Atch_5_Renovate_BLDG_527_Int_Revs_-_A101_-_DEMOLITION_PLAN.pdf

PDF 143 KB Posted

Attached to
Renovate Bldg 527 A&FRC Federal contract opportunity
Solicitation number
FA4625-17-R-0007
Issued by
Department of the Air Force Global Strike Command

About this file

Atch 5 Renovate BLDG 527 Int Revs - A101 - DEMOLITION PLAN

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Bldg 527 A&FRC, newest first.
File Type Posted
Atch_3,_087100_SF_-_REVISED_DOOR_HARDWARE_SCHEDULE_(003).pdf PDF
Atch_1,_17R0007_Reno_Bldg_527_QA_dated_1Mar18.docx DOCX document
Atch_2,_17R0007_WAFB_Reno_Bldg_527_Atch_8_Ktr_Major_Cat_Price_Brkdwn_Rev_28Feb18.pdf PDF
Atch_4,_14_Dwgs,_Renovate_BLDG_527-Rev_1-1Mar2018.pdf PDF
Atch_1_FA462517R0007_Reno_Bldg_527_QA_dated_23Feb18.pdf PDF
Atch_6_Renovate_BLDG_527_Int_Revs_-_A103_-_REFLECTED_CEILING_PLAN.pdf PDF
Atch_7_Renovate_BLDG_527_Int_Revs_-_A102_-_FLOOR_PLAN.pdf PDF
17R0007_Reno_Bldg_527_SF30_Amend__11,_Extension,_Q&A_dated_23_Feb.pdf PDF
Atch_3_Specification_Section_26_12_19.10,_Three-Phase_Pad-Mounted_Transformers.pdf PDF
17R0007_Reno_Bldg_527_Amend_10,_SF30_QA_dated_16Feb18.pdf PDF
17R0007_Reno_Bldg_527_SF30_Amend__9,_3rd_Site_Visit_Rev_Floor_Plans.pdf PDF
17R0007_Reno_Bldg_527_3rd_Site_Visit_Sign-In_Sheet,_Atch_2.pdf PDF
17R0007_Reno_Bldg_527_Rev._Floor_Plans,_Welcome_Ctr_131st_Area,_Atch_1.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend_8_SF30.pdf PDF
FA462517R0007_Reno_Bldg_527_Brick_Staining_Spec,_Atch_3.docx DOCX document
FA462517R0007_Reno_Bldg_527_QA_dtd_29_Jan_18,_Atch_2.docx DOCX document
FA462517R0007_Reno_Bldg_527_As-builts,_Atch_1.zip ZIP file
FA462517R0007_Reno_Bldg_527_Amend__6,_Extend_Offer_Date.pdf PDF
FA462517R0007_Reno_Bldg_527_QA_dated_14_Jul_2017.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__04,_2nd_Site_Visit.pdf PDF
FA462517R0007_Reno_Bldg_527_Second_Site_Visit_Sign-in_Sheet.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_007_E1_ELECTRICAL_DEMO_PLAN.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_009_LF1.2_GRD_LOOP_WELL_FIELD_LAY_PLAN.pdf PDF
Amend__3,_2014_Whiteman_AFB_Design_Guide.pdf PDF
Amend__3,_HVAC_As-builts_SHEET_003_M1_MECH_DEMO_PLAN.pdf PDF
FA462517R0007_Reno_Bldg_527_QA_dated_27_Jun_2017.3.pdf PDF
Amend__3,_WAFB_Plumbing_HVAC_Design_Requirements.pdf PDF
Amend__3,_HVAC_As-builts_SHEET_001_CV1_COVER_SHEET.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_006_M4_MECH_SCHEDULES_DIAGRAMS.pdf PDF
Amend__3,_WAFB_Fire_Emergency_Services_Design_Guide.pdf PDF
Amend__3,_HVAC_As-builts_SHEET_002_ME1_MEP_SYMBOLS_LEGENDS.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_004_M2_MECH_IMPROVE_PLAN.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__03,_2nd_Round_Q&A.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_008_E2_ELECTRICAL_IMPROVE_PLAN.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_005_M3_MECH_DETAILS.pdf PDF
Amend__3,_Telecomm_Ubstall_Criteria_for_Facility_Design_Renovation.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__02,_Sign-in_Sheet.pdf PDF
FA462517R0007_Reno_Bldg_527_Site_Visit_Sign-in_Sheet.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__1,_Q&A.pdf PDF
FA462517R0007_Reno_Bldg_527_Q&A,_dated_12_Jun_2017.docx DOCX document
17-R-0007_WAFB_Reno_Bldg_527_Atch_8_Ktr_Major_Cat_Price_Brkdwn_27Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_6_Design_Specifications_3May16.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_4_AF_3064,_Progress_Schedule_Blank_27Apr17.xlsx XLSX spreadsheet
17-R-0007_WAFB_Reno_Bldg_527_Atch_2_Local_Info_27Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_7_100_prcnt_Design_Drwgs_Full_Set_3May16.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_SF_1442_RFP_2Jun17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_9_Staging_Area_26Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_5_AF_3065,_Progress_Report_Blank_27Apr17.xlsx XLSX spreadsheet
17-R-0007_WAFB_Reno_Bldg_527_Atch_3_Local_Info_Atch_1,_General_Rqmts_27Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_1_WD_MO170012_28Apr17.pdf PDF
Show all 50

Renovate Bldg 527 A&FRC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6

A

B

C

D

9'

8"

162' - 0"

92' - 2" 19' - 9" 50' - 1"

1 10

2 22

15 22

5 5

5 5 5 5 5 5

• DO NOT SCALE THESE DRAWINGS.

• FIELD VERIFY ALL QUANTITIES AND CONDITIONS.

• DEMOLITION PLANS ARE INTENDED TO DEPICT A SCOPE AND

SCHEMATIC LOCATION OF DEMOLITION WORK. ACTUAL DEMOLITION

SHALL BE ACCOMPLISHED AS REQUIRED AND IN COORDINATION

WITH NEW CONSTRUCTION WORK.

• ALL DEMOLITION WORK SHALL BE DONE IN A SAFE MANNER AND IN

STRICT ACCORDANCE WITH OSHA REGULATIONS.

• CONTRACTOR SHALL LOCATE AND IDENTIFY ALL UTILITY LINES

WITHIN WORK AREAS AND PROTECT THE SAME AS REQUIRED TO

MAINTAIN THEM IN GOOD OPERATING CONDITION.

• AT EXISTING PLUMBING AND ELECTRICAL FIXTURES TO BE REMOVED

AND NOT REPLACED, TERMINATE EXISTING PLUMBING AND

ELECTRICAL RUNS BEHIND FINISHED SURFACE IN ACCORDANCE

WITH LOCAL CODES.

• UNLESS NOTED OR SPECIFIED OTHERWISE, ALL ITEMS NOTED TO BE

REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR

AND SHALL BE REMOVED FROM THE PROJECT SITE.

• UNLESS OTHERWISE NOTED, THE OWNER SHALL REMOVE ALL ITEMS

THEY DESIRE TO SALVAGE PRIOR TO COMMENCEMENT OF

DEMOLITION. CONTRACTOR SHALL VERIFY THAT THIS HAS BEEN

DONE PRIOR TO COMMENCEMENT OF DEMOLITION OPERATIONS.

• AT REMOVAL OF WALLS (OR PORTIONS THEREOF), GRIND OR CHIP

SLAB AND WALL AREAS SMOOTH AS REQUIRED; TERMINATE ANY

PROTRUDING ITEMS; PATCH ANY HOLES AND MAKE AREAS READY

TO RECEIVE NEW WORK.

• WHERE ITEMS ARE SHOWN TO BE REMOVED, CARE SHALL BE TAKEN

TO PROTECT THE ADJACENT ITEMS SCHEDULED TO REMAIN. SAW-

CUT EXISTING CONCRETE FLOOR SLAB AND/OR CORE DRILL

EXISTING CONCRETE/MASONRY WALL(S) AS REQUIRED TO INSTALL

NEW CONSTRUCTION.

• PATCH EXISTING SLAB CONSTRUCTION TO MATCH ADJACENT

CONDITIONS.

• IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO

COORDINATE DEMOLITION OF THE EXISTING WITH THE

MECHANICAL, ELECTRICAL, AND PLUMBING DOCUMENTS. REFER TO

MECH. AND ELEC. DWGS. FOR DEMOLITION WORK REQUIRED BY

THESE TRADES.

• UNLESS NOTED OR SPECIFIED OTHERWISE, ALL EXISTING HVAC

SYSTEMS ARE TO BE REMOVED IN THEIR ENTIRETY. THIS INCLUDES,

BUT IS NOT LIMITED TO, ROOFTOP EQUIPMENT, FAN COILS,

DUCTWORK, PIPING, CONTROLS, WIRING, DIFFUSERS, GRILLES,

EXHAUST FANS, ETC. RE: MEP FOR ADDITIONAL INFORMATION.

• EXISTING FINISHES (FLOORING, WALL BASE, WALL FINISHES,

ETC.) ARE TO BE REMOVED. REPAIR OR REPLACE SUBSTRATE

AS NECESSARY TO RECEIVE NEW FINISHES.

• WHERE A PORTION(S) OF AN EXISTING WALL IS INDICATED TO BE

REMOVED, BRACE AND OTHERWISE SHORE-UP EXISTING

CONSTRUCTION, AS NECESSARY, UNTIL NEW SUPPORTS ARE IN

PLACE.

DEMOLITION GENERAL NOTES

1. MASONRY WALL TO REMAIN. REMOVE ALL ATTACHMENTS.

2. STEEL COLUMN TO REMAIN. REMOVE ALL ATTACHMENTS.

3. REMOVE WOOD/METAL STUDWALL COMPLETE INCLUDING ALL

DOORS, FRAMES AND COMPONENTS IN AND ON THE WALL.

4. REMOVE FURRING ON EXISTING WALL TO REMAIN INCLUDING ALL

COMPONENTS IN AND ON THE FURRING AMD THE UNDERLYING

WALL.

5. REMOVE ALL FLOOR FINISHES AND ACOUSTICAL/DRYWALL

CEILINGS INCLUDING ALL BASE, FIXTURES, DEVICES, WIRING, ETC.

6. REMOVE THE PLASTER/DRYWALL CEILING INCLUDING ALL

FIXTURES, DEVICES, WIRING ETC.

7. REMOVE ALL FIXTURES, DEVICES, WIRING, ETC. ON EXISTING

WALL TO REMAIN.

8. REMOVE COILING DOOR AND PREPARE FOR NEW DOORS.

9. REMOVE ALUMINUM AND GLASS STOREFRONT SYSTEM AND

INFILL WALL. REPARE OPENING FOR NEW WALL INFILL.

10. REMOVE PORTION OF WALL FOR NEW OPENING. REFER TO NEW

WORK FOR STRUCTURAL AND ARCHITECTURAL REQUIREMENTS.

11. REMOVE DOOR/FRAME AND INFILL WALL.

12. REMOVE ALL CABINETS, COUNTERS, EQUIPMENT, FIRE

EXTINGUISHER CABINET, FIXTURES, SOFFITS, ELECTRICAL AND

PLUMBING COMPLETE.

13. REMOVE THE WINDOW AND MASONRY BELOW. PREPARE FOR

NEW DOOR.

14. REMOVE ALL PLUMBING, ELECTRICAL, FIXTURES, PARTITIONS,

ACCESSORIES, MIRROR, MOP SINK, SHELVES, ETC. COMPLETE

15. REMOVE ACCORDIAN DOORS AND SUPPORT SYSTEMS.

16. LEAVE 16", MINIMUM OF ONE FULL CMU COURSE BETWEEN

EXISTING OPENING AND NEW OPENING.

17. EXISTING DRYWALL CEILING TO REMAIN. REPAIR AND PATCH

AFTER EXISTING LIGHTING AND HVAC COMPONENTS HAVE BEEN

REMOVED. PAINT.

18. EXISTING ATRIUM ROOF TO REMAIN. PROTECT.

19. SAWCUT AND REMOVE PORTIONS OF EXISTING FLOOR SLAB

SUFFICIENT TO INSTALL NEW FLOOR ELECTRICAL AND DATA

OUTLETS. RE: MEP. REPAIR AND PATCH CONCRETE FLOOR SLAB

AS REQUIRED.

20. SAW CUT AND REMOVE EXISTING CONCRETE LANDING, STEPS,

PORTIONS OF ADJACENT SIDEWALKS AND WOOD RAMP. RE: SITE

PLANS.

21. EXISTING FIRE SPRINKLER RISER TO REMAIN. PROTECT. RE:

MEP.

DEMOLITION PLAN NOTES

1 NOTE DESIGNATION

Whiteman Air Force

Base Missouri

Approved

SIGNATURE OFFICE

Commander

Base Civil Engineer Chief of Programming

User

Coordination Airfield Manager

Ground Safety

Communication/ Computers Bioenvironmenta l Engineer Security Police

Security System

Fire Chief

Chief of Operations Construction Management Roofing Engineer Pavements Engineer Corrosion Engineer Protective Coatings Engr.

Contracting

Design Firm

Facility Number D.O. Number

Project Number

Project Title

Sheet Of

Sheet Title

Revision By/Date

Project Manager

Draftsman

Task Order Mngr.

Date

Drafting/IGI&S

CONSULTANTS

INCORPORATED May 1, 1955 Crowley Wade Milstead Inc.

Corporate License Missouri 000310

Structural Engineer

Mechanical / Electrical Engineer

CWM

CWM

A-101

DEMOLITION FLOOR PLAN

YWHG 15-0090

RENOVATE BUILDING

527 FOR POST OFFICE

AND A&FRC

3 May 2016

1/8" = 1'-0"1 DEMOLITION FLOOR PLAN

0' 4' - 0" 8' - 0" 16' - 0"

SCALE: 1/8" = 1' - 0"

No. Description Date

1 Interior Changes

?? Mar 2018

Sheets
A-101 - DEMOLITION FLOOR PLAN
A-102 - FLOOR PLAN
A-103 - REFLECTED CEILING PLAN

File details come from the government source that posted it.