FA462517R0007_Reno_Bldg_527_Q&A,_dated_12_Jun_2017.docx

DOCX document 14 KB Posted

Attached to
Renovate Bldg 527 A&FRC Federal contract opportunity
Solicitation number
FA4625-17-R-0007
Issued by
Department of the Air Force Global Strike Command

About this file

Reno Bldg 527_Q&A dated 12 Jun 2017

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Bldg 527 A&FRC, newest first.
File Type Posted
Atch_3,_087100_SF_-_REVISED_DOOR_HARDWARE_SCHEDULE_(003).pdf PDF
Atch_1,_17R0007_Reno_Bldg_527_QA_dated_1Mar18.docx DOCX document
Atch_2,_17R0007_WAFB_Reno_Bldg_527_Atch_8_Ktr_Major_Cat_Price_Brkdwn_Rev_28Feb18.pdf PDF
Atch_4,_14_Dwgs,_Renovate_BLDG_527-Rev_1-1Mar2018.pdf PDF
17R0007_Reno_Bldg_527_SF30_Amend__12,_Dwgs_&_Q&A_dated_1Mar18.pdf PDF
17R0007_Reno_Bldg_527_SF30_Amend__11,_Extension,_Q&A_dated_23_Feb.pdf PDF
Atch_3_Specification_Section_26_12_19.10,_Three-Phase_Pad-Mounted_Transformers.pdf PDF
Atch_1_FA462517R0007_Reno_Bldg_527_QA_dated_23Feb18.pdf PDF
Atch_6_Renovate_BLDG_527_Int_Revs_-_A103_-_REFLECTED_CEILING_PLAN.pdf PDF
Atch_7_Renovate_BLDG_527_Int_Revs_-_A102_-_FLOOR_PLAN.pdf PDF
Atch_5_Renovate_BLDG_527_Int_Revs_-_A101_-_DEMOLITION_PLAN.pdf PDF
Atch_4_Specification_Section_33_71_02,_Underground_Electrical_Distribution.pdf PDF
Atch_2_Revised_Electrical_One_Line_Diagram.pdf PDF
FA462517R0007_Reno_Bldg_527_QA_dated_18Feb16.pdf PDF
17R0007_Reno_Bldg_527_Rev._Floor_Plans,_Welcome_Ctr_131st_Area,_Atch_1.pdf PDF
17R0007_Reno_Bldg_527_SF30_Amend__9,_3rd_Site_Visit_Rev_Floor_Plans.pdf PDF
17R0007_Reno_Bldg_527_3rd_Site_Visit_Sign-In_Sheet,_Atch_2.pdf PDF
FA462517R0007_Reno_Bldg_527_Brick_Staining_Spec,_Atch_3.docx DOCX document
FA462517R0007_Reno_Bldg_527_QA_dtd_29_Jan_18,_Atch_2.docx DOCX document
FA462517R0007_Reno_Bldg_527_As-builts,_Atch_1.zip ZIP file
FA462517R0007_Reno_Bldg_527_Amend__6,_Extend_Offer_Date.pdf PDF
FA462517R0007_Reno_Bldg_527_QA_dated_14_Jul_2017.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__5_SF30.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__04,_2nd_Site_Visit.pdf PDF
FA462517R0007_Reno_Bldg_527_Second_Site_Visit_Sign-in_Sheet.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_006_M4_MECH_SCHEDULES_DIAGRAMS.pdf PDF
Amend__3,_WAFB_Fire_Emergency_Services_Design_Guide.pdf PDF
Amend__3,_HVAC_As-builts_SHEET_002_ME1_MEP_SYMBOLS_LEGENDS.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_004_M2_MECH_IMPROVE_PLAN.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__03,_2nd_Round_Q&A.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_007_E1_ELECTRICAL_DEMO_PLAN.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_009_LF1.2_GRD_LOOP_WELL_FIELD_LAY_PLAN.pdf PDF
Amend__3,_2014_Whiteman_AFB_Design_Guide.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_008_E2_ELECTRICAL_IMPROVE_PLAN.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_005_M3_MECH_DETAILS.pdf PDF
Amend__3,_Telecomm_Ubstall_Criteria_for_Facility_Design_Renovation.pdf PDF
Amend__3,_HVAC_As-builts_SHEET_003_M1_MECH_DEMO_PLAN.pdf PDF
FA462517R0007_Reno_Bldg_527_Site_Visit_Sign-in_Sheet.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__02,_Sign-in_Sheet.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__1,_Q&A.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_SF_1442_RFP_2Jun17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_9_Staging_Area_26Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_5_AF_3065,_Progress_Report_Blank_27Apr17.xlsx XLSX spreadsheet
17-R-0007_WAFB_Reno_Bldg_527_Atch_8_Ktr_Major_Cat_Price_Brkdwn_27Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_6_Design_Specifications_3May16.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_4_AF_3064,_Progress_Schedule_Blank_27Apr17.xlsx XLSX spreadsheet
17-R-0007_WAFB_Reno_Bldg_527_Atch_2_Local_Info_27Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_3_Local_Info_Atch_1,_General_Rqmts_27Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_1_WD_MO170012_28Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_7_100_prcnt_Design_Drwgs_Full_Set_3May16.pdf PDF
Show all 50

Renovate Bldg 527 A&FRC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bldg 527 Renovation Q&A

1. QUESTION: On the Presol Notice in FBO this solicitation is noted as a Total Small Business set-aside, but I could not see where that is noted on the RFP. Please clarify that this is a Total Small Business set.

ANSWER: Yes, this is total small business set-aside.

2. QUESTION: Pg. 58. B. Bid – Insert proposed pricing on the SF 1442 CLIN 0001. - Is pricing to be noted on the SF 1442 and Attachment 8?

ANSWER: Yes, annotate total pricing on the SF 1442 CLIN 0001 and complete Attachment 8’s Contractor Major Category Price Breakdown for evaluation purposes only. Attachment 8’s price breakdown will not include all costs associated with CLIN 0001, but will only be for the categories identified in Attachment 8. This price breakdown will not include overhead and profit.

3. QUESTION: Please clarify that binders are not required - just four (4) CD's total (see chart below) Pg. 56. PART I - TECHNICAL CAPABILITY …… Submit Original with one (1) and (1) sanitized copy with Offerors CAGE code only.

Pg. 59. B. INFORMATION REGARDING SUBMISSION OF PROPOSALS: Electronic submission of proposals is required Is the following correct?

CD

Original

CD

Copy

CD

Redacted Copy

Part I - Technical Capability
1
1
1
Part II - Price Proposal
1
0
0

ANSWER: Correct, binders are not required and your chart above correctly reflects the CDs required with proposal submission.

4. QUESTION: When is the cut-off date & time for questions?

ANSWER: A date and time will be determined following the site visit of 15 Jun 2017, and posted along with site visit notes in an amendment.

5. QUESTION: If this is an all-electronic submission, can a scan of the Bid Bond be placed as the last item in the Price Proposal? And the original of the bid bond be submitted with the CD's?

ANSWER: Yes, a scanned copy of the Bid Bond may be placed on the Price Proposal CD and the original document be submitted with the proposal submission.

6. QUESTION: Regarding Division 1 requirements: the specifications attachment refers Div. 1 to WAFB Contracting, and there are no Div. 1 specifications listed in the RFP or other attachments, only the technical requirements in the RFP Section L. Please confirm those are the only requirements.

ANSWER: Division 1 requirements are 509 CONS’ contract specific requirements. The Government may add sections at some point to Division 1, but currently everything in that division is Contracting related, such as the RFP Section L and Section M.