Att._2_-_Pricing_Worksheet(Rev4Sep18).xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Foam Fire Suppresion Maintenance
- Solicitation number
- FA462018QA075
About this file
pricing worksheet revised 04 September
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_03.pdf | ||
| Att._7_-_ANSULITE_3__SDS.pdf | ||
| Amendment_03.pdf | ||
| MFR_-_Site_visit_minutes.pdf | ||
| Amendment_01.pdf | ||
| Sign_in_Sheet.pdf | ||
| Att._6_-_JET-X_SDS.PDF | ||
| Amendment_01.pdf | ||
| FA462018QA075_-_Combo_RFQ_-_FFS_ITM.pdf | ||
| Att._2_-_Pricing_Worksheet.xlsx | XLSX spreadsheet | |
| Att._3_Wage_Determination_15-5537_(Rev-6).pdf | ||
| Att._5_-_PP_Questionnaire.pdf | ||
| Att._4_-_FAFB_OPSEC_Information.pdf | ||
| Att._1_-_PWS.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Foam Fire System Maintenance - Pricing Worksheet | ||||||
| Base Year (1 Oct 18 - 30 Sep 19) | ||||||
| CLIN | Description | Extended Description | Unit of issue | Quantity | Unit Price | Total |
| 0001 | Monthly Maintenance | Contractor shall perform monthly maintenance of control panels, annunciator equipment of fire detection, alarm systems, and control valves of foam spray systems, sprinkler systems, and foam monitors nozzle systems and all other routine maintenance in accordance with attached Performance Work Statement. | Month | 12 | $ - 0 | |
| 0002 | Semi-Annual | Contractor shall verify supply of foam concentrate, test foam proportioning pump to ensure operability, inspect foam proportioning system for proper valve alignment and system condition, and perform all other semi-annual services required by the attached performance work statement (PWS). | Each | 2 | $ - 0 | |
| 0003 | Annual | Contractor shall verify proper receipt of alarm, supervisory, and trouble signals and auxiliary functions, verify LED lights, an test backup batteries for control panel and annunciator equipment, test alarm initiation, verify control valves are in proper position, sample and test foam concentrate, inspect foam concentrate strainers, lubricate nozzle and nozzle drivers, and perform all other annual services required by the attached performance work statement (PWS). | Each | 1 | $ - 0 | |
| 0004 | Replacement Parts (NTE) | All approved parts in excess of $250.00 will be reimbursed under this CLIN. Parts costs exceeding $2,500.00 must be approved by the CO in writing. The contractor must provide a detailed list of parts required including but not limited to part numbers and costs. The contractor will need to provide the receipt with the invoice. | Lot | 1 | $ 10,000.00 | $ 10,000.00 |
| 0005 | 5 Year ITM Tasks | Contractor shall test sensitivity of smoke detectors to ensure they remain within listed and marked sensitivity range, flush balancing valve to prevent concentrate buildup, clean and inspect strainers, and perform all other 5 year ITM task required by the attached performance work statement (PWS) on all six facilities listed in PWS. | Each | 6 | $ - 0 | |
| 0006 | 10 Year ITM Tasks | Contractor shall drain, flush, and perform internal inspection for corrosion and perform hydrostatic test (if applicable), and perform all other 10 year ITM task required by the attached performance work statement (PWS) in buildings 1012, 1018, & 1019. | Each | 3 | $ - 0 | |
| Base Year Total | $ 10,000.00 |
| Option Year 1 (1 Oct 19 - 30 Sep 20) | ||||||
| CLIN | Description | Extended Description | Unit of issue | Quantity | Unit Price | Total |
| 1001 | Monthly Maintenance | Contractor shall perform monthly maintenance of control panels, annunciator equipment of fire detection, alarm systems, and control valves of foam spray systems, sprinkler systems, and foam monitors nozzle systems and all other routine maintenance in accordance with attached Performance Work Statement (PWS). | Month | 12 | $ - 0 | |
| 1002 | Semi-Annual | Contractor shall verify supply of foam concentrate, test foam proportioning pump to ensure operability, inspect foam proportioning system for proper valve alignment and system condition, and perform all other semi-annual services required by the attached performance work statement (PWS). | Each | 2 | $ - 0 | |
| 1003 | Annual | Contractor shall verify proper receipt of alarm, supervisory, and trouble signals and auxiliary functions, verify LED lights, an test backup batteries for control panel and annunciator equipment, test alarm initiation, verify control valves are in proper position, sample and test foam concentrate, inspect foam concentrate strainers, lubricate nozzle and nozzle drivers, and perform all other annual services required by the attached performance work statement (PWS). | Each | 1 | $ - 0 | |
| 1004 | Replacement Parts (NTE) | All approved parts in excess of $250.00 will be reimbursed under this CLIN. Parts costs exceeding $2,500.00 must be approved by the CO. The contractor must provide a detailed list of parts required including but not limited to part numbers and costs. The contractor will need to provide the receipt with the invoice. | Lot | 1 | $ 10,000.00 | $ 10,000.00 |
| 1005 | 2 Year ITM Tasks | Contractor shall test manual fire alarms to ensure operability, test heat detectors to verify alarm receipt, test smoke detectors with smoke simulant, test supervisory alarm, operate control valves to ensure operability, conduct flow test of foam proportioning system, verify operability of actuators, verify nozzle coverage during test flow, inspect piping hangers and sprinklers, inspect and clean foam concentrate strainers after test flow, and perform all other 2 year ITM task required by the attached performance work statement (PWS). | Each | 6 | $ - 0 | |
| Option Year 1 Total | $ 10,000.00 |
| Option Year 2 (1 Oct 20 - 30 Sep 21) | ||||||
| CLIN | Description | Extended Description | Unit of issue | Quantity | Unit Price | Total |
| 2001 | Monthly Maintenance | Contractor shall perform monthly maintenance of control panels, annunciator equipment of fire detection, alarm systems, and control valves of foam spray systems, sprinkler systems, and foam monitors nozzle systems and all other routine maintenance in accordance with attached Performance Work Statement (PWS). | Month | 12 | $ - 0 | |
| 2002 | Semi-Annual | Contractor shall verify supply of foam concentrate, test foam proportioning pump to ensure operability, inspect foam proportioning system for proper valve alignment and system condition, and perform all other semi-annual services required by the attached performance work statement (PWS). | Each | 2 | $ - 0 | |
| 2003 | Annual | Contractor shall verify proper receipt of alarm, supervisory, and trouble signals and auxiliary functions, verify LED lights, an test backup batteries for control panel and annunciator equipment, test alarm initiation, verify control valves are in proper position, sample and test foam concentrate, inspect foam concentrate strainers, lubricate nozzle and nozzle drivers, and perform all other annual services required by the attached performance work statement (PWS). | Each | 1 | $ - 0 | |
| 2004 | Replacement Parts (NTE) | All approved parts in excess of $250.00 will be reimbursed under this CLIN. Parts costs exceeding $2,500.00 must be approved by the CO. The contractor must provide a detailed list of parts required including but not limited to part numbers and costs. The contractor will need to provide the receipt with the invoice. | Lot | 1 | $ 10,000.00 | $ 10,000.00 |
| Option Year 2 Total | $ 10,000.00 |
| Option Year 3 (1 Oct 21 - 30 Sep 22) | ||||||
| CLIN | Description | Extended Description | Unit of issue | Quantity | Unit Price | Total |
| 3001 | Monthly Maintenance | Contractor shall perform monthly maintenance of control panels, annunciator equipment of fire detection, alarm systems, and control valves of foam spray systems, sprinkler systems, and foam monitors nozzle systems and all other routine maintenance in accordance with attached Performance Work Statement (PWS). | Month | 12 | $ - 0 | |
| 3002 | Semi-Annual | Contractor shall verify supply of foam concentrate, test foam proportioning pump to ensure operability, inspect foam proportioning system for proper valve alignment and system condition, and perform all other semi-annual services required by the attached performance work statement (PWS). | Each | 2 | $ - 0 | |
| 3003 | Annual | Contractor shall verify proper receipt of alarm, supervisory, and trouble signals and auxiliary functions, verify LED lights, an test backup batteries for control panel and annunciator equipment, test alarm initiation, verify control valves are in proper position, sample and test foam concentrate, inspect foam concentrate strainers, lubricate nozzle and nozzle drivers, and perform all other annual services required by the attached performance work statement (PWS). | Each | 1 | $ - 0 | |
| 3004 | Replacement Parts (NTE) | All approved parts in excess of $250.00 will be reimbursed under this CLIN. Parts costs exceeding $2,500.00 must be approved by the CO. The contractor must provide a detailed list of parts required including but not limited to part numbers and costs. The contractor will need to provide the receipt with the invoice. | Lot | 1 | $ 10,000.00 | $ 10,000.00 |
| 3005 | 2 Year ITM Tasks | Contractor shall test manual fire alarms to ensure operability, test heat detectors to verify alarm receipt, test smoke detectors with smoke simulant, test supervisory alarm, operate control valves to ensure operability, conduct flow test of foam proportioning system, verify operability of actuators, verify nozzle coverage during test flow, inspect piping hangers and sprinklers, inspect and clean foam concentrate strainers after test flow, and perform all other 2 year ITM task required by the attached performance work statement (PWS) on all six facilities listed in PWS. | Each | 6 | $ - 0 | |
| Option Year 3 Total | $ 10,000.00 |
| Option Year 4 (1 Oct 22 - 30 Sep 23) | ||||||
| CLIN | Description | Extended Description | Unit of issue | Quantity | Unit Price | Total |
| 4001 | Monthly Maintenance | Contractor shall perform monthly maintenance of control panels, annunciator equipment of fire detection, alarm systems, and control valves of foam spray systems, sprinkler systems, and foam monitors nozzle systems and all other routine maintenance in accordance with attached Performance Work Statement (PWS). | Month | 12 | $ - 0 | |
| 4002 | Semi-Annual | Contractor shall verify supply of foam concentrate, test foam proportioning pump to ensure operability, inspect foam proportioning system for proper valve alignment and system condition, and perform all other semi-annual services required by the attached performance work statement (PWS). | Each | 2 | $ - 0 | |
| 4003 | Annual | Contractor shall verify proper receipt of alarm, supervisory, and trouble signals and auxiliary functions, verify LED lights, an test backup batteries for control panel and annunciator equipment, test alarm initiation, verify control valves are in proper position, sample and test foam concentrate, inspect foam concentrate strainers, lubricate nozzle and nozzle drivers, and perform all other annual services required by the attached performance work statement (PWS). | Each | 1 | $ - 0 | |
| 4004 | Replacement Parts (NTE) | All approved parts in excess of $250.00 will be reimbursed under this CLIN. Parts costs exceeding $2,500.00 must be approved by the CO. The contractor must provide a detailed list of parts required including but not limited to part numbers and costs. The contractor will need to provide the receipt with the invoice. | Lot | 1 | $ 10,000.00 | $ 10,000.00 |
| 4005 | 10 Year ITM Tasks | Contractor shall drain, flush, and perform internal inspection for corrosion and perform hydrostatic test (if applicable), and perform all other 10 year ITM task required by the attached performance work statement (PWS) in buildings 2044, 2050. | Each | 2 | $ - 0 | |
| Option Year 4 Total | $ 10,000.00 | |||||
| Total Evaluated Price (TEP) CLINS 0001 - 4005 | $ 50,000.00 |