Atch_7_Renovate_BLDG_527_Int_Revs_-_A102_-_FLOOR_PLAN.pdf
PDF 228 KB Posted
- Attached to
- Renovate Bldg 527 A&FRC Federal contract opportunity
- Solicitation number
- FA4625-17-R-0007
About this file
Atch 7 Renovate BLDG 527 Int Revs - A102 - FLOOR PLAN
View the file
Other files for this federal contract opportunity
Show all 50
Renovate Bldg 527 A&FRC has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
1 2 3 4 5 6
A
B
C
D
PO Lobby
USPS CS
Men
USPS
Workroom
Receiving
Base Distrib
Pkg Hold Area
Storage
FLE/CFP M
Tap Mgr
Tap Data
EFMP
Relo Mgr
Relo Asst
MFLC
Conference
Tap Asst
FLE/CFP A
VA Ben
VA Ed
Copy/Storage
Classroom
Recep
Lobby 101 Waiting
Ft Viv Adv
SARC 131
170Vic Space
SARC 509
166 Storage
Classroom
Admin
Classroom
Admin
DPH
Fam Read
Mechanical
Vestibule
Comm
Elec
Mech
CSC
442 Ad
Kitchen/Break
Jan
Corr
Admin 152A
Corr
Corridor
Men
Women
Women
Break
Corridor
Super
RNCO
RNCO
BPO Office
Storage
BPO
Workroom
Director
DPH
Storage
Corridor
Corridor
Corr
Corridor
Corr
4 1/4" 24' - 4 3/4" 4' - 4" 24' - 11 3/4" 55' - 1 1/8" 2 1/2" 2 1/2" 48' - 9 1/2"
8'
1/
8" 8'
3/ 4"
0"
9'
4" 8'
4'
0"
1'
4"2 1/
2"
Fo r R ef O nl y
/4
1/
4"
1/ 4"
/4
/4
/4
4 1/4" 41' - 2 1/4" 25' - 7 7/8" 22' - 6 5/8"
4 1/4" 32' - 4 1/4" 9' - 2 7/8"
1/
2" 5'
3/ 8"
4'
7/
8"
/8
/2
0"
1/
4"
4' - 5 1/2"
/8
/8
MO
6' - 0" 4" 5'
3/ 8"
1/
4"
6'
4" 3'
8"
A-301
5'
0" 10
/4
/4
/8
10' - 7" 4' - 9" 10' - 1 1/2" 2 1/2"
/4
4'
/4
/4
13' - 3" 6' - 3" 12' - 10 1/4" 2' - 5 1/2"
6' - 4 1/2"
7'
3/
4"
1/
4" 5'
6"
/4
13' - 11 5/8" 10' - 4" 10' - 4" 10' - 4" 10' - 1 1/2"
10' - 3 5/8" 4' - 4" 12' - 10" 13' - 2" 4' - 4"
/2
/4
/2
/4
4'
8'
8"
/4
/4
5'
6"
17' - 0" 9' - 0"
/2
A-301
26' - 9 1/2" 21' - 7 3/4" 4 1/4"
14' - 4 5/8" 12' - 4 7/8" 16' - 7 1/8"
5' - 4 7/8"
1/ 8"
5'
3/
4" 8'
1/ 4"
9'
3/
4"
24' - 3 3/8" 10' - 6 3/8"
B2
A1
A1 C2
C2
B1 B1 B1
B1
B1
B1B1
B1
B1
B1
B1
B1
B1
B1
D1
B1
D1
D1
D1
D1
D1
D1
D1 B1
B1
B1
B1
B2
D1
D1
D1
D1
D1
D1
B1
D1
D1 D1
D1 D1 D1D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
B1
B1 B2
A3
B1 B1
B1
B1
B1
A1
B1
A1
A1
B1
B1
164B
100C
131132
124130
122121120119
128A
15' - 0"
4'
6"
9' - 11" 4' - 0"
Fire Sprinkler
C3
C1 C1
C3
C3
C3
C3
C3
C1
C1 C1
C1
C1
C1
C1
C1
C1
C1
C1C3
C3
136A
136B
138 140
136C
143A
143B
A-301
158B
149A
158A
164A
171 170
109A
109B
EXISTING CONCRETE
SIDEWALK
NEW CONCRETE
WALK. RE: SITE
PLANS
A-104108A
100A
100B
128B
1/
4"
/8
1'
1/ 2"
A-201
A-104
A-104
A-104
149B
C3
A-104
1'
8"
3'
0"
Min.
1' - 4"
M.O.
6' - 0"C3
C3
SIGN
S160
SIGN
S161
SIGN S159
SIGN S164
SIGN S164
SIGN
S158
SIGN
S158
SIGN
S109
SIGN
S109
7' - 0" 5' - 2"
1'
6"
4' - 0"
5'
8"
4"
15 16
A-104
D1
A1
5' - 4"
145A B1
18 19
C3
EXISTING PAD MOUNTED
ELECTRICAL TRANSFORMER
PROVIDE 6" (MIN.)
THICK CONCRETE PAD
FOR NEW AIR-COOLED
CHILLER. RE: MEP.
EXISTING CONCRETE
SIDEWALK
22' - 0"
BACK OF EXISTING CURB.
SEE SITE PLANS.
EXISTING PATIO
AND ENCLOSURE
Fam Read
1/
2"
/8
7'
/8
7'
/8
4'
1/ 8"
D1
152A
153A
9' - 0 1/2" 9' - 0 5/8"
B1
Yel Rib 153A
Storage
0"
0"
0"
9' - 9" 4' - 5 7/8" 9' - 9"
6'
0"
6'
0"
DRC
Lib/Client
CPTS
106C
CS
FSS
106A
MDG
106B
Waiting
106C
106A
106B
D1
D1
D1
D1
D1
D1
6' - 0 7/16"
1' - 8 1/2"
6' - 4" 2' - 0"
6' - 4"
A101
SIM
A101
SIM
1i
1t
Wall Type
Window Type
Door Type
Detail Callout
Section Callout
North Arrow
Revision Cloud and Revision Number
Section Number Sheet
Detail Number Sheet
Floor Plan Symbols
Room name
Room Name
Room Number
1i Storefront Type
THESE NOTES APPLY ONLY TO SHEET A-102.
NOTE DESIGNATION
1. VENDING MACHINES BY OWNER, TYPICAL.
COORDINATE WITH OWNER.
2. FLOOR STANDING REFRIGERATOR BY WAFB.
COORDINATE WITH WAFB.
3. UNDER COUNTER REFRIGERATOR BY WAFB.
COORDINATE WITH WAFB.
4. TYPE 2-A/10-BC FIRE EXTINGUISHER. MOUNT
WITH TOP @ 5' - 0" ABOVE FLOOR.
5. SEMI-RECESSED FIRE EXTINGUISHER CABINET
WITH 2-A/10-BC FIRE EXTINGUISHER.
6. ADA COMPLIANT WALL HUNG WATER
FOUNTAIN. RE: MEP DRAWINGS.
7. EXISTING STEEL COLUMN. PREP FOR SMOOTH
FINISH AND PAINT. RE: 10 ON A-104 FOR
TYPICAL WALL TERMINATIONS AT THE COLUMN.
8. DELUGE SHOWER. RE: MEP DRAWINGS.
9. MOP SINK. RE: MEP DRAWINGS.
10. X-RAY MACHINE BY BASE POST OFFICE.
COORDINATE EXACT LOCATION WITH BASE
POST OFFICE REPRESENTATIVE. RE: MEP.
11. LEAVE 16", MINIMUM OF ONE FULL CMU
COURSE BETWEEN EXISTING OPENING AND
NEW OPENING.
12. INSTALL ACOUSTICAL SEALANT ON BOTH SIDES
OF WALL AT ALL PENETRATIONS.
13. TRANSACTION TOP AND ROLLING COUNTER
DOOR. RE: ELEVATION 9/A-301.
14. P.O. BOXES AT USPS SPACE TO BE SUPPLIED
AND INSTALLED BY OTHERS. CONTRACTOR TO
VERIFY SIZE OF OPENING REQUIRED WITH
USPS TENANT, PRIOR TO CONSTRUCTION OF
ADJACENT WALLS.
15. FLOOR SUPPORTED OPERABLE PARTITION.
HEIGHT TO MATCH CEILING HEIGHT.
16. OPERABLE PARTITION STACKING SPACE.
17. INFILL OPENING IN EXISTING WALL WITH CMU.
MATCH EXISTING WALL CONSTRUCTION,
THICKNESS, ETC.
18. INFILL OPENING IN EXISTING WALL WITH CMU
AND BRICK. MATCH EXISTING BRICK COLOR,
WALL CONSTRUCTION, THICKNESS, ETC.
19. INFILL REMAINING PORTION OF OPENING IN
EXISTING WALL WITH CMU AND BRICK. MATCH
EXISTING BRICK COLOR, WALL CONSTRUCTION,
THICKNESS, ETC.
20. EXISTING SPRINKLER RISER. PROTECT. RE:
MEP.
21. NEW CONC. LANDING, STAIRS, RAMP AND
SIDEWALKS. RE: SITE PLANS.
22. EXTERIOR PORTION OF EXISTING EXHAUST FAN
TO REMAIN. FILL DUCT WITH INSULATION AND
PROVIDE CAP ON INTERIOR SIDE. PAINT.
Floor Plan Notes
WALL TYPES
TYPE DESCRIPTION
1. ALL DIMENSIONS OF NEW WALLS ARE TO FINISH FACE UNLESS
NOTED/SHOWN OTHERWISE
2. PROVIDE BRACING ABOVE CEILING AT ALL WALLS AS REQUIRED.
3. PROVIDE BLOCKING IN ALL WALLS THAT HAVE CASEWORK,
ACCESSORIES AND/ OR EQUIPMENT MOUNTED TO THEM.
4. PROVIDE TILE BACKER BOARD AT ALL WALLS SCHEDULED TO
RECEIVE CERAMIC WALL TILE.
A1
• 3 5/8" 20 ga Metal Stud Framing at 16" O.C.
• Sound attenuation batt
• 5/8" gyp bd. ea face
• Wall height 6" Above Finish Ceiling
7/
8"
C1
D1
• 3 5/8" 20 ga Metal Stud Framing at 16" O.C.
• Sound attenuation batt
• 5/8" gyp. bd one face
• Wall height 6" Above Finish Ceiling
• Place semi-rigid fiberglass insulation on
CMU above studwall to deck above.
New Modular Wall
• Re: Specs.
• 4" thick maximum
• Wall to extend to acoustical ceiling.
• 3 5/8" 20 ga Metal Stud Framing at 16" O.C.
• Sound attenuation batt
• 5/8" gyp bd. ea face
• Sound Caulk Top/Bottom and Openings.
• Extend wall construction to bottom of Deck
B1 4 7/
8"
B2
1/
4"
• 3 5/8" 20 ga Metal Stud Framing at 16" O.C.
• Sound attenuation batt
• 5/8" gyp bd. ea face
• 5/8" Tile Backer Board and Wall Tile
Wainscot Up 4'-6" on Toilet Side.
• Sound Caulk Top/Bottom and Openings.
• Extend wall construction to bottom of Deck
C3 • 1 5/8" 20 ga Metal Stud Framing at 16" O.C.
• 5/8" gyp bd. one face
• Wall height 6" Above Finish Ceiling2
1/ 4"
4"
• 3 5/8" 20 ga Metal Stud Framing at 16" O.C.
• Sound attenuation batt
• 5/8" gyp bd. ea face above Wainscot
• 5/8" Tile Backer Board and Wall Tile
Wainscot Up 4'-6" both Sides.
• Wall height 6" Above Finish Ceiling
A2 5 5/
8"
C2 • 3 5/8" 20 ga Metal Stud Framing at 16" O.C.
• Sound attenuation batt
• 5/8" Tile Backer Board and Wall Tile Full
Height.
• Wall height 6" Above Finish Ceiling
5/
8"
A3
1/
4"
• 6" 20 ga Metal Stud Framing at 16" O.C.
• 5/8" gyp bd. ea face
• Wall height 6" Above Finish Ceiling
GENERAL WALL TYPE NOTES:
1/8" = 1'-0"1 FLOOR PLAN
Whiteman Air Force
Base Missouri
Approved
SIGNATURE OFFICE
Commander
Base Civil Engineer Chief of Programming
User
Coordination Airfield Manager
Ground Safety
Communication/ Computers Bioenvironmenta l Engineer Security Police
Security System
Fire Chief
Chief of Operations Construction Management Roofing Engineer Pavements Engineer Corrosion Engineer Protective Coatings Engr.
Contracting
Design Firm
Facility Number D.O. Number
Project Number
Project Title
Sheet Of
Sheet Title
Revision By/Date
Project Manager
Draftsman
Task Order Mngr.
Date
Drafting/IGI&S
CONSULTANTS
INCORPORATED May 1, 1955 Crowley Wade Milstead Inc.
Corporate License Missouri 000310
Structural Engineer
Mechanical / Electrical Engineer
CWM
CWM
A-102
FLOOR PLAN
YWHG 15-0090
RENOVATE BUILDING
527 FOR POST OFFICE
AND A&FRC
3 May 2016
0' 4' - 0" 8' - 0" 16' - 0"
SCALE: 1/8" = 1' - 0"
No. Description Date
1 Interior Changes
?? Mar 2018
| Sheets |
| A-101 - DEMOLITION FLOOR PLAN |
| A-102 - FLOOR PLAN |
| A-103 - REFLECTED CEILING PLAN |
File details come from the government source that posted it.