A18_ID Floorings Sheets Amended.pdf

PDF 3 MB Posted

Attached to
Repair and Renovate Dorm 742
Solicitation number
FA4626-26-R-0009
Issued by

About this file

This document consists of architectural floor plans for a federal facility renovation project at Malmstrom Air Force Base, Montana, prepared for Global Strike Command.

The plans depict finish details for the first, second, and third floors of a residential dormitory building. Each floor plan is drawn at a scale of 1/8" = 1'-0" and includes detailed room layouts with material tag designations. The building contains multiple residential units, common areas including corridors, laundry facilities, mail room, storage areas, bicycle storage, and utility spaces such as electrical rooms, telecommunications rooms, and janitorial closets. The plans utilize a floor material tag legend that identifies various finish materials by code (RFT, CT, CONC, WOM, TCTP) indicating specifications for flooring materials throughout the structure. Architectural details include stair locations, room designations, and material callouts positioned at regular intervals around the plan margins. The document serves as a reference for construction contractors regarding the specified floor finishes and spatial organization required for the building renovation at the military installation.

View the file

Other files

File Type Posted
Solicitation Amendment FA462626R00090003 SF 30.pdf PDF
A13_QandA_Repair and Renovate Dorm 742_14 May 2026.pdf PDF
A1_Combined Specifications.pdf PDF
Solicitation Amendment FA462626R00090002 SF 30.pdf PDF
A19_Malmstrom Dorm 742-Bid Addendum 1.pdf PDF
A13_Repair and Renovate Dorm 742 QA_13May26.pdf PDF
A8_FA462626R0009_Section_L_and_M.pdf PDF
A18_Finish Palettes 742.pdf PDF
A15_Staging Area.pdf PDF
A14_Water Heater Detail.pdf PDF
A12_Furniture Inventory Dorm 742.xlsx XLSX spreadsheet
A16_Traffic Control.pdf PDF
Solicitation Amendment FA462626R00090001 SF 30.pdf PDF
A17_Building Envelope Report.pdf PDF
A13_Repair and Renovate Dorm 742 QandA dated 11 May 2026.pdf PDF
A11_Subcontractor Consent.pdf PDF
A10_ CEAL_Blank.xlsx XLSX spreadsheet
A7_Past Performance Reference_Questionnaire.docx DOCX document
A4_Drawings.pdf PDF
A3_Schedule of Drawings.pdf PDF
Solicitation - FA462626R0009.pdf PDF
A2_Submittal Schedule.xlsx XLSX spreadsheet
A1_Combined Specifications.pdf PDF
A8_FA462626R0009_Section_L_and_M.pdf PDF
A6_Microbial Inspection Report.pdf PDF
A9_WD MT20260062.pdf PDF
A5_Asbestos and Lead Paint Inspection Report.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLOOR MATERIAL TAG LEGEND

TCPT-1

CARPET TILE (TCPT-1)

HATCH INDICATES APPROX AREA OF CARPET TILE FLOOR.

REFER TO DETAILS, FLOOR FINISH SCHEDULE AND SPECIFICATIONS

FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT CENTERLINE OF

DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

CONC-1

SEALED CONCRETE (CONC-1)

HATCH INDICATES APPROX AREA OF CONCRETE FLOOR TO BE RE-SEALED,

REFER TO DETAILS, FLOOR FINISH DIAGRAM, SEE SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT

CENTERLINE OF DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

RTF-1

RESILIENT FLOORING (RTF-1 )

HATCH INDICATES APPROX AREA OF RESILIENT TILE/PLANK FLOORING

REFER TO DETAILS, FLOOR FINISH DIAGRAM, SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT

CENTERLINE OF DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

(E)

EXISTING / NOT IN SCOPE FLOORING (E )

HATCH INDICATES APPROX AREA OF FLOORING NOT IN SCOPE

REFER TO DETAILS, FLOOR FINISH DIAGRAM, SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT

CENTERLINE OF DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

WOM-1

WALK OFF MAT FLOORING (WOM-1 )

HATCH INDICATES APPROX AREA OF WALK OFF MAT FLOORING

REFER TO DETAILS, FLOOR FINISH DIAGRAM, SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT

CENTERLINE OF DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

NOTE:

SEE SHEET ID6.5 FOR FLOOR TRANSITION DETAILS

CT-1

TILE FLOORING (CT-1)

HATCH INDICATES APPROX AREA OF TILE FLOOR.

REFER TO DETAILS, FLOOR FINISH SCHEDULE AND SPECIFICATIONS

FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT CENTERLINE OF

DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

1/8" = 1'-0"16 FIRST FLOOR FINISH PLAN

PROJECT

NORTH

TRUE

NORTH

MATOC-24-0002

Attachment #10

FLOOR MATERIAL TAG LEGEND

TCPT-1

CARPET TILE (TCPT-1)

HATCH INDICATES APPROX AREA OF CARPET TILE FLOOR.

REFER TO DETAILS, FLOOR FINISH SCHEDULE AND SPECIFICATIONS

FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT CENTERLINE OF

DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

CONC-1

SEALED CONCRETE (CONC-1)

HATCH INDICATES APPROX AREA OF CONCRETE FLOOR TO BE RE-SEALED,

REFER TO DETAILS, FLOOR FINISH DIAGRAM, SEE SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT

CENTERLINE OF DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

RTF-1

RESILIENT FLOORING (RTF-1 )

HATCH INDICATES APPROX AREA OF RESILIENT TILE/PLANK FLOORING

REFER TO DETAILS, FLOOR FINISH DIAGRAM, SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT

CENTERLINE OF DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

(E)

EXISTING / NOT IN SCOPE FLOORING (E )

HATCH INDICATES APPROX AREA OF FLOORING NOT IN SCOPE

REFER TO DETAILS, FLOOR FINISH DIAGRAM, SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT

CENTERLINE OF DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

WOM-1

WALK OFF MAT FLOORING (WOM-1 )

HATCH INDICATES APPROX AREA OF WALK OFF MAT FLOORING

REFER TO DETAILS, FLOOR FINISH DIAGRAM, SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT

CENTERLINE OF DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

NOTE:

SEE SHEET ID6.5 FOR FLOOR TRANSITION DETAILS

CT-1

TILE FLOORING (CT-1)

HATCH INDICATES APPROX AREA OF TILE FLOOR.

REFER TO DETAILS, FLOOR FINISH SCHEDULE AND SPECIFICATIONS

FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT CENTERLINE OF

DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

1/8" = 1'-0"16 SECOND FLOOR FINISH PLAN

PROJECT

NORTH

TRUE

NORTH

RST-1

RST-1

FLOOR MATERIAL TAG LEGEND

TCPT-1

CARPET TILE (TCPT-1)

HATCH INDICATES APPROX AREA OF CARPET TILE FLOOR.

REFER TO DETAILS, FLOOR FINISH SCHEDULE AND SPECIFICATIONS

FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT CENTERLINE OF

DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

CONC-1

SEALED CONCRETE (CONC-1)

HATCH INDICATES APPROX AREA OF CONCRETE FLOOR TO BE RE-SEALED,

REFER TO DETAILS, FLOOR FINISH DIAGRAM, SEE SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT

CENTERLINE OF DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

RTF-1

RESILIENT FLOORING (RTF-1 )

HATCH INDICATES APPROX AREA OF RESILIENT TILE/PLANK FLOORING

REFER TO DETAILS, FLOOR FINISH DIAGRAM, SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT

CENTERLINE OF DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

(E)

EXISTING / NOT IN SCOPE FLOORING (E )

HATCH INDICATES APPROX AREA OF FLOORING NOT IN SCOPE

REFER TO DETAILS, FLOOR FINISH DIAGRAM, SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT

CENTERLINE OF DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

WOM-1

WALK OFF MAT FLOORING (WOM-1 )

HATCH INDICATES APPROX AREA OF WALK OFF MAT FLOORING

REFER TO DETAILS, FLOOR FINISH DIAGRAM, SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT

CENTERLINE OF DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

NOTE:

SEE SHEET ID6.5 FOR FLOOR TRANSITION DETAILS

CT-1

TILE FLOORING (CT-1)

HATCH INDICATES APPROX AREA OF TILE FLOOR.

REFER TO DETAILS, FLOOR FINISH SCHEDULE AND SPECIFICATIONS

FOR ADDITIONAL INFORMATION. FINISH TRANSITION AT CENTERLINE OF

DOOR, EXTEND FINISH WALL TO WALL AS INDICATED.

1/8" = 1'-0"16 THIRD FLOOR FINISH PLAN

PROJECT

NORTH

TRUE

NORTH

File details come from the government source that posted it. Updated .