Atch_5_Renovate_BLDG_527_Int_Revs_-_A101_-_DEMOLITION_PLAN.pdf
PDF 143 KB Posted
- Attached to
- Renovate Bldg 527 A&FRC Federal contract opportunity
- Solicitation number
- FA4625-17-R-0007
About this file
Atch 5 Renovate BLDG 527 Int Revs - A101 - DEMOLITION PLAN
View the file
Other files for this federal contract opportunity
Show all 50
Renovate Bldg 527 A&FRC has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6
A
B
C
D
9'
8"
162' - 0"
92' - 2" 19' - 9" 50' - 1"
1 10
2 22
15 22
5 5
5 5 5 5 5 5
• DO NOT SCALE THESE DRAWINGS.
• FIELD VERIFY ALL QUANTITIES AND CONDITIONS.
• DEMOLITION PLANS ARE INTENDED TO DEPICT A SCOPE AND
SCHEMATIC LOCATION OF DEMOLITION WORK. ACTUAL DEMOLITION
SHALL BE ACCOMPLISHED AS REQUIRED AND IN COORDINATION
WITH NEW CONSTRUCTION WORK.
• ALL DEMOLITION WORK SHALL BE DONE IN A SAFE MANNER AND IN
STRICT ACCORDANCE WITH OSHA REGULATIONS.
• CONTRACTOR SHALL LOCATE AND IDENTIFY ALL UTILITY LINES
WITHIN WORK AREAS AND PROTECT THE SAME AS REQUIRED TO
MAINTAIN THEM IN GOOD OPERATING CONDITION.
• AT EXISTING PLUMBING AND ELECTRICAL FIXTURES TO BE REMOVED
AND NOT REPLACED, TERMINATE EXISTING PLUMBING AND
ELECTRICAL RUNS BEHIND FINISHED SURFACE IN ACCORDANCE
WITH LOCAL CODES.
• UNLESS NOTED OR SPECIFIED OTHERWISE, ALL ITEMS NOTED TO BE
REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR
AND SHALL BE REMOVED FROM THE PROJECT SITE.
• UNLESS OTHERWISE NOTED, THE OWNER SHALL REMOVE ALL ITEMS
THEY DESIRE TO SALVAGE PRIOR TO COMMENCEMENT OF
DEMOLITION. CONTRACTOR SHALL VERIFY THAT THIS HAS BEEN
DONE PRIOR TO COMMENCEMENT OF DEMOLITION OPERATIONS.
• AT REMOVAL OF WALLS (OR PORTIONS THEREOF), GRIND OR CHIP
SLAB AND WALL AREAS SMOOTH AS REQUIRED; TERMINATE ANY
PROTRUDING ITEMS; PATCH ANY HOLES AND MAKE AREAS READY
TO RECEIVE NEW WORK.
• WHERE ITEMS ARE SHOWN TO BE REMOVED, CARE SHALL BE TAKEN
TO PROTECT THE ADJACENT ITEMS SCHEDULED TO REMAIN. SAW-
CUT EXISTING CONCRETE FLOOR SLAB AND/OR CORE DRILL
EXISTING CONCRETE/MASONRY WALL(S) AS REQUIRED TO INSTALL
NEW CONSTRUCTION.
• PATCH EXISTING SLAB CONSTRUCTION TO MATCH ADJACENT
CONDITIONS.
• IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
COORDINATE DEMOLITION OF THE EXISTING WITH THE
MECHANICAL, ELECTRICAL, AND PLUMBING DOCUMENTS. REFER TO
MECH. AND ELEC. DWGS. FOR DEMOLITION WORK REQUIRED BY
THESE TRADES.
• UNLESS NOTED OR SPECIFIED OTHERWISE, ALL EXISTING HVAC
SYSTEMS ARE TO BE REMOVED IN THEIR ENTIRETY. THIS INCLUDES,
BUT IS NOT LIMITED TO, ROOFTOP EQUIPMENT, FAN COILS,
DUCTWORK, PIPING, CONTROLS, WIRING, DIFFUSERS, GRILLES,
EXHAUST FANS, ETC. RE: MEP FOR ADDITIONAL INFORMATION.
• EXISTING FINISHES (FLOORING, WALL BASE, WALL FINISHES,
ETC.) ARE TO BE REMOVED. REPAIR OR REPLACE SUBSTRATE
AS NECESSARY TO RECEIVE NEW FINISHES.
• WHERE A PORTION(S) OF AN EXISTING WALL IS INDICATED TO BE
REMOVED, BRACE AND OTHERWISE SHORE-UP EXISTING
CONSTRUCTION, AS NECESSARY, UNTIL NEW SUPPORTS ARE IN
PLACE.
DEMOLITION GENERAL NOTES
1. MASONRY WALL TO REMAIN. REMOVE ALL ATTACHMENTS.
2. STEEL COLUMN TO REMAIN. REMOVE ALL ATTACHMENTS.
3. REMOVE WOOD/METAL STUDWALL COMPLETE INCLUDING ALL
DOORS, FRAMES AND COMPONENTS IN AND ON THE WALL.
4. REMOVE FURRING ON EXISTING WALL TO REMAIN INCLUDING ALL
COMPONENTS IN AND ON THE FURRING AMD THE UNDERLYING
WALL.
5. REMOVE ALL FLOOR FINISHES AND ACOUSTICAL/DRYWALL
CEILINGS INCLUDING ALL BASE, FIXTURES, DEVICES, WIRING, ETC.
6. REMOVE THE PLASTER/DRYWALL CEILING INCLUDING ALL
FIXTURES, DEVICES, WIRING ETC.
7. REMOVE ALL FIXTURES, DEVICES, WIRING, ETC. ON EXISTING
WALL TO REMAIN.
8. REMOVE COILING DOOR AND PREPARE FOR NEW DOORS.
9. REMOVE ALUMINUM AND GLASS STOREFRONT SYSTEM AND
INFILL WALL. REPARE OPENING FOR NEW WALL INFILL.
10. REMOVE PORTION OF WALL FOR NEW OPENING. REFER TO NEW
WORK FOR STRUCTURAL AND ARCHITECTURAL REQUIREMENTS.
11. REMOVE DOOR/FRAME AND INFILL WALL.
12. REMOVE ALL CABINETS, COUNTERS, EQUIPMENT, FIRE
EXTINGUISHER CABINET, FIXTURES, SOFFITS, ELECTRICAL AND
PLUMBING COMPLETE.
13. REMOVE THE WINDOW AND MASONRY BELOW. PREPARE FOR
NEW DOOR.
14. REMOVE ALL PLUMBING, ELECTRICAL, FIXTURES, PARTITIONS,
ACCESSORIES, MIRROR, MOP SINK, SHELVES, ETC. COMPLETE
15. REMOVE ACCORDIAN DOORS AND SUPPORT SYSTEMS.
16. LEAVE 16", MINIMUM OF ONE FULL CMU COURSE BETWEEN
EXISTING OPENING AND NEW OPENING.
17. EXISTING DRYWALL CEILING TO REMAIN. REPAIR AND PATCH
AFTER EXISTING LIGHTING AND HVAC COMPONENTS HAVE BEEN
REMOVED. PAINT.
18. EXISTING ATRIUM ROOF TO REMAIN. PROTECT.
19. SAWCUT AND REMOVE PORTIONS OF EXISTING FLOOR SLAB
SUFFICIENT TO INSTALL NEW FLOOR ELECTRICAL AND DATA
OUTLETS. RE: MEP. REPAIR AND PATCH CONCRETE FLOOR SLAB
AS REQUIRED.
20. SAW CUT AND REMOVE EXISTING CONCRETE LANDING, STEPS,
PORTIONS OF ADJACENT SIDEWALKS AND WOOD RAMP. RE: SITE
PLANS.
21. EXISTING FIRE SPRINKLER RISER TO REMAIN. PROTECT. RE:
MEP.
DEMOLITION PLAN NOTES
1 NOTE DESIGNATION
Whiteman Air Force
Base Missouri
Approved
SIGNATURE OFFICE
Commander
Base Civil Engineer Chief of Programming
User
Coordination Airfield Manager
Ground Safety
Communication/ Computers Bioenvironmenta l Engineer Security Police
Security System
Fire Chief
Chief of Operations Construction Management Roofing Engineer Pavements Engineer Corrosion Engineer Protective Coatings Engr.
Contracting
Design Firm
Facility Number D.O. Number
Project Number
Project Title
Sheet Of
Sheet Title
Revision By/Date
Project Manager
Draftsman
Task Order Mngr.
Date
Drafting/IGI&S
CONSULTANTS
INCORPORATED May 1, 1955 Crowley Wade Milstead Inc.
Corporate License Missouri 000310
Structural Engineer
Mechanical / Electrical Engineer
CWM
CWM
A-101
DEMOLITION FLOOR PLAN
YWHG 15-0090
RENOVATE BUILDING
527 FOR POST OFFICE
AND A&FRC
3 May 2016
1/8" = 1'-0"1 DEMOLITION FLOOR PLAN
0' 4' - 0" 8' - 0" 16' - 0"
SCALE: 1/8" = 1' - 0"
No. Description Date
1 Interior Changes
?? Mar 2018
| Sheets |
| A-101 - DEMOLITION FLOOR PLAN |
| A-102 - FLOOR PLAN |
| A-103 - REFLECTED CEILING PLAN |