TE-01 - Applicable Contractor Coefficient Requirements.pdf
PDF 461 KB Posted
- Solicitation number
- FA4661-10-R-0002
About this file
SOW Technical Exhibit 01 (of 10) Applicable Contractor Coefficient Requirements
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Exhibit 1
TE-1 Page 1 of 5
APPLICABLE CONTRACTOR COEFFICIENT REQUIREMENTS AND
RESPONSIBILITIES
The following is a consolidation of the Contractor’s coefficient for quick reference and general description purposes and shall not be construed as all-inclusive. The Contractor shall refer to the applicable paragraph for specific responsibilities and requirements:
Paragraph Subject Requirement/Responsibility
1.1 Contractor Coefficient Explanation
1.4.1 Office Facilities Perform housekeeping, vegetation
maintenance, and snow/ice removal
1.4.2 Permanent Storage Area Provide, establish, maintain, and disassemble the perimeter fencing, and maintain worksite caretakership and restoration of the Permanent
Storage Area
2.1.5.2 Contractor Employee
Identification Badge (EIB)
Provide all Contractor and Sub-Contractor
Employee Identification Badges (EIB)
2.2.1 Quality Control Program Provide the Quality Control Program
2.2.2 Health and Safety Programs Provide the Health and Safety Programs
2.3.1 Contractor Required
Equipment, Materials and
Services
Provide all contractor required equipment, materials and services to maintain its own operations
2.3.2 Contractor Provided Materials
to the Government
Provide a technical Library, with updates as published; and provide programs/licenses/upgrades, and perform installation and troubleshooting for various software programs
2.3.3 Contractor Provided Services
to the Government
Provide various initial and three-year refresher training to Government employees
3.2 Commencement Documents Provide project proposals
3.2.1 Statement of Work (SOW)
Package
Provide all commencement documents to include specifications, cost estimates, project drawings, AFFM 66, and CWS
3.2.2 AF Form 3000, Material
Approval Submittal (AFFM
3000)
Provide all material submittals to include preparation, documentation, samples, color boards (when applicable) and O & M Manuals
3.2.2.4 Submittal Library Establish and maintain a submittal library
3.2.3 AF Form 3064, Contract
Progress Schedule (AFFM
3064)
Provide all documentation and updates
3.3.2.4.1.4 Mechanical System Testing Provide new Boiler/HVAC systems tests by an independent firm with a formal Test and
Balance Report (TABs); provide field verification and operability for design of all existing Boiler/HVAC systems
3.3.2.4.3 Direct Digital Control (DDC)
Systems
Provide all programming, certification, documentation, software, and programming tools for set-up and system configuration
3.3.2.4.4 Mechanical Equipment
Identification Tags, Plaquards, and Schematics
Provide all identification tags, plaquards, and schematics for mechanical components.
TE-1 Page 2 of 5
3.3.2.5.3 Plumbing Equipment
Identification Tags and
Schematics
Provide all identification tags and schematics for plumbing components
3.3.2.7.7 Electrical Equipment
Identification Tags and
Schematics
Provide all identification tags and schematics for electrical components
3.3.2.8.3 Fire Protection Equipment
Identification Tags and
Schematics
Provide all identification tags and schematics for fire protection and notification components
3.4.1.1 Design Analysis, Civil Provide all design analysis as minimum to include: water demand, and sewage and ground water flow, irrigation systems design analyses and pressure calculations, and soil bearing capacity
3.4.1.2 Design Analysis, Architectural/Structural
Provide all design analysis as minimum to include: live and dead structural loads, roof loads, wind loads, seismic loads, and snow loads
3.4.1.3 Design Analysis, Mechanical Provide all HVAC design analysis as minimum to include: catalog cuts of projected equipment;
cooling and heating load analysis and calculations; a completed AF Form 108;
control valve sizing; duct sizing and air flow;
fan sizing and fan curves; psychometric chart analysis; and heat exchanger selection
3.4.1.4 Design Analysis, Plumbing Provide all design analysis as minimum to include: pipe sizing, pump sizing and pump curves, and static pressure loss
3.4.1.5 Design Analysis, Electrical Provide all design analysis as minimum to include: photometric data, and power requirement and distribution loads
4.2.1 AF Form 3065, Contract
Progress Report (AFFM 3065)
Provide, maintain, and update progress reports
4.2.2.1 Worksite Redline Drawings Provide, maintain, and update the worksite drawings to include: all approved changes, corrections, deviations, underground utilities locations, discoveries of previously unknown or non-included conditions, and modifications from the plans and details of the approved
SOW Package
4.2.2.1.2 Geospatial Information System
(GIS) Data
Provide, maintain, and update all GIS data
IAW TE 7 - 1CES LAFB CONTRACTOR
DRAWING AND GEOSPATIAL
INFORMATION SYSTEM (GIS) DATA
STANDARDS
4.2.2.2 Welding/Cutting Permits Provide, maintain, and update all
Welding/Cutting Permit
4.2.2.3 Sediment and Storm Water
Management Plan Permit
Provide, maintain, and update all Sediment and
Storm Water Management Permit
4.2.2.4 AF Form 103, Base Civil
Engineer Work Clearance
Request (AFFM 103)
Provide, maintain, and update all Work
Clearance Requests
TE-1 Page 3 of 5
4.2.2.5.1 Worksite Layout Plans Provide, maintain, and update all Worksite
Layout Plans
4.2.2.5.2 Dust/Debris Control Plans Provide, maintain, and update all Interior and
Exterior Dust/Debris Control Plans
4.2.2.5.3 Detour Plans Provide, maintain, and update all Detour Plans, and to establish and maintain approved detours, to include, but not limited to all signage, materials, equipment, and ramping
4.2.2.5.4 Falsework Plans Provide, maintain, and update all Falsework
Plans and to establish and maintain approved falseworks
4.2.2.6 Field/Lab Testing and Utility
Outage Roster
Provide, maintain, and update all Field/Lab
Testing and Utility Outage Rosters and to perform all required field/lab testing and utility outages
4.2.2.7 Asbestos/Lead-Based Paint
Abatement/ Encapsulation
Plans
Provide, maintain, and update all
Asbestos/Lead-Based Paint
Abatement/Encapsulation Plans and associated permits
4.2.2.8 Hazardous Materials Inventory
Reports
Provide, maintain, and update all Hazardous
Materials Inventory Reports
4.2.2.9 Radiation Source Reports Provide, maintain, and update all Radiation
Source Reports, to include Permission Request
Letters, licenses, NRC Form 241’s, and Leak
Test Reports
4.2.2.10 Debris Tonnage/Cubic
Yardage Reports
Provide, maintain, and update all Debris
Tonnage/Cubic Yardage Reports
4.5.1.1 Perimeter Fencing Establish, maintain, disassemble, and restore all Perimeter Fencing
4.5.1.2 Erosion Control Fencing Establish, maintain, disassemble, and restore all Erosion Control Fencing
4.5.1.3 Excavation Fencing Establish, maintain, disassemble, and restore all Excavation Fencing
4.5.1.4 Temporary Stabilized
Construction Entrances
Establish, maintain, disassemble, and restore all Temporary Stabilized Construction
Entrances
4.5.2.1 Storage Trailers/Boxes Establish, secure and maintain all Storage
Trailers/Boxes, and any mobilization and local travel
4.5.2.2 Laydown/Bulk/Stockpile
Storage
Establish, secure and maintain all
Laydown/Bulk/ Stockpile Storage, and any mobilization and local travel
4.5.2.3.1 Storage of Government
Furnished Equipment/
Materials GFE/GFM
Establish, secure and maintain all Storage of
GFE/GFM, and any mobilization and local travel
4.5.2.3.2 Processing Unused GFE/GFM Process all unused GFE/GFM
4.5.3.1.1 Daily Cleanup Perform all daily clean up (not to include loading and haul of demolition debris)
4.5.3.1.1.1 Trash Receptacles Provide all trash receptacles
4.5.3.2.1 Government Salvage Handle all Government salvage
4.5.3.3 Sanitation Facilities Provide and maintain all sanitation facilities
4.5.3.4 Pavements Cleaning Perform all pavements cleaning
TE-1 Page 4 of 5
4.5.3.5 Grounds Maintenance Perform all grounds maintenance to Grasses and Trees/Shrubs/Bushes
4.5.4.1 Signage Establish, maintain, and disassemble all
worksite safety signage (except asbestos/lead abatement requirements)
4.5.4.2 Safety Clothing and
Equipment
Establish, maintain, and disassemble all worksite safety Clothing and Equipment
(except asbestos/lead abatement requirements)
4.5.4.3 Safety Barricades/ Fencing Establish, maintain, and disassemble all worksite Safety Barricades/ Fencing for
Detours and Safety Requirements
4.5.5.2 Protection of Curbs/
Pedestrianways/ Roadways
Provide all protection of curbs/pedestrian/ roadways
4.6.1.1 Field/Lab Testing, Civil Perform all Civil Field/Lab Testing to include but not limited to Soils Load Bearing Test
4.6.1.2 Field/Lab Testing, Architectural/Structural
Perform all Architectural/Structural Field/Lab
Testing to include but not limited to Concrete
Slump Tests and Concrete Compression Tests
4.6.1.3 Field/Lab Testing, Mechanical Perform all Mechanical Field/Lab Testing to include but not limited to HVAC Volumeter
Tests and HVAC Test and Balance (for new installed systems and/or reconfigured division of workspaces)
4.6.1.4 Field/Lab Testing, Plumbing Perform all Plumbing Field/Lab Testing to include but not limited to Pressure Tests, Disinfections of Lines, Positive Flow Tests of
Sewage/Strom Drain Lines, and Irrigation
System Operational & Pressure Tests
4.6.1.5 Field/Lab Testing, Environmental
Perform all Environmental Field/Lab Testing to include but not limited to Asbestos Tests and clearance samples, Lead Tests and clearance samples, and Soils Tests for PH content, Nutrient content, and Soluble Salts content
4.6.1.6 Field/Lab Testing, Electrical Perform all Electrical Field/Lab Testing to include but not limited to Continuity and Load
Tests
4.6.1.7 Field/Lab Testing, Fire
Protection/Security Alarms
Perform all Fire Protection/Security Alarms
Field/Lab Testing to include Alarms Tests and
Detectors Tests
4.6.1.8 Field/Lab Testing, Communications Perform all Electrical Field/Lab Testing to include but not limited to Category 5e
Tests
4.6.3.1.1 Interior Haul/Delivery Routes Establish, maintain, and disassemble all
Interior Haul/Delivery Routes
4.6.3.1.2 Dust Barriers Establish, maintain, and disassemble all Dust
Barriers
4.6.3.1.3 Finishes/Equipment/Furniture
to Remain
Establish, maintain, and disassemble all protection to existing Government
Finishes/Equipment/Furniture to Remain
4.6.3.1.4 Inclement Weather/Security Establish, maintain, and disassemble all protection for all Inclement Weather/Security
TE-1 Page 5 of 5
4.6.3.1.5 Vegetation Establish, maintain, and disassemble all protection for all Vegetation to include trees, shrubs, bushes, and grasses
4.6.3.1.6 HVAC Utility Rooms Establish, maintain, and disassemble all protection for HVAC Utility Rooms
4.6.3.2 Storage of Government
Property to Remain
Establish, maintain, disassemble, handle, relocate, and store all Government Property to remain
4.6.4.1 Control Tower
Communications
Provide two-way radio communication with the Control Tower
4.6.5.1 Field Verification Perform field verifications for all excavations
4.6.5.2 Markings Maintain all utility markings
4.6.8 Soils and Vegetation
Restoration
Provide all soils and vegetation restoration
4.6.8.2.1 Establishment of Grasses Provide, operate, maintain and disassemble all irrigation apparatus, fertilizer, and weed control to ensure successful growth of grasses
4.6.8.3 Irrigation Systems Perform all irrigation systems testing
4.6.10.9 Erosion and Sediment Control Provide, operate, maintain and disassemble all erosion and sediment controls
5.1.1 Worksite Preparation Perform all preparation for inspections of exterior and interior areas
5.2.1 Roster of Known
Discrepancies
Provide Roster of Known Discrepancies documentation
5.2.2 Final Worksite Redline
Drawings
Provide Final Worksite Redline Drawings documentation
5.2.3 As-Built
Drawings/Deliverables
Provide As-Built Drawings/Deliverables and associated GIS Data
5.2.4 Operation and Maintenance
Manuals
Provide Operation and Maintenance Manuals
5.2.5 Warranty of Construction Provide Warranty of Construction, roofs and grasses
5.2.6 Construction Data Worksheet
(CDW)
Provide CDW documentation
5.3 Equipment Training Provide equipment training as applicable
File details come from the government source that posted it. Updated .