TX Demo Reno Notification Form.pdf

PDF 119 KB Posted

Attached to
Simplified Acquisition of Base Engineer Requirements (SABER)
Solicitation number
FA4661-10-R-0002
Issued by

About this file

Attachment 7 of SABER Solicitation FA4661-10-R-0002 Seed Project 2 TX Demo Reno Notification Form (Seed Project 2 Doc 4 of 16) NOTE AUTO CAD Drawings will be available at the site visit and will be available electronically after the site visit. POC is Mr. Michael Shafer (325) 696-4211 michael.shafer dyess.af.mil

View the file

Other files

File Type Posted
08-0082 SOW —
05-0032 - Concept Drawing —
05-0032 - Concept Drawing —
DYESS SABER SOLICITATION FA4661-10-R-0002.pdf PDF
UFC 4-010-01 - DoD Minimum Aniterrorism Standards for Buildings.pdf PDF
05-0032 - Concept Drawing —
05-0032 09-0106 SOO —
SABER Q A.pdf PDF
basewallmap2007image.pdf PDF
TE-08 - Work Clearance Request.pdf PDF
08-0082 SOW.pdf PDF
TE-10 - DAFB Technical Specifications.pdf PDF
Asbestos Survey 7422 - 31 Aug 09.pdf PDF
DYS-W-1201 - Sheet 2 of 5.PDF PDF
AF Form 66 Submittal Requirements.pdf PDF
05-0032 - Concept Drawing-Final-10.pdf PDF
05-0032 09-0106 SOO.pdf PDF
05-0032 - Concept Drawing-Kitch-4.pdf PDF
05-0032 - Concept Drawing-Arch-3.pdf PDF
TX100300 03-19-2010 TX300 Building.pdf PDF
TE-05 - Applicable Codes Regulations and Standards.pdf PDF
TE-07 - Contractor Drawing and GIS Data Standards.pdf PDF
TE-02 - Construction Data Worksheet.pdf PDF
05-0032 - Concept Drawing-Built-In Cab-5.pdf PDF
Attach 3 - Question Form.pdf PDF
TE-06 - SABER SOW Package Format.pdf PDF
TX100028 3-12-2010 TX28 Heavy and Highway.pdf PDF
TX Demo Reno Notification Form Instructions.pdf PDF
Attach 5 - Reservation Form.pdf PDF
TX100307 03-12-2010 TX307 Residential.pdf PDF
05-0032 - Concept Drawing-Floor-7.pdf PDF
TE-01 - Applicable Contractor Coefficient Requirements.pdf PDF
DYS-W-1201 - Sheet 1 of 5.PDF PDF
05-0032 - Concept Drawing-Fire CO Det-8.pdf PDF
Attach 4 - Past Performance Questionnaire —
DYS-W-1201 - Sheet 4 of 5.PDF PDF
05-0032 - Concept Drawing-Cover-1.pdf PDF
SOW-SABER Statement of Work FA4661-10-R-0002.pdf PDF
05-0032 - Concept Drawing-Bath-6.pdf PDF
DYS-W-1201 - Sheet 5 of 5.PDF PDF
05-0032 - Concept Drawing-Comm-9.pdf PDF
08-0082 AF Form 66.pdf PDF
DYS-W-1201 - Sheet 3 of 5.PDF PDF
UFC 3-600-01 - DESIGN-FIRE PROTECTION.pdf PDF
08-0082 SOO Atch 1.pdf PDF
FA4661-10-R-0002 SOLICITATION.pdf PDF
TE-03 - Equipment Warranty-Guarantee Record.pdf PDF
TE-04 - List of Acronyms.pdf PDF
TE-09 - Definitions.pdf PDF
05-0032 - Concept Drawing-Demo-2.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEMOLITION / RENOVATION

NOTIFICATION FORM

NOTE: CIRCLE ITEMS THAT ARE AMENDED

NOTIFICATION#

1) Abatement Contractor: DSHS License Number:

Address : City: State: Zip:

Office Phone Number: ( ) Job Site Phone Number:( ) Site Supervisor: DSHS License Number:

Site Supervisor: DSHS License Number:

Trained On-Site NESHAP Individual: Certification Date:

Demolition Contractor: Office Phone Number( ) Address: City: State: Zip:

2) Project Consultant or Operator: DSHS License Number:

Mailing Address:

City: State: Zip: Office Phone Number: ( )

3) Facility Owner:

Attention:

Mailing Address:

City: State: Zip: Owner Phone Number( ) **Note: The invoice for the notification fee will be sent to the owner of the building at the address listed in this section after the project is completed.

4) Description or Facility Name:

Physical Address: County: City: Zip:

Facility Phone Number( ) Facility Contact Person:

Description of Area/Room Number:

Prior Use: Future Use:

Age of Building/Facility: Size: Number of Floors: School (K - 12): YES NO

5) Type of Work (CHECK ONLY ONE): Demolition Renovation (Abatement) Annual Consolidated Work will be during: Day Evening Night Phased Project Description of work schedule:

6) Type of Building (CHECK ONLY ONE): Public Building Federal Facility Industrial Site NESHAP-Only Facility Is Building/Facility Occupied? YES NO

7) Notification Type (CHECK ONLY ONE):

Original (10 Working Days) Amendment Cancellation Emergency Ordered (see item 15) If this is an amendment, which amendment number is this? (Enclose copy of original and/or last amendment) If an emergency, who did you talk with at DSHS? Emergency#:

Date and Hour of Emergency (HH/MM/DD/YY): / / / Description of the sudden, unexpected event and explanation of how the event caused unsafe conditions or would cause equipment damage (computers, machinery, etc

8) Description of procedures to be followed in the event that unexpected asbestos is found or previously non-friable asbestos material becomes crumbled, pulverized, or reduced to powder:

9) Was an Asbestos survey performed? YES NO Date: / / DSHS Inspector License No: _____________ Analytical Method: PLM TEM Assumed DSHS Laboratory License No: ______________ (For TAHPA (public building) projects: an assumption must be made by a DSHS Licensed Inspector)

10) Description of planned demolition or renovation work, type of material, and method(s) to be used:

11) Description of work practices and engineering controls to be used to prevent emissions of asbestos at the demolition/renovation:

F O R

F F I C E

U S

N L Y

T A H P

S H

P

T

H

L

V I O L A T I O

Y

S

12) ALL applicable items in the following table must be completed: IF NO ASBESTOS PRESENT CHECK HERE

Approximate amount of Asbestos

Check unit of measurement

Asbestos-Containing Building Material Type

Pipes Surface Area

Ln Ft

Ln M

SQ

SQ

Cu

Cu

RACM to be removed

RACM NOT removed

Interior Category I non-friable removed

Exterior Category l non-friable removed

Category I non-friable NOT removed

Interior Category ll non-friable removed

Exterior Category II non-friable removed

Category II non-friable NOT removed

RACM Off-Facility Component

13) Waste Transporter Name: DSHS License Number:

Address: City: State: Zip:

Contact Person: Phone Number: ( )

14) Waste Disposal Site Name:

Address: City: State: Zip:

Telephone: ( ) TCEQ Permit Number:

15) For structurally unsound facilities, attach a copy of demolition order and identify Governmental Official below:

Name: Registration No:

Title:

Date of order (MM/DD/YY) / / Date order to begin (MM/DD/YY) / /

16) Scheduled Dates of Asbestos Abatement (MM/DD/YY) Start: / / Complete: / /

17) Scheduled Dates Demolition/Renovation (MM/DD/YY) Start: / / Complete: / / ** Note: If the start date on this notification can not be met, the DSHS Regional or Local Program office Must be contacted by phone prior to the start date. Failure to do so is a violation in accordance to TAHPA, Section 295.61.

I hereby certify that all information I have provided is correct, complete, and true to the best of my knowledge. I acknowledge that I am responsible for all aspects of the notification form, including, but not limiting, content and submission dates. The maximum penalty is $10,000 per day per violation.

(Signature of Building Owner/ Operator (Printed Name) (Date) (Telephone) or Delegated Consultant/Contractor)

(Fax Number)

MAIL TO: ENVIRONMENTAL HEALTH NOTIFICATIONS GROUP

DEPARTMENT OF STATE HEALTH SERVICES

*Faxes are not accepted* PO BOX 143538 *Faxes are not accepted*

AUSTIN, TX 78714-3538

PH: 512-834-6612, 1-888-778-9440

Form APB#5, dated 05/01/05. For assistance in completing form, call 1-888-778-9440

File details come from the government source that posted it. Updated .