FA462517R0007_Reno_Bldg_527_Brick_Staining_Spec,_Atch_3.docx

DOCX document 17 KB Posted

Attached to
Renovate Bldg 527 A&FRC Federal contract opportunity
Solicitation number
FA4625-17-R-0007
Issued by
Department of the Air Force Global Strike Command

About this file

Reno Bldg 527_Brick Staining Spec, Atch 3

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Bldg 527 A&FRC, newest first.
File Type Posted
Atch_1,_17R0007_Reno_Bldg_527_QA_dated_1Mar18.docx DOCX document
Atch_2,_17R0007_WAFB_Reno_Bldg_527_Atch_8_Ktr_Major_Cat_Price_Brkdwn_Rev_28Feb18.pdf PDF
Atch_4,_14_Dwgs,_Renovate_BLDG_527-Rev_1-1Mar2018.pdf PDF
17R0007_Reno_Bldg_527_SF30_Amend__12,_Dwgs_&_Q&A_dated_1Mar18.pdf PDF
Atch_3,_087100_SF_-_REVISED_DOOR_HARDWARE_SCHEDULE_(003).pdf PDF
17R0007_Reno_Bldg_527_SF30_Amend__11,_Extension,_Q&A_dated_23_Feb.pdf PDF
Atch_3_Specification_Section_26_12_19.10,_Three-Phase_Pad-Mounted_Transformers.pdf PDF
Atch_4_Specification_Section_33_71_02,_Underground_Electrical_Distribution.pdf PDF
Atch_2_Revised_Electrical_One_Line_Diagram.pdf PDF
Atch_1_FA462517R0007_Reno_Bldg_527_QA_dated_23Feb18.pdf PDF
17R0007_Reno_Bldg_527_Amend_10,_SF30_QA_dated_16Feb18.pdf PDF
FA462517R0007_Reno_Bldg_527_QA_dated_18Feb16.pdf PDF
17R0007_Reno_Bldg_527_Rev._Floor_Plans,_Welcome_Ctr_131st_Area,_Atch_1.pdf PDF
17R0007_Reno_Bldg_527_3rd_Site_Visit_Sign-In_Sheet,_Atch_2.pdf PDF
17R0007_Reno_Bldg_527_SF30_Amend__9,_3rd_Site_Visit_Rev_Floor_Plans.pdf PDF
FA462517R0007_Reno_Bldg_527_QA_dtd_29_Jan_18,_Atch_2.docx DOCX document
FA462517R0007_Reno_Bldg_527_Amend_8_SF30.pdf PDF
FA462517R0007_Reno_Bldg_527_As-builts,_Atch_1.zip ZIP file
FA462517R0007_Reno_Bldg_527_Amend__6,_Extend_Offer_Date.pdf PDF
FA462517R0007_Reno_Bldg_527_QA_dated_14_Jul_2017.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__5_SF30.pdf PDF
FA462517R0007_Reno_Bldg_527_Second_Site_Visit_Sign-in_Sheet.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_006_M4_MECH_SCHEDULES_DIAGRAMS.pdf PDF
Amend__3,_WAFB_Fire_Emergency_Services_Design_Guide.pdf PDF
Amend__3,_HVAC_As-builts_SHEET_002_ME1_MEP_SYMBOLS_LEGENDS.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_004_M2_MECH_IMPROVE_PLAN.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__03,_2nd_Round_Q&A.pdf PDF
Amend__3,_HVAC_As-builts_SHEET_003_M1_MECH_DEMO_PLAN.pdf PDF
FA462517R0007_Reno_Bldg_527_QA_dated_27_Jun_2017.3.pdf PDF
Amend__3,_WAFB_Plumbing_HVAC_Design_Requirements.pdf PDF
Amend__3,_HVAC_As-builts_SHEET_001_CV1_COVER_SHEET.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_008_E2_ELECTRICAL_IMPROVE_PLAN.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_005_M3_MECH_DETAILS.pdf PDF
Amend__3,_Telecomm_Ubstall_Criteria_for_Facility_Design_Renovation.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_007_E1_ELECTRICAL_DEMO_PLAN.pdf PDF
Amend__3,_HVAC_As-Builts_SHEET_009_LF1.2_GRD_LOOP_WELL_FIELD_LAY_PLAN.pdf PDF
FA462517R0007_Reno_Bldg_527_Site_Visit_Sign-in_Sheet.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__02,_Sign-in_Sheet.pdf PDF
FA462517R0007_Reno_Bldg_527_Amend__1,_Q&A.pdf PDF
FA462517R0007_Reno_Bldg_527_Q&A,_dated_12_Jun_2017.docx DOCX document
17-R-0007_WAFB_Reno_Bldg_527_SF_1442_RFP_2Jun17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_9_Staging_Area_26Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_5_AF_3065,_Progress_Report_Blank_27Apr17.xlsx XLSX spreadsheet
17-R-0007_WAFB_Reno_Bldg_527_Atch_7_100_prcnt_Design_Drwgs_Full_Set_3May16.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_3_Local_Info_Atch_1,_General_Rqmts_27Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_1_WD_MO170012_28Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_8_Ktr_Major_Cat_Price_Brkdwn_27Apr17.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_6_Design_Specifications_3May16.pdf PDF
17-R-0007_WAFB_Reno_Bldg_527_Atch_4_AF_3064,_Progress_Schedule_Blank_27Apr17.xlsx XLSX spreadsheet
17-R-0007_WAFB_Reno_Bldg_527_Atch_2_Local_Info_27Apr17.pdf PDF
Show all 50

Renovate Bldg 527 A&FRC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 042050 – BRICK STAINING

PART 1 – GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections, apply to this Section.

1.2 PERFORMANCE REQUIREMENTS

A. Quality Assurance:

1. Applicator Prerequisite: All team members have completed the Manufacturer’s instruction course for the application materials involved in the brick staining process. A superintendent must have a minimum of three years experience to supervise the project.

2. Mock-up: Apply masonry stain per manufacturer’s instructions to substrate material on the building. After sample treatment has cure in accordance with manufacturer’s recommendations, verify the substrate is coated with sufficient stain material to produce the desired appearance and color. Obtain Government’s approval of appearance and color prior to full-scale application.

3. This mock-up will become the standard of quality.

1.3 PRODUCT DELIVERY:

A. Material: All brick staining material shall be delivered to the job site in sealed containers and clearly marked with Manufacturer’s name.

B. Storage and Protection: Acrylic-base materials must be kept from freezing. Store and handle in accordance with Manufacturer’s instructions.

1.4 PROJECT CONDITIONS:

A. Surface preparation: Surface must be free of foreign matter, which may affect the appearance or performance of the brick staining product.

B. Environmental Requirements: Air and substrate temperature must be above 40 degrees F. and below 110 degrees F. Do not proceed with application if the substrate has frozen water present.

C. Protections: All precautions will be taken to protect all properties including appropriate masking, shielding, etc.

1.5 WARRANTY: The contractor and applicator shall jointly and severally warrant masonry stain against failure in material and workmanship for a standard period of fifteen (15) years from the date of application.

PART 2 PRODUCTS

Manufacturer: Brick stain shall be by BrickImaging or approved equal.

PART 3 EXECUTION

1.1 EXAMINATION: Verify the following:

A. Surface to be treated is clean, dry, and contains no frozen water.

B. Environmental conditions are appropriate for application.

1.2 PROTECTON:

A. Protect shrubs, metal, wood trim, glass, asphalt, and building hardware during application from over-spray.

B. Do not permit mist (if spraying) or liquid to drift onto surrounding properties or parking lots.

1.3 APPLICATION:

A. The brick staining shall match the existing brick on the west end of the facility. The staining shall match the base brick color, soldier course color, and the joint material.

1.4 FIELD QUALITY CONTROL

A. After masonry stain has cured (minimum of 2 hours) verify color uniformity. Re-apply to any area that requires additional color change.

1.5 CLEANING

A. At completion, remove from the jobsite, all excess materials, debris, and waste resulting from this work. Dispose of containers according to state, provincial, and local governmental regulations.