This is a demolition site plan drawing for Building 631 at Malmstrom Air Force Base in Great Falls, Montana, prepared by the 341st Civil Engineering Squadron. The drawing shows detailed utility layouts and demolition requirements for Building 631, including water lines, sewer lines, electrical infrastructure, and stormwater systems.
The plan outlines three key demolition requirements: 1) demolition of sidewalks and picnic areas, 2) removal of vegetation adjacent to the dorm building while protecting other trees/shrubs, and 3) demolition of the berm and AT wall with site grading. The general notes specify complete demolition of the building including below-grade elements, asbestos abatement, lead paint survey requirements, proper material disposal off-base, installation of new irrigation systems, and seeding of disturbed areas. The drawing includes a comprehensive legend identifying various utility lines and infrastructure elements that must be considered during demolition work. The scale is 1"=20' and the drawing is marked as "NOT FOR CONSTRUCTION" and "ADDENDUM #1."
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
G
G
G
G
G
G
G
WV
WV
WV
WV
WV
WV
WV
WV
WV
WV
WV
N/A Contract No.:
NZAS 23-0030
Project No.:Designed by:
Drawn by:
Checked by:
N/A Drawing No.:
APR 2024
Date:
1" = 20' Scale:
Sheet No.
Sheet: 1
D. PACE
D. PACE
341ST MISSLE WING
341ST CIVIL ENGINEERING SQUADRON
ENGINEERING TECHNICAL SUPPORT (CEN)
AIR FORCE GLOBAL STRIKE COMMAND
MALMSTROM AIR FORCE BASE
GREAT FALLS, MONTANA
SITE PLAN
BLDG 631 DEMO
M. AMMONS
Sheet Id.
C-100
DNAMMOCEKIRTS
AIRFORCE GLOBAL
G
WI
N
ELI
1 s t M I S S
LEGEND
WATER_S_LINE
WATER_M_LINE
WATER_CONTROL_VALVE
WALLS
STORMWATER_LINES
STORMWATER_INLET
SIDEWALKS
SEWER_S_LINE
SEWER_MANHOLE
SEWER_M_LINE
PAVEMENTS
PAVEMENT_SLAB
HTHW_SUPPLY
HTHW
GAS_S_LINE
GAS_M_LINE
GAS_CONTROL_VALVE
FIRE_HYDRANT
FENCE_LINE
EXTR_LIGHTS
ELECTRICAL_TRANSFORMER
ELECTRICAL_S_UG
ELECTRICAL_S_OVERHEAD
ELECTRICAL_P_UG
ELECTRICAL_P_OVERHEAD
CURB_GUTTER
COMM_UTIL
BLDGS
WV
G
NOT FOR CONSTRUCTION
KEY NOTES
1) DEMOLISH SIDEWALKS AND PICNIC AREA AS SHOWN ON THE ATTACHED PLAN.
2) DEMOLISH VEGETATION IMMEDIATELY ADJACENT TO THE DORM TO ALLOW FOR BUILDING
DEMOLITION. PROTECT OTHER TREES AND SHRUBS ON THE SITE.
3) DEMOLISH BERM AND AT WALL & GRADE SITE, REMOVE EXCESS MATERIALS.
GENERAL NOTES
CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES NOT SHOWN FOR DEMOLITION INCLUDING UTILITIES THAT CROSS THE SITE, VEGETATION NOT IMMEDIATELY ADJACENT TO BUILDING AND
SIDEWALKS AROUND THE PERIMETER OF THE SITE. CONTRACTOR WILL BE RESPONSIBLE FOR
REPAIR/REPLACEMENT OF ANY ITEMS DAMAGED DURING DEMOLITION.
CONTRACTOR IS RESPONSIBLE FOR ALL SURVEYS NEEDED FOR THE DEMOLITION AND TO GRADE THE
SITE.
PERFORM ASBESTOS ABATEMENT, LEAD PAINT SURVEY AND ADDITIONAL ASBESTOS TESTING PRIOR
TO DEMOLITION.
DEMOLISH COMPLETELY THE BUILDING, ALL ABOVE GRADE AND BELOW GRADE ELEMENTS, INCLUDING
BUT NOT LIMITED TO CONCRETE FOOTINGS AND FOUNDATION.
DISPOSE OF ALL DEMOLISHED, EXCAVATION AND EXCESS MATERIAL IN A LEGAL MANNER, OFF MAFB.
DEMO ENTIRE ATFP WALL AND BERM SURROUNDING BUILDING.
IMPORT BACKFILL MATERIAL, COMPACT AND BRING SITE TO GRADE, GRADE SITE OF DEMOLISHED BUILDING TO TIE INTO EXISTING AREAS AND PROVIDE POSITIVE DRAINAGE TO NEARBY STORM DRAIN
SYSTEM.
ALL DISTURBED AREAS SHALL BE SEEDED AND MAINTAINED UNTIL GRASSES ARE ESTABLISHED.
INSTALL NEW IRRIGATION SYSTEM TO COVER NEWLY SEEDED AREAS.
Feet 0 40 80
ADDENDUM #1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION BOUNDARIES
| Sheets and Views |
| Bldg 631 Site-Layout1 |
File details come from the government source that posted it. Updated .