FA462517R0007_Reno_Bldg_527_Amend_8_SF30.pdf

PDF 296 KB Posted

Attached to
Renovate Bldg 527 A&FRC
Solicitation number
FA4625-17-R-0007
Issued by

About this file

Reno B527 Amendment 8 SF30

View the file

Other files

File Type Posted
17R0007_Reno_Bldg_527_SF30_Amend__12,_Dwgs_&_Q&A_dated_1Mar18.pdf PDF
Atch_3,_087100_SF_-_REVISED_DOOR_HARDWARE_SCHEDULE_(003).pdf PDF
Atch_2,_17R0007_WAFB_Reno_Bldg_527_Atch_8_Ktr_Major_Cat_Price_Brkdwn_Rev_28Feb18.pdf PDF
Atch_1,_17R0007_Reno_Bldg_527_QA_dated_1Mar18.docx DOCX document
Atch_4,_14_Dwgs,_Renovate_BLDG_527-Rev_1-1Mar2018.pdf PDF
Atch_3_Specification_Section_26_12_19.10,_Three-Phase_Pad-Mounted_Transformers.pdf PDF
Atch_2_Revised_Electrical_One_Line_Diagram.pdf PDF
Atch_1_FA462517R0007_Reno_Bldg_527_QA_dated_23Feb18.pdf PDF
17R0007_Reno_Bldg_527_SF30_Amend__11,_Extension,_Q&A_dated_23_Feb.pdf PDF
Atch_6_Renovate_BLDG_527_Int_Revs_-_A103_-_REFLECTED_CEILING_PLAN.pdf PDF
Atch_5_Renovate_BLDG_527_Int_Revs_-_A101_-_DEMOLITION_PLAN.pdf PDF
Atch_7_Renovate_BLDG_527_Int_Revs_-_A102_-_FLOOR_PLAN.pdf PDF
Atch_4_Specification_Section_33_71_02,_Underground_Electrical_Distribution.pdf PDF
FA462517R0007_Reno_Bldg_527_QA_dated_18Feb16.pdf PDF
17R0007_Reno_Bldg_527_Amend_10,_SF30_QA_dated_16Feb18.pdf PDF
17R0007_Reno_Bldg_527_3rd_Site_Visit_Sign-In_Sheet,_Atch_2.pdf PDF
17R0007_Reno_Bldg_527_SF30_Amend__9,_3rd_Site_Visit_Rev_Floor_Plans.pdf PDF
17R0007_Reno_Bldg_527_Rev._Floor_Plans,_Welcome_Ctr_131st_Area,_Atch_1.pdf PDF
FA462517R0007_Reno_Bldg_527_Brick_Staining_Spec,_Atch_3.docx DOCX document
FA462517R0007_Reno_Bldg_527_QA_dtd_29_Jan_18,_Atch_2.docx DOCX document
FA462517R0007_Reno_Bldg_527_As-builts,_Atch_1.zip ZIP file
FA462517R0007_Reno_Bldg_527_Amend__6,_Extend_Offer_Date.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__5_SF30.pdf PDF
FA462517R0007_Reno_Bldg_527_QA_dated_14_Jul_2017.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__04,_2nd_Site_Visit.pdf PDF
FA462517R0007_Reno_Bldg_527_Second_Site_Visit_Sign-in_Sheet.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__03,_2nd_Round_Q&A.pdf PDF
Amend__3,_HVAC_As-builts_SHEET_001_CV1_COVER_SHEET.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_006_M4_MECH_SCHEDULES_DIAGRAMS.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_007_E1_ELECTRICAL_DEMO_PLAN.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_009_LF1.2_GRD_LOOP_WELL_FIELD_LAY_PLAN.pdf PDF
Amend__3,_WAFB_Fire_Emergency_Services_Design_Guide.pdf PDF
Amend__3,_HVAC_As-builts_SHEET_002_ME1_MEP_SYMBOLS_LEGENDS.pdf PDF
Amend__3,_HVAC_As-builts_SHEET_003_M1_MECH_DEMO_PLAN.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_004_M2_MECH_IMPROVE_PLAN.pdf PDF
FA462517R0007_Reno_Bldg_527_QA_dated_27_Jun_2017.3.pdf PDF
Amend__3,_WAFB_Plumbing_HVAC_Design_Requirements.pdf PDF
Amend__3,_2014_Whiteman_AFB_Design_Guide.pdf PDF
Amend__3,_Telecomm_Ubstall_Criteria_for_Facility_Design_Renovation.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_008_E2_ELECTRICAL_IMPROVE_PLAN.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_005_M3_MECH_DETAILS.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__02,_Sign-in_Sheet.pdf PDF
FA462517R0007_Reno_Bldg_527_Site_Visit_Sign-in_Sheet.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__1,_Q&A.pdf PDF
FA462517R0007_Reno_Bldg_527_Q&A,_dated_12_Jun_2017.docx DOCX document
17-R-0007_WAFB_Reno_Bldg_527_Atch_9_Staging_Area_26Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_5_AF_3065,_Progress_Report_Blank_27Apr17.xlsx XLSX spreadsheet
17-R-0007_WAFB_Reno_Bldg_527_Atch_7_100_prcnt_Design_Drwgs_Full_Set_3May16.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_8_Ktr_Major_Cat_Price_Brkdwn_27Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_4_AF_3064,_Progress_Schedule_Blank_27Apr17.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA462517R0007

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

A. List the indefinite postponement for proposal submission.

B. Extend the offer due date to Wednesday, 28 February 2018 at 1300/1:00 PM CST.

C. For full details, see continuation page attached.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jan-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA462517R0007

X 9B. DATED (SEE ITEM 11)

02-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jan-2018

CODE

509 CONS/PKA - FA4625

660 TENTH STREET, STE 222

WHITEMAN AFB MO 65305-5316

FA4625 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT #8 CONTINUATION PAGE

FA462517R0007, Amendment #08:

The purpose of this amendment is to:

1. Remove all references to a 3‐phased construction approach from the requirement. Upon Notice to Proceed (NTP) issuance, the contractor shall have complete access to and control of Bldg 527 for the duration of the period of performance. There is NO phasing plan; the following references are amended, but not limited to, as follows:

A. Attch #6/Design Specifications:

1. Section 220500‐1, para. 1.2 Submittals A.4. – Delete word "phasing"

2. Section 230010‐9, para. 3.3 Selective Demolition F.1. – Delete word

"phasing"

3. Section 230500‐1, para. 1.2 Submittals A.4. – Delete word "phasing"

4. Section 230880‐2, para. 1.8 Commissioning Documentation A.1. – Delete word "phasing"

B. Attch#7/100%Design Drawings:

1. Drwg G‐101 – Delete Phasing Plan with Legend in its entirety Drwg M‐000, General Demolition Notes, 4. – Delete reference to "phasing"

2. Drwg P‐101, General Demolition Notes, 4. – Delete reference to "phasing"

3. Drwg P‐101, General Demolition Notes, 9. – Delete reference to "phasing"

4. Drwg P‐201, General Demolition Notes, 4. – Delete reference to "phasing"

5. Drwg P‐201, General Demolition Notes, 9. – Delete reference to "phasing"

6. Drwg E‐000, General Demolition Notes, 3. – Delete reference to "phasing"

7. Drwg FP‐000, Fire Alarm General Demolition Notes, 4. – Delete reference to

"phasing"

8. Drwg FP‐000, Fire Sprinkler General Demolition Notes, 5. – Delete reference to "phasing"

C. SF 1442, Section L/Instructions, Conditions and Notices to Bidders, Part I:

1. Sub Factor 2‐Construction Schedule, para. 1 Criteria – Delete reference to

Drwg G‐101, last sentence of paragraph in its entirety

D. SF 1442, Section M/Evaluation Factors for Award, Part I:

1. Sub Factor 2‐Construction Schedule, para. 1 Criteria – Delete reference to

Drwg G‐101, last sentence of paragraph in its entirety

2. Sub Factor 2‐Construction Schedule, para. 2 Minimum Standard of

Acceptability – Delete reference to inclusion of required 3‐phased construction approach detailed in Drwg G‐101, underscored statement within the paragraph

2. Reduce the proposed construction schedule/proposed period of performance not to exceed from 395 days to 270 days.

A. SF 1442, Section L/Instructions, Conditions and Notices to Bidders, Part I:

1. Sub Factor 2‐Construction Schedule, para. 1 Criteria – Delete the two references to 395 days and replace with 270 days

B. SF 1442, Section M/Evaluation Factors for Award, Part I:

1. Sub Factor 2‐Construction Schedule, para. 1 Criteria – Delete the two references to 395 days and replace with 270 days

3. The INDEFINITE postponement for proposal submission is lifted. An OFFER DUE date has been established; a 30‐day period shall be allotted for proposal submissions. The hour and date specified for Receipt of Offer is extended to Wed, 28 Feb 2018 at 1300/1:00 PM Central Standard Time (CST); See Block 13 of SF 1442.

4. A final site visit is scheduled/offered for Wed, 07 Feb 2018 at 1300/1:00 pm Central Standard Time (CST); Report to the WAFB Visitors Center to sign‐in and obtain base passes, if needed, NLT 12:45 pm. If base passes not needed, report directly to Bldg 527’s front entrance, NLT 1:00 pm.

5. Post the fourth response of Questions & Answers, dated 29 Jan 2018; See Q&A Attachment 2.

Review all Q&As, as several previous responses have been updated/revised. Announce solicitation questions final submission due date of Thurs, 15 Feb 2018 at 1500/3:00 pm Central Standard Time (CST).

6. Change Block 9A and 9B to read: Tammie S. Clippert, 660‐687‐5920 respectively, as the Contract

Administrator has changed.

7. Remove FAR 52.222‐62 “Paycheck Transparency” clause

8. Add brick staining of the faculty’s exterior; to match existing west brick wall, ~8,254 sq. ft. See attached specification sheet, Attachment 3.

9. Change all references for commissioning responsibilities from the requirement to read

Contractor. The Contractor shall be the Commissioning Authority (CxA) for the complete requirement. The Contractor shall be responsible for the commissioning of all systems required in the requirement. The Contractor shall complete and submit all required certificates and reports to the Government.

10. Change all references throughout of “Owner” to read “Government”.

11. Change all references throughout of “Architect” to read “Government”.

12. See attachment 1 for as‐builts:

1993 YWHG93‐0572A1 CONSTRUCT FAMILY SUPPORT

1993 YWHG93‐0572B1 REPAIR LIBRARY

1995 YWHG95‐0158 INSTALL VENT, FAMILY SUPPORT

1995 YWHG94‐0067 REPAIR RESTROOMS (FAMILY SUPPORT)

1994 YWHG94‐0036 CONSTRUCT FOYER LIBRARY‐FAMILY SUPPORT

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time 28-Feb-2018 01:00 PM has been added.

The contractor period of performance end date has decreased by 125 days from 395 days to 270 days.

The required performance has changed from Notice to Offeror: Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.Reference Block 11: The Period of Performance is NTE 395 calendar days.Reference Block 12B: Performance and Payment Bonds are required prior to the Notice to Proceed. Davis-Bacon Act Wage Determination Number MO170012 dated 28 Apr 17, shall apply to the resulting contract, Attachment 1.Attention: Whiteman Air Force Base is a drug-free installation. FAR 52.223-6, Drug-Free Workplace and DFARS 252.223-7006, Drug Free Work Force apply to this contract. This will include any subcontractors, teaming arrangements, or joint venture arrangements. The magnitude of this project is estimated to be between $1,000,000.00 and $5,000,000.00.Attention: Staging area available on SW side of Bldg 527 (as noted in Attachment 9). Staging area will be available for use of a construction trailer. Contractor is responsible for temporary fence installation and all maintenance in staging area.See Block 10 Continuation. to Notice to Offeror:

Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.Reference Block 11: The Period of Performance is NTE 270 calendar days.Reference Block 12B: Performance and Payment Bonds are required prior to the Notice to Proceed. Davis-Bacon Act Wage Determination Number MO170012 dated 28 Apr 17, shall apply to the resulting contract, Attachment 1.Attention: Whiteman Air Force Base is a drug-free installation. FAR 52.223-6, Drug-Free Workplace and DFARS 252.223-7006, Drug Free Work Force apply to this contract. This will include any subcontractors, teaming arrangements, or joint venture arrangements. The magnitude of this project is estimated to be between $1,000,000.00 and $5,000,000.00.Attention:

Staging area available on SW side of Bldg 527 (as noted in Attachment 9). Staging area will be available for use of a construction trailer. Contractor is responsible for temporary fence installation and all maintenance in staging area.See Block 10 Continuation..

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

This construction project will locate both Bomb Wings' A&FRCs within the same office areas and provide the Central Post Office its allotted spacein Building 527. This contract will involve the construction/modification of Building 527's floor plan and perform upgrades as necessary tomake the building a complete and usable facility for the 509th/131st A&FRCs and the Central Post Office, along with associated functions. Thework will include moving walls, upgrading entryways, relocating/rewiring utilities, and other typical renovations and finish work. PoP NTE 395 days after issuance of Notice to Proceed.

To:

This construction project will locate both Bomb Wings' A&FRCs within the same office areas and provide the Central Post Office its allotted spacein Building 527. This contract will involve the construction/modification of Building 527's floor plan and perform upgrades as necessary tomake the building a complete and usable facility for the 509th/131st A&FRCs and the Central Post Office, along with associated functions. Thework will include moving walls, upgrading entryways, relocating/rewiring utilities, and other typical renovations and finish work. PoP

NTE 270 days after issuance of Notice to Proceed.

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

395 dys. ANP N/A

FOB: Destination

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

270 dys. ANP N/A

FOB: Destination

SECTION I - CONTRACT CLAUSES

The following have been deleted:

52.222-62

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

SECTION L

THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL

BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD, BUT WILL BE

DEEMED INCORPORATED BY REFERENCE.

Evaluation will be made in accordance with Section M of this solicitation.

NOTE: All proposal preparation cost will be the sole responsibility of the Offeror. The Government will not reimburse any firm for their proposal preparation cost.

Period for acceptance of offers: The Offeror agrees to hold the prices in its offer firm until 180 days after proposal due date.

Proposal Preparation Instructions

A. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of two (2) separately bound parts:

Part I - TECHNICAL CAPABILITY Part II -

PRICE

B. Offerors must complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. Offerors shall submit only those pages that require a fill-in.

C. Relationship between Solicitation Section L and Section M. Your attention is directed to the functional relationship between Section L and M of this solicitation. Section L provides information for the purpose of organizing the proposal and is not intended to be all-inclusive. Section M describes the evaluation factors for award, to include the evaluation procedures for the Technical Capability acceptability and the ranking of the Price proposals. Since the Government evaluation of proposals will cover areas identified in Section M, proposals should address all such areas of evaluation. Proposals that do not contain the information required risk rejection and consideration for award.

PART I – TECHNICAL CAPABILITY – Professional Qualifications, Construction Schedule & Past Performance shall be limited to no more than 15 pages total. The Quality Control plan shall be limited to no more than 10 pages total. Submit original with one (1) and one (1) sanitized copy with Offerors CAGE code only. A sanitized copy removes all direct references that can identify an Offeror by name or other easily recognizable characteristic. The sanitized copy will only contain a CAGE code as an identifier. The sanitized copy will be used during source selection procedures as detailed in Section M of the solicitation.

A. Sub Factor 1 - Professional Qualifications.

1. CRITERIA: Offeror must provide an organizational block identifying key on-site personnel with a description of their work experience relating to projects similar in scope (commercial building remodel/renovation; minimum threshold value of $500,000) to those expected under this proposal. Additionally, the Offeror must provide a narrative describing the organization’s program management policies, procedures, and processes, along with the performance history of similar scope and sized projects (commercial building remodel/renovation; minimum threshold value of $500,000), the Offeror’s Site Superintendent, Quality Assurance Manager and Safety Manager have accomplished. At a minimum, the Offeror shall provide the following information

a) An organizational block identifying on-site key personnel associated with this requirement to include:

(1) Key personnel: Each individual’s name, title, duty, years of experience and experience level relating to a similar contracts in size and scope of the contract (commercial building remodel/renovation; minimum threshold value of $500,000). At a minimum, the Offeror shall provide information for the following disciplines:

(a) Site Superintendent

(b) Quality Assurance Manager

(c) Safety Manager

(2) The narratives for the Site Superintendent, Quality Assurance Manager and Safety

Manager must show a minimum of two (2) years’ experience for each respective discipline on a project of similar size and scope (commercial building remodel/renovation; minimum threshold value of $500,000), showing project history with these key personnel in relations to the project’s description. The Quality Assurance Manager and the Safety Manager may be the same individual, but must show the minimum of two (2) years’ experience for each respective discipline.

(3) A description of the organization’s program management policies and procedures to include project planning approach, the process of information flow, reporting, and thepolicies and procedures for maintaining and recruiting qualified staffing throughout the contract period for prime and subcontractor employees in accordance with the SOW.

B. Sub Factor 2 - Construction Schedule

1. CRITERIA: Offeror must provide a proposed construction schedule not to exceed

270 days, AFIMT Form 3064; prepare and submit a practicable construction schedule laying out all necessary performance elements needed to complete this project identified in the solicitation in a proposed period of performance of 270 days. The schedule must be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the performance period. In addition, the schedule must be submitted in the Microsoft Project format. The AF IMT Form 3064 (Contract Progress Schedule) shall be used and submitted in conjunction with the Microsoft Project format. Offerors should only include the work elements necessary to complete the required work. It is the Offeror’s responsibility to identify all necessary project/work elements and the proposal adequately identifies acceptable critical path elements. Per Drawing G-101, the 100% designed project details a 3- phased construction approach, due to Government personnel occupying within Bldg

527 during construction (Note Phasing Legend, Drawing G-101).

C. Sub Factor 3 - Quality Control Plan

1. CRITERIA: Offeror must provide a plan to implement the requirements of Contract Clause entitled “Inspection of Construction” FAR 52.246-12. The plan shall identify personnel, procedures, control, instructions, test, records, and forms to be used. A finalized, more detailed Quality Control Plan (QCP) will be required to be submitted and approved after contract award.

a) The Offeror must submit the following as part of their respective firm’s quality control plan:

(1) A description of the quality control system, including a chart showing lines of authority and acknowledgement that the Quality Control (QC) Manager shall implement the three-phase control system for all aspects of work specified. The QC System Manager shall report to the project manager or someone higher in the Contractor’s organization. Project Manager in this context shall mean the individual with responsibility for the overall management of the project including quality and production. The proposal provides a Quality Control approach that effectively addresses the internal processes to identify and prevent deficiencies in the quality of construction and installation of the air handler components. This approach shall also show the plans for implementation ensuring the compliance of regulatory and Specifications statutes are strictly adhered to. The approach must also clearly address the QC organizational lines of authority and the Offeror’s approach to monitor corrective actions ensuring successful and timely problem resolution.

The detailed QC approach shall identify how quality inspections will meet the minimum requirements of the Specifications. The QCP shall effectively address how the Offeror will correct identified discrepancies found during QC checks and the process to provide resolution to the CO/COR for any discrepancies identified in the Specifications or design.

(2) The names, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a QC function. Any replacements must have similar qualifications in dealing with projects of similar size and scope.

D. Sub Factor 4 - Past Performance

1. CRITERIA: Offerors must provide a minimum of three (3) and a maximum of five (5) references of their choice of projects of similar contracts in size and scope (commercial building remodel/renovation; minimum threshold value of $500,000). The Offeror must provide for each reference the reference's company name, POCs, address, contact information to include phone number and e-mail address, project description, dollar value and period of performance. The Government will consider and evaluate Offeror's past performance information, to include the references, which are deemed recent and relevant for the requirements of this RFP in evaluation of Offeror’s adherence to period of performance/time of construction and construction according to contract specifications and design without deficiencies. The Government will also use information submitted by the Offeror and other sources such as other Federal Government offices and commercial sources, to assess performance. Recent and Relevant is defined in the subparagraph below:

i. Recency Assessment: An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed during the past 6 years from the date of issuance of this solicitation.

Past performance information that fails this condition will not be evaluated.

ii. Relevancy Assessment: An evaluation of all recent performance information obtained to determine whether the provided construction performed under those contracts relate to a similar size and scope as those required by this solicitation. In determining the relevancy of effort performed under individual past performance contracts, the Government will consider the specific effort or portion consistent with that proposed by the prime contractor and/or subcontractors. The past performance information obtained from sources will be used to establish the relevancy of past performance.

Technical Capability will be evaluated as ACCEPTABLE/UNACCEPTABLE.

Professional Qualifications, Construction Schedule, Quality Control Plan and Past Performance sub-factors will be weighted equally and all areas must have an acceptable rating. The Technical Capability sub-factors rating of ACCEPTABLE will be required for all sub-factors in order to be considered for award.

PART II – PRICE PROPOSAL

A. Complete the SF 1442, Blocks 14, 15, 17, 19, 20A, 20B, 20C and 30. An official having the authority to bind your company contractually must sign and date the SF 1442 Block 30b. One copy of the SF 1442 must bear an original, authorized signature. Submit original and one (1) copy of this part. In doing so, the Offeror accedes to the contract terms and conditions as written in the RFP. All sections of the RFP, excluding Instructions to Offerors and Evaluation Procedures Sections, constitute the model contract.

B. Bid – Insert proposed pricing on the SF 1442 CLIN 0001. As part of their bid, each Offeror shall be required to complete Attachment 8, Contractor Major Category Price Breakdown, for CLIN 0001 only. This CLIN 0001 price breakdown of four (4) major categories of construction will be provided for evaluation purposes only. This price breakdown will not include all costs associated with CLIN 0001, but will only be for the categories identified in Attachment 8. This price breakdown will not include overhead and profit.

C. Acknowledge any and all amendments to the solicitation.

D. Complete all forms and certifications in all sections, to include Section K. Offerors shall submit only those pages that require fill-in.

GENERAL INFORMATION

A. Pages exceeding the page limitations set forth will not be read or evaluated, and will be removed from the proposal.

Format for proposal Part I & II shall be as follows:

1. A page is defined as one face of an 8 ½” x 11” sheet of paper containing information.

2. Typing shall not be less than 12 pitch.

B. INFORMATION REGARDING SUBMISSION OF PROPOSALS: Electronic submission of proposals is required. All proposals and related documents will be submitted via CD/disc to the 509th Contracting Squadron, unless otherwise noted. The CD/disc must arrive at the designated time specified in the solicitation to be considered responsive, and considered in the evaluation process. The physical address is:

Attn. to: Tammie Clippert

509 CONS/PKA

660 Tenth St, Ste 222 Whiteman AFB, MO 65305-5344

C. Acknowledgement of solicitation amendments (SF30s) will be accepted electronic on the CD/disc or by e-mail. The acknowledgement must be received prior to solicitation closing date. The e-mail address is 509cons.sollgca@us.af.mil.

D. FEDERAL HOLIDAYS: The following Federal Legal Holidays are observed by this base: New Year’s Day – 1 January Martin Luther King’s Birthday – Third Monday in January Presidents Day – Third Monday in February Memorial Day – Last Monday in May Independence Day – 4 July Labor Day – First Monday in September Columbus Day – Second Monday in October Veterans Day – 11 November Thanksgiving Day – Fourth Thursday in November Christmas Day – 25 December

END OF SECTION L

Source Selection Information -- See FAR 2.101 and 3.104 – FOR OFFICIAL USE ONLY

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

SECTION M

THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION

WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD, BUT

WILL BE DEEMED INCORPORATED BY REFERENCE.

Evaluation will be made in accordance with Section M of this solicitation.

1. The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used in the following order to evaluate offers:

Part I - TECHNICAL CAPABILITY Part II -

PRICE

2. BASIS FOR CONTRACT AWARD: This is a competitive Lowest Price Technically Acceptable (LPTA) source selection in which technically acceptable competing Offerors will be moved on to Cost or Price; cost/price will contribute substantially to the selection decision. By submission of its offer, the Offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being determined unacceptable. The evaluation process shall proceed as follows:

PART I – TECHNICAL CAPABILITY

1. First, the technical capability of all offers will be evaluated on an

ACCEPTABLE / UNACCEPTABLE basis. Professional Qualifications, Construction Schedule, Quality Control Plan and Past Performance sub-factors will be weighted equally and all areas must have an ACCEPTABLE rating. Because risk of unsuccessful performance is expected to be minimal, risk is not separately evaluated, but instead is included as part of the technical capability and will be evaluated for acceptability only.

2. Evaluators shall assign a rating of ACCEPTABLE / UNACCEPTABLE based on the minimum requirements stated below.

A. Sub-Factor 1 – Professional Qualifications

Professional Qualifications Acceptable/Unacceptable Rating Method

Adjectival Rating Description Acceptable Proposal meets the requirements of the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

1. CRITERIA: Offeror must provide an organizational block identifying key on-site personnel with a description of their work experience relating to projects similar in scope (commercial building remodel/renovation; minimum threshold value of $500,000) to those expected under this proposal. Additionally, the Offeror must provide a narrative describing the organization’s program management policies, procedures, and processes, along with the performance history of similar scope and sized projects (commercial building remodel/renovation; minimum threshold value of $500,000), the Offeror’s Site Superintendent, Quality Assurance Manager and Safety Manager have accomplished.

2. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides:

a) An organizational block identifying on-site key personnel associated with this requirement to include:

(1) Key personnel: Each individual’s name, title, duty, years of experience and experience level relating to similar contracts in size and scope (commercial building remodel/renovation; minimum threshold value of $500,000). At a minimum, the Offeror shall provide information for the following disciplines:

(a) Site Superintendent

(b) Quality Assurance Manager

(c) Safety Manager

(2) The narratives for the Site Superintendent, Quality Assurance Manager and Safety Manager must show a minimum of two (2) years’ experience for each respective discipline on a project of similar size and scope (commercial building remodel/renovation; minimum threshold value of $500,000), showing project history with these key personnel in relations to the project’s description. The Quality Assurance Manager and the Safety Manager may be the same individual, but must show the minimum of two (2) years’ experience for each respective discipline.

(3) A description of the organization’s program management policies and procedures to include project planning approach, the process for information flow, reporting, and the policies and procedures for maintaining and recruiting qualified staffing throughout the contract period for prime and subcontractor employees in accordance with the SOW.

B. Sub-Factor 2 – Construction Schedule

Construction Schedule Acceptable/Unacceptable Rating Method

Acceptable Proposal meets the requirements of the solicitation.

1. CRITERIA: Offeror must provide a proposed construction schedule not to exceed 270 days, AFIMT Form 3064; prepare and submit a practicable construction schedule laying out all necessary performance elements needed to complete this project identified in the solicitation in a proposed period of performance not to exceed 270 days. The schedule must be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the performance period. In addition, the schedule must be submitted in the Microsoft Project format. The AF IMT Form 3064 (Contract Progress Schedule) shall be used and submitted in conjunction with the Microsoft Project format. Offerors should only include the work elements necessary to complete the required work. It is the Offeror’s responsibility to identify all necessary project/work elements and the proposal adequately identifies acceptable critical path elements. Per Drawing G-101, the 100% designed project details a 3-phased construction approach, due to Government personnel occupying within Bldg 527 during construction (Note Phasing Legend, Drawing G-101).

2. MINIMUM STANDARD OF ACCEPTABILITY: The schedule must be submitted in the Microsoft Project format. The AF IMT Form 3064 (Contract Progress Schedule) shall be used and submitted in conjunction with the Microsoft Project format. Offerors should only include the work elements necessary to complete the required work. It is the Offeror’s responsibility to identify all necessary project/work elements, to include the required 3-phased construction approach detailed in Drawing G-101, and the proposal adequately identifies acceptable critical elements. The proposal shall effectively demonstrate a detailed time line that fully addresses elements of work outlined in the Specifications and Design. The approach shall address the start and completion of each event, including but not limited to, the purchasing and installation of long lead time items, hiring of contract personnel, and work start dates, linking all associated critical path elements.

C. Sub-Factor 3 – Quality Control Plan

Quality Control Plan Acceptable/Unacceptable Rating Method

Acceptable Proposal meets the requirements of the solicitation.

1. CRITERIA: Offeror must provide a plan to implement the requirements of Contract Clause entitled “Inspection of Construction” FAR 52.246-12. The plan shall identify personnel, procedures, control, instructions, test, records, and forms to be used. A finalized, more detailed Quality Control Plan (QCP) will be required to be submitted and approved after contract award.

2. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standards of acceptability are met when the Offeror provides:

a) A description of the quality control system, including a chart showing lines of authority and acknowledgement that the Quality Control (QC) Manager shall implement the three-phase control system for all aspects of work specified. The QC System Manager shall report to the project manager or someone higher in the Contractor’s organization. Project Manager in this context shall mean the individual with responsibility for the overall management of the project including quality and production.

The proposal provides a Quality Control approach that effectively addresses the internal processes to identify and prevent deficiencies in the quality of construction. This approach shall also show the plans for implementation ensuring the compliance of regulatory and Specification statutes are strictly adhered

to. The approach shall also clearly address the QC organizational lines of authority and the Offeror’s approach to monitor corrective actions ensuring successful and timely problem resolution. The detailed QC approach shall identify how quality inspections will meet the minimum requirements of the Specifications. The QCP shall effectively address how the Offeror will correct identified discrepancies found during QC checks and the process to provide resolution to the CO/COR for any discrepancies identified in the Specifications or design.

b) The names, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a Quality Control (QC) manager. Any replacements must have similar qualifications in dealing with projects of similar size and scope.

D. Sub-Factor 4 – Past Performance

Past Performance Acceptable/Unacceptable Rating Method

Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.

Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

1. CRITERIA: Offerors must provide a minimum of three (3) and a maximum of five (5) references of their choice of projects of similar contracts in size and scope (commercial building remodel/renovation;

minimum threshold value of $500,000). The Offeror must provide for each reference the reference's company name, POCs, address, contact information to include phone number and e-mail address, project description, dollar value and period of performance. The Government will consider and evaluate Offeror's past performance information, to include the references, which are deemed recent and relevant for the requirements of this RFP in evaluation of Offeror’s adherence to period of performance/time of construction and construction according to contract specifications and design without deficiencies. The Government will also use information submitted by the Offeror and other sources such as other Federal Government offices and commercial sources, to assess performance. Recent and Relevant is defined in the subparagraph below:

i. Recency Assessment: An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed during the past 6 years from the date of issuance of this solicitation. Past performance information that fails this condition will not be evaluated.

ii. Relevancy Assessment: An evaluation of all recent performance information obtained to determine whether the provided construction performed under those contracts relate to a similar size and scope as those required by this solicitation. In determining the relevancy of effort performed under individual past performance contracts, the Government will consider the specific effort or portion consistent with that proposed by the prime contractor and/or subcontractors. The past performance information obtained from sources will be used to establish the relevancy of past performance.

2. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides minimum of three (3) and a maximum of five (5) references of their choice of projects of similar contracts in size and scope (commercial building remodel/renovation; minimum threshold value of $500,000) in which the Offeror adhered to period of performance/time of construction and construction according to contract specifications and design without deficiencies. The Offeror must provide for each reference the reference's company name, POCs, address, contact information to include phone number and e-mail address, project description, dollar value and period of performance. The Government will consider and evaluate Offeror's past performance information, to include the references, which are deemed recent and relevant for the requirements of this RFP in evaluation of Offeror’s adherence to period of performance/time of construction and construction according to contract specifications and design. The Government will also use information submitted by the Offeror and other sources such as other Federal Government offices and commercial sources, to assess performance.

Recent and Relevant is defined in the subparagraph below:

i. Recency Assessment: An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed during the past 6 years from the date of issuance of this solicitation. Past performance information that fails this condition will not be evaluated.

ii. Relevancy Assessment: An evaluation of all recent performance information obtained to determine whether the provided construction performed under those contracts relate to a similar size and scope as those required by this solicitation. In determining the relevancy of effort performed under individual past performance contracts, the Government will consider the specific effort or portion consistent with that proposed by the prime contractor and/or subcontractor. The past performance information obtained from sources will be used to establish the relevancy of past performance.

3. Those offers not meeting the minimum standard for acceptability will not be considered for award.

Professional Qualifications, Construction Schedule, Quality Control Plan and Past Performance sub-factors will be weighted equally and all areas must have an ACCEPTABLE rating. The Technical capability sub-factors ratings of ACCEPTABLE will be required in order to be considered for award.

PART II – PRICE PROPOSAL

A. Next, offers that are deemed technically acceptable shall be ranked according to price, including all aspects of the proposal. The Offeror’s price proposal will be submitted in a separate volume.

No price information is to be included in the technical sections of the proposal.

B. The Government will evaluate offers for award purposes by reviewing the total price of the bid to include all work, supplies, etc. to meet the solicitation. Each Offeror’s price proposal will be evaluated for completeness and reasonableness. Each Offeror’s price proposal shall include Attachment 8, Contractor Major Category Price Breakdown for CLIN 0001. This CLIN 0001 price breakdown of four

(4) major categories of construction will be provided for evaluation purposes only. This price breakdown will not include all cost associated with CLIN 0001, but will only be for the categories identified in Attachment 8. The price breakdown will not include overhead and profit. Unrealistically low or high proposed costs/prices may be grounds for eliminating a proposal from competition either on the basis that either the Offeror does not understand the requirement or the Offeror has made an unrealistic proposal.

C. An Offeror’s proposal may be rejected if the Contracting Officer determines the lack of realistic or reasonable price information contained in any portion of an Offerors price proposal.

3. The Government intends to award a contract without discussions with respective Offerors.

Therefore, the Offeror’s initial offer should contain that Offeror’s best terms from a price and technical standpoint. The Government, however, reserves the right to conduct discussions if deemed in its best interest. Prior to discussions, a competitive range may be established and the Offerors within the competitive range will be part of the discussions. The Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

END OF SECTION M

(End of Summary of Changes)