Att._2_-_Pricing_Worksheet.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Foam Fire Suppresion Maintenance Federal contract opportunity
Solicitation number
FA462018QA075
Issued by
Department of the Air Force Air Mobility Command

About this file

Pricing worksheet. Please fill in "Unit Price" column

View the file

Other files for this federal contract opportunity

Other files attached to Foam Fire Suppresion Maintenance, newest first.
File Type Posted
Att._2_-_Pricing_Worksheet(Rev4Sep18).xlsx XLSX spreadsheet
Amendment_03.pdf PDF
Amendment_03.pdf PDF
Att._7_-_ANSULITE_3__SDS.pdf PDF
MFR_-_Site_visit_minutes.pdf PDF
Att._6_-_JET-X_SDS.PDF PDF
Amendment_01.pdf PDF
Sign_in_Sheet.pdf PDF
Amendment_01.pdf PDF
Att._5_-_PP_Questionnaire.pdf PDF
FA462018QA075_-_Combo_RFQ_-_FFS_ITM.pdf PDF
Att._3_Wage_Determination_15-5537_(Rev-6).pdf PDF
Att._1_-_PWS.pdf PDF
Att._4_-_FAFB_OPSEC_Information.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Foam Fire System Maintenance - Pricing Worksheet
Base Year (1 Oct 18 - 30 Sep 19)
CLINDescriptionExtended DescriptionUnit of issueQuantityUnit PriceTotal
0001Monthly MaintenanceContractor shall perform monthly maintenance of control panels, annunciator equipment of fire detection, alarm systems, and control valves of foam spray systems, sprinkler systems, and foam monitors nozzle systems and all other routine maintenance in accordance with attached Performance Work Statement.Month12$ - 0
0002Semi-AnnualContractor shall verify supply of foam concentrate, test foam proportioning pump to ensure operability, inspect foam proportioning system for proper valve alignment and system condition, and perform all other semi-annual services required by the attached performance work statement (PWS).Each2$ - 0
0003AnnualContractor shall verify proper receipt of alarm, supervisory, and trouble signals and auxiliary functions, verify LED lights, an test backup batteries for control panel and annunciator equipment, test alarm initiation, verify control valves are in proper position, sample and test foam concentrate, inspect foam concentrate strainers, lubricate nozzle and nozzle drivers, and perform all other annual services required by the attached performance work statement (PWS).Each1$ - 0
0004Replacement Parts (NTE)All approved parts in excess of $250.00 will be reimbursed under this CLIN. Parts costs exceeding $2,500.00 must be approved by the CO in writing. The contractor must provide a detailed list of parts required including but not limited to part numbers and costs. The contractor will need to provide the receipt with the invoice.Lot1$ 10,000.00$ 10,000.00
00055 Year ITM TasksContractor shall test sensitivity of smoke detectors to ensure they remain within listed and marked sensitivity range, flush balancing valve to prevent concentrate buildup, clean and inspect strainers, and perform all other 5 year ITM task required by the attached performance work statement (PWS) on all six facilities listed in PWS.Each6$ - 0
000610 Year ITM TasksContractor shall drain, flush, and perform internal inspection for corrosion and perform hydrostatic test (if applicable), and perform all other 10 year ITM task required by the attached performance work statement (PWS) in buildings 1012, 1018, & 1019.Each3$ - 0
Base Year Total$ 10,000.00
Option Year 1 (1 Oct 19 - 30 Sep 20)
CLINDescriptionExtended DescriptionUnit of issueQuantityUnit PriceTotal
1001Monthly MaintenanceContractor shall perform monthly maintenance of control panels, annunciator equipment of fire detection, alarm systems, and control valves of foam spray systems, sprinkler systems, and foam monitors nozzle systems and all other routine maintenance in accordance with attached Performance Work Statement (PWS).Month12$ - 0
1002Semi-AnnualContractor shall verify supply of foam concentrate, test foam proportioning pump to ensure operability, inspect foam proportioning system for proper valve alignment and system condition, and perform all other semi-annual services required by the attached performance work statement (PWS).Each2$ - 0
1003AnnualContractor shall verify proper receipt of alarm, supervisory, and trouble signals and auxiliary functions, verify LED lights, an test backup batteries for control panel and annunciator equipment, test alarm initiation, verify control valves are in proper position, sample and test foam concentrate, inspect foam concentrate strainers, lubricate nozzle and nozzle drivers, and perform all other annual services required by the attached performance work statement (PWS).Each1$ - 0
1004Replacement Parts (NTE)All approved parts in excess of $250.00 will be reimbursed under this CLIN. Parts costs exceeding $2,500.00 must be approved by the CO. The contractor must provide a detailed list of parts required including but not limited to part numbers and costs. The contractor will need to provide the receipt with the invoice.Lot1$ 10,000.00$ 10,000.00
10052 Year ITM TasksContractor shall test manual fire alarms to ensure operability, test heat detectors to verify alarm receipt, test smoke detectors with smoke simulant, test supervisory alarm, operate control valves to ensure operability, conduct flow test of foam proportioning system, verify operability of actuators, verify nozzle coverage during test flow, inspect piping hangers and sprinklers, inspect and clean foam concentrate strainers after test flow, and perform all other 2 year ITM task required by the attached performance work statement (PWS).Each6$ - 0
Option Year 1 Total$ 10,000.00
Option Year 2 (1 Oct 20 - 30 Sep 21)
CLINDescriptionExtended DescriptionUnit of issueQuantityUnit PriceTotal
2001Monthly MaintenanceContractor shall perform monthly maintenance of control panels, annunciator equipment of fire detection, alarm systems, and control valves of foam spray systems, sprinkler systems, and foam monitors nozzle systems and all other routine maintenance in accordance with attached Performance Work Statement (PWS).Month12$ - 0
2002Semi-AnnualContractor shall verify supply of foam concentrate, test foam proportioning pump to ensure operability, inspect foam proportioning system for proper valve alignment and system condition, and perform all other semi-annual services required by the attached performance work statement (PWS).Each2$ - 0
2003AnnualContractor shall verify proper receipt of alarm, supervisory, and trouble signals and auxiliary functions, verify LED lights, an test backup batteries for control panel and annunciator equipment, test alarm initiation, verify control valves are in proper position, sample and test foam concentrate, inspect foam concentrate strainers, lubricate nozzle and nozzle drivers, and perform all other annual services required by the attached performance work statement (PWS).Each1$ - 0
2004Replacement Parts (NTE)All approved parts in excess of $250.00 will be reimbursed under this CLIN. Parts costs exceeding $2,500.00 must be approved by the CO. The contractor must provide a detailed list of parts required including but not limited to part numbers and costs. The contractor will need to provide the receipt with the invoice.Lot1$ 10,000.00$ 10,000.00
Option Year 2 Total$ 10,000.00
Option Year 3 (1 Oct 21 - 30 Sep 22)
CLINDescriptionExtended DescriptionUnit of issueQuantityUnit PriceTotal
3001Monthly MaintenanceContractor shall perform monthly maintenance of control panels, annunciator equipment of fire detection, alarm systems, and control valves of foam spray systems, sprinkler systems, and foam monitors nozzle systems and all other routine maintenance in accordance with attached Performance Work Statement (PWS).Month12$ - 0
3002Semi-AnnualContractor shall verify supply of foam concentrate, test foam proportioning pump to ensure operability, inspect foam proportioning system for proper valve alignment and system condition, and perform all other semi-annual services required by the attached performance work statement (PWS).Each2$ - 0
3003AnnualContractor shall verify proper receipt of alarm, supervisory, and trouble signals and auxiliary functions, verify LED lights, an test backup batteries for control panel and annunciator equipment, test alarm initiation, verify control valves are in proper position, sample and test foam concentrate, inspect foam concentrate strainers, lubricate nozzle and nozzle drivers, and perform all other annual services required by the attached performance work statement (PWS).Each1$ - 0
3004Replacement Parts (NTE)All approved parts in excess of $250.00 will be reimbursed under this CLIN. Parts costs exceeding $2,500.00 must be approved by the CO. The contractor must provide a detailed list of parts required including but not limited to part numbers and costs. The contractor will need to provide the receipt with the invoice.Lot1$ 10,000.00$ 10,000.00
30052 Year ITM TasksContractor shall test manual fire alarms to ensure operability, test heat detectors to verify alarm receipt, test smoke detectors with smoke simulant, test supervisory alarm, operate control valves to ensure operability, conduct flow test of foam proportioning system, verify operability of actuators, verify nozzle coverage during test flow, inspect piping hangers and sprinklers, inspect and clean foam concentrate strainers after test flow, and perform all other 2 year ITM task required by the attached performance work statement (PWS) on all six facilities listed in PWS.Each6$ - 0
Option Year 3 Total$ 10,000.00
Option Year 4 (1 Oct 22 - 30 Sep 23)
CLINDescriptionExtended DescriptionUnit of issueQuantityUnit PriceTotal
4001Monthly MaintenanceContractor shall perform monthly maintenance of control panels, annunciator equipment of fire detection, alarm systems, and control valves of foam spray systems, sprinkler systems, and foam monitors nozzle systems and all other routine maintenance in accordance with attached Performance Work Statement (PWS).Month12$ - 0
4002Semi-AnnualContractor shall verify supply of foam concentrate, test foam proportioning pump to ensure operability, inspect foam proportioning system for proper valve alignment and system condition, and perform all other semi-annual services required by the attached performance work statement (PWS).Each2$ - 0
4003AnnualContractor shall verify proper receipt of alarm, supervisory, and trouble signals and auxiliary functions, verify LED lights, an test backup batteries for control panel and annunciator equipment, test alarm initiation, verify control valves are in proper position, sample and test foam concentrate, inspect foam concentrate strainers, lubricate nozzle and nozzle drivers, and perform all other annual services required by the attached performance work statement (PWS).Each1$ - 0
4004Replacement Parts (NTE)All approved parts in excess of $250.00 will be reimbursed under this CLIN. Parts costs exceeding $2,500.00 must be approved by the CO. The contractor must provide a detailed list of parts required including but not limited to part numbers and costs. The contractor will need to provide the receipt with the invoice.Lot1$ 10,000.00$ 10,000.00
400510 Year ITM TasksContractor shall drain, flush, and perform internal inspection for corrosion and perform hydrostatic test (if applicable), and perform all other 10 year ITM task required by the attached performance work statement (PWS) in buildings 2044, 2050.Each2$ - 0
Option Year 4 Total$ 10,000.00
Total Evaluated Price (TEP) CLINS 0001 - 4005$ 50,000.00

File details come from the government source that posted it.