Atch_6_Renovate_BLDG_527_Int_Revs_-_A103_-_REFLECTED_CEILING_PLAN.pdf
PDF 201 KB Posted
- Attached to
- Renovate Bldg 527 A&FRC Federal contract opportunity
- Solicitation number
- FA4625-17-R-0007
About this file
Atch 6 Renovate BLDG 527 Int Revs - A103 - REFLECTED CEILING PLAN
View the file
Other files for this federal contract opportunity
Show all 50
Renovate Bldg 527 A&FRC has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6
A
B
C
D
Base Distrib
Pkg Hold Area
USPS
Workroom
Receiving
Fire Sprinkler
Mech
Elec
Comm
Mechanical
INSTALL 3 1/2" UNFACED BATT
INSULATION ABOVE ALL
CLASSROOM CEILINGS.
INSTALL 3 1/2" UNFACED
BATT INSULATION ABOVE
ALL CLASSROOM CEILINGS.
FLOOR SUPPORTED
OPERABLE PARTITION SYSTEM
RE: SPECS AND 8/A-104.
FLOOR SUPPORTED
OPERABLE PARTITION
SYSTEM
RE: SPECS AND 8/A-104.
A.F.F.
2' x 2' ACT
9' - 0"
A.F.F.
2' x 2' ACT
9' - 0"
A.F.F.
2' x 2' ACT
11' - 0"
A.F.F.
2' x 2' ACT
9' - 0" A.F.F.
2' x 2' ACT 9' - 0"
A.
F.
F.
2' x
' A C
T 9'
0"
A.F.F.
2' x 2' ACT
12' - 0"
A.F.F.
2' x 2' ACT
9' - 0"
A.F.F.
2' x 2' ACT
9' - 0"
A.F.F.
2' x 2' ACT
9' - 0"
A.F.F.
2' x 2' ACT
9' - 0" A.F.F.
2' x 2' ACT 9' - 0"
A.F.F.
2' x 2' ACT
9' - 0"
A.F.F.
2' x 2' ACT
9' - 0"
A.F.F.
2' x 2' ACT
12' - 0"
A.F.F.
2' x 2' ACT
9' - 0"
ACOUSTICAL CEILING TO BE
INSTALLED CONTINUOUS
OVER MODULAR WALLS
MODULAR WALL UP TO
BOTTOM OF CEILING. TYP.
ACOUSTICAL CEILING TO BE
INSTALLED CONTINUOUS
OVER MODULAR WALLS
Storage
Classroom
Classroom
DRC
Lib/Client
Lobby
Waiting
Recep
Corridor
Women
Men
Kitchen/Break
Classroom
Corridor
Corridor
A.F.F.
2' x 2' ACT
9' - 0"
MODULAR WALL UP TO
BOTTOM OF CEILING. TYP.
A.F.F.
2' x 2' MR ACT
9' - 0"
A.F.F.
2' x 2' MR ACT
9' - 0"
A.F.F.
2' x 2' MR ACT
9' - 0"
MODULAR WALL UP
TO BOTTOM OF
CEILING. TYP.
ACOUSTICAL CEILING TO BE
INSTALLED CONTINUOUS
OVER MODULAR WALLS
PO Lobby
BPO
Workroom
BPO Office
Storage
FLE/CFP M
Tap Mgr
Tap Data
EFMP
Storage
Copy/Storage
VA Ed
RNCO
126Corridor
Corr
Corridor
Tap Asst
FLE/CFP A
Conference
VA Ben
Director
MFLC
Relo Asst
C or rid or
CSC
442 Ad
DPH
Fam Read
Corridor
Admin
DPH
Classroom
Classroom
SARC 509
166 Storage
Ft Viv Adv
Corr
Corr
Vic Space
SARC 131
Admin
Vestibule
Corr
USPS CS
Break 140Women
Men
Jan
DRYWALL CEILING AT
+/- 8' A.F.F. REPAIR AND
PATCH AFTER
DEMOLITION AND NEW
LIGHTING INSTALLATION.
PAINT.
DRYWALL CEILING AT
+/- 8' A.F.F. REPAIR AND
PATCH AFTER
DEMOLITION AND NEW
LIGHTING INSTALLATION.
PAINT.
UNDERSIDE OF
ATRIUM ROOF.
PROTECT.
HANGER ROD CANOPY
Admin 152A
Yel Rib 153A
Fam Read
Storage
FSS
106A
MDG
106B
CPTS
106C
Waiting
CS
METAL STUD & DRYWALL "HEADER"
W/ BOTTOM AT 8' A.F.F. CONSTRUCT
SIMILAR TO WALL TYPE A1 WITHOUT
SOUND BATT INSULATION
A.F.F.
2' x 2' ACT
9' - 0"
CEILING PLAN SYMBOLS
2'x2' SUSPENDED
ACOUSTIC CEILING
2x4 RECESSED
LIGHT
RECESSED CAN LIGHT
EXHAUST FAN
RETURN AIR GRILLE
SUPPLY AIR DIFFUSER
EXISTING OR METAL
STUD/GYPSUM BOARD
WALL TYPE
MODULAR WALL TYPE
FROM FLOOR TO
UNDERSIDE OF
CEILING
SURFACE MOUNTED OR
SUSPENDED LIGHT
DECORATIVRE SURFACE
MOUNTED OR SUSPENDED
LIGHT
Whiteman Air Force
Base Missouri
Approved
SIGNATURE OFFICE
Commander
Base Civil Engineer Chief of Programming
User
Coordination Airfield Manager
Ground Safety
Communication/ Computers Bioenvironmenta l Engineer Security Police
Security System
Fire Chief
Chief of Operations Construction Management Roofing Engineer Pavements Engineer Corrosion Engineer Protective Coatings Engr.
Contracting
Design Firm
Facility Number D.O. Number
Project Number
Project Title
Sheet Of
Sheet Title
Revision By/Date
Project Manager
Draftsman
Task Order Mngr.
Date
Drafting/IGI&S
CONSULTANTS
INCORPORATED May 1, 1955 Crowley Wade Milstead Inc.
Corporate License Missouri 000310
Structural Engineer
Mechanical / Electrical Engineer
CWM
CWM
A-103
REFLECTED CEILING PLAN
YWHG 15-0090
RENOVATE BUILDING
527 FOR POST OFFICE
AND A&FRC
3 May 2016
1/8" = 1'-0"1 REFLECTED CEILING PLAN
0' 4' - 0" 8' - 0" 16' - 0"
SCALE: 1/8" = 1' - 0"
No. Description Date
1 Interior Changes
?? Mar 2018
| Sheets |
| A-101 - DEMOLITION FLOOR PLAN |
| A-102 - FLOOR PLAN |
| A-103 - REFLECTED CEILING PLAN |
File details come from the government source that posted it.