Solicitation Amendment FA462520R00030008 SF 30.pdf

PDF 529 KB Posted

Attached to
Whiteman AFB Multiple Award Task Order Contract (MATOC) - FA462520R0003 Federal contract opportunity
Solicitation number
FA462520R0003
Issued by
Department of the Air Force Global Strike Command

About this file

This document provides details for a federal solicitation seeking a Multiple Award Task Order Contract (MATOC) for construction services at Whiteman Air Force Base in Missouri. The solicitation is a 100% small business set-aside for North American Industry Classification System code 236220, with a size standard of $39.5 million. The MATOC will provide for multi-discipline construction projects involving design, repair, renovation, alteration, or new construction. The Air Force seeks to award three indefinite-delivery, indefinite-quantity contracts valued between $100-250 million over a potential nine-year period. Small businesses have until June 10, 2020 to submit proposals, which will be evaluated in two phases spanning five factors. The representative project involves repairing infrastructure at the base club, with pricing required for evaluation.

View the file

Other files for this federal contract opportunity

Other files attached to Whiteman AFB Multiple Award Task Order Contract (MATOC) - FA462520R0003, newest first.
File Type Posted
Solicitation Amendment FA462520R00030012 SF 30.pdf PDF
20R0003 Atch 19 ISV Attendees.pdf PDF
20R0003 Atch 20 Q and A 200622.pdf PDF
20R0003 Atch L-4 Construction Cost Breakdown - Amended.xls XLS spreadsheet
Solicitation Amendment FA462520R00030011 SF 30.pdf PDF
20R0003 Atch 18 Q and A 200609.pdf PDF
Solicitation Amendment FA462520R00030010 SF 30.pdf PDF
20R0003 Atch 17 WAFB IFS Appendix.pdf PDF
20R0003 Atch 1 SOW 20May20.docx.pdf PDF
Solicitation Amendment FA462520R00030009 SF 30.pdf PDF
20R0003 Atch 15 Q and A 200520.pdf PDF
Attachment 13 509 MDG Public Health Travel Risk Assessment Form.pdf PDF
Attachment 14 509 SF Fast Pass Request.pdf PDF
20R0003 Atch 12 Q and A 200512.pdf PDF
20R0003 Atch 1 SOW 11May20.pdf PDF
Solicitation Amendment FA462520R00030007 SF 30.pdf PDF
Solicitation Amendment FA462520R00030006 SF 30.pdf PDF
Q and A 200507 Atch 1 - Bldg 3008 AHU Schedule.PNG PNG image
Q and A 200507 Atch 2 - Restroom Floor.jpeg JPEG file
20R0003 Atch L-3 Consent Letter.pdf PDF
20R0003 Atch L-1 Past Performance Questionaire.pdf PDF
20R0003 Atch 10 Q and A 200507.pdf PDF
Q and A 200507 Atch 3 - Storage Room Floor.jpeg JPEG file
20R0003 Atch L-2 Transmittal Letter.pdf PDF
20R0003 Atch 8 Q and A 200506.pdf PDF
Solicitation Amendment FA462520R00030005 SF 30.pdf PDF
20R0003 Atch L-4 Construction Cost Breakdown.xls XLS spreadsheet
Solicitation Amendment FA462520R00030004 SF 30.pdf PDF
20R0003 Atch 8 Q and A 200430.pdf PDF
20R0003 Atch 5 Q and A 200420 REVISED.pdf PDF
20R0003 Atch L-4 Construction Cost Breakdown.xls XLS spreadsheet
Solicitation Amendment FA462520R00030003 SF 30.pdf PDF
Solicitation Amendment FA462520R00030002 SF 30.pdf PDF
20R0003 Q and A 200420.pdf PDF
Solicitation Amendment FA462520R00030001 SF 30.pdf PDF
20R0003 Atch 2 Rep Project SOO 02Jan20.pdf PDF
20R0003 Atch 1 SOW 02April20.pdf PDF
20R0003 Atch L-2 Transmittal Letter.pdf PDF
20R0003 Atch 3 Whiteman AFB Climatology Data.pdf PDF
Solicitation - FA462520R0003.pdf PDF
20R0003 Atch L-4 Construction Cost Breakdown.xls XLS spreadsheet
20R0003 Atch L-1 Past Performance Questionaire.pdf PDF
20R0003 Atch L-3 Consent Letter.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

To schedule a site visit, extend the deadline for solicitation questions, and extend the solicitation deadline as The Purpose of This Amendment Is:

follows:

A) It has come to our attention that representatives from four (4) companies entered B3008, Base Club, without the knowledge or express consent of authorized Government personnel. The intent of this was to survey the site to gather information in relation to this MATOC representative project for proposal preparation. As this could create an unfair advantage, the Government will conduct a site visit on 27 May 2020 to ensure fair and equitable information for all potential Offerors.

1) No more than two (2) contractor employees/representatives per company will be allowed to attend the site visit and access the site.

2) Requests to attend the site visit must be received no later than 4:00 PM CST on 19 May 2020. Offerors are requested to submit site visit requests to 509cons.sollgca@us.af.mil, James McCoy, james.mccoy.17@us.af.mil, and Caleb Kirchhoff, caleb.kirchhoff@us.af.mil. Offerors are required to complete and submit Attachment 13, 509 MDG Public Health Travel Risk Assessment Form, and Attachment 14, 509 SF Fast Pass Request.

Attachments 13 and 14 are hereby incorporated with this amendment. Failure to complete and submit the required forms will result in denial of requests. Late requests will not be considered.

3) The site visit will take place on 27 May 2020, with times to be scheduled after receipt of all site visit requests. Instructions for arrival and meeting locations will be provided when scheduling allotted times.

4) Site visits will be conducted with small groups of contractor and Government representatives, not to exceed a total of 10 people. All attendees must wear a mask at all times and practice appropriate social distancing. Masks will not be provided by the Government. Failure to provide/wear a mask will result in denial of access to the site visit.

5) Site visit duration will be limited to no more than one (1) hour. There will be no discussions during the site visit, and questions will not be entertained. All questions must be submitted in writing to the Contracting Officer after conclusion of the site visit.

B) The deadline for submission of questions is extended to 3 June 2020, amending Section L Paragraph 1.4.

C) The solicitation deadline is hereby changed from 2 June 2020 at 2:00 PM CST to 10 June 2020 at 2:00 PM CST.

D) As a reminder, any questions or concerns in this matter or any other matters regarding this solicitation should be addressed solely with the Contracting Officer, James McCoy, at 509cons.sollgca@us.af.mil and james.mccoy.17@us.af.mil.

////////////LAST ITEM//////////////////

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Miscellaneous text in this section has been modified to:

SECTION L - INSTRUCTIONS TO OFFERORS

THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE PHYSICALLY

REMOVED FROM ANY RESULTANT AWARD, BUT WILL BE DEEMED INCORPORATED BY

REFERENCE.

1.0. Magnitude of Construction

a. The estimated project magnitudes fall under three categories:

i. Overall Multiple Award Task Order Contract (MATOC) Ceiling

ii. Subsequent Task Orders

iii. The Representative Project, Repair Missions End Club Infrastructure - B3008

b. IAW FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitudes for each category are as follows:

i. Overall MATOC ceiling - $135,000,000.00 in aggregate

ii. Task Orders - Subsequent Task Orders are estimated to be:

1. Between $250,000 and $500,000

2. Between $500,000 and $1,000,000

3. Between $1,000,000 and $5,000,000

4. Between $5,000,000 and $10,000,000

iii. Representative Project - Between $1,000,000 and $5,000,000

FA462520R00030008

1.1. Budget/Funding Information

Funding is available for the minimum guarantee ($500) for each of the MATOC awardees. Funding is not currently available for the representative project.

1.2. Eligibility

Proposals may be submitted by any Small Business concern. The NAICS for this solicitation is 236220. Joint ventures, teaming arrangements and Mentor Protege partners will be considered for award. Offerors must be registered in the System for Award Management (SAM) by the due date of proposals.

1.3. Notice of Pre-Proposal Conference

Pre-proposal information will be provided in a future amendment. Please continue to monitor beta.sam.gov to stay informed.

1.4 Solicitation Questions

Offerors are requested to submit questions to 509cons.sollgca@us.af.mil, James McCoy, james.mccoy.17@us.af.

mil, 660-687-5435 and Caleb Kirchhoff, caleb.kirchhoff@us.af.mil, 660-687-5436 no later than 3 June 2020.

All questions must be submitted in writing. All appropriate questions will be answered in an amendment(s) and posted to Beta.Sam.Gov. Information provided at the pre-proposal conference shall not qualify as a change in the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. See paragraph 2.5 for amendment acknowledgement requirements.

2.0. PROPOSAL PREPARATION INSTRUCTIONS

To assure timely and equitable evaluation of proposals, Offerors must follow the instructions herein. Proposals shall be neat, indexed (cross-indexed as appropriate), and assembled in an orderly manner. Include only information that is relevant to this source selection. Offerors must understand the functional relationship between Section L and Section M of this Solicitation. Section L provides information for the purpose of organizing the proposal and is not intended to be all-inclusive. Section M describes the evaluation factors for award. Since the Government evaluation of proposals will cover areas identified in Section M, proposals should address all such areas of evaluation. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Proposals that do not contain the information required will be ineligible for award.

Whiteman AFB networks utilizes a firewall that may cause delays in receipt of e-mails/attachments. Late receipts due to the network firewall or outages will be considered late. Offerors should allow sufficient time for the e-mail traffic to be delivered.

Proposals shall consist of three (3) separately labeled volumes; Volume A - Contract Documentation/Company Information, Volume B - Phase I, and Volume C - Phase II.

NOTE: All proposal preparation costs will be the sole responsibility of the Offeror. The Government will not reimburse any firm for their proposal preparation cost.

2.1 Volume A - Contract Documentation and Company Information

2.1.1. Contract Documentation

A signed copy of the SF 1442 and Amendments Acknowledgements must be included in this volume. Offerors must also complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the Offeror shall submit only those pages that require a fill-in.

2.1.2. Company Information

Authorized Offeror Personnel. Provide the name, title, telephone number, and e-mail address of the company

/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.

Company/Division Address, Identifying Codes, and Applicable Designations. Provide company/division's street address, county and facility code; CAGE code; DUNS code; TIN; and size of business (large or small).

2.2. Volumes B and C - Phase/Factor Index

Proposals will be evaluated in two (2) separate phases spanning five (5) distinct factors. Phases I and II correspond with submission Volumes B and C respectively. See below for a summary of each phase and the corresponding factors:

2.2.1 Volume B, Phase I

Factor 1 - KEY PERSONNEL Factor 2 - PAST EXPERIENCE Factor 3 - PAST PERFORMANCE

2.2.2. Volume C, Phase II

Factor 4 - REPRESENTATIVE PROJECT TECHNICAL CAPABILITY Factor 5 - PRICE

2.3. Proposal Formatting

Pages exceeding the page limitations set forth will not be read or evaluated, and will be removed from the proposal.

Volume Paragraph Number Factor CD/disc Requirement** Page Limit A. Contract Documentation/ General Information 1.0. N/A 1 Original Unlimited B. Phase I 2.0. Factor 1 - Key Personnel 1 Original 16 Pages B. Phase I 3.0. Factor 2 - Past Experience 1 Original Maximum of 3 Pages for each project (No more than 15 Pages total) B. Phase I 4.0. Factor 3 - Past Performance 1 Original Maximum of 3 Pages for each project (No more than 15 Pages total) C. Phase II 5.0. Factor 4 - Technical Approach to *Representative Project 1 Original 15 pages (not including drawings& Gantt chart) C. Phase II 6.0. Factor 5 - Cost/Price 1 Original Unlimited

*Representative Project NOTE: The Representative Project outlined in this solicitation will be used for evaluation purposes only.

Whereas the project represents a real requirement at Whiteman AFB, a task order will not be issued against the MATOC for the project upon award of the IDIQ Contract. It is intended that this will be a future project based on funding availability.

**CD submission is only required if submitting via mail. If you are submitting electronically, no disc submission is required.

Format for all proposal volumes shall be as follows (this format does not apply to drawings or Gantt charts):

a. Page size is required to be no more than 8 1/2" x 11" with 1" overall page margins.

b. Font size should be no less than 12.

2.4. INFORMATION REGARDING SUBMISSION OF PROPOSALS

All proposals and related documents will be submitted via CD/disc or electronically via e-mail/DoD SAFE to the 509th Contracting Squadron, unless otherwise noted. The CD/disc or e-mail must arrive at the designated time specified in the solicitation to be considered responsive and considered in the evaluation process. It is the Offeror's responsibility to ensure receipt of proposal at this office by the proposal due date and time identified in the solicitation. Mailed proposals (USPS, FedEx, UPS, DHL, etc.) must be sent to the following address:

509 CONS/PKA

Attn: Caleb Kirchhoff 660 10th Street, Suite 222 Whiteman AFB, MO 65305

E-mailed proposals must be sent to the following e-mail address:

509cons.sollgca@us.af.mil

Whiteman AFB network firewall or outages may delay receipt of proposals or attachments. Proposals received after proposal due date/time will be considered late. Late proposals will be processed in accordance with FAR

15.208 "Submission, Modification, Revisions, and Withdrawals of Proposals."

If an Offeror elects to submit their proposal electronically but the proposal exceeds e-mail attachment limitations, the Offeror may contract the 509th Contracting Squadron at 509cons.sollgca@us.af.mil to request the establishment of a DoD SAFE Drop-Box. The Government will not be responsible for delays in receiving a proposal due to a DoD SAFE Drop-Box establishment request.

Acknowledgement of solicitation amendments (SF30s) will be accepted electronically on the CD/disc or by e-mail. The acknowledgement must be received prior to solicitation closing date. The e-mail address is: 509cons.

sollgca@us.af.mil. Whiteman AFB network utilizes a firewall that may cause delays in receipt of e-mails /attachments. Late receipt of amendments due to a network firewall or outages will be considered late. Offerors should allow sufficient time for the email traffic to be delivered.

Offerors are cautioned that Whiteman AFB, MO has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAY SHOULD BE ANTICIPATED WHEN HANDCARRYING PROPOSALS. Offerors should allow sufficient time to obtain a visitor pass and arrive at 509 CONS PRIOR to the time specified for receipt.

Late proposals will be processed in accordance with FAR 15.208 "Submission, Modifications, Revisions and Withdrawals of Proposals."

Period for acceptance of offers: The Offeror agrees to hold its offer firm until 180 days after proposal due date.

2.5. Federal Holidays

The following Federal Legal Holidays are observed by Whiteman AFB:

New Year's Day (January 1).

Birthday of Martin Luther King, Jr. (Third Monday in January).

Washington's Birthday (Third Monday in February).

Memorial Day (Last Monday in May).

Independence Day (July 4).

Labor Day (First Monday in September).

Columbus Day (Second Monday in October).

Veterans Day (November 11).

Thanksgiving Day (Fourth Thursday in November).

Christmas Day (December 25).

3.0. FACTOR 1 - KEY PERSONNEL. NOTE: No more than sixteen (16) pages for this factor.

3.1. Each of the Factor 1 requirements are deemed to be material requirements of the solicitation. Specific required experience attributes must be supported; inferences will not be made by the Government. With respect to the required minimum durations of experience identified in Section M, Paragraph 2.1, Offerors must calculate and set forth expressly the total number years of experience. These totals must be supported by a Resume(s) which provides beginning and end dates for each period of claimed experience. Offeror shall affirm unequivocally that the proposed key personnel are either currently employed by the prime Offeror or shall submit with its proposal signed letters of intent to accept employment with the prime Offeror contingent upon contract award.

3.2. The Offeror shall submit key personnel that includes all of the following:

a. Offeror shall propose key personnel for all key positions described in Section M Paragraph 2.1;

b. Offeror shall provide identification of each proposed key person by position, title, and name;

c. Offeror's shall not propose that an actual or prospective employee hold more than one key position;

d. Offeror shall propose key personnel that individually meet both the certification and experience qualifications for the applicable key position detailed in Section M, Paragraph 2.1; and

4.0. FACTOR 2 - PAST EXPERIENCE.

NOTE: No more than a total of fifteen (15) pages for this factor.

4.1. Submit a minimum of two (2) example projects and a maximum of five (5) example projects demonstrating the Offeror's recent, relevant past experience. If more than five (5) projects are submitted, only the first five (5) will be evaluated. The projects submitted shall be limited to no more than three (3) pages each. Project descriptions that do not clearly describe the Offeror's experience, the scope of the project, or the periods of project performance will not be considered. This shall be compiled with Company experience. Do not include individual employee names, or any data that could be used to identify specific employees in this Factor.

4.2. Multiple Award Task Order Contracts (MATOCs) and other types of IDIQ contracts that provide for the issuance of task orders for the performance of projects may also be submitted for Factor 2. If an IDIQ type contract is submitted, an individual task order issued under the contract must also be submitted. The IDIQ and subsequent task order will be considered overall one project.

4.3. Provide the following information for each project:

a. Project Title

b. Location

c. Contract Number

d. Project Delivery Method: Indicate Design/Build; Design/Bid/Build; Integrated Design; Design Only; etc.

e. Role of Offeror: Indicate type and percentage of work performed by the Offeror or Offeror's team member.

f. Total Dollar Amount: Indicate if for design only, construction only or both design and construction. If the project is an IDIQ, identify the not to exceed (NTE) amount as well as dollar amounts for the range of task orders issued under the IDIQ.

g. Construction Start and Completion Dates: Project construction must be identified as complete or substantially complete. If an Offeror presents a project that is not substantially complete, the proposal must include an explanation of why that project should be considered.

h. Brief Description of Project: Address how the project experience is relevant to the Whiteman AFB MATOC Statement of Work. Indicate, as applicable, the facility type; square footage of office/admin space, any applicable security requirements i.e. ICD 705 compliance, and sustainability/energy efficient features. Provide a narrative that provides details on each of the above topics in order for the board to evaluate the relevancy of each project.

i. Customer Primary Point of Contact: Name, relationship to project, agency/firm, phone number, and e-mail address. The Government may contact and interview project references. Reference information will not be revealed to other parties.

j. Procuring Activity Point of Contact: Name, relationship to project, agency/firm, phone number, and e-mail address. The Government may contact and interview project references. Reference information will not be revealed to other parties.

k. Provide an explanation of relatable contract aspects, which are relevant to the proposed effort. This may include discussion of efforts to resolve problems encountered on previous contracts, and past efforts to identify and manage program risk. Clearly demonstrate management actions employed in overcoming problems and the effects of those actions in terms of improvements achieved or problems rectified.

5.0. FACTOR 3 - PAST PERFORMANCE.

NOTE: No more than a total of fifteen (15) pages for this factor.

5.1. Each Offeror shall submit a past performance volume with its proposal, containing past performance information in accordance with paragraph 5.4 and 5.5. This information is required for the Offeror and/or Joint Venture, Teaming Arrangements and/or Mentor Protege partners. Offerors are cautioned that the Government will use data provided by each Offeror in this volume and data obtained from other sources in the evaluation of past performance.

5.2. If applicable, the Offeror shall submit a consent letter (Attachment L-3) executed by each Joint Venture partner, Teaming Arrangement partner and/or Mentor Protege partners, authorizing release of adverse past performance information to the Offeror so the Offeror can respond to information requests from the Government. For each identified effort for a commercial customer, the Offeror shall also submit a client authorization letter, authorizing release to the Government of requested information on the Offeror's performance. Consent letters and client authorization letters are excluded from this factor's page limitations.

5.3. Relevant Contracts. Submit information in accordance with paragraph 5.4 and 5.5 on at least two (2), but no more than five (5) recent contracts that you consider most relevant in demonstrating your ability to perform the proposed effort. Past performance submitted on behalf of a Joint Venture, Mentor-Protege and/or Teaming Arrangement may be from projects performed by the individual partners. Include rationale supporting your assertion of relevance. A minimum of one (1) project submitted for Factor 3 - Past Performance must be from the list of projects submitted for Factor 2 - Past Experience. For a description of the characteristics or aspects the Government will consider in determining recency and relevancy, see Section M, paragraph 2.3 - Past Performance Factor.

Multiple Award Task Order Contracts (MATOCs) and other types of IDIQ contracts that provide for the issuance of task orders for the performance of projects may also be submitted for Factor 3. If an IDIQ type contract is submitted, an individual task order issued under the contract must also be submitted. The IDIQ and subsequent task order will be considered overall one project.

5.4. Contract Information:

Offerors shall include but not be limited to the following information for each contract listed:

a. Offeror Name (include Cage code and DUNS Number)

b. Solicitation Number and Program Title

Contract Specific Information

c. Government Agency/Commercial Organization for which work was performed

d. Address

e. Contract Number

f. Date of Award

g. Period of Performance

h. Prime Contractor or percentage of work performed

i. Relevancy

j. Current/Final Contract Cost/Price

k. Annual Contract Dollar Value

l. Brief Description of Effort

m. Primary Customer Points of Contract

5.5. Questionnaires:

a. The Government requests the Offeror send out past and present performance questionnaires (see Attachment L-1) to each of the points of contact (POCs) identified in the past performance volume. Once the past and present performance questionnaires are completed by the POCs, the information contained therein shall be considered sensitive and shall not be released to the Offeror. However, adverse past performance information may be released to the Offeror so the Offeror can respond to such information.

b. Provide a list of questionnaire recipients, to include two current POCs and phone numbers for each contract reference provided. The Offeror is solely responsible for the accuracy of the contact information provided.

c. The completed past/present performance questionnaire may be emailed to: 509cons.sollgca@us.af.mil, james.

mccoy.17@us.af.mil and caleb.kirchhoff@us.af.mil. Questionnaire(s) may also be mailed to the address listed below. If mailing (through contracted courier providers), the outside envelope must be marked as follows:

NOTE: TO BE OPENED BY ADDRESSEE ONLY

509 CONS/PKA

Attn: Mr. James McCoy, Contracting Officer 660 Tenth Street, Ste 222 Whiteman AFB, MO 65305-5316

Note: Electronic submission is preferred.

6.0. FACTOR 4 - REPRESENTATIVE PROJECT TECHNICAL CAPABILITY.

NOTE: No more than a total of fifteen (15) pages for this factor. (Drawings, Design Calculations and Gantt chart not included in page count).

6.1. The Offeror shall provide a conceptual design proposal in accordance with the solicitation and Representative Project Statement of Objectives (SOO), to include the following:

a. List of required permits, tests & surveys

b. Complete design calculations in accordance with (IAW) the Representative Project SOO

c. List of code deficiencies to be addressed by design

d. Drawings (must include, but not limited to)

i. Structural Sections

ii. Mechanical, Electrical and other distribution system layouts

e. Unified Facilities Guide Specifications (UFGS) index

6.2. Gantt chart - detailing overall performance period, including design and construction phases, identifying all critical milestones.

6.3. The Offeror's narrative regarding the design/build process that will be used to carry the representative project from the design through the construction phases. This includes the composition of the design/build team.

7.0. FACTOR 5 - PRICE PROPOSAL.

7.1. Price Reasonableness.

This section is to assist you in submitting data other than certified cost or pricing data that is required to evaluate the reasonableness of your proposed price. Compliance with this requirement is mandatory and failure to comply may result in rejection of your proposal. Offers should be sufficiently detailed to demonstrate their reasonableness.

7.2. Representative Project.

Provide proposed prices for the Representative Project on Attachment L-4, Construction Cost Estimate Breakdown Form. Instead of completing Section B of the Solicitation, Offerors shall submit a completed Construction Cost Estimate Breakdown Form for the representative project. The Construction Cost Estimate Breakdown should identify an appropriate mix of labor and materials in reasonable quantities at reasonable prices. Failure to propose pricing in accordance with the Construction Cost Estimate Breakdown shall result in a determination that the proposal is nonresponsive to the solicitation. The proposal shall fully justify the proposed prices and document any assumptions made in developing the proposal.

7.3. FFP CLINs.

The Contracting Officer has determined there is a high probability of adequate price competition for this acquisition. Upon examination of the initial offers, the Contracting Officer will review this determination and if, in the Contracting Officer's determination, adequate price competition exists, no additional data will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition, the Contracting Officer determines that adequate price competition no longer exists; Offerors may be required to submit cost data to the extent necessary for the Contracting Officer to determine the reasonableness and affordability of the price. Additionally, unbalanced pricing poses an unacceptable risk to the Government and may be a reason to reject an Offeror's proposal.

7.4. Price Data.

Data beyond that required by this instruction should not be submitted, unless you consider it essential to document or support your price position. All data relating to the proposed price, including all required supporting documentation, must be included in the section of the proposal designated as the Price Factor. Under no circumstances shall this data and documentation be included elsewhere in the proposal.

Attachments L-1: Past/Present Performance Questionnaire L-2: Request for Past Performance Evaluation Letter L-3: Sample Joint Venture/Mentor/Protege/Teaming Partner Consent Letter L-4: Construction Cost Estimate Breakdown Form

FAR Clauses Incorporated by Reference

Number Title Effective Date 52.232-13 Notice of Progress Payments. 1984-04 52.215-20 Alternate IV Requirements for 2010-10 Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data. - (Alternate IV)

FAR Clauses Incorporated by Full Text

52.204-22 Alternative Line Item Proposal. 2017-01

As prescribed in 4.1008, insert the following provision:

Alternative Line Item Proposal (Jan 2017)

(a) The Government recognizes that the line items established in this solicitation may not conform to the Offeror's practices.

Failure to correct these issues can result in difficulties in acceptance of deliverables and processing payments.

Therefore, the Offeror is invited to propose alternative line items for which bids, proposals, or quotes are requested in this solicitation to ensure that the resulting contract is economically and administratively advantageous to the Government and the Offeror.

(b) The Offeror may submit one or more additional proposals with alternative line items, provided that alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation. However, acceptance of an alternative proposal is a unilateral decision made solely at the discretion of the Government. Offers that do not comply with the line items specified in this solicitation may be determined to be nonresponsive or unacceptable.

(End of provision)

52.216-27 Single or Multiple Awards. 1995-10 As prescribed in 16.506(f), insert the following provision:

Single or Multiple Awards (Oct 1995)

The Government may elect to award a single delivery order contract or task order contract or to award multiple delivery order contracts or task order contracts for the same or similar supplies or services to a target of three (3) sources under this solicitation.

(End of provision)

END OF SECTION L

IDCode:
Page: 1
Pages: 10
AmendNo: 0008
EffDate: 5/15/2020
ReqNo: A003263
ProjNo: MATOC
IssCode: FA4625
AdmCode:
IssuedBy: FA4625 509 CONS CC

660 TENTH STREET STE 222

BLDG 709 CP 660 687 5423

WHITEMAN AFB, MO 65305-5344

United States Tammy Shumate, Email: tammy.shumate.1@us.af.mil Telephone: 975-2370

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA462520R0003
SolDate: 4/3/2020
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: 1
Require:
Copies:
Descript:

SEE CONTINUATION PAGE

ContNameTitle:
CoNameTitle: James McCoy

Email: james.mccoy.17@us.af.mil Telephone: 660-687-5435

ContDate:
CODate:

File details come from the government source that posted it. Updated .