20R0003 Q and A 200420.pdf

PDF 74 KB Posted

Attached to
Whiteman AFB Multiple Award Task Order Contract (MATOC) - FA462520R0003 Federal contract opportunity
Solicitation number
FA462520R0003
Issued by
Department of the Air Force Global Strike Command

About this file

This document contains questions and answers regarding a solicitation for a Multiple Award Task Order Contract (MATOC) to provide construction services at Whiteman Air Force Base in Missouri. The solicitation is set aside for small businesses only and offers a potential contract value between $100-250 million over a 9-year period consisting of a 5-year base and two 2-year options. Services include multi-discipline construction projects involving design, repair, renovation, alteration, or new construction. The Air Force plans to award this indefinite delivery/indefinite quantity contract to three contractors who will then compete for firm fixed price task orders. Proposals are due by May 19, 2020 and must include past performance questionnaires and design drawings for a seed project. The document provides additional details on proposal formatting and instructions for accessing facility drawings.

View the file

Other files for this federal contract opportunity

Other files attached to Whiteman AFB Multiple Award Task Order Contract (MATOC) - FA462520R0003, newest first.
File Type Posted
20R0003 Atch 19 ISV Attendees.pdf PDF
Solicitation Amendment FA462520R00030012 SF 30.pdf PDF
20R0003 Atch L-4 Construction Cost Breakdown - Amended.xls XLS spreadsheet
20R0003 Atch 20 Q and A 200622.pdf PDF
Solicitation Amendment FA462520R00030011 SF 30.pdf PDF
20R0003 Atch 18 Q and A 200609.pdf PDF
Solicitation Amendment FA462520R00030010 SF 30.pdf PDF
20R0003 Atch 1 SOW 20May20.docx.pdf PDF
Solicitation Amendment FA462520R00030009 SF 30.pdf PDF
20R0003 Atch 17 WAFB IFS Appendix.pdf PDF
20R0003 Atch 15 Q and A 200520.pdf PDF
Attachment 13 509 MDG Public Health Travel Risk Assessment Form.pdf PDF
Attachment 14 509 SF Fast Pass Request.pdf PDF
Solicitation Amendment FA462520R00030008 SF 30.pdf PDF
20R0003 Atch 12 Q and A 200512.pdf PDF
20R0003 Atch 1 SOW 11May20.pdf PDF
Solicitation Amendment FA462520R00030007 SF 30.pdf PDF
Q and A 200507 Atch 2 - Restroom Floor.jpeg JPEG file
20R0003 Atch L-3 Consent Letter.pdf PDF
Solicitation Amendment FA462520R00030006 SF 30.pdf PDF
Q and A 200507 Atch 1 - Bldg 3008 AHU Schedule.PNG PNG image
20R0003 Atch L-2 Transmittal Letter.pdf PDF
20R0003 Atch L-1 Past Performance Questionaire.pdf PDF
20R0003 Atch 10 Q and A 200507.pdf PDF
Q and A 200507 Atch 3 - Storage Room Floor.jpeg JPEG file
20R0003 Atch 8 Q and A 200506.pdf PDF
20R0003 Atch L-4 Construction Cost Breakdown.xls XLS spreadsheet
Solicitation Amendment FA462520R00030005 SF 30.pdf PDF
Solicitation Amendment FA462520R00030004 SF 30.pdf PDF
20R0003 Atch 8 Q and A 200430.pdf PDF
20R0003 Atch 5 Q and A 200420 REVISED.pdf PDF
20R0003 Atch L-4 Construction Cost Breakdown.xls XLS spreadsheet
Solicitation Amendment FA462520R00030003 SF 30.pdf PDF
Solicitation Amendment FA462520R00030002 SF 30.pdf PDF
Solicitation Amendment FA462520R00030001 SF 30.pdf PDF
20R0003 Atch L-2 Transmittal Letter.pdf PDF
20R0003 Atch 2 Rep Project SOO 02Jan20.pdf PDF
20R0003 Atch 1 SOW 02April20.pdf PDF
20R0003 Atch L-1 Past Performance Questionaire.pdf PDF
20R0003 Atch L-3 Consent Letter.pdf PDF
20R0003 Atch 3 Whiteman AFB Climatology Data.pdf PDF
Solicitation - FA462520R0003.pdf PDF
20R0003 Atch L-4 Construction Cost Breakdown.xls XLS spreadsheet
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Whiteman AFB MATOC Solicitation Q&A

FA462520R0003

4/20/2020

Q1: Section L, 2.0 Proposal Preparation Instructions states that Whiteman AFB utilizes a firewall. Is there a size limitation of attachments, in terms of MB, that offerors should abide by to ensure successful receipt?

A1: The Government does not recommend providing information through email when attachments have an aggregate size exceeding 12.0 MB. Attachments up to 8.0 GB may be transmitted electronically through DoD SAFE through the process outlined Section L paragraph 2.4. Section L paragraph 2.4 also outlines the process to submit proposals via CD/disc. Should a contractor choose to transmit their proposal using email, the Government encourages them to request email/attachment receipt acknowledgement to ensure the transmission was successfully received.

Q2: RFP section 2.3, Proposal Formatting limits Factor 1 to 8 pages. However, in accordance with Section M, offerors must provide letters of intent (LOI) for non‐current employees. Since there are 4 positions, should an offeror need to provide 4 LOIs, this leaves only 4 pages to provide the remaining Section M requirements to include: organizational chart; 4 resumes; and the management policies, procedures and processes. Therefore, we request that the Factor 1 page limitation be increased to a minimum of 16 pages.

A2: Factor 1 page limitation has been increased to 16 pages.

Q3: The RFP appears to call out for Phase I and Phase II proposals. Are we to submit ONLY Phase I proposal by May 19th Due date? Once results of Phase I are announced, only 7 selected offerors would submit Phase II. Is our understanding correct?

A3: Proposals will be evaluated using a two phased approach. Proposals must consist of three Volumes (A, B, and C) IAW Section L. All three Volumes must be submitted by the May 19th Due Date.

Q4: RFP Phase II requires submission of design drawings for the seed project. Can you provide all current as‐builts of Bldg 3008 including all CAD files?

A4: The As‐Built drawings for B3008 will be provided via Beta.SAM in an amendment to the solicitation on Beta.SAM at a later date.

Q5: RFP Phase I proposal asks for the Past Performance volume. All DoD contracts have completed CPARS that serves the purpose of Past Performance repository DoD‐wide. Can we provide copies of CPARS for those projects that have CPARS in lieu of Past Performance Questionnaires?

A5: As mentioned in Section M paragraph 2.3, the Government may additionally use CPARS to evaluate an offeror’s past performance. However IAW Section L paragraph 5.1 “Each Offeror shall submit a past performance volume with its proposal, containing past performance information in accordance with paragraph 5.4 and 5.5”. Section L paragraph 5.5 outlines the requirements for past performance questionaires, therefore questionaires are required.

Q6: Can you tell if this is a follow on MACC? If it is, we would appreciate it if you can provide a list of incumbent contractors.

A6: This is not a follow on contract.

Q7: Can you provide a list of historical task orders and amounts issued under the previous MATOC?

A7: As this is not a follow on contract, a list of historical task orders and amounts is not available.

Q8: Solicitation indicates site visit was held in March whiles solicitation was posted in April. Will a site visit be held with a new date and time?

A8: Due to the current environment, a site visit will not be held. A video of the representative project site was published to Beta.SAM in Amendment 01 dated 4/17/2020.

Q9: Can as built drawings be provided for Building 3008 in both pdf and CAD so offerors can provide design drawings to subcontractor and suppliers?

A9: Pdf and CAD as‐built drawings for Building 3008 will be provided in an amendment published to Beta.SAM at a later date.

File details come from the government source that posted it. Updated .