3_1996 Reno As Builts.pdf
PDF 11 MB Posted
- Attached to
- DSN/CSN Demo Dorm 631 Federal contract opportunity
- Solicitation number
- FA4626-25-R-0001
About this file
This document is a Solicitation for the DSN/CSN Demo Dorm 631 project. The work under this project includes providing conceptual drawings and a 100% construction drawing, as well as demolishing an existing building and associated site work, in accordance with the Statement of Work (SOW). The project NAICS code is 238910 with a small business size standard of $19,000,000.00, and the estimated project magnitude is between $1,000,000.00 and $5,000,000.00. The Solicitation is issued by the Department of the Air Force Global Strike Command. Funds are not presently available for this effort, and the Government reserves the right to cancel the solicitation at any time.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PG01-G1-TITLE SHEET
| PG02-G2- SYMBOLS |
| PG03-G3-ABBREVIATIONS |
| PG04-C1-SITE UTILITY PLAN |
| PG05-C2- SITE UTILITY DETAILS |
| PG06-C3- BORIN LOGS |
| PG07-L1- LANDSCAPING PLAN |
| PG08-L2- IRRIGATION PLAN |
| PG09-L3- LANDSCAPING-IRRIGATION DETAILS |
| PG11-D2- DEMOLITION PLANS BASEMENT AND FIRST FLOOR |
| PG12-D3-DEMOLITON PLANS SECOND AND THIRD FLOOR |
| PG13-D4-MECHANICAL DEMOLITION- BASEMENT AND FIRST FLOOR |
| PG14-D5-MECHANICAL DEMOLITION- SECOND AND THIRD FLOOR |
| PG15-D6- ELEC. DEMOLITION- BASEMENT & FIRST FLOOR |
| PG16-D7-ELEC DEMOLITION- SECOND & THIRD FLOORS |
| PG17-A1.1- FLOOR PLANS BASEMENT AND FIRST FLOOR |
| PG18-A1.2- FLOOR PLANS SECOND AND THIRD FLOOR |
| PG19-A1.3- ENLARGED FLOOR PLANS |
| PG20-A1.4- REFLECTED CEILING PLANS BASEMENT AND FIRST FLOOR |
| PG21-A1.5-REFLECTED CEILING PLANS SECOND AND THIRD FLOORS |
| PG22-A1.6-ROOF PLAN |
| PG23-A2.1- WALL AND PARTITION TYPES FINISH SCHEDULE |
| PG24-A2.2- DOOR SCHEDULE DETAILS |
| PG25-A3.1-INTERIOR ELEVATIONS |
| PG26-A3.2-INTERIOR ELEVATIONS |
| PG27-A4.1- EXTERIOR BLDG ELEVATIONS NORTH, WEST, & PARTIAL DEMO |
| PG28-A4.2- EXT BLDG ELEVATIONS SOUTH, EAST, & PARTIAL WEST |
| PG29-A5.1- BUILDING SECTIONS DETAILS |
| PG30-A6.1- WALL SECTIONS, MECHANICAL ROOM SECTION, DETAILS |
| PG31-A6.2- MISC DETAILS |
| PG32-A7.1- FIRST FLOOR PLAN FLOORING INSTALLATION PLAN |
| PG33-A7.2-SECOND & THIRD FLOORS FLOORING INSTALLATION PLAN |
| PG34-A8.1-SIGNAGE |
| PG35-S1.1- KEY PLAN, GENERAL NOTES AND DETAILS |
| PG37-S2.2-KITCHEN ADDITION, PLANS, SECTIONS AND DETAILS |
| PG38-S3.1- MECHANICAL ROOM, ROF, MEZZANINE FRAMING AND FOUNDATION PLANS |
| PG39-S3.2- MECHANICAL ROOM, ROOF AND MEZZANINE DETAILS |
| PG40-S3.3-MECHANICAL ROOM, SCREEN WALL DETAILS |
| PG41-S4.1-BASEMENT STORAGE, PLAN, SECTIONS AND DETAILS |
| PG42-M1.1-PLUMBING-BELOW GRADE AND BASEMENT |
| PG43-M1.2-PLUMBING-FIRST FLOOR |
| PG44-M1.3-PLUMBING-SECOND AND THIRD FLOOR |
| PG45-M2.1-HYDRONIC PIPING-BASEMENT AND FIRST FLOOR |
| PG46-M2.2-HYDRONIC PIPING- SECOND AND THIRD FLOOR |
| PG47-M3.1-HVAC-BASEMENT AND FIRST FLOOR |
| PG48-M3.2- HVAC- SECOND AND THIRD FLOOR |
| PG49-M3.3- MECHANICAL ROOM |
| PG50-M4.1- HEATING,COOLING SYSTEM MECHANICS |
| PG51-M4.2- WASTE;WATER RISER DIAGRAM |
| PG52-M5.1- SCHEDULES |
| PG53-M5.2- SCHEDULES & DETAILS |
| PG54-M5.3-DETAILS |
| PG55-M6.1- EMCS |
| PG56-M7.1- FIRE SPRINKLER BASEMENT AND FIRST FLOOR |
| PG57-M7.2- FIRE PROTECTION SECOND AND THIRD FLOOR |
File details come from the government source that posted it. Updated .