drywall Walls (Include Ceramic Wall

Tile) to 15 feet high for the Base Year of the contract (1 Jun 10 - 31 Mar 11).

Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos

Abatement for drywall walls up to 15' high in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement drywall walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Drywall Walls up to 15' high Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

1001 1 Lot OPTION Option Year One, SABER

FFP

Option Year One, SABER (1 Apr 11 - 31 Mar 12). Contractor shall provide all labor, supplies, materials, supervision, transportation and equipment necessary for estimation and construction efforts issue by individual task orders in accordance with the SABER contract and the statement of work for each task order at Dyess

Air Force Base, Texas.

UNIT UNIT PRICE EST AMOUNT

1002 8,000 Square

OPTION Asbestos Abatement No Carpet

Asbestos Abatement for no carpet areas in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic (No Carpet) for option year one of the contract (1 Apr 11

- 31 Mar 12). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees.

Overall estimated quantity for asbestos abatement (no carpet) is 8,000 Square

Feet. Price the below amounts for asbestos abatement (no carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (No Carpet) Option Year One for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

1003 8,000 Square

OPTION Asbestos Abatement Including Carpet

Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic

(includes Carpet Over Tile) in accordance with the Statement of Work, Attachment 1, 4.2.2.7, for option year one of the contract (1 Apr 11 - 31 Mar 12).

Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (including carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (including carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (Including Carpet) Option Year One for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

1004 8,000 Square

OPTION Demo/Abatement Ceilings/Walls up to 15'

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls up to

15 feet high for Option Year One of the contract (1 Apr 11 - 31 Mar 12). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for

Ceilings and Walls up to 15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement Ceilings and Walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls up to 15' high Option

Year One for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

1005 8,000 Square

OPTION Demo/Asbestos Abatement Ceilings 15'-30'

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls (15 to

30 feet high) for Option Year One of the contract (1 Apr 11 - 31 Mar 12). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for

Ceilings and Walls 15' to 30' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement Ceilings and Walls 15' - 30' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls 15' to 30' high, Option

Year One for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

1006 8,000 Square

OPTION Demo/Asbestos Abatement Drywall to 15'

Demo and perform Asbestos Abatement of Drywall Walls (Include Ceramic Wall

Tile) to 15 feet high for Option Year One of the contract (1Apr 11 - 31 Mar 12).

Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos

Abatement for drywall walls up to 15' high in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement drywall walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Drywall Walls up to 15' high Option

Year One for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

2001 1 Lot OPTION Option Year Two, SABER

FFP

Option Year Two, SABER (1 Apr 12 - 31 Mar 13). Contractor shall provide all labor, supplies, materials, supervision, transportation and equipment necessary for estimation and construction efforts issue by individual task orders in accordance with the SABER contract and the statement of work for each task order at Dyess

Air Force Base, Texas.

UNIT UNIT PRICE EST AMOUNT

2002 8,000 Square

Asbestos Abatement for no carpet areas in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic (No Carpet) for option year two of the contract (1 Apr 12

- 31 Mar 13). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees.

Overall estimated quantity for asbestos abatement (no carpet) is 8,000 Square

Feet. Price the below amounts for asbestos abatement (no carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (No Carpet) Option Year Two for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

2003 8,000 Square

Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic

(includes Carpet Over Tile) in accordance with the Statement of Work, Attachment 1, 4.2.2.7, for option year two of the contract (1 Apr 12 - 31 Mar 13).

Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (including carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (including carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (Including Carpet) Option Year Two for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

2004 8,000 Square

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls up to

15 feet high for Option Year Two of the contract (1 Apr 12 - 31 Mar 13). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for

Ceilings and Walls up to 15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement Ceilings and Walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls up to 15' high Option

Year Two for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

2005 8,000 Square

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls (15 to

30 feet high) for Option Year Two of the contract (1 Apr 12 - 31 Mar 13). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for

Ceilings and Walls 15' to 30' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement Ceilings and Walls 15' - 30' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls 15' to 30' high, Option

Year Two for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

2006 8,000 Square

Demo and perform Asbestos Abatement of Drywall Walls (Include Ceramic Wall

Tile) to 15 feet high for Option Year Two of the contract (1Apr 12 - 31 Mar 13).

Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos

Abatement for drywall walls up to 15' high in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement drywall walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Drywall Walls up to 15' high Option

Year Two for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

3001 1 Lot OPTION Option Year Three, SABER

FFP

Option Year Three, SABER (1 Apr 13 - 31 Mar 14). Contractor shall provide all labor, supplies, materials, supervision, transportation and equipment necessary for estimation and construction efforts issue by individual task orders in accordance with the SABER contract and the statement of work for each task order at Dyess

Air Force Base, Texas.

UNIT UNIT PRICE EST AMOUNT

3002 8,000 Square

Asbestos Abatement for no carpet areas in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic (No Carpet) for option year three of the contract (1 Apr

13 - 31 Mar 14). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees.

Overall estimated quantity for asbestos abatement (no carpet) is 8,000 Square

Feet. Price the below amounts for asbestos abatement (no carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (No Carpet) Option Year Two for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

3003 8,000 Square

Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic

(includes Carpet Over Tile) in accordance with the Statement of Work, Attachment 1, 4.2.2.7, for option year three of the contract (1 Apr 13 - 31 Mar

14). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (including carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (including carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (Including Carpet) Option Year Three for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

3004 8,000 Square

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls up to

15 feet high for Option Year Three of the contract (1 Apr 13 - 31 Mar 14). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for

Ceilings and Walls up to 15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement Ceilings and Walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls up to 15' high Option

Year Three for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

3005 8,000 Square

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls (15 to

30 feet high) for Option Year Three of the contract (1 Apr 13 - 31 Mar 14). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for

Ceilings and Walls 15' to 30' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement Ceilings and Walls 15' - 30' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls 15' to 30' high, Option

Year Three for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

3006 8,000 Square

Demo and perform Asbestos Abatement of Drywall Walls (Include Ceramic Wall

Tile) to 15 feet high for Option Year Three of the contract (1Apr 13 - 31 Mar 14).

Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos

Abatement for drywall walls up to 15' high in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement drywall walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Drywall Walls up to 15' high Option

Year Three for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

4001 1 Lot OPTION Option Year Four, SABER

FFP

Option Year Four, SABER (1 Apr 14 - 31 Mar 15). Contractor shall provide all labor, supplies, materials, supervision, transportation and equipment necessary for estimation and construction efforts issue by individual task orders in accordance with the SABER contract and the statement of work for each task order at Dyess

Air Force Base, Texas.

UNIT UNIT PRICE EST AMOUNT

4002 8,000 Square

Asbestos Abatement for no carpet areas in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic (No Carpet) for option year four of the contract (1 Apr

14 - 31 Mar 15). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees.

Overall estimated quantity for asbestos abatement (no carpet) is 8,000 Square

Feet. Price the below amounts for asbestos abatement (no carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (No Carpet) Option Year Four for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

4003 8,000 Square

OPTION Asbestos Abatement Includes Carpet

Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic

(includes Carpet Over Tile) in accordance with the Statement of Work, Attachment 1, 4.2.2.7, for option year four of the contract (1 Apr 14 - 31 Mar 15).

Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (including carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (including carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (Including Carpet) Option Year Four for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

4004 8,000 Square

OPTION Demo/Abatement Ceilings/Walls

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls up to

15 feet high for Option Year Four of the contract (1 Apr 14 - 31 Mar 15). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for

Ceilings and Walls up to 15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement Ceilings and Walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls up to 15' high Option

Year Four for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

4005 8,000 Square

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls (15 to

30 feet high) for Option Year Four of the contract (1 Apr 14 - 31 Mar 15). Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for

Ceilings and Walls 15' to 30' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement Ceilings and Walls 15' - 30' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls 15' to 30' high, Option

Year Four for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE EST AMOUNT

4006 8,000 Square

Demo and perform Asbestos Abatement of Drywall Walls (Include Ceramic Wall

Tile) to 15 feet high for Option Year Four of the contract (1Apr 14 - 31 Mar 15).

Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos

Abatement for drywall walls up to 15' high in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Overall estimated quantity for asbestos abatement drywall walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Drywall Walls up to 15' high Option

Year Four for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

CLAUSES INCORPORATED BY REFERENCE

52.216-19 Order Limitations OCT 1995

Section E - Inspection and Acceptance

52.246-12 Inspection of Construction AUG 1996

252.246-7000 Material Inspection And Receiving Report MAR 2008

Section F - Deliveries or Performance

DELIVERIES OR PERFORMANCE

SSEECCTTIIOONN FF:: DDEELLIIVVEERRIIEESS OORR PPEERRFFOORRMMAANNCCEE

F-1 PERIOD OF PERFORMANCE

(a) This is an indefinite delivery, indefinite quantity (IDIQ) requirements contract for the maintenance, repair, alteration, and/or construction of the items specified, effective from date of award (estimated base period is 1 Jun 10 – 31 Mar 11) as required by the statement of work and specifications. This contract also provides for four option year periods of 12 months each to be exercised at the discretion of the Government.

(b) Delivery or performance shall be specified in each task order issued. Individual task order periods of performance times shall be negotiated.

F-2 CONTRACT AMOUNTS

The minimum guaranteed amount for the base period is $25,000.00, and $25,000.00 per option period, if awarded. The total contract maximum limitation is $25 million (NOTE: The Government only guarantees the minimum amount set forth in the first sentence of this paragraph).

ADDITIONAL INFORMATION

F-3 HOLIDAYS

This base observes the following Federal legal holidays:

New Year’s Day 1 January

Martin Luther King’s Birthday Third Monday in January

President’s Day Third Monday in February

Memorial Day Last Monday in May

Independence Day 4 July

Labor Day First Monday in September

Columbus Day Second Monday in October

Veterans Day 11 November

Thanksgiving Day Fourth Thursday in November

Christmas Day 25 December

NOTE: Any of the above holidays falling on a Saturday will be observed on the preceding Friday;

holidays falling on a Sunday will be observed on the following Monday.

F-4 PERFORMANCE (SEE DFAR 252.236-7001)

(a) All work performed by the contractor is guided by the drawings/plans. It is the contractor’s responsibility to read and understand these requirements. If the contractor does not agree with the specifications and/or the drawings/plans for whatever reason, it is their responsibility to bring this to the attention of the Contracting Officer during discussions. Omissions from the drawings/plans or the misdirection of details of work which are necessary to carry out the intent of the drawings/plans, or which are customarily performed, shall not relieve the contractor from performing such omitted or misdescribed details of the work. They shall be performed as if fully and correctly set forth and described in the drawings/plans.

(b) Prior to the contractor starting work on the contract, the contractor shall notify the Contracting

Officer 5 working days in advance to allow sufficient time to notify the applicable using organization to prevent delays in performance of work. Notification of customers and using organizations is a joint effort of the contractor and the Government.

F-5 NOTIFICATION OF START OF WORK

Twenty-four hours prior to reporting to the job site, and prior to starting any work on this installation, the contractor shall notify the Contracting Officer or authorized representative. Failure to do so may cause unnecessary delays in performance of the contract, for which the Government will not be held responsible. Some work will require scheduling coordination with customers as much as 10 working days ahead to properly advertise to the public or to avoid mission degradation.

F-6 SCHEDULING OF WORK

(a) Before any work is initiated under this contract, the contractor shall confer with the Contracting

Officer or authorized representatives and agree on a sequence of procedures; means of access to premises and building; space for storage of materials and equipment; delivery of materials and use of approaches; the location of eating spaces, and restrooms for Contractor’s employees.

(b) Furniture and portable office equipment in the immediate area shall be moved by the Contractor and replaced to the original position upon completion of work. If the work required by the task order will not allow furniture and portable office equipment to be replaced in its original position, new locations will be designated by the Contracting Officer for replacement by the Contractor.

Movement of generic furniture and equipment should be considered as part of the coefficient, as no line item cost will be allowed for this activity. The building occupant is expected to make a good faith effort to cooperate with the Contractor in making arrangements to facilitate renovation.

(c) Delivery of materials and equipment shall be made with a minimum of interference to Government operations and personnel.

(d) The work shall, so far as practicable, be done in definite sections or divisions and confined to limited areas which shall be completed before work in other sections or divisions begin.

(e) Prior to beginning any excavation, which may be required under this contract, the contractor shall obtain from the Base Engineering representative an AF Form 103, Work Clearance Request. Five (5) working days are normally required for processing the construction permit between the various activities that must coordinate on the request.

(f) The Contractor shall obtain a welding permit from the base fire chief immediately prior to performing any welding.

F-7 SEVERE WEATHER

The contractor shall develop and be prepared to implement procedures to evacuate and/or protect people and facilities under its control in the event of severe weather. These procedures will include provisions for securing or repositioning equipment. The contractor shall notify the Contracting Officer of any evacuation procedures. Upon receipt by the Contracting Officer of a severe weather warning, the contractor shall take immediate action to tie down, remove, protect, or secure its materials and equipment to the satisfaction of the Air Force inspector providing reasonable assurance that the severe weather will not damage Government property.

F-8 BARRIERS AND ENCLOSURES

The contractor shall isolate all work sites using barriers, cording off, or other appropriate measures from mobilization to completion of construction. The Contractor will prepare a site plan indicating the proposed location and dimensions of any area to be fenced and used by the Contractor, the number of trailers to be used, avenues of ingress/egress to the fenced area and details of the fence installation. Any areas which may have to be graveled to prevent the tracking of mud shall also be identified. All barriers or safety/traffic equipment shall be considered part of the coefficient and no remuneration shall be made for installation of said equipment/devices.

(a) Indoor Barricades. The Contractor shall furnish, install, and maintain adequate barricades and warning signs to isolate the construction area from other occupied building areas, to control dust, debris, and noise, and to block direct access to open floor areas, areas with tripping hazards, and/or areas with overhead construction hazards.

(b) Outdoor Barricades. The Contractor shall furnish, install, and maintain adequate barricades, warning signs, and warning lights to isolate outdoor construction areas. The Contractor shall identify and barricade all open trenches and excavations at the end of each work day. In the vicinity of traveled ways

(pedestrian and vehicular), the Contractor shall use flashing barricades with spacing not to exceed 25 feet. In other areas, the Contractor may use unlit barricades, flagging, rope, fences, or other suitable means.

(c) Fencing. The Contractor shall install fences to isolate construction sites when instructed by the

Contracting Officer per recommendations of the base safety office. Fencing material shall consist of heavy duty plastic mesh construction barriers or equivalent.

F-9 ACCESS ROADS

At the end of each day, the contractor shall inspect for and clear all mud, dirt, debris, foreign objects, or spills of any kind from the contractor’s operations (including subcontractors and suppliers) on streets and parking lots used as access to the work or staging areas.

F-10 CONSTRUCTION SIGNS

All construction sites shall have signs posted that say, ―Construction Area—Authorized Personnel Only‖, ―Hard-Hat Area—Construction in Progress‖, and ―Detour‖ (with an arrow), as applicable. In large renovation or construction task orders, the Contracting Officer, or authorized representative, may direct the Contractor to erect a construction identification sign. When directed, the Contractor shall, at the time of commencement of work, place on each construction site an identification sign approximately 3 feet x 4 feet. The sign may contain project specific information as well as safety information and a visitor log, but will contain the minimum data below and shall remain on the site until final acceptance of the work.

Signs shall be made of metal, with brown background (Dyess Sign Colors) and white vinyl letters that can be easily read.

52.211-13 Time Extensions SEP 2000

52.242-14 Suspension of Work APR 1984

252.219-7011 Notification to Delay Performance JUN 1998

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the date specified on each individual task order. *The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date per each individual task order.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government. Each task order will have independent liquidated damages assigned depending on location and magnitude of work.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

Dyess AFB SABER Project

NAME OF CONTRACTOR

PROJECT NUMBER

PROJECT TITLE

ESTIMATED COMPLETION DATE

5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (Aug 2007)

(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or security police for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, and valid vehicle insurance certificate to obtain a vehicle pass.

(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Volume I,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .