This document contains questions and answers regarding solicitation number FA4654-23-R0006 for base operational services at Grissom Air Reserve Base in Indiana. The services required include facilities maintenance, transportation services, supply operations, and fuels management. The incumbent contractor is requested to provide workload and inventory data to assist bidding, including equipment specifications, staffing levels, and preventative maintenance schedules. Questions seek clarification on the completeness of existing asset records and work orders, as well as responsibility for purchasing consumable supplies and replacement parts. Responses indicate the government will provide additional details and workload quantities where data is currently insufficient for offerors to accurately prepare proposals.

View the file

Other files for this federal contract opportunity

Other files attached to Base Operational Services - Grissom ARB IN, newest first.
File Type Posted
Attachment 28 Q-A 20231211.pdf PDF
Attachment 2 - GARB CDRLs - 20231205.pdf PDF
Attachment 10-Tab F - Tech Lib 20231211.pdf PDF
Attachment 1 - GARB PWS - 20231211 v1.3 (1).pdf PDF
Solicitation Amendment FA465423R00060003 SF 30 (2).pdf PDF
Solicitation Amendment FA465423R00060002 SF 30 (1).pdf PDF
Attachment 1 - GARB PWS - 20231102 v1.2.pdf PDF
Solicitation Amendment FA465423R00060001 SF 30.pdf PDF
Attachment 22- FACTS Sheet Word Format 20231011 AMENDED.docx DOCX document
Attachment 19- GARB Section M Evaluation Basis for Award 20231116 AMENDED.pdf PDF
Attachment 10-Tab F - Tech Lib 20231102 AMENDED.pdf PDF
Attachment 2 - GARB CDRLs - 20231101 AMENDED.pdf PDF
Attachment 18- GARB Section L Proposal Instructions - 20231116 AMENDED.pdf PDF
Attachment 27- Question Worksheet.xlsx XLSX spreadsheet
Attachment 24- Sample Subcontractor-Teaming Consent Letter 20230523.pdf PDF
Attachment 23-Past Performance Questionnaire 20230623v1.pdf PDF
Attachment 12- Tab G - Tech Lib 20230330.pdf PDF
Attachment 8 - Tab C - Tech Lib 20230519.pdf PDF
Attachment 4- GARB ITO Pricing Workbook 20230911.xlsx XLSX spreadsheet
Attachment 3 Government Furnished Property 20230725.xlsx XLSX spreadsheet
Solicitation - FA465423R0006.pdf PDF
Attachment 14 Grissom CBA 6.14.2023.pdf PDF
Attachment 26- Base Access requirements - site visit 20230523.docx DOCX document
Attachment 19- GARB Section M Evaluation Basis for Award.docx DOCX document
Attachment 17 in6.pdf PDF
Attachment 15 15-4809.pdf PDF
Attachment 7- Tab B - Tech Lib 20230330.pdf PDF
Attachment 1 - GARB PWS - 20230928 v1.1.pdf PDF
Attachment 10-Tab F - Tech Lib 20230725.pdf PDF
Attachment 25- Client Authorization Letter 20230523.pdf PDF
Attachment 20 Phase-Out Plan 20180702.pdf PDF
Attachment 13- GARB Stmt of Equiv Rates 202301.pdf PDF
Attachment 22- FACTS Sheet 20230523.pdf PDF
Attachment 21- Financial Institution Reference Sheet 20230523.pdf PDF
Attachment 18- GARB Section L Proposal Instructions .docx DOCX document
Attachment 16 in2.pdf PDF
Attachment 9- Tab D - Tech Lib 20230330.pdf PDF
Attachment 6 - GARB Task Ordering Procedures 20230911.pdf PDF
Attachment 5- GARB DD-254 - May 2023.pdf PDF
Attachment 2 - GARB CDRLs - 20230928.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grissom Base Operations Support Services Question WorkSheet

FA4654-23-R0006 Attachment 27 15 Nov 2023

ITEM

PWS TAB

or

TYPE OF SERVICE

PARAGRAPH

or

ATTACHMENT

PAGE

NUMBER

STATEMENT QUESTION/COMMENT RESPONSE

1 FACTS Sheets Attachment 22 2 Some of the cells on page 2 appear with shadowy text and cause those cells to be virtually unreadable.

Will the Government please address this issue and repost correctly-formatted sheets?

Attachment 22 - FACTS Sheet Word Format 20231011 - Word Document provided in amendment.

2 Phase-In/Phase-Out

Schedule B;

Phase-Out Plan;

multiple references in Sections L & M various Both "Phase-In/Phase-Out" and "Mobilization/Demobilization" are referred to throughout the solicitation documents.

Please clarify which terminology we should use in our porposal. Mobilization/De-Mobilization is the correct terminology.

3 Pricing Section L - L5.0 Volume IV Price

18-19 There is no specific reference to submitting a completed Schedule B/CLIN schedule with the proposal documents.

Please verify that we should not include a completed Schedule B with any of the volumes in our proposal.

Offerors are to review and follow proposal instructions in Attachment 18 Section L – Instructions, Conditions, and Notices to Offerors.

4 TAB F

Attachment 11

GARB - F-TE-6 WLD

n/a F-TE-6 for RPM workload is incomplete.

Will the Government please provide complete information on workload for the RPM tab/services?

See Attachment 1 - GARB PWS - 20231102 v1.2, paragraph F5.3.2.4.6 Water Softeners was added. Also see Attachment 10-Tab F - Tech Lib 20231102, Technical Exhibit, F-TE-6 Workload Data for Water Softeners.

5 TAB F

F5.3.1.2.1 F5.3.1.2.2

F-TE-2K

F-12 Will the government reimburse the contractor for the purchase of the materials (i.e. gutter brooms, curtains, replacement parts, etc) required to fulfill the street sweeping requirement IAW these PWS references?

See Attachment 1 - GARB PWS - 20231102 v1.2, states in paragraph 5.3.1.2.2 Roads and Parking Lots Sweeping, "The KTR shall be responsible for the purchase, installation and maintenance of all sweeper consumables such as gutter brooms, curtains, and associated parts as FFP."

Quantities can be found in Attachment 10-Tab F - Tech Lib 20231102, Technical Exhibit, F-TE-2 Workload Data, Spreadsheet - F-TE-2k.

6 TAB F

F5.3.1.2.3.1 F5.3.1.2.3.3 F5.3.1.2.3.4 F5.3.1.2.3.5

F-TE-2K

F-12

Will the government reimburse the contractor for the purchase of the materials (i.e. snowplow blades, shoes, cables, snow brooms, broom core replacements, snow marker stakes, snow fencing, hydrant flags, sand barrels/ice melt, E-36 Potassium Acetate, etc) required to fulfill the snow/ice removal requirement IAW these PWS references?

Attachment 1 - GARB PWS - 20231102 v1.2, states in paragraph F5.3.1.2.3.3 Snow Plow Blades, Brooms. "The KTR shall be responsible for the purchase, installation, and maintenance of all snowplow blades, shoes, cables, snow brooms and associated parts for all snow equipment as FFP." The purchase of the materials (i.e. snowplow blades, shoes, cables, snow brooms, broom core replacements are FFP and will not be reimbursed by the Government. Quantities can be found in Attachment 10-Tab F - Tech Lib 20231102, Technical Exhibit, F-TE-2 Workload Data, Spreadsheet - F-TE-2k.

Attachment 1 - GARB PWS - 20231102 v1.2, paragraphs F5.3.1.2.3.2, F5.3.1.2.3.4, and F5.3.1.2.3.5 were updated to reflect non-vehicle material for snow and ice control (such as snow marker stakes, hydrant flags, sand barrels/ice melt, E-36 Potassium Acetate, and sand) being ordered under the applicable RPS CLIN of the contract.

7 TAB F

F5.2.1 Integrates and Synchronizes

Preventive Maintenance (PM)

Program

F-9

Paragraph states the Contractor will implement and manage the PM program in NexGen IT. It also states that the Contractor create, schedule and complete PM actions to include building Asset Records, Job Plans, assign PMTLs and implement schedules within the 1st year.

Is the PM program in NexGen operational? No. The PM program has not been built.

FA4654-23-R0006 Attachment 27 15 Nov 2023

ITEM

PWS TAB

or

TYPE OF SERVICE

PARAGRAPH

or

ATTACHMENT

PAGE

NUMBER

STATEMENT QUESTION/COMMENT RESPONSE

8 TAB F

F5.2.1 Integrates and Synchronizes

Preventive Maintenance (PM)

Program

F-9

Paragraph states the Contractor will implement and manage the PM program in NexGen IT. It also states that the Contractor create, schedule and complete PM actions to include building Asset Records, Job Plans, assign PMTLs and implement schedules within the 1st year.

How Complete are the Asset Records in NexGen?

BUILDER PM01 data has been uploaded into NexGen IT (NGIT) for the equipment Preventive Maintenance would be conducted on, but the data has not been checked for accuracy and quality. Assets to be incorporated into the PM program are listed in Attachment 10-Tab F - Tech Lib 20231102, -Technical Exhibits - F-TE-2 and F-TE-6.

9 TAB F

F5.2.1 Integrates and Synchronizes

Preventive Maintenance (PM)

Program

F-9

Paragraph states the Contractor will implement and manage the PM program in NexGen IT. It also states that the Contractor create, schedule and complete PM actions to include building Asset Records, Job Plans, assign PMTLs and implement schedules within the 1st year.

Have any Job Plans and Schedules been completed? Very few have been built.

10 TAB F

F5.2.2, F5.2.3.2

BUILDERTM

Integrates and synchronizes Sustainment Management

Systems (SMS) data standards, collection, and analysis

F-9 & 10 Paragraphs both refer to the Builder program reflecting an accurate asset inventory for facilities. Also, that the Facility Condition Assessments verify complete Facility data.

Does the Builder Program contain a complete and accurate inventory of assets and RPIE for all facilities?

The last large scale inventory and inspection was conducted in 2020. BUILDER inspections are require on a 5 year basis to capture equipment missed or replaced throughout the period.

11 TAB F

F5.2.2, F5.2.3.2

BUILDERTM

Integrates and synchronizes Sustainment Management

Systems (SMS) data standards, collection, and analysis

F-9 & 10 Paragraphs both refer to the Builder program reflecting an accurate asset inventory for facilities. Also, that the Facility Condition Assessments verify complete Facility data.

At what percent is Builder completed with asset records for all facilities?

The last large scale inventory and inspection was conducted in 2020. BUILDER inspections are require on a 5 year basis to capture equipment missed or replaced throughout the period.

12 TAB F

F5.2.2, F5.2.3.2

BUILDERTM

Integrates and synchronizes Sustainment Management

Systems (SMS) data standards, collection, and analysis

F-9 & 10 Paragraphs both refer to the Builder program reflecting an accurate asset inventory for facilities. Also, that the Facility Condition Assessments verify complete Facility data.

Is the Contractor expected to complete FCA’s with only the assets currently loaded in Builder for each facility?

FCAs shall be conducted IAW Attachment 1 - GARB PWS - 20231102 v1.2, paragraph F5.2.3 and BUILDER Assessment Guides.

FA4654-23-R0006 Attachment 27 15 Nov 2023

ITEM

PWS TAB

or

TYPE OF SERVICE

PARAGRAPH

or

ATTACHMENT

PAGE

NUMBER

STATEMENT QUESTION/COMMENT RESPONSE

13 TAB F

F5.2.2, F5.2.3.2

BUILDERTM

Integrates and synchronizes Sustainment Management

Systems (SMS) data standards, collection, and analysis

F-9 & 10 Paragraphs both refer to the Builder program reflecting an accurate asset inventory for facilities. Also, that the Facility Condition Assessments verify complete Facility data.

Is the Contractor expected to complete the assets in each facility before any FCA is performed?

In regards to FCAs, inspection and inventory are generally conducted at the same time.

14 N/A Attachment 22 FACTS

Sheet 20230523 All The PDF form fields are not expandable.

Will the Government please provide a Microsoft Word version of Attachment 22 FACTS Sheet please?

Attachment 22 - FACTS Sheet Word Format 20231011 - Word Document provided in amendment.

15 F-TE-6 Hangar Doors F-28, Hangar

Doors tab CM versus T&M work on hangar doors

Please clarify if Hangar Doors Inspections are to be performed under FFP or T&M portion of contract?

Hangar door inspections are FFP.

16 Attachment 23 Past Performance

Questionaire Attachment

Past Performance Questionaire

Will the Government accept the same PPQs for Homestead as have already been sent/received for Dobbins and Youngstown?

No - Each solicitation is independent of one another. It is the responsibility of each offeror to provide the necessary documents, the Government requires for each solicitation. To be considered in this solicitation, all relevant Past Performance Questionnaires (PPQs) must be submitted. The Government will not independently retrieve.

17 F-TE-6 All tabs F-TE-6 All tab F-TE-

Each tab in F-TE-6 is color coded either grey, yellow, green, or red

Can the Government please explain the purpose of the color coding for the different tabs shown in F-TE-6?

All tab colors have been removed.

18 Solicitation, Section B Solicitation, Section

B, CLINS 0010 - 0018

5-6/124 The Time and Materials CLINS 0010 - 0018 show the figure "5" as Quantity and "Lot" as unit.

Can the Government please clarify the meeting of "5" Quantity and "Lot" as unit in Section B?

The Government will use one ordering Lot per year to support T&M CLINS. The amount of funded work and work orders may vary per year but will not exceed the total.

19 G G5.2.4.3, G5.2.5.2..1 G3, G4 KTR will issue and maintain IL Keys for authorized base vehicles. When is Grissom scheduled to transfer to EPoS (Energy Electronic Point of sale)? Grissom is tentatively scheduled for the second quarter of 2024.

20 G G-TE-2 G-17 Aircraft Deicing Fluid in #1, 2, 5, 6. There are no entries. What are the annual receipts? Number of deliveries annually?

See Attachment 1 - GARB PWS - 20231102 v1.2, Tab G, Technical Exhibit, G-TE-2 Workload Estimates, for updated Aircraft Deicing Fluid information.

21 B B2.3 B4 Flight Service Center In which Building and Room number is the Flight Service Center Located?

Flight Service Center responsibilities are handled in Bldg 209 in the general warehouse area of Stockroom 01J.

22 B B-TE-4c B24 Government Furnished Telephones What Function is located in Building 233?

See Attachment 1 - GARB PWS - 20231102 v1.2, Building 233 was remove from Tab B - Technical Exhibit B-TE-4e.

FA4654-23-R0006 Attachment 27 15 Nov 2023

ITEM

PWS TAB

or

TYPE OF SERVICE

PARAGRAPH

or

ATTACHMENT

PAGE

NUMBER

STATEMENT QUESTION/COMMENT RESPONSE

23 D D-TE-2 D-15 Workload, Lumber Requirements Are all Lumber requirements in TAB D included in the FFP or Government paid?

See Attachment 1 - GARB PWS - 20231102 v1.2, Tab D - Technical Exhibit D-TE-2 Workload Data was updated to reflect the appropriate cost per year for lumber.

24 N/A L5.3 Section 2 Pages 19-20

TThe RFP requires that firm-fixed prices be supplied for CLINS. To do this, bidders will have to make assumptions and provide details on how the estimate was prepared. This data will provide the Government with a clear basis for the estimates to determine the reasonableness and risk of each bid received.

Within the RFP Section L5.3, there is no place to include a basis of estimate/cost narrative.is of estimate/cost narrative.

Please indicate where in the Volume IV Price the basis of estimate or price narrative should be included, for example, as part of Section 2: Pricing Documents. The location of the narrative, supporting calculations, or other support for pricing is not clearly specified.

A BOE is not a required document, however if a contractor wants to provide one they may do so as long as it fits in the page limitations of Volume IV.

25 Tab F-TE-2 Attachment 1, Attachment 10

N/A Please indicate where in the Volume IV Price the basis of estimate or price narrative should be included, for example, as part of Section 2: Pricing Documents.

Please provide units of measure in column D, so that the bidders can estimate the costs of providing the required services. Without this data, only the incumbent will be able to provide accurate, and therfore, reasonable/realistic pricing.

Offerors Question Clarification: "This refers to the Excel file GARB F-TE WL Est- 20221208 tab F-TE2i tab which is contained in Attachment 10. When Attachment 10 is opened, it contains 3 spreadsheets, one of which is GARB F-TE WL Est- 20221208."

See Attachment 10-Tab F - Tech Lib 20231102 - Technical Exhibit - F-TE-2 Workload Data, Spreadsheet F-TE-2i, the number represented in column "D" is the number of floors/stories in the building. Facilities without a value are single story.

Tab F-TE-2, F-TE-6, Tab F-AF-PMTL

Attachment 1, Attachment 10

N/A

Workload data is provided in multiple files, including the PWS, Attachment 10, tab F-TE-2 WL Est, and Tab F-TE-6 WLD. Tab F-AF-PMTL has RS Means maintenance data for compressors based on the horsepower. Tab F-TE-6 lists a number of compressors, not all of which have part numbers, which will allow bidders to determine the horsepower of each unit to determine the maintenance schedule requirements stipulated in Tab F-AF-PMTL.

Please provide additional data on these compressors such as model numbers or size, so that bidders can determine the maintenance requirements stipulated in Tab F-AF-PMTL.

See Attachment 10-Tab F - Tech Lib 20231102, Technical Exhibit, F-TE-6 Workload Data

Tab F-TE-2, F-TE-6, Tab F-AF-PMTL

Attachment 1, Attachment 10

N/A

Workload data is provided in multiple files, including the PWS, Attachment 10, tab F-TE-2 WL Est, and Tab F-TE-6 WLD. In Tab F-AF-PMTL. Tab F-AF-PMTL has RS Means maintenance data for the BAK-12, BAK-4, & BAK 15 Aircraft Arresting System. No aircraft arresting systems appear in the other workload data.

Please Confirm that there are arresting systems and, if so, how many and which align with the maintenance schedule for BAK-12, BAK-14, and BAK-15 RS Means maintenance data so that bidders can accurately price the requirements that would otherwise only be available to the incumbent.

There are no Aircraft Arresting Systems at Grissom Air Reserve Base. Aircraft Arresting Systems are RESERVED in the PWS and there is no Aircraft Arresting System workload data.

Tab F-TE-2, F-TE-6, Tab F-F-AF-PMTL

PWS F5.3.1.2.1

(Pavement Clearance)

Attachment 1, Attachment 3, Attachment 8, and Attachment 10

N/A

Tab F-TE-2 has an estimate of 4 curtain replacements and gutter broom replacements for flight-line sweeping. Neither the Grissom MVR May 2023 spreadsheet contained within Attachment 8 nor the serially managed Government Furnished Property in Attachment 3 contain any details relating to the replacement parts.

No other details relating to sweeper specifications are supplied in the request for proposals.

Without sweeper details, bidders cannot accurately price replacement parts.

Please indicate if the bidders are to supply the sweeper to perform the pavement clearance PWS F5.3.1.2.1 in addition to the consumables. If the Government supplies the sweeper, please provide details on the model so that the parts can be accurately priced. Without this information, the incumbent will have an unfair advantage over the other bidders.

Please see vehicle/equipment information in Attachment 8-Tab C - Tech Lib 20230519 - MVR Spreadsheet and Attachment 3 Government Furnished Property 20230725.

FA4654-23-R0006 Attachment 27 15 Nov 2023

ITEM

PWS TAB

or

TYPE OF SERVICE

PARAGRAPH

or

ATTACHMENT

PAGE

NUMBER

STATEMENT QUESTION/COMMENT RESPONSE

Tab F-TE-2i

PWS F5.3.1.2.1

(Pavement Clearance)

Attachment 1 Attachment 10

N/A

The PWS (Attachment 1) PWS F5.3.1.2.1 requires that the contractor check all Air Force-owned pavements daily for FOD and perform necessary sweeping.

Attachment 10 Tab F-TE-2i indicates the paved area for the runways, aprons, taxiways, vehicle parking, and aircraft wash rack.

The list of Government-furnished property included in Attachment 3 Grissom MVR May 2023 spreadsheet does not list a sweeper. Similarly, the Grissom MVR May 2023 list of Government vehicles to be maintained does not include any vehicle that appears to be a sweeper. Please indicate whether runway sweepers are to be provided by the contractor and if so, what performance specifications for the equipment.

Without this information, the bidders cannot provide accurate pricing and are at a disadvantage to the incumbent.

Please indicate whether runway sweepers are to be provided by the contractor and if so, what the performance specifications the equipment must meet.

Without this information, the bidders cannot provide accurate pricing and are at a disadvantage to the incumbent.

Please see vehicle/equipment information in Attachment 8-Tab C - Tech Lib 20230519 - MVR Spreadsheet and Attachment 3 Government Furnished Property 20230725.

30 Tab F-TE-2 Attachment 1, Attachment 10

N/A Tab F-TE-2l has a table indicating pole number, heads, height, and wattage for High Mast lighting, which presumably exists at the base. However, there is no data contained in the table.

Without data for the high mast lighting that the contractor is required to maintain, there is no way for bidders, other than the incumbent, to provide a price for this service requirement. Please provide the required data or remove the requirement from the scope of work and Tab F-TE-l.

High mast lighting was RESERVED Attachment 10-Tab F - Tech Lib 20231102, - Technical Exhibits - F-TE-2 Workload Data, Spreadsheet - F-TE-2l

Construction Wage Rates

Tab Attachment 4 N/A

The construction wage tab has a number of positions, such as a laborer shaded grey, and instructions indicating that there are multiple groups within each labor category for which rates must be provided.

For those labor categories with multiple groups, please provide the percentage splits for the multiple groups. Without this, bidders will have substantially different rates that are not comparable and possibly be deemed unreasonable.

Only the incumbent has the historical data and, as such, has an unfair advantage in the development of pricing.

Individual rates in the group should be evenly spread when developing the composite rate. For example if 2 rates make up the composite, split the given rates 50-50 to develop a composite rate.

Service Contract Labor

Standard Tab

Attachment 4 &Attachment 14

N/A

The Union Collective Bargaining Act (CBA) stipulates the number of vacation days members receive based upon seniority with the preceding contract(s). These vacation days factor into the development of fringe rates and direct working hours in each year. The RFP does not provide any insights into the level of staff seniority, and only the incumbent has this data.

So that all bidders are using a similar basis, please provide an indication of average union employee seniority. If this is not possible, how will the Government determine the reasonableness of the rates?

The list will be provided to the successful offeror at the commencement of the new contract for determining employee eligibility for vacation or other fringe benefits per the FAR.

33 C 1.1 C-1 Ground Transportation hours of operation are 0700-2030 Is the workload data provided reflective of a second shift requirement?

Staffing requirements are the responsibility of the offerors to determine. The Government requirement is for Documented Cargo coverage from 0700-2030 - Monday through Friday.

34 D 1.3 D-2 "Provide Receiving/X-Ray Operation" Language for x-ray operations has been removed from the PWS compared to historical PWS. However, Hours of Operation require x-ray operations. Will it be a KTR duty to provide X-Ray Operations?

See Attachment 1 - GARB PWS - 20231102 v1.2, removed X-Ray Operations reference from D1.3 Hours of Operation table.

FA4654-23-R0006 Attachment 27 15 Nov 2023

ITEM

PWS TAB

or

TYPE OF SERVICE

PARAGRAPH

or

ATTACHMENT

PAGE

NUMBER

STATEMENT QUESTION/COMMENT RESPONSE

35 G 5.2.4.5 G-3 Deicing Fluid- The KTR shall receive, store, and issue ADF. The KTR shall monitor inventory levels and notify the Grissom ARB, 434 LRS/LGRM when ADF levels need to be replenished. The 434 LRS/LGRFM will coordinate 434 MXG to purchase ADF (Government Furnished) when inventory levels dictate.

FTL 23-03 states that the Fuels Management team will relinquish control in the procurement, storage, issuing and accounting for Bulk de-icing fluid. How will this affect workload, overall cost incurred, etc?

Currently the base has no timeframe nor the infrastructure to transition control of procurement, storage, issuing and accounting for Bulk de-icing Fluid.

36 G G5 G-1 Performance Requirements Are there any waivers in Fuels? If yes, please explain and/or provide a copy of the fuel waivers.

There are no Fuels waivers.

37 Tab F All All Subcontractors Please provide a list of Subcontractors and the services they perform. The Government does not have this information.

38 PWS

C.4.4 Scheduled

Maintenance c-8

C4.4.2 Seasonal Preparation. The KTR shall accomplish repairs and scheduled maintenance of seasonal equipment during the off-season such as snow removal and deicing equipment IAW DAFI 24-302, TO 36-1-191, and the base Snow Plan. If equipment will not be in service before season start or falls below MEL during the season, the KTR shall notify the AO and COR. The KTR shall ensure completed work information is input into DPAS as a work order “SLPR”

Will the Government reimburse the Contractor for replacement, worn or unusable snow blades?

Attachment 1 - GARB PWS - 20231102 v1.2, states in paragraph F5.3.1.2.3.3 Snow Plow Blades, Brooms. "The KTR shall be responsible for the purchase, installation, and maintenance of all snowplow blades, shoes, cables, snow brooms and associated parts for all snow equipment as FFP." The purchase of the materials (i.e. snowplow blades, shoes, cables, snow brooms, broom core replacements are FFP and will not be reimbursed by the Government. Quantities can be found in Attachment 10-Tab F - Tech Lib 20231102, Technical Exhibit F-TE-2 Workload Data, Spreadsheet F-TE-2k.

39 TAB C

C1.2.3/C1.2.3.1 & C1.2.4

Fleet Management and Analysis

(FM&A)/Material Control; Ground

Transportation/Vehic le Dispatcher

C-2 Both positions state the selected employee(s) will not operate in a full-time capacity in any other position detailed within the PWS. C1.2.3.1 Materiel Control.

The KTR shall provide an individual to perform Materiel Control responsibilities.

Is it the government’s intent that this is also a full-time position?

The requirement for the positions is to have an individual that does not have any competing full time priorities. This verbiage does not preclude an individual from having additional duties, tasks, or responsibilities.

40 TAB C

C1.2.3/C1.2.3.1 & C1.2.4

Fleet Management and Analysis

(FM&A)/Material Control; Ground

Transportation/Vehic le Dispatcher

C-2 Both positions state the selected employee(s) will not operate in a full-time capacity in any other position detailed within the PWS. C1.2.3.1 Materiel Control.

The KTR shall provide an individual to perform Materiel Control responsibilities.

Is it the government’s expectation that these positions are staffed with different people and that one position cannot accomplish the duties of any others?

The requirement for the positions is to have an individual that does not have any competing full time priorities. This verbiage does not preclude an individual from having additional duties, tasks, or responsibilities.

41 TAB F

F4.5.1

RSMeans Estimate F-8

The estimate is derived from RSMeans Facilities Maintenance & Repair Cost Data (not Government provided) as the primary standard and shall be completed within 5 business days of CM WT initiation, unless otherwise specified by the BCE.

If this standard is inadequate, the next source for standard hours is the RSMeans Construction Cost Data. Need clarification about “… the next source for standard hours is the RS Means Construction Cost Data”.

What does this mean relative to completing RS Means estimates? Is the KTR expected to buy the Construction Cost Data along with FM&R Cost Data?

RSMeans Facilities Maintenance & Repair Cost Data shall be the primary source for WT requiring an estimate as it better describes the repair work accomplished on this contract and the format requested. If this standard is inadequate, the next source for standard hours is the RSMeans Construction Cost Data. No cost estimating material is provided by the Government.

FA4654-23-R0006 Attachment 27 15 Nov 2023

ITEM

PWS TAB

or

TYPE OF SERVICE

PARAGRAPH

or

ATTACHMENT

PAGE

NUMBER

STATEMENT QUESTION/COMMENT RESPONSE

42 TAB F

F4.5.1

RSMeans Estimate F-8

The estimate is derived from RSMeans Facilities Maintenance & Repair Cost Data (not Government provided) as the primary standard and shall be completed within 5 business days of CM WT initiation, unless otherwise specified by the BCE.

If this standard is inadequate, the next source for standard hours is the RSMeans Construction Cost Data. Need clarification about “… the next source for standard hours is the RS Means Construction Cost Data”.

Are there any other Cost Data Dictionaries the KTR is required to have?

Estimates shall be derived from RSMeans Facilities Maintenance & Repair Cost Data, and if this is not sufficient, use RSMeans Construction Cost Data.

43 TAB F

F4.5.1

RSMeans Estimate F-8

While the contract states the KTR must use RS Means Cost Data, there is no medium/method specified that must be used to provide the data/estimate.

Is there a specific RS Means Program the KTR must use?

While excel is the preferred format, there is no specified 'program' required, estimates shall be in a RSMeans format providing the task name, number, crew size, labor hours etc., so estimates can be reviewed by the Government.

44 TAB F

F4.6

Subcontracted Work F-9

Subcontracted work will only be considered for approval in circumstances where the work required is determined to only be available from a justified sole source (e.g. proprietary source); unusual or compelling urgency as a result of a real world emergency or contingency; or specialty skillset as determined by the BCE.

How does the BCE determine if the skillset is a specialty?

Any skillset necessary to repair Real Property, that is beyond the normal day to day maintenance and repair. The skillsets are tied to the nature of work in the commercial industry and shall follow state certifications/licenses for the required work.

45 TAB F

F4.6

Subcontracted Work F-9

Subcontracted work will only be considered for approval in circumstances where the work required is determined to only be available from a justified sole source (e.g. proprietary source); unusual or compelling urgency as a result of a real world emergency or contingency; or specialty skillset as determined by the BCE.

Are all required skillsets listed in the PWS?

See Attachment 1 - GARB PWS - 20231102 v1.2, Technical Exhibit - F-TE-9 - - Key Personnel, Special Training, Certification, and Licensing Requirements are general in nature. The actual skillsets required will be tied to the nature of work in the commercial industry and shall follow state certifications/licenses for the specific required work.

46 TAB F

F4.6

Subcontracted Work F-9

Subcontracted work will only be considered for approval in circumstances where the work required is determined to only be available from a justified sole source (e.g. proprietary source); unusual or compelling urgency as a result of a real world emergency or contingency; or specialty skillset as determined by the BCE.

Can the government provide a list of CM and PM work that REQUIRES the KTR to use subcontractors due to existing agreements or contracts?

There are only two known systems that are proprietary at this time, Industrial Controls Systems and generator control systems. Neither are FFP requirements and would be invoiced under the applicable reimbursable CLIN of the contract.