Attachment 10-Tab F - Tech Lib 20230725.pdf

PDF 48 MB Posted

Attached to
Base Operational Services - Grissom ARB IN Federal contract opportunity
Solicitation number
FA4654-23-R0006
Issued by
Department of the Air Force Reserve Command

About this file

This document appears to be an attachment to a solicitation for base operational services at Grissom Air Reserve Base in Indiana. The solicitation was issued by the Department of the Air Force Reserve Command under number FA4654-23-R0006. It seeks proposals from contractors to provide various operational support services at the base, including facility maintenance and repair, transportation, equipment operation, and supply services. Proposals are due by July 25, 2023, and the contract award is expected in late 2023. Small businesses, including HUBZone, 8(a), woman-owned, and veteran-owned small businesses, are encouraged to compete. The period of performance will be a one year base period with four one-year options to extend. Pricing should be fixed for the base period but may be adjusted annually for the option periods.

View the file

Other files for this federal contract opportunity

Other files attached to Base Operational Services - Grissom ARB IN, newest first.
File Type Posted
Attachment 28 Q-A 20231211.pdf PDF
Attachment 2 - GARB CDRLs - 20231205.pdf PDF
Attachment 10-Tab F - Tech Lib 20231211.pdf PDF
Attachment 1 - GARB PWS - 20231211 v1.3 (1).pdf PDF
Solicitation Amendment FA465423R00060003 SF 30 (2).pdf PDF
Solicitation Amendment FA465423R00060002 SF 30 (1).pdf PDF
Attachment 1 - GARB PWS - 20231102 v1.2.pdf PDF
Solicitation Amendment FA465423R00060001 SF 30.pdf PDF
Attachment 22- FACTS Sheet Word Format 20231011 AMENDED.docx DOCX document
Attachment 19- GARB Section M Evaluation Basis for Award 20231116 AMENDED.pdf PDF
Attachment 10-Tab F - Tech Lib 20231102 AMENDED.pdf PDF
Attachment 2 - GARB CDRLs - 20231101 AMENDED.pdf PDF
Attachment 27 Questions and Answers AMENDED.pdf PDF
Attachment 18- GARB Section L Proposal Instructions - 20231116 AMENDED.pdf PDF
Attachment 25- Client Authorization Letter 20230523.pdf PDF
Attachment 20 Phase-Out Plan 20180702.pdf PDF
Attachment 13- GARB Stmt of Equiv Rates 202301.pdf PDF
Attachment 27- Question Worksheet.xlsx XLSX spreadsheet
Attachment 24- Sample Subcontractor-Teaming Consent Letter 20230523.pdf PDF
Attachment 23-Past Performance Questionnaire 20230623v1.pdf PDF
Attachment 12- Tab G - Tech Lib 20230330.pdf PDF
Attachment 8 - Tab C - Tech Lib 20230519.pdf PDF
Attachment 4- GARB ITO Pricing Workbook 20230911.xlsx XLSX spreadsheet
Attachment 3 Government Furnished Property 20230725.xlsx XLSX spreadsheet
Solicitation - FA465423R0006.pdf PDF
Attachment 14 Grissom CBA 6.14.2023.pdf PDF
Attachment 26- Base Access requirements - site visit 20230523.docx DOCX document
Attachment 19- GARB Section M Evaluation Basis for Award.docx DOCX document
Attachment 17 in6.pdf PDF
Attachment 15 15-4809.pdf PDF
Attachment 7- Tab B - Tech Lib 20230330.pdf PDF
Attachment 1 - GARB PWS - 20230928 v1.1.pdf PDF
Attachment 22- FACTS Sheet 20230523.pdf PDF
Attachment 21- Financial Institution Reference Sheet 20230523.pdf PDF
Attachment 18- GARB Section L Proposal Instructions .docx DOCX document
Attachment 16 in2.pdf PDF
Attachment 9- Tab D - Tech Lib 20230330.pdf PDF
Attachment 6 - GARB Task Ordering Procedures 20230911.pdf PDF
Attachment 5- GARB DD-254 - May 2023.pdf PDF
Attachment 2 - GARB CDRLs - 20230928.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Table of Contents

F-TE-2 Workload Estimates

F-TE-2a Corrective Maintenance and Modernization/Revitalization

F-TE-2b RSMeans Estimates

F-TE-2c AF Form 103 Work Clearance Form

F-TE-2d NexGen IT Work Load Estimates

F-TE-2e Builder Facility Condition Assessments

F-TE-2f Reserve Training

F-TE-2g Facilities Requiring Pest Management Inspections

F-TE-2h Ice Buckets and Utility Hydrant Stakes

F-TE-2i Facilities to be Maintained by the Contractor

F-TE-2j Grounds Maintenance

F-TE-2k Pavement Clearance Consumable Estimates (Sweeper & Snow Removal)

F-TE-2l High Mast Lighting

F-TE-2m Key Cutting

F-TE-2a

TOC

F-TE-2 Work Load Estimates

F-TE-2a. Corrective Maintenance (CM) and Modernization/Revitalization (M/R).

FY19-21 Totals Work Priority Data

Priority 1 3A 3B 3C 4A Total WT

Craft HRS # WT HRS # WT HRS # WT HRS # WT HRS # WT HRS # WT

CARPENTER 0 0 74.5 10 359 14 2158 78 0 0 2591.5 102

ELECTRICIAN 0.5 1 28 13 41 16 235.3 72 0 0 304.8 102

ENTOMOLOGY 0 0 26 18 204.5 39 3276.3 463 0 0 3506.8 520

EQUIP OPERATOR 5 2 220.5 24 647.3 53 12505.7 529 0 0 13378.5 608

EXT ELECT 44.5 8 1128.3 507 78.5 17 1311 309 0 0 2562.3 841

FIRE ALARM MECH 39 8 737.5 280 44 12 559.5 216 0 0 1380 516

GARDENER 0 0 0 0 0 0 18.5 4 0 0 18.5 4

GEN MAINT WKR 19 3 648.4 222 558.9 117 5991.3 1400 4.5 2 7222.1 1744

GROUNDS MAINT WKR 0 0 6 1 89 13 1851 88 0 0 1946 102

HEAVY EQUIP OP 0 0 0 0 71 3 1466.5 72 0 0 1537.5 75

HVAC MECH 22.5 9 1233 307 434 97 2930.1 722 0 0 4619.6 1135

INT ELECT 19.5 11 592 70 230 37 3231.8 722 42.5 8 4115.8 848

LABORER 5 4 807 61 1145 83 11490.2 709 6 3 13453.2 860

LIQUID FUELS 5 3 56 10 18.5 2 801.5 120 0 0 881 135

LOCKSMITH 7 4 56.5 34 62 32 1282.5 716 0 0 1408 786

PAINTER 0 0 5 1 60 6 1139.5 146 5 3 1209.5 156

PAVEMENT MAINT WKR 0 0 15.5 1 0 0 58 12 0 0 73.5 13

PIPEFITTER 0 0 305 10 168 3 1090.5 39 0 0 1563.5 52

PLUMBER 43 11 375.5 125 116 27 1916.5 573 4 1 2455 737

ROOFER 0 0 59.5 1 11 1 81.5 3 0 0 152 5

SHEETMETAL 0 0 4 1 54.5 9 121 5 0 0 179.5 15

SIGN MAKER 0 0 11 2 54 12 263.5 43 0 0 328.5 57

SPRINKLER FITTER 0 0 3 1 0 0 79.5 3 0 0 82.5 4

TRACTOR OPERATOR 0 0 0 0 26 5 464.5 49 0 0 490.5 54

TRUCK DRIVER 0 0 0 0 0 0 1130.8 50 0 0 1130.8 50

WELDER 0 0 0 0 0 0 10.5 3 0 0 10.5 3

Grand Total 210 64 6392.2 1699 4472.2 598 55465 7146 62 17 66601.4 9524

FY21 Work Priority Data

Priority 1 3A 3B 3C FY21 Totals

Craft HRS # WT HRS # WT HRS # WT HRS # WT HRS # WT

CARPENTER 7 3 166 6 672.5 26 845.5 35

ELECTRICIAN 27 12 2 1 149.5 44 178.5 57

ENTOMOLOGY 7.5 4 62.5 8 975 144 1045 156

EQUIP OPERATOR 85.5 10 179.5 16 5313 191 5578 217

EXT ELECT 36 5 408.5 168 45.5 8 383 75 873 256

FIRE ALARM MECH 9.5 4 304 118 21.5 3 125.5 43 460.5 168

GARDENER 2 1 2 1

GEN MAINT WKR 269.4 81 212.2 40 1799.4 419 2281 540

GROUNDS MAINT WKR 0 2 1119 55 1119 57

HEAVY EQUIP OP 62.5 2 15 3 77.5 5

HVAC MECH 17 8 637.5 154 153 31 735.5 163 1543 356

INT ELECT 9.5 5 120.5 31 62 16 773.5 193 965.5 245

LABORER 157.5 18 222 25 2486.5 198 2866 241

LIQUID FUELS 1 1 21 5 18.5 2 315 39 355.5 47

LOCKSMITH 26.5 14 11.5 6 475 210 513 230

PAINTER 20 3 174 28 194 31

PAVEMENT MAINT WKR 19 3 19 3

PIPEFITTER 159.5 3 136 2 116.5 5 412 10

PLUMBER 6 2 174.5 52 69.5 17 610 160 860 231

ROOFER 4 1 4 1

SHEETMETAL 4 1 4 6 121 5 129 12

SIGN MAKER 3 1 14 2 130 16 147 19

SPRINKLER FITTER 3 1 71.5 1 74.5 2

TRACTOR OPERATOR 15.5 3 395 34 410.5 37

TRUCK DRIVER 111.5 15 111.5 15

WELDER 10.5 3 10.5 3

Grand Total 79 25 2415.9 676 1477.7 199 17102.4 2075 21075 2975

FY20 Work Priority Data

Priority 1 3A 3B 3C FY20 Totals

Craft HRS # WT HRS # WT HRS # WT HRS # WT HRS # WT

CARPENTER 37 6 183 6 881 28 1101 40

ELECTRICIAN 0.5 1 36.5 11 59.5 14 96.5 26

ENTOMOLOGY 18.5 14 112.5 23 1361 165 1492 202

EQUIP OPERATOR 4 1 98 6 353.5 19 3510.6 147 3966.1 173

EXT ELECT 2.5 1 345 145 21 4 403 106 771.5 256

FIRE ALARM MECH 361 130 8 4 131 51 500 185

GARDENER 10.5 2 10.5 2

GEN MAINT WKR 4 1 166.5 54 241.7 41 2146 424 2558.2 520

GROUNDS MAINT WKR 6 1 47.5 6 539 27 592.5 34

HEAVY EQUIP OP 410 12 410 12

HVAC MECH 5.5 1 516.5 128 149 36 961.3 242 1632.3 407

INT ELECT 10 4 395.5 27 156.5 16 1218.5 236 1780.5 283

LABORER 506.5 33 646.5 35 4264.1 226 5417.1 294

LIQUID FUELS 7 2 220.5 38 227.5 40

LOCKSMITH 2.5 2 23.5 11 34 11 337.5 227 397.5 251

PAINTER 5 1 40 3 521.5 58 566.5 62

PAVEMENT MAINT WKR 15.5 1 20 5 35.5 6

PIPEFITTER 145.5 7 580 18 725.5 25

PLUMBER 5.5 4 148.5 48 41 9 677 193 872 254

ROOFER 45.5 1 45.5 1

SHEETMETAL 50.5 3 50.5 3

SIGN MAKER 8 1 71 10 79 11

SPRINKLER FITTER 8 2 8 2

TRACTOR OPERATOR 2.5 1 54.5 12 57 13

TRUCK DRIVER 424.3 11 424.3 11

WELDER

Grand Total 34.5 15 2803.5 615 2123.7 228 18855.3 2255 23817 3113

FY19 Work Priority Data

Priority 1 3A 3B 3C 4A FY19 Totals

Craft HRS # WT HRS # WT HRS # WT HRS # WT HRS # WT HRS # WT

CARPENTER 30.5 1 10 2 604.5 24 645 27

ELECTRICIAN 1 1 2.5 4 26.3 14 29.8 19

ENTOMOLOGY 29.5 8 940.3 154 969.8 162

EQUIP OPERATOR 1 1 37 8 114.3 18 3682.1 191 3834.4 218

EXT ELECT 6 2 374.8 194 12 5 525 128 917.8 329

FIRE ALARM MECH 29.5 4 72.5 32 14.5 5 303 122 419.5 163

GARDENER 6 1 6 1

GEN MAINT WKR 15 2 212.5 87 105 36 2045.9 557 4.5 2 2382.9 684

GROUNDS MAINT WKR 41.5 5 193 6 234.5 11

HEAVY EQUIP OP 8.5 1 1041.5 57 1050 58

HVAC MECH 79 25 132 30 1233.3 317 1444.3 372

INT ELECT 0 2 76 12 11.5 5 1239.8 293 42.5 8 1369.8 320

LABORER 5 4 143 10 276.5 23 4739.6 285 6 3 5170.1 325

LIQUID FUELS 4 2 28 3 266 43 298 48

LOCKSMITH 4.5 2 6.5 9 16.5 15 470 279 497.5 305

PAINTER 444 60 5 3 449 63

PAVEMENT MAINT WKR 19 4 19 4

PIPEFITTER 32 1 394 16 426 17

PLUMBER 31.5 5 52.5 25 5.5 1 629.5 220 4 1 723 252

ROOFER 59.5 1 11 1 32 1 102.5 3

SHEETMETAL

SIGN MAKER 40 10 62.5 17 102.5 27

SPRINKLER FITTER

TRACTOR OPERATOR 8 1 15 3 23 4

TRUCK DRIVER 595 24 595 24

WELDER

Grand Total 96.5 24 1172.8 408 870.8 171 19507.3 2816 62 17 21709.4 3436

F-TE-2b

TOC

F-TE-2b. RSMEANS Estimates.

CM CALLS M/R WORK

Average 12 Month Average 12 Month

Per Month Total Per Month Total

F-TE-2c

TOC

F-TE-2c.

AF 103, Work Clearance Form, Estimates: 60 annually

F-TE-2d

F-TE-2d. NexGen IT Work Load Estimates. TOC

NexGen IT PM Build

The Niagara Modified PM1 Report and the Niagara Building Equipment Report are available upon request. The Niagara Modified PM1 Report is from BUILDER. Assets names may have changed based on current naming conventions, and the report is a snap shot in time. The data may have changed after the report was pulled as the system is continuously updated. The Youngstown Modified PM1 Report is for reference only.

The Equipment Report is pulled from NGIT and reflects the equipment that migrated from BUILDER.

Create PM Program In NexGen IT Count

BEAR* migrated from BUILDER into NGIT** 2188

* Building Equipment Asset Record (BEAR): Associates a piece of equipment with a facility. Migrated information saves 3-5 minutes of typing versus creating a BEAR.

** Includes equipment not listed in F-TE-2 and F-TE-6, thus not part of this contract

70% - Avg of 3 frequencies roughly 200 hours* 20% - 1 frequencies- roughly 25 hours* 10% - 6 frequencies- roughly 75 hours* Note: *This is just an estimate, there are several variables in which these times can change

It is estimated to take 90 hours to create 100 additional Job Plans**

** For new eqiupment or equipment that didn't migrate from BUILDER

F-TE-2e

F-TE-2e Facility Condition Assessments: TOC

Annual Facility Condition Assessments (FCA) (F5.2.3) – Estimated 100,000 sq ft per day, based on a crew of five technicians familiar/proficient with their craft/discipline (carpenter, electrician, HAVC, plumber and fire alarms) and BUILDER. Square footage is listed in the F-TE-2i, Facilities To Be Maintained.

A Homestead Modified PM1 Report available upon request. The report is from BUILDER. Assets names may have changed based on current naming conventions, and the report is a snap shot in time. The data may have changed after the report was pulled as the system is continuously updated. The Homestead Modified PM1 Report is for reference only.

Section Categories to be Assessed and Inventoried

System - Description Section Category Definition

B20 EXTERIOR ENCLOSURE EXTERIOR WALLS All materials associated with the following construction: exterior load-bearing walls, insulation and vapor barrier, parapets, exterior louvers and screens, sun control devices (exterior), balcony walls and handrails, exterior soffits, screen walls, and exterior coatings.

B20 EXTERIOR ENCLOSURE B201006 BALCONY WALLS & HANDRAILS Fixed ladders

B20 EXTERIOR ENCLOSURE EXTERIOR DOORS All doors located in exterior walls or exterior skin.

B20 EXTERIOR ENCLOSURE B203004 OVERHEAD AND ROLL- UP DOORS Overhead and roll-up doors installed in exterior walls or exterior skin. Assemblies include frames, hardware, hoisting devices, and finish and other associated work. The unit of measure at the assembly level is each door. (Electrical or manual)

B20 EXTERIOR ENCLOSUREB203005HANGAR
DOORSLarge aircraft doors used on medium and

high bay hangars. Assemblies would include frames, hardware, hoisting devices, and finish and other associated work.

B20 EXTERIOR ENCLOSURE B203006 BLAST RESISTANT DOORS Special exterior doors used for blast resistance. Assemblies would include frames, hardware, hoisting devices, and finish and other associated work. Igloo/Blast, Hinged/Sliding

B30 ROOFING ROOF COVERINGS This system includes all waterproof roof coverings and insulation, expansion joints, together with skylights, hatches, ventilators, and all required trim. In addition to roof coverings, the system includes all waterproof membranes and traffic toppings over below grade enclosed areas, balconies and the like.

B30 ROOFING B301001 STEEP SLOPE ROOF SYSTEM Assemblies include roof coverings such as shingle, wood shake, structural standing seam, metal roofing, tile etc.

B30 ROOFING B301002 LOW SLOPE ROOF SYSTEMS Assemblies include roof coverings such as built-up, elastomeric, modified bitumen, polyurethane foam, single ply membranes, etc. Also, walkways and work areas will be included here.

B30 ROOFING B301005 GUTTERS & DOWNSPOUTS Assemblies include all gutters, downspouts, and associated works including splash blocks

B30 ROOFING B301006 ROOF OPENINGS AND SUPPORTS All roof penetrations including roof hatches, sky lights, area glazing, gravity roof ventilators, smoke vents, etc.for Munitions Storage facilities only.

B30 ROOFING B301090 OTHER ROOFING Roof ing not described by the assembly categories listed above including berms over flat roofed and barrel roof munitions storage facilities.

C10 INT CONSTRUCTION INTERIOR DOORS All interior doors.

C10 INT CONSTRUCTION C102003 FIRE DOORS Assemblies include all interior fire doors, including all necessary frames, and sensing devices integral with the door. Interior door hardware is located in C102007 INTERIOR DOOR HARDWARE.

C10 INT CONSTRUCTION C102005 INTERIOR OVERHEAD DOORS Overhead doors installed in the interior of a facility. Assemblies include frames, hardware, hoisting devices, and finish and other associated work. The unit of measure at the assembly level is each door.

C10 INT CONSTRUCTION C102090 OTHER INTERIOR SPECIALTY Any special type door installed in the interior of a facility. Assemblies include frames, hardware, hoisting devices, and finish and other associated work. The unit measure at the assembly level is each gate.

C10 INT CONSTRUCTION C103090 OTHER INTERIOR SPECIALTY Fixed Ladders

D10 CONVEYING ELEVATORS AND LIFTS This system includes personnel and equipment moving equipment such as elevators, and lifts, both hydraulic and electric

D10 CONVEYING D101002 PASSENGER ELEVATORS Assemblies include car, hoistway, machine room.

D10 CONVEYING D101003 FREIGHT ELEVATORS Assemblies include car, hoistway, machine room.

D10 CONVEYING D101004 WHEELCHAIR LIFTS Assemblies includes all associated equipment

D10 CONVEYING WEIGHT HANDLING EQUIPMENT This system includes built-in material lifting devices such as overhead cranes and monorails.

D10 CONVEYING D102001 OVERHEAD CRANES Assemblies includes all associated equipment

D10 CONVEYING D102003 MONORAILS Assemblies includes all associated equipment

D10 CONVEYING ESCALATORS AND MOVING WALKWAYS This system includes escalators used to move personnel vertically and moving walkways used to move horizontally.

D10 CONVEYING D103001 ESCALATORS Assemblies includes all associated equipment

D20 PLUMBING DOMESTIC WATER DISTRIBUTION This system provides for human health and comfort. The water supply needed is determined by the number of fixtures attached. Hot water heaters and special equipment are not counted as a fixture.

D20 PLUMBING D202002 BACKFLOW PREVENTERS This equipment prevents possibly contaminated / stagnant fire or mechanical system water from flowing back into potable water systems.

D20 PLUMBING D202003 DOMESTIC WATER EQUIPMENT This assembly includes equipment associated with the domestic water supply, including fittings, and specialties required for hook-up. Assemblies include hot water heaters and water treatment components; pumps directly associated with domestic water supply; and tanks for the potable hot or cold water system. The unit of measure at the assembly level is each.

D30 HVACHEAT GENERATING
SYSTEMSThis subsystem includes steam, hot water, furnace, and unit heater systems. Fuels include coal, oil, gas and electric unless otherwise noted.

D30 HVAC D302001 BOILERS Assemblies include steam or hot water boilers, chemical feeders, air separators, pumps, heat exchangers, boiler feed units, etc. This assembly would also include fittings and specialties and the flue stack. The unit of measure at the assembly level is each system.

D30 HVAC D302002 FURNACES This is a system that heats air. Assemblies would include furnace and necessary fittings and specialties required for hook-up, including flue and stack. The unit of measure at the assembly level is each.

D30 HVAC D302003 FUEL-FIRED UNIT HEATERS Assemblies would include unit heaters and the energy supply system hook-up (other than electrical), including all necessary pipe, fittings, and specialties required for hook-up. Flue and stack, if required, are included in this assembly. The unit of measure at the assembly level is each.

D30 HVAC D302004 AUXILIARY EQUIPMENT (Auxiliary equipment is Optional.( Assemblies would include any other equipment associated with heat generating systems. The unit of measure at the assembly level is each. (Boiler Feedwater Tank, Chemical Feedwater, Feedwater Tank)

D30 HVACCOOLING GENERATING
SYSTEMSCooling generating equipment of the absorption, centrifugal, reciprocating, and direct expansion types.

D30 HVAC D303001 CHILLED WATER SYSTEMS Assemblies include condensers, compressors, chillers, pumps, cooling towers, etc., including fittings and specialties required for hook-up. The unit of measure at the assembly level is each.

D30 HVAC D303002 DIRECT EXPANSION SYSTEMS Assemblies include condensers, evaporators, compressors, heat pumps, and refrigerant piping. The unit of measure at the assembly level is each.

D30 HVAC D303090 OTHER COOLING GENERATING SYSTEMS General, Other, Unknown need to be avoided.

D30 HVAC DISTRIBUTION SYSTEMS This includes systems that distribute heated and cooled air, ventilating and exhaust air, hot and chilled water, steam, and glycol heating.

D30 HVAC D304001 AIR DISTRIBUTION, HEATING & COOLING Assemblies include air separators, dehumidifiers, humidifiers, VAV terminals, fire dampers, and smoke vents. The unit of measure at the assembly level is each.

D30 HVAC D304002 STEAM DISTRIBUTION SYSTEMS Assemblies include pipe and fittings, supports, wall and floor sleeves, and pipe insulation. The unit of measure at the assembly level is MBH. SMS does not currently have steam equipment adequately identified. Only inventory and assess equipment for which a PMTL is accomplished. Under “General” each section should provide enough information for future assessment and correction of data (date installed, size, location, condition, quantity).

D30 HVAC D304003 HOT WATER DISTRIBUTION SYSTEMS Assemblies pumps and heat exchangers Unit of measure at the assembly level is each.

D30 HVAC D304005 GLYCOL DISTRIBUTION SYSTEMS Inventory pumps and equipment under D304006.

D30 HVACD304006CHILLED WATER DISTRIBUTION
SYSTEMSAssemblies include pumps, sensors and control valves Unit of measure at the assembly level is each.

D30 HVAC D304007 EXHAUST SYSTEMS Assemblies include vents, dust collectors, and fans. Unit of measure at the assembly level is each.

D30 HVAC D304008 AIR HANDLING UNITS Assemblies include all fan sections, controls, sensors, and valves. Unit of measure at the assembly level is each.

D30 HVAC TERMINAL & PACKAGE UNITS This category includes self-contained heating and cooling units.

D30 HVAC D305001 UNIT VENTILATORS Assemblies include centrifugal, utility, or make-up air units. Unit of measure at assembly level is each.

D30 HVAC D305002 UNIT HEATERS Assemblies include hydronic or infrared units. Unit of measure at assembly level is each.

D30 HVAC D305003 FAN COIL UNITS Assemblies include cab/duct mount (2 or 4 pipe) and DX units. Unit of measure at assembly level is each.

D30 HVAC D305004 FIN TUBE RADIATION Assemblies include baseboard units. Unit of measure at assembly level is each.

D30 HVAC D305005 ELECTRIC HEATING Assemblies include electrical heating units. Unit of measure at assembly level is each.

D30 HVAC D305006 PACKAGE UNITS Assemblies can be cooling only or cooling with heating (air or liquid cooled, DX split or thru-wall, evaporative, heat pump, or rooftop) units. Unit of measure at assembly level is each.

D30 HVAC CONTROLS & INSTRUMENTATION Includes devices such as thermostats, timers, sensors, control valves, etc., necessary to operate the system as designed.

D30 HVAC D306001 HVAC CONTROLS General, Other, Unknown need to be avoided.

D30 HVAC D306002 ELECTRONIC CONTROLS Direct Digital Control (DDC) system. Includes devices such as supervisory, standalone, input/output controllers, network communications. The unit of measure at the network level is each system.

D30 HVAC D306003 PNEUMATIC CONTROLS Assemblies includes ball and butterfly valves, actuators, high pressure chokes, valve positioners, sensors, regulators, etc.

D30 HVAC D306004 INSTRUMENT AIR COMPRESSORS Assemblies include air compressors, dryers, and distribution tubing, (only used with pneumatic control systems). The unit of measure at the assembly level is each.

D40 FIRE PROTECTION FIRE ALARM AND DETECTION SYSTEMS This subsystem includes fire alarm and mass notification control panels and distribution, fire detection devices, notification appliances, electromechanical releases, and all electrical connections and other associated items.

D40 FIRE PROTECTION D401001 FIRE ALARM DISTRIBUTION Assemblies include general (wiring, conduit, conduit support or fastening systems, switches and connections); conventional fire alarm control panel (single, multi-zone); addressable fire alarm systems, mass notification systems, and combination systems.

D40 FIRE PROTECTION D401002 FIRE ALARM DEVICES Assemblies include notification appliances and detection devices: alarm bell, annunciator, strobe, strobe/annunciator combo, battery backup, fixed temperature heat detector, smoke detector, rate of rise heat detector, manual pull station, rate compensate heat detector, combination heat/smoke detectors, duct detectors, and explosion proof devices such as, detectors, pull stations, and notification appliances.

D40 FIRE PROTECTION FIRE SUPPRESSION WATER SUPPLY AND EQUIPMENT This subsystem includes items located upstream of the suppression systems such as, backflow preventers, piping, fire pumps etc. supplying a single facility. Equipment supporting multiple facilities is covered as a water utility.

D40 FIRE PROTECTION D402001 FIRE PROTECTION WATER PIPING AND EQUIPMENT Assemblies include air compressor, air dryer, reduced pressure backflow preventers, and double check valve backflow preventers.

D40 FIRE PROTECTION D402002 FIRE PUMP Assemblies include fire pumps (including controller), jockey pump including (controller and disconnects); fire pump test header, flow meters, and recirculation system; and hydraulic transience controls (surge arrestors).

D40 FIRE PROTECTION STANDPIPE SYSTEMS This subsystem includes the standpipe risers, racks, cabinets, hoses, hose connections, and all other piping, fittings, and supports associated.

D40 FIRE PROTECTION D403001 STANDPIPE EQUIPMENT & PIPING Assemblies include wet or dry, class I, II, or III, hose connections for ground floors, and each additional floor.

D40 FIRE PROTECTION SPRINKLERS This subsystem includes the water supply equipment and related piping, control valves, alarm valves, and connections, from the base of the riser to the sprinkler head.

D40 FIRE PROTECTION D404001 SPRINKLERS AND RELEASING DEVICES (SYSTEMS) Assemblies include wet-pipe, dry pipe, pre-action, deluge, and multi- cycel systems spanning mulitple hazard categories.

D40 FIRE PROTECTION D404002 SPRINKLER WATER SUPPLY EQUIPMENT AND PIPING Assemblies include alarm valves, flow control valves, pipe and fittings from equipment to sprinkler heads, including all supports and wall or floor sleeves. All equipment including tanks, pumps, and other associated equipment, fittings and specialties required for hook-up are in this assembly. The unit of measure at the assembly level is each sprinkler head.

D40 FIRE PROTECTIONOTHER FIRE PROTECTION
SYSTEMSThis subsystem includes special fire detection and extinguishing systems.

D40 FIRE PROTECTION D409001 CARBON DIOXIDE SYSTEMS Assemblies include carbon dioxide systems.

D40 FIRE PROTECTION D409002 FOAM GENERATING EQUIPMENT Assemblies include all high expansion foam, AFFF, and foam-water deluge systems.

D40 FIRE PROTECTION D409003 CLEAN AGENT SYSTEMS Assemblies include all halon, clean agent, and inert gas systems.

D40 FIRE PROTECTION D409090 OTHER FIRE PROTECTION SYSTEMS Assemblies include ultasensative smoke detection systems, UV/IR3 detectors.

D50 ELECTICAL ELECTRICAL SERVICE & DISTRIBUTION This system provides for all electroical devices that are required to deliver the main source of power to the facility and to distribute this power to distribution subpanelboards.

D50 ELECTICAL D501001 MAIN TRANSFORMERS Transfpormers used for pimary electrical service and located near or within the facility. Assemblies include transformers, raised pad, trenching, and backfill. Inventory distribution transformers in SMS UTILITY

D50 ELECTICAL D501002 SERVICE ENTRANCE EQUIPMENT This includes the protection equipment and metering devices for main distribution. Assemblies include underground conduits and service entrance conductors from the secondary taps of the distribution transformer to the Main Distribution Panel, protected service disconnects (circut breakers or fuses), and meters. Main distribution panels should be inventoried under D501004 Panelboards.

D50 ELECTICAL D501003 INTERIOR DISTRIBUTION TRANSFORMERS Transformers fed downstream of the Main Distribution Panel. Assemblies include transformers, conduit, conduit support, and wire from the Main Distribution Panel to the Transformer.

D50 ELECTICAL D501004 PANELBOARDS Branch circuit distribution panelboards. Assemblies include panelboards, breakers, and conduit and wire provideing power to the panelboards. Main Distribution Panelboards and distribution subpanels are included in this equipment category. Also includes Automatic Transfer Systems (ATS) that normally selects the primary or normal source of power from an emergency source when the primary or normal source of power is interrupted.

D50 ELECTICAL D501005 ENCLOSED BREAKERS Over-current protection device enclosed in its own housing for protecting a single circuit. Asseblies include enclosed circuit breaker, conduit and wiring providing power to the enclosed circuit breaker.

D50 ELECTICAL D501006 MOTOR CONTROL CENTERS This is a cabinet in which motor starters and operational devices are contained. Assemblies include the motor control center cabinet, motor starters, contacts, switches, conduit and wire providing power to the motor control center and all associated items.

D50 ELECTICAL LIGHTING AND BROANCH WIRING Lighting systems include light fixtures and devices, i.e., switches, recepticles, and equipment connections.

D50 ELECTICAL D502001 BRANCH WIRING This assembly includes conduit and wire from a branch circuit ditributio panelboard to recepticles, lighting switches, and equipment connections. Recepticles are also included.

D50 ELECTICAL D502002 LIGHTING EQUIPMENT This assembly includes conduit and wire from switching devices to fixtures, fixture mountings, lamps (type and wattage), and switching devices. Includes interior and exterior (attached to facility). Exit lights to identify code required ingress/egress paths are also included.

D50 ELECTICAL OTHER ELECTRICAL Systems not included in System D5030

D50 ELECTICAL D509002 EMERGENCY LIGHTING AND POWER Assemblies include fixtures, motors used for power generation, connection and teating, conduit, wire, battery chargers, batteries, and solar panels.

D50 ELECTICAL Emergency Lighting Lighting providing illumination for a pathway to emergency exit in a facility in the event of failed electrical power

D50 ELECTICAL Emergency Power (Generator) An emergency generator providing electrical power to a facility or system in the event the primary or normal source of power is interrupted.

F-TE-2f

TOC

F-TE-2f Reserve Training

AFSC Annual Hours

3E0X1 - Electrical/Power Production 116

3E1X1 - HVAC 116

3E2X1 - Pavements/Equipment 116

3E3X1 - Structures 116

3E4X1 - WFMS (Plumbing/Fuels) 116

3E6X1 - Ops Mgt 116

F-TE-2g

TOC

F-TE-2g. Facilities requiring Pest Management Inspections

Facility Isp Frequency Square Footage

470 Monthly 12,798

440 Monthly 1,654

474 Monthly 27,979

F-TE-2h

TOC

F-TE-2h. Sand Barrel/Ice Melt Buckets/PVC Snow Marker Stakes and Hydrant Flags:

Location Est Qty

Sand Barrel/Ice Melt Buckets/Snow Shovels Basewide 60

Snow Marker Stakes 800

F-TE-2i

F-TE-2i. Facilities to Be Maintained By KTR. The KTR shall inspect and clean mechanical/utility rooms monthly. TOC

Facility Nomenclature QTY Bld Story Roof Type Gutter Inspections Qty in SF Utility Mechanical Room Building Gutters and Downspouts to be maintained:

15 Billboard 1 ea Location Quantity

98 Storage 864 1 Asphalt Shingle Basewide Gutters 27,443 LF

99 Rec facility 1ea Asphalt Shingle Basewide Downspout/Leaders 14,930 LF

100 Old Fire Station 16,007 1 Tar

102 Switch Station 1 ea

151 Comm 3,084 1 Fiberglass Shingle

153 Antenna Support 1 ea

201 Sewage Pump Sta 250 1 Metal

207 Storage 2,064 1 Metal

209 Supply 94,007 1 Metal

20907 Warehouse Sup & Equip 120 1 Precast Concrete

20908 Warehouse Sup & Equip 120 1 Precast Concrete

20909 Warehouse Sup & Equip 120 1 Precast Concrete

20910 Warehouse Sup & Equip 120 1 Precast Concrete

20911 Warehouse Sup & Equip 120 1 Precast Concrete

20912 Warehouse Sup & Equip 120 1 Precast Concrete

20913 Warehouse Sup & Equip 120 1 Precast Concrete

20914 Warehouse Sup & Equip 120 1 Precast Concrete

20915 Warehouse Sup & Equip 120 1 Precast Concrete

20916 Warehouse Sup & Equip 120 1 Precast Concrete

20917 Warehouse Sup & Equip 120 1 Precast Concrete

20918 Warehouse Sup & Equip 120 1 Precast Concrete

20919 Warehouse Sup & Equip 120 1 Precast Concrete

20920 Warehouse Sup & Equip 144 1 Precast Concrete

20921 Warehouse Sup & Equip 144 1 Precast Concrete

20922 Warehouse Sup & Equip 144 1 Precast Concrete

20923 Warehouse Sup & Equip 144 Precast Concrete

20924 Warehouse Sup & Equip Precast Concrete

211 Load Platform 1 ea

213 Supply Shed 6,336 1 Metal

214 Supply Shed 6,336 1 Metal

233 Haz Storage Fac 5,775 1 Metal

23901 Retaining Wall Coal yard 763 LF

241 Scales 1 ea 891 1

380 Mogas storage 10,000 ga 1

381 Solvent Storage 25,000 ga 1

382 Solvent Storage 25,000 ga 1

383 Hydrant Fueling Building Metal

384 Veh Fill Station - Overhead Protection Metal

385 Veh Fill Station - Overhead Protection Metal

391 Light, Beacon 1 EA 1

393 Truck Inspection 1,928 1 Metal

394 Visitor’s Center 1,600 1 Metal

395 Fuels Pmp Sta 274 Metal Gable

396 Petrol Ops Bldg 2,438 1 Asphalt Shingle

397 Fuels Unload 10L 1

399 Trk Fill Stand 10L 1

400 Fuel Storage Tank 630,000 ga

402 Fuel Storage Tank 630,000 ga

403 Fuel Storage Tank 630,000 ga

404 Hydr FL Bldg 1,342 1

405 POL Storage Shed 1,008 Metal

412 Veh Parking 25,101 SY 3

413 Trk Fill Stand 20L 1

414 Trk Fill Stand 20L 1

416 Fuels Unload 40L

419 Veh Fill Station 30L Metal

420 Veh Maint 29,123 Metal

421 Refuel Veh 2,113 1 Metal

422 Antenna Support 1 ea 1

423 Rec Facility 1 ea 1

426 Aircraft Shop 19,444 1 Metal

427 Res Forces Tng 29,041 2 Metal/Built-up

428 EOD Vehicle Ops Parking Garage 3,100 2 Metal

430 SP Ops 8,518 1 Metal

431 Res Forces Tng 8,460 Metal

433 Rec Pavilion (Reserve Forces Gen Training) Asphalt Shingle

434 Nose Dock 36,267 2 Metal

435 Nose Dock 28,679 2 Metal

436 Nose Dock 28,679 Metal

437 Nose Dock 31,142 2 Metal

438 Nose Dock 29,471 2 Metal

439 Nose Dock 31,738 2 Metal

440 Community Activity Center 1,654 1 Metal

441 Community Center Pavilion 1,200 1 Metal

443 Main Gate 1,680 1 Metal

444 Overwatch Facility 77 1 Metal

44301 Billboard 1 EA

446 Vehicle Barrier 1 EA

447 Access Control Facility (Annex Guard Shack) 36 SF 1 Pre-Fab Metal

448 Contract/TMO 17079 1 Metal

44801 Retaining Wall 182 LF

450 MWR Facility 5,120 1 Metal

451 Veh Parking Comp 6,967 SY Metal

452 Sanitary Sewer Pump Station 30

453 Aircraft Shop 9,733 1 Metal

45301 Retaining Wall 135 LF

454 Carwash 1,477 1 Metal

455 Aircraft Shop 166 Asphalt Shingle

460 Rec Facility 1 ea 1

467 Recreation Pavilion 1500 Metal

468 Recreation Pavilion 1500 1 Metal

469 Billboard 1 ea 1

470 Dining Hall 12,798 Metal

474 Fire Station 27,979 1 Metal

47410 Vehicle Parking Non Org 1,784 SY

47420 Fire Dept Sidewalks 450 SY

475 Fire Dept Storage 3,496 Metal

476 Deluge Pump Station 1,222 Metal

477 Fire Reserve Station Metal

563 Gym 11,580 1 Metal/Tar

572 Toilet/Shower Building 1,369 1 Metal

573 Athletic Field/Softball 75,966

574 Tennis Court 7,200

575 Basketball Court 7,980

576 Volleyball Court 3,911

578 Horseshoe Court 500

591 Jet Eng Shop 10,501 1 Metal

592 Maint Shop 68,085 1 Metal

59211 Elec Aircraft Outlets 6 ea

593 A/SE Shop 7,195 1

59301 Veh Fuel Sta 380 1

59302 Indust Waste/Treatment 1KG

595 Res Forces Tng 13,616 1

59501 Sewage Pump Sta 28

596 Res Forces Tng 36,985 2 Metal

59601 Ant support structure 2 ea

59602 Sewage Pump Sta 12

597 Res Forces Tng 14,858 2 Metal/Tar

59701 Sewage Pump Sta 20

599 Base Flag Pole 1 ea

600 Base Operations 31,485 1 Metal

60001 Sewage Pump Sta 36

60002 Retaining Wall 45 Sy

601 Rec Facility 1 ea Asphalt Shingle

602 Util Vault 684

604 Shed Sup & Equip BSE

609 Aerial Port Training Facility 1

611 Veh Fill Station - Overhead Protection

624 DASR/Generator 618 1 Precast Concrete

627 Fire Training Plane

628 Fire Simulator 1 ea 4 Metal

629 Firing Range 15 FP/3,596 Metal

633 CE Compressed Gas Building 1 ea 1 Metal

634 Open Grenade Launch 1 ea Metal

636 Storm Detention Pond 1 ea

637 Rec Facility 1 ea Metal

638 Sewage Pump Sta 75 Metal

641 BCE Facility 50,984 1 Metal

64110 Vehicle Parking Non Org 45,442 SY

64120 BCE Sidewalks 600 SY

64130 Open Storage BCE 132110 Sy

64140 Misc Storage Tank 1 ea

642 BCE Storage 2,000 1 Metal

643 Pest Control Shop 2,160 1 Metal

644 Pavilion 1 ea Asphalt Shingle

645 Readiness Storage 3,360 1 Metal

646 Pedestrian Bridge 1 ea

647 Marine Retention Pond 3,200LF

648 Marine Complex 23,544 SF 1 Metal

64810 Vehicle Parking Non Org 3,683 SY

64820 Marines Sidewalks 520 SY

64840 Vehicle Parking Org 3667 SY

649 Marine Vehicle Wash Facility 1,683 SF Metal

661 Rec Facility 1 EA Asphalt Shingle

663 Sqdrn Ops 25,965 1 Steel (P.S.R.)

665 Antenna Support 2 EA

667 Res Forces Tng 9,182 1 Metal

668 Sqdrn Ops/Simulator 13,147 2 Metal

669 Medical Fac 18,660 1 Metal

670 Res Forces Tng 8,398 1 Metal

671 Cmd Post/Offices 14,907 1 Metal

674 Road Bridge 60 LF

676 Antenna Support 4 ea

679 Fuel Spill Collector 36 kg

683 Admin Offices 1709 1 Metal

685 Weigh Scale 1 ea

687 Recycle Shop 4,000 1 Metal

688 Generator Shop 4,000 1 Metal

689 Load Platform 270

691 BCE Storage Shop 1,200 1 Metal

692 Traffic Chk House 132 1 Asphalt Shingle

694 Ammo Bunker 1,500 1 Concrete-Earth

695 Ammo Storage 760 1 Metal

696 Ammo Storage 2,400 1 Metal

702 Airfield Instruments 197

703 Deicing Recovery 956 BL

704 ILS/Generator 1 ea

705 ILS/Generator 1 ea

708 ASR/Generator 1,520

714 Vortac 1 ea

716 Comm/Receiver 1

731 ILS/Generator 1 ea

732 Airfield Instruments 2 ea

739 Fuels Hydraulic System 1,750 gm

740 Pipeline 22,550 LF

760 RAPCON 9,500 1 Metal

761 Rec Pavilion (Rapcon Center) Asphalt Shingle

762 Control Tower 6,992 7 EPDM

767 Airfield Lighting Vault 1 ea 1 Metal

770 Windsock 1 ea

771 Windsock 1 ea

772 Airfield Instruments 1 ea

791 Septic Tank 1 ea 36KG

805 Water well 26 kg

809 Pump House 1

810 Septic Tank 1 ea 1 KG

887 Spill Collector 3kg

895 Spill Collector 25kg

899 Walkway Bridge 157 LF

900 Steam mains(VACANT) 82856 LF

901,905, 957 Roads Includes 905, 957 130,619LF

903 Road Bridge 20 LF

904 Vehicle Parking Non Org 113,873 SY

913 Vehicle Parking Non Org 292 SY

931 Vehicle Parking Non Org 2,323 SY

906 Sidewalk 22,374SY

907 Retaining wall 1,077 SY

908 Driveway Includes 911, 929 68,221 SY

909 Load Platform 23,309

912 Curbs and Gutters 89,612LF

914 Open storage 6,076 SY

915 Open storage 16,009 SY

916 Vehicle Parking Org 5,514 SY

932 Vehicle Parking Org 374SY

917 Open Storage 6,458 SY

919 Gas Mains 28,735 LF

921 Water Dist Mains 43,318LF

922 Storm Drain Disp 108,274 LF

923 Water Supply Main 28,813 LF

925 Fire Protection Water Mains 9,001 LF

926 Sanitary Sewer Main 47,279 LF

927 Fire Hydrants 91EA

935 Equip Pads 1,545 SY

937 Telephone pole Fac 630 LF

938 Exterior lights 313 EA

940 OH Power lines, Primary 2,612 LF

941 UG power lines, Primary 6,522 LF

943 Telephone ducts 8 mi

946 OH Power lines, Second 758 LF

947 UG Power lines, Second 12,913 LF

950 Security fence 14,762LF

951 Interior fence 1139 LF

952 Boundary Fence 64,101 LF

954 Aircraft Storage 3,252 SY

955 Runway 277,777 Sy

956 Navy Runway 38,000 Sy

958 Power Check Pad 7,301 SY

959, 960 Power Check Pad Includes 960 9,331 SY

961 Jet Engine Shop 750 Metal

963 Oil Water Separator 15 kg

964 Oil Water Separator 30 kg

965 Oil Water Separator 25 kg

966 Oil Water Separator 40 kg

967 Traffic Lights 3 ea

971 Approach lights 2,400 LF

973 Open Storage Supply 100 SY

980 Support Structure 88 EA

984 Wash Rack 6100

986 Approach lights 12,000 LF

987 Taxiway Lights 28,977 LF

988 Runway Lights 34,251 LF

989 Airfield Lights 2 ea

991 Apron 301,441 SY

996 Pad Power Check 563 Sy

997 Paved Shoulders 351,738 SY

998 Taxiway 380,807 SY

999 Overruns 44,444 Sy

F-TE-2j

TOC

F-TE-2j. Grounds Maintenance - Wetlands - Herbicide Application Summary

Item Amount Unit Note

Improved Grounds 79.39 Acres

Edging 130,351 Linear Feet

Trim 25,660 Linear Feet Includes 2,430 LF of fencing (2,280 LF for POL)

Police improved grounds 86.78 Acres Additionally this includes 580,833 square yards of paved areas within the improved grounds.

Shrubs 358 Each

Hedge 265 Linear Feet

Mulch 22,000 Square Feet See Grass Cutting Map

Mulch around trees 5,680 Square Feet Set Tree Mulching Map

Fence 67,733 Linear Feet

Semi-improved Grounds 932.23 Acres 295 acres of this is BASH

Vegetation Control security fences 67,733 Linear Feet 26,660 linear feet to be treated with herbicide

Vegetative beds 41,224 Square Feet

Flower beds 700 Square Feet

Stream banks & Drainage ditches 28,716 Linear Feet

Wetlands on NFARS: F-TE-7 Base Wetland Delineation Map

Wetland ID Acres

Wetland A 4.87

Wetland B 5.28

Wetland C 2.71

Wetland D 2.02

Wetland E 1.19

Wetland F 2.38

Wetland G 0.7

Wetland H 0.67

Wetland I 0.86

Wetland J1 0.7

Wetland J2 0.1

Wetland K 1.43

Wetland L 0.28

Wetland LA 0.09

Wetland LA2 0.04

Wetland LA3 0.01

Wetland M 0.12

Wetland N 1.32

Regulated Ditches 24,000 LF

Cayuga Creek 1,000 LF

Herbicide Application Summary

Area of Application Herbicide Combination* Application Times Acres to be Treated Maximum Estimated Application Volume per Treatment (pints) Purpose

Fenceline Pre-emergent: AM-40, Barricade Growing season, IAW manufacturer’s recommendations. Maximum application of twice per year. 0.61 AM-40: 0.61 Retard weed growth and help to eradicate resilient weeds.

Post-emergent: Roundup Pro™ or Kleenup Pro™, Triamine® Barricade: 0.61

Roundup Pro™: 4.90

Kleenup Pro™: 1.22

Triamine®: 2.44

Railroad Tracks, Taxiways, and Runway Overruns Pre-emergent: AM-40 Growing season, IAW manufacturer’s recommendations. Maximum application of twice per year. 1.88 AM-40: 1.88 Eradicate vegetation and help to eradicate resilient weeds.

Post-emergent: Roundup Pro™ or Kleenup Pro™, Triamine® Roundup Pro™: 15.04

Kleenup Pro™: 3.76

Triamine®: 7.52

Improved Areas Pre-emergent: Growing season, IAW manufacturer’s recommendations. Maximum application of twice per year. 87.5 Barricade: 116.10 Broadleaf weed control.

Barricade Triamine®: 464.40

Post-emergent:

Triamine®

Tree Beds and Landscape Beds Pre-emergent: Growing season, IAW manufacturer’s recommendations. Maximum application of four times per year. 1.07 Barricade: 1.07 To control weed growth in tree beds and landscape beds.

Barricade Roundup Pro™: 8.56

Post-emergent: Roundup Pro™, Triamine® Triamine®: 4.28

F-TE-2k

TOC

F-TE-2k Pavements Clearance Maintenance Consumable Estimates (Sweeper & Snow Removal)

F5.3.1.2 Pavement Sweeping. See Airfield and Street Sweeping Plans in F-TE-7

Flightline Sweeping Equipment

Estimate only and is dependent on frequency of use and operator proficiency.

Equipment Type Frequency Qty

Curtain Replacements Annual 4 Sets

Gutter Broom Replacements Annual 4 Sets

Snow Plow Blades, Brooms: Frequency is Annual

Equipment Type Size Qty

Blades 72”x6” 3 Ea.

Blades 100”x8” 1 Ea. every other year

Blades 96”x8”x5/8” 1 Set. Set equals 2

Under Body Grader Blades 72”x6” 10-15 Sets. Set equals 2

Shoes 32 Ea.

Broom Core Replacements 18’ Wide 2-4 Sets

F-TE-2l

TOC

F-TE-2l High Mast Lighting

Area Pole Number Heads Height Wattage

F-TE-2-m

F5.3.1.1.3 Locksmith Program

Quantity keys cut per year 200

Sheet of

SHEET NUMBER

S U

B M

I T

E

D

Y

R

A W

N

G

V

PROJECT NO.

ISSUE DATE:

VER.

C H

F

L

P

O J

Z

K

1OCT 2022

N/A

F-TE-7

BASE OPERATING SUPPORT CONTRACT

CONTRACT NO:

AWARD DATE:

u s c e a b o n t r w i g d

AutoCAD SHX Text

BOOM PLACE

G-731

TAXIWAY 'E'

US. HWY. 31

NE - SW (INSTRUMENT) RUNWAY 200' X 12,500'

PARALLEL TAXIWAY 'F'

TAXIWAY 'D'

OFF BASE

DINING FACILITY

77901

TOWER

WATER

TAXIWAY 'B'

NE - SW (INSTRUMENT) RUNWAY (200' X 12,500')

TAXIWAY 'C'

TAXIWAY 'G'

EAST LOOP ROAD

G-702

20001

G-28

(11)

G-14

20901-20924

10001

TAXIWAY 'A'

MAINTENANCE

VEHICLE

HOOSIER BLVD

59601

59602

60001

59302

59301

59701

67102

G-671

DEAN BALDWIN

59501

WEST GATE

WARTHOG STREET

GRISSOM AVENUE

G-410

FORTRESS ST.

33701

DOC EVENS AVE.

THUNDERBOLT AVE.

STORAGE AREA

RV

G-404

HARRY FOREMAN DR.

TANKER

STREET

CHOCKS LANE

SKYTRAIN

BOOM

PLACE

BOXCAR

BAKALAR LANE

ATTERBURY WAY

SEXTANT LANE

LEATHERNECK

DRIVE

DRAGONFLY LANE

MUNITIONS DRIVE

DOC EVENS AVENUE

DISCOUNT TIRE WAREHOUSE

MARATHON GAS STATION

CAR DEALERSHIP

GRISSOM AEROPLEX AIR PARK AND MUSEUM

DRIVING RANGE

LEANING TREE GOLF COURSE

TAXIWAY 'H'

PAINTING

(200)

MIAMI COUNTY AVIATION

C-STORE

VILLAGE

PANTRY

GAS MAIN

WAREHOUSE

VERSION

APPROVED BY:

DESCRIPTION

DATE

FH

SS

ST

CB

MW

G-731

TAXIWAY 'E'

MATCH LINE

MATCH LINE

ROADS, PARKING & R.R.S

STREETS, ROADS, RAILROADS

AND VEHICLE PARKING AREAS

EDGE OF RUNWAY, TAXIWAYS, PARKING RAMP

OVERRUN

DRAINAGE CHANNEL OR DITCH

NATURAL FEATURES

AIRFIELD PAVEMENT

AIR FORCE PROPERTY LINE

%%uLEGEND

WETLANDS

GRAPHIC SCALE IN FEET

776 ILS LOCALIZER

FAC # DESCRIPTION

727 CONTROL TOWER

715 TRANSMITTER/RECEIVER

708 ASR

151 TELEPHONE EXCHANGE BUILDING

102 ELECTRICAL SWITCHING STATION

18 RAPCON COMMUNICATION BUILDING

THE FOLLOWING ARE USAFR FACILITIES OUTSIDE AIR FORCE OWNED PROPERTY

M. S. L.

MAG VARIATION 4%%D 27' WEST

DATE OF DATA MAY 2010

ANNUAL CHANGE 0.1%%D WEST

AIRFIELD ELEV. 811' ABOVE

ELECTRICAL ROOM RM 224

CANOPY

RM 100

STRUCTURES SUPPORT RM 115

RESOURCES OPERATIONS RM 114

STORAGE RM 113

READINESS OPERATIONS RM 111

READINESS CHIEF RM 112

OPS PROGRAMMING CHIEF RM 109

OPS OFFICER RM 110

PROGRAMMING RM 108

ORDERLY ROOM RM 106A

1ST SGT ART RM 106C

TMG ART RM 1011

SENIOR ART RM 107

ASSOCIATE ART RM 106B

ADMINISTRATION RM 102

COMMANDER'S OFFICE RM 104

BASE CIVIL ENGINEER RM 103

RM 136

RM 135

COPY ROOM RM 105

TRAINING ROOM RM 119

RM 101

MEETING/ CONFERENCE RM 118

OPERATIONS ADMINISTRATION RM 120

OPERATIONS OFFICE RM 121

WOMEN'S ROOM

MEN'S ROOM

ENVIRONMENTAL OPERATIONS RM 124

ENVIRONMENTAL CHIEF RM 125

OFFICE RM 126

CHIEF OF DESIGN RM 128

ENGINEERING CHIEF RM 129

OPERATIONS OFFICE RM 127

PRINT ROOM RM 130

STORAGE RM 117

CONTRACT OFFICE RM 132

CONTRACT MANAGEMENT RM 131

CONFERENCE/ CLASSROOM RM 116

STRUCTURES FOREMAN RM 209

STORAGE RM 219

RM 201

RM 137

RM 138

BREAK ROOM RM 139

JANITOR'S CLOSET RM 228

MEN'S LOCKER ROOM

STRUCTURES OFFICE RM 210

SIGN SUPERVISOR RM 211

ELECTRICAL TESTING RM 212

STRUCTURES SHOP RM 213

ELECTRICIAN RM 215

CARPENTRY RM 214

ELECTRICAL DISTRIBUTION RM 216

SHEET METAL RM 217

LOCKSMITH RM 216

PAVEMENTS AND GROUNDS RM 300

HORIZONTAL FOREMAN RM 220

HORIZONTAL RM 221

MATERIAL CONTROL OFFICE RM 226

SUPPLY RM 225

MOBILITY OFFICE RM 222

MOBILITY RM 223

MATERIAL CONTROL RM 227

OVERHEAD DOOR (TYPICAL)

RM 134

RM 202

RM 200

RM 203

WOMEN'S LOCKER ROOM

WOMEN'S ROOM

MEN'S ROOM

RM 301

RM 232

RM 107

RM 101

RM 106

RM 109

RM 108

RM 110

RM 104

RM 105

RM 102

RM 103

OVERHEAD DOOR

%%UBUILDING 641

SCALE: NONE

%%UBUILDING 642

%%UBUILDING 643

%%UBUILDING 691

CONTRACTOR ADMINISTRATION AREAS

JOINT SHOP USE AREAS

CONTRACTOR STORAGE AREA

WINDCONE

VG 14'

VG 20'

ROADS, PARKING & R.R.S

STREETS, ROADS, RAILROADS

AND VEHICLE PARKING AREAS

EDGE OF RUNWAY, TAXIWAYS, PARKING RAMP

OVERRUN

AIRFIELD PAVEMENT

AIR FORCE PROPERTY LINE

SWITCH

TRANSFORMER, PAD MOUNTED

UTILITY

HANDHOLE

MANHOLE

GENERATOR

PRIMARY OVERHEAD

PRIMARY UNDERGROUND

SECONDARY OVERHEAD

SECONDARY UNDERGROUND

X600

X629A

X629

X628

X696

X639

X687

X683

X648

X692

X593

X591

X596

X597

X592B

X592A

X595

X638A

X638B

X668A

X668B

X669

X667

X663

X641

X473

X472

X470

X440

X421

X420

X394

X404

X201

X396

X563

X427B

X427A

X476

X430

X474

X426A

X426B

X453

X100

X434

X431

X435

X436

X436A

X439B

X233

X448

X439A

X438

X670

X437

B14

B13

B12

B11

B10

B9

B8

B7

B6

B5

B4

X13

X736

X767

X523

X735

X714

X715

X708

X727

X704

X702

X760

X393

X645

X475

XFR-00563-01

XFR-00443-01

XFR-00426-01

XFR-00101-01

XFR-00431-01

SCI4-1

NEED ID

SCI-7

SC9-2

SCI2-1

MH211E

MH229E

AutoCAD SHX Tex

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .