About this file

The specification for Asbestos Removal and related work. Please review.

View the file

Other files for this federal contract opportunity

Other files attached to Demolition Multiple Award Contract (DMAC), newest first.
File Type Posted
Amendment 3 with revised PWS dtd 23 June 2011.pdf PDF
Amendment 0002 as 0006.pdf PDF
PWS 10-0171 Bldg 1710 Rev 13June.pdf PDF
Atch H Spec 028301-Lead Paint Removal Specification.pdf PDF
Atch E HazMat Survey 10-0171.pdf PDF
Amend 1 remove LDs fix set aside.pdf PDF
RFP attach 6 orientation seminar PWS.pdf PDF
Atch 5 Demo Bldg 1710 DMAC Seed PWS and attachments.pdf PDF
DMAC LIQUIDAM Template PWS appendix B.xlsx XLSX spreadsheet
DMAC RFP Attach 4 WD 05-2565 rev 10.pdf PDF
11-Q-B002.pdf PDF
11-Q-B002 attach 1 DMAC PWS w appendix A.pdf PDF
DMAC RFP attch 2 PPQ.pdf PDF
RFP attach 3 Reps Certs.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEMOLISH BUILDING 1710 ATTACHMENT G

GJKZ 10-0171 ASBESTOS REMOVAL AND RELATED WORK

1021.10 028300 - 1

SECTION 02 83 00 - ASBESTOS REMOVAL AND RELATED WORK

PART 1 - GENERAL

1.1 WORK SUMMARY

A. This specification covers the asbestos-containing materials abatement and off-site disposal of asbestos-containing materials of the FAFB Building 1710 interior and exterior prior to building demolition activities. The Contractor must remove all asbestos containing materials prior to the commencement of building demolition activities. The General Contractor will be responsible for providing a 3rd Party Industrial Hygienist to perform final asbestos abatement cleanup inspection and final clearance air sampling of the asbestos work areas.

B. The results of the asbestos survey conducted at Building 1710 for building demolition are contained in the report Asbestos Survey Building 1710 Demolition Project, June 7, 2011, prepared by Environmental Risk Management. This report provides information on the suspect asbestos-containing materials that were tested and the results. A complete copy of the report is included herewith as part of this specification section. Photographs of the asbestos-containing materials can be found in Appendix C of the asbestos survey report.

C. This section details, but is not limited to, the following major items of work for the project. The

Abatement Contractor shall furnish all labor, materials, services, training, insurance, and equipment as needed to complete removal of asbestos-containing materials and asbestos-containing waste disposal from the above-referenced building area prior to selective demolition.

The Abatement Contractor shall follow all federal, state and local ordinances, regulations or rules pertaining to asbestos containing materials removal and disposal.

1.2 DESCRIPTION OF WORK

A. FAFB Building 1710 Interior – Friable Asbestos Containing Materials

1. Pipe insulation (mag) and mudded joint packings in all rooms throughout the building along walls and ceilings on radiant heat pipes. Sample Numbers: TSI: 17-9, 17-10. MJP:

17-8, 17-11, TSI: Pipe wrap: N.D. Insulation: 15% Amosite. MJP: Wrap: N.D., Insulation:

5%-85% Chrysotile, 10% Amosite

Thermal system insulation (Class I Friable Material) Estimated quantity: 318 LF

a. The pipe insulation in the restroom, storage room, and heat equipment room is coated with lead-containing paint. The asbestos abatement contractor must comply with Occupational Health & Safety Administration’s (OSHA) Lead Exposure in Construction Standard (29 CFR 1926.62).

1021.10 028300 - 2

B. FAFB Building 1710 Heat Equipment Room – Friable Asbestos Containing Materials

1. Mudded joint packing and debris on abandoned non-ACM air cell boiler piping and floor. Sample Numbers: Air cell TSI: 17-14, MJP: 17-15. TSI: Pipe wrap: N.D., Insulation:

N.D.

MJP: Wrap: N.D. Insulation: 85% Chrysotile, 15% Amosite. (Assumed ACM contaminated).

Estimated quantity: 84 SF (ACM contaminated aircell insulation and MJP included in TSI quantity.)

a. All interior ACM thermal system insulation abatement activities must be performed in a HEPA-filtered negative pressure enclosure with HEPA exhaust venting to the outside of the building. A constant negative pressure differential must be maintained from the time of initial disturbance of any asbestos-containing materials until final clearance results have been posted by 3rd Party Industrial Hygienist and the Abatement Contractor has been authorized in writing for work area demobilization by the 92 CONS Contracting Officer.

Each building room in which Class I friable asbestos abatement activities are being conducted must be treated as a separate work area

C. FAFB Building 1710 Interior – Non-Friable Asbestos Containing Materials

1. Green 9x9 floor tile/ black mastic on office area floor (bottom layer). Sample Number 17-

8, Floor tile: 12% Chrysotile, Mastic: 10% Chrysotile, Miscellaneous (Class II Non-friable Material).

Estimated quantity: 355 SF

a. All interior ACM flooring and mastic abatement activities must be performed utilizing manual methods in a regulated work area with critical barriers installed. The work area must remain a regulated area from the time of initial disturbance of any asbestos-containing materials until final clearance results have been posted by 3rd Party Industrial Hygienist and the Abatement Contractor has been authorized in writing for work area demobilization by the 92 CONS Contracting Officer.

2. Sealer caulk at intersections of concrete demising walls and CMU perimeter walls.

Sample Number: 17-27. Sealer caulk: 7% Chrysotile, Miscellaneous (Class II Non-friable Material)

Estimated quantity: 25 SF

3. Sealer caulk in interiors of office area and restroom metal door jambs and CMU partition walls. Sample Number: Assumed ACM. Sealer caulk: Assumed ACM, Miscellaneous (Class II Non-friable Material)

Estimated quantity: 5 SF

a. Door jambs are coated with lead-containing paint. The asbestos abatement contractor must comply with Occupational Health & Safety Administration’s (OSHA) Lead Exposure in Construction Standard (29 CFR 1926.62). The door jambs are required to be salvaged.

D. FAFB Building 1710 Exterior Roofs- Asbestos Containing Materials

1021.10 028300 - 3

1. Black/gray roof mastic on exterior roof edges and penetrations of building. Sample Numbers: 17-19, 17-20, 17-22, 17-23, Roof mastic: 8%-10% Chrysotile, Miscellaneous (Class II Non-friable Material)

Estimated quantity: 305 SF

a. Roof flashing is coated with lead-containing paint. The asbestos abatement contractor must comply with Occupational Health & Safety Administration’s (OSHA) Lead Exposure in Construction Standard (29 CFR 1926.62).

E. FAFB Building 1710 Exterior Walls- Asbestos Containing Materials

1. Sealer caulk on exterior windows to CMU/brick wall intersections. Sample Number 17-24, Sealer caulk: 10% Chrysotile, Miscellaneous (Class II Non-friable Material) Estimated quantity: 30 SF

a. Windows are coated with lead-containing paint. The asbestos abatement contractor must comply with Occupational Health & Safety Administration’s (OSHA) Lead Exposure in Construction Standard (29 CFR 1926.62).

2. Sealer caulk on exterior and interior steel door jambs to CMU/brick wall intersections.

Sample Number: 17-25, Sealer caulk: 10% Chrysotile, Miscellaneous (Class II Non-friable Material)

Estimated quantity: 80 SF

a. Steel door jambs are coated with lead-containing paint. The asbestos abatement contractor must comply with Occupational Health & Safety Administration’s (OSHA) Lead Exposure in Construction Standard (29 CFR 1926.62). The door jambs are required to be salvaged.

3. Sealer caulk on intersections of concrete demising walls and CMU perimeter walls.

Sample Number: 17-26, Sealer caulk: 10% Chrysotile, Miscellaneous (Class II Non-friable Material)

Estimated quantity: 35 SF

4. Sealer caulk on Intersection of heat equipment wall to main building CMU wall. Sample

Number: 17-3, Sealer caulk: 10% Chrysotile, Miscellaneous (Class II Non-friable Material) Estimated quantity: 5 SF

F. All interior/exterior ACM sealer caulks and ACM roof mastics must be removed as asbestos-containing regulated materials and must be removed by an asbestos abatement contractor in a regulated work area. All workers involved in removal activities must currently be Certified Asbestos Workers.

G. The removal contractor shall ensure that workers comply with the work practices regulating asbestos removal, including but not limited to:

1. The Non-friable asbestos-containing materials must be removed by manual methods utilizing hand tools. The asbestos-containing materials must be wetted during removal.

1021.10 028300 - 4

2. All removed asbestos-containing materials or asbestos-contaminated materials must be placed in a 6-mil plastic lined dumpster, drop box, or approved bags.

3. The removal contractor must keep any asbestos-containing materials debris from accumulating during removal.

4. If the project disposal containers are left unattended, they must be sealed and secured against vandalism.

H. All asbestos-containing materials must be disposed of as asbestos-containing material and dump receipts submitted prior to payment.

I. The owner requires air monitoring during ACM roofing mastic removal activities. Air monitoring must be conducted upwind, downwind, the perimeter of the roof work area, and at the ground level dump box or ACM waste staging area during all ACM removal activities.

J. The asbestos removal contractor must perform all removal activities in compliance with all federal, state, regional, and local regulations. If the above outline is in conflict with any of these regulations, the most stringent requirement shall apply.

1. All asbestos-containing materials must be sealed in minimum 6-mil plastic at the time of removal. No debris will be allowed to accumulate during removal activities.

2. Remove and legally dispose of off-site all asbestos-containing material in accordance with project specifications, and federal, state, and local regulations.

3. Perform final clean-up of area to remove all abatement debris.

4. Safety Compliance. In addition to detailed requirements of this specification, comply with administrative codes, laws, ordinances, rules and regulations of Federal, state, regional, and local authorities regarding work procedures for asbestos including, but not limited to, handling, storing, transporting, and disposing of waste materials. Comply with current requirements of 29 CFR 1910.1001 or 29 CFR 1926.1101 as applicable, SRCAA Regulation I (Article IX), 29 CFR 1926.62, 29 CFR 1910.1025, 40 CFR 745, and 40 CFR 61, Subparts A and M. Comply with current requirements for hazardous waste, including but not limited to handling, storing, transporting and disposal according to the Washington State Regulation WAC 173-303 governing dangerous waste.

1.3 APPLICABLE PUBLICATIONS

A. The publications listed below shall form a part of this specification, as if printed herein.

Reference includes any and all current amendments, addenda, and errata to the basic publication.

In case of conflict between referenced documents and the following text, the more stringent requirements shall apply.

Code of Federal Regulations (CFR)

29 CFR Part 1910 Occupational Safety and Health Standards 29 CFR Part 1926 Safety and Health Regulations for Construction 29 CFR Part 1926, Subpart T Demolition

1021.10 028300 - 5

40 CFR Part 61 National Emissions Standards for Hazardous Air Pollutants 40 CFR Part 763 Asbestos

American National Standard Institute (ANSI)

Z9.2-79 Fundamentals Governing the Design and Operation of Local Exhaust Systems Z87.1-89 Occupational and Educational Eye and Face Protection Z88.2-80 Practices for Respiratory Protection

American Society for Testing and Materials (ASTM)

D 1331 Surface and Interfacial Tension of Solutions of Surface-Active Agents E 1368 Visual Inspection of Asbestos Abatement Projects

Environmental Protection Agency (EPA)

EPA 340/1-90-018 Asbestos/NESHAP Regulated Asbestos Containing Materials Guidance EPA 340/1-90-019 Asbestos /NESHAP Adequately Wet Guidance EPA 560/5-85-024 Guidance for Controlling Asbestos Containing Materials in Building

National Institute for Occupational Safety and Health

Underwriters Laboratories (UL)

UL 586 High-Efficiency, Particulate, Air Filter Units

Compressed Gas Association (CGA)

CGA G-7 Compressed Air for Human Respiration CGA G-7.1 Commodity Specification for Air

Washington Administrative Code (WAC)

WAC 296-62 Occupational Health Standards WAC 296-65 Asbestos Removal and Encapsulation Occupational Safety and Health Administration (OSHA) WAC 173-303 Dangerous Waste Regulation

Spokane Regional Clean Air Agency (SRCAA)

Regulation I, Article IX Standards for Removal and Disposal of Asbestos Containing Material

NOTE: These publications form a part of this specification only to the extent referenced.

1.4 DEFINITIONS

A. Abatement. Procedures to control fiber release from asbestos-containing building materials.

Includes encapsulation, enclosure and removal.

1021.10 028300 - 6

B. Action Level (Asbestos). Means an airborne concentration of asbestos of 0.1 fiber per cubic centimeter of air calculated as an 8 hour time weighted average.

C. Airlock. A system for ingress or egress without permitting air movement between a contaminated area and an uncontaminated area, consisting of two curtained doorways at least six (6) feet apart.

D. Air Monitoring. The process of measuring the asbestos fiber content of a specific volume of air in a stated period of time.

E. Area Monitoring. Sampling of asbestos fiber concentrating within the asbestos control area and outside the asbestos control area which is representative of the airborne concentrations of asbestos fibers which may reach the breathing zone.

F. Asbestos. A naturally occurring fibrous mineral which includes chrysotile, amosite, crocidolite, tremolite, anthophyllite, and actionolite, and any of these that have been chemically treated and/or altered.

G. Asbestos Containing Material (ACM). Material composed of asbestos in an amount greater than

1 percent by weight, either alone or mixed with other fibrous or nonfibrous materials.

H. Asbestos Control Area. Any area where asbestos removal operations are performed which is isolated by physical boundaries to prevent the spread of asbestos dust, fibers, or debris.

I. Asbestos Fibers. For this specification, asbestos fibers are those fibers five (5) microns or longer having an aspect ratio of at least 3:1.

J. Clean Room. An uncontaminated area or room which is part of the work decontamination enclosure system, with storage for workers' street clothes and uncontaminated protective equipment.

K. Curtained Doorway. A device to allow ingress or egress from one room to another while permitting minimal air movement between the rooms, constructed by placing two overlapping sheets of plastic over an existing or temporarily formed doorway, securing each along the top of the doorway, securing the vertical edge of one along one vertical side of the doorway, and securing the vertical edge of the other sheet along the opposite vertical side of the doorway.

L. 3rd Party Industrial Hygienist. The third party industrial hygienist shall be subject to approval as specified in paragraph SUBMITTALS and shall be (1) have prior experience in the health and safety aspects of an asbestos removal project, or (2) have a minimum of three years prior experience in industrial hygiene relating to asbestos work.

M. Clearance. Final clearance of the containments shall be determined by the 3rd Party Industrial

Hygienist from a 1,200 liter minimum air sample collected in the previously contaminated area and analyzed in accordance with the methods prescribed in 29 CFR 1910.1001 or 29 CFR 1926.1101, Appendix A.

N. Asbestos Supervisor. One who is licensed by the State of Washington as such and capable of identifying existing asbestos hazards in the workplace and who has the authority to take prompt

1021.10 028300 - 7 corrective measures to eliminate them. The duties of the Asbestos Supervisor include at least the following: Establishing the negative-pressure enclosure, ensuring its integrity, and controlling entry to and exit from the enclosure; supervising any employee exposure monitoring required by the standard; ensuring that all employees working within such an enclosure wear the appropriate personnel protective equipment, are trained in the use of appropriate methods of exposure control, and use the hygiene facilities and decontamination procedures specified in the standard; and ensuring that engineering controls in use are in proper operating condition and are functioning properly.

O. Competent Person. One who is capable of identifying existing or predictable hazards in the surroundings or working conditions and who has authorization to take prompt corrective measures to eliminate them.

P. Disposal. Procedures necessary to transport and deposit the asbestos-contaminated material stripped and removed from the building in an approved waste disposal site in compliance with the EPA regulations.

Q. Equipment Room. A contaminated area or room within the decontamination enclosure system that is supplied with impermeable bags or containers for disposal of contaminated clothing and equipment.

R. Excursion Limit. No employees shall be exposed to an airborne concentration of asbestos, in any combination of the minerals defined, in excess of 1 fiber per cubic centimeter over a period of 30 minutes in locations subject to OSHA and WISHA (Washington Industrial Safety and Health Administration) inspections, or whatever exposure limit and time interval that is more stringent when required by local or state government. Excursion limit is an OSHA defined term which may also be referred to as "STEL", Short Term Exposure Limit, or as Ceiling Concentration. Method of determination shall be as described in 29 CFR 1926.1101, Appendix A, or an equivalent method recognized and approved by applicable regulatory agencies.

S. Friable ACM. A term as defined in CFR 40 Part 61, Subpart M and EPA 340/1-90-018 that means any material containing more than 1 percent asbestos as determined using the method specified in CFR 40 Part 763, Appendix A, Subpart F, Section 1, Polarized Light Microscopy, that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.

T. Glove Bag System. A portable asbestos abatement system designed for isolation of small groups of pipe fittings, etc., requiring asbestos removal.

U. HEPA Filter Equipment. High efficiency particulate air filtered equipment (vacuum and breathing) with a filter system capable of collecting and retaining asbestos fibers. Filters shall be capable of trapping and retaining at least 99.97 percent of 0.3 micrometer diameter mono disperse particles.

V. Negative Pressure Fan System. An air purifying fan system located within or outside the isolated work area, which draws air out of the work area through a HEPA filter, thus keeping the static air pressure in the work area lower than in adjacent areas and preventing infiltration of contaminated air from work area to adjacent areas.

W. Nonfriable ACM. A term as defined in CFR 40 Part 61, Subpart M and EPA 340/1-90-018 that means any material containing more than 1 percent asbestos as determined using the method

1021.10 028300 - 8 specified in 40 CFR 763, Appendix A, Subpart F, Section 1, Polarized Light Microscopy, that when dry, cannot be crumbled, pulverized or reduced to powder by hand pressure.

X. Permissible Exposure Limit (PEL). ASBESTOS: No employee shall be exposed to an airborne concentration of asbestos, in any combination of the minerals defined, in excess of 0.1 fibers per cubic centimeter as an 8 hour time weighted average (TWA) as determined by the method prescribed in Appendix A of 29 CFR 1926.1101, or an equivalent method recognized and approved by applicable regulatory agencies.

Y. Personal Monitoring. Sampling of asbestos fiber concentrations within the breathing zone (within 12 inches of the mouth) of an employee.

Z. Prior Experience. Experience required of the Abatement Contractor on asbestos project of similar nature and scope to ensure capability of performing the asbestos removal in a satisfactory manner. Similarities shall be in areas related to material composition, project size, number of employees, and the engineering work practice and personal protection controls required.

AA. Shower Room. A room between the clean room and the equipment room in the worker decontamination enclosure system, with hot and cold or warm running water and arranged for complete showering during decontamination. The shower room comprises an airlock between contaminated and clean areas.

BB. Surfactant. A chemical wetting agent added to water to improve penetration, thus reducing the quantity or water required for a given operation or area.

CC. Tack Coat. A coat of penetrating encapsulant applied to all surfaces from which asbestos containing-materials have been removed.

DD Time Weighted Average (TWA). The TWA is an 8 hour time weighted average of airborne concentration of asbestos fibers (longer than 5 micrometers) per cubic centimeter of air which represents the employee's 8-hour workday as determined by Appendix A of CFR 29 Part 1926, Section 1926.1101.

EE. Wet Cleaning. The process of eliminating asbestos from building surfaces and objects by using cloths, mops, or other cleaning tools dampened with water.

FF. Work Area. An isolated area of the facility where asbestos abatement activities are performed.

GG. Work Decontamination Enclosure System. A decontamination system for workers, consisting of a clean room, a shower room, and an equipment room. One entrance to the clean room shall be outside of the contaminated area. One entrance to the equipment room shall be connected directly to the contaminated area.

1.5 ABATEMENT ROLES AND RESPONSIBILITIES

A. Certified Industrial Hygienist. The CIH shall be required to certify that the Abatement Contractor’s asbestos abatement plan, and the air sampling plan are in compliance with the contract specifications as well as all applicable regulations.

1021.10 028300 - 9

B. General Contractor. The General Contractor will be responsible for providing a 3rd Party Industrial Hygienist and ensuring the Abatement Contractor is compliant with contract specifications and regulatory compliance.

C. 3rd Party Industrial Hygienist. The 3rd Party Industrial Hygienist shall be responsible for performing the final asbestos abatement cleanup inspections and final clearance air sampling of the asbestos work areas.

D. Abatement Contractor Licensed Project Designer. As required by 40 CFR 763.90 (g) Asbestos, the Abatement Contractor’s Licensed Designer shall write the Abatement Plan.

E. Abatement Contractor Supervisor. The Abatement Contractor Supervisor shall ensure the correct number of air samples, prepare daily work logs, keep daily entry/exit logs, and perform all other duties required of the competent person including: interpret the air sampling results and number of samples to ensure they are consistent with the abatement and air monitoring plans, and provide daily abatement oversight for compliance with the abatement and air monitoring plans, as well as all applicable regulations.

F. Approved Labs. The approved labs shall analyze all air samples and document the results.

1.6 QUALITY ASSURANCE

A. The safety of the General Contractor’s employees, Abatement Contractor's employees, Owner’s employees, representatives and the public is the sole responsibility of the General Contractor and the Abatement Contractor. The General Contractor will be responsible for providing a 3rd Party Industrial Hygienist to perform final asbestos abatement cleanup inspection and final clearance air sampling of the asbestos work areas.

B. The General Contractor and Abatement Contractor are solely responsible for Quality Assurance during the performance period; however, Owner’s monitoring of the Abatement Contractor shall include, but is not limited to, the following methods:

1. On-site Observation. The 92 CONS Contracting Officer may perform site visits at site after removal of materials (after the 3rd Party Industrial Hygienist removal inspection) or any time during performance period.

2. The 92 CONS Contracting Officer or 3rd Party Industrial Hygienist may provide observation regarding: integrity of project site barriers, worker protection program, performance of work area preparation, demolition and disposal, and conformance with EPA and OSHA regulations.

3. If the 92 CONS Contracting Officer determines that practices are in violation of applicable regulation, or are endangering workers or the facility, he will immediately notify the General Contractor and the Abatement Contractor orally that operations must cease until corrective action is taken. Such notification will be followed by written confirmation from the 92 CONS Contracting Officer.

4. After receiving such notification to stop work, the work may not be restarted until the General Contractor and the Abatement Contractor receives written authorization from the 92 CONS Contracting Officer. Any costs resulting from such a stop work order issued by the 92 CONS

1021.10 028300 - 10

Contracting Officer will be borne by the General Contractor and the Abatement Contractor and will not be a basis for an increase in the contract amount.

1.7 TITLE TO MATERIALS

A. All materials resulting from asbestos abatement work shall become the property of the Abatement Contractor and shall be disposed in accordance with Federal, state, and local ordinances, regulations, and rules.

1.8 MEDICAL REQUIREMENTS (29 CFR 1910.20/29 CFR 1926.1101)

A. Examinations. Before exposure to airborne asbestos fibers, provide workers with a comprehensive medical examination as required by 29 CFR 1910.20. This examination is not required if adequate records show the employee has been examined as required by 29 CFR

1910.20 or 29 CFR 1926.1101 as applicable within the past year. The examination shall be given on an annual basis to employees engaged in an occupation involving asbestos fibers and within 30 calendar days before or after the termination of employment. Identify x-ray films of asbestos workers to the consulting radiologist and mark medical record jackets "ASBESTOS".

B. Medical Records. Maintain complete and accurate records of employees' medical examinations for 30 years after termination of employment and make records of the required medical examinations available for inspection and copying to: The Assistant Secretary of Labor for Occupational Safety and Health, and employee's physician upon the request of the employee or former employee, and any authorized Federal or State agency.

1.9 RESPIRATOR PROGRAM

A. Establish a respirator program as required by ANSI Z88.2, 29 CFR 1926.1101, 29 CFR

B. 1910.134, CGA G-7 and CGA G-7.1.

1.10 HAZARD COMMUNICATION PROGRAM

A. Abatement Contractor shall establish and implement a hazard communication program in accordance with 29 CFR 1926.59.

1.11 SUBMITTALS

A. Schedule of Submittals: The Abatement Contractor shall address the following submittals. This schedule is an outline of basic requirements, the Abatement Contractor is responsible for ensuring that all applicable submittals are completed.

1. Plan of Work Schedule.

1021.10 028300 - 11

2. Testing Laboratory.

3. Notifications.

4. Abatement Plan.

5. Air Monitoring Plan

6. Disposal Plan

7. Local Exhaust System.

8. Training.

9. Employee Certification.

10. Certified Industrial Hygienist Resume

11. Respirator Program.

12. Safety Plan

13. Disposal Site(s) Dump Records.

14. Air Monitoring Results

B. 3rd Party Industrial Hygienist. The General Contractor shall submit the name, address, telephone number and credentials of the 3rd party industrial hygienist selected to perform the final asbestos abatement cleanup inspections and clearance air sampling of the work areas.

C. Air Monitoring Results. Friable and non-friable fiber counting shall be completed and results reviewed by their Abatement Contractor’s Supervisor within 24 hours following sample collections. The Abatement Contractor shall notify the 92 CONS Contracting Officer immediately of any exposures to asbestos fibers in excess of the acceptable limits. Submit all monitoring results to the 92 CONS Contracting Officer within three (3) working days.

D. Notifications. Within ten (10) work days after Notice to Proceed, but two days prior to commencement of work, submit to the for approval, written proof that all required notifications have been submitted and arrangement for transport and disposal of demolition materials to a site approved by EPA and other responsible agencies have been made, including:

1. Spokane Regional Clean Air Agency (SRCAA)

2. Washington Department of Labor and Industries

3. Washington Industrial Safety and Health Administration

4. All other responsible State and local agencies

E. Abatement Plan. Submit an abatement plan to the 92 CONS Contracting Officer within five working days after contract award, but before Notice to Proceed. The abatement plan shall include methods for containment, abatement methodology, and the proposed sequence of the abatement. Abatement Plan must be approved by the Abatement Contractor’s Certified Industrial Hygienist.

F. Disposal Plan. Submit a disposal plan to the 92 CONS Contracting Officer within five working days after contract award, but before Notice to Proceed. Plan shall include methods of disposal operations, and landfill site(s) to be utilized for debris. Abatement Contractor must receive written authorization from the 92 CONS Contracting Officer prior to disposal of wastes. Waste must be identified as hazardous or non-hazardous.

G. Disposal Site(s) Dump Records. Submit three copies of written proof of disposal at approved disposal site(s) within 2 working days to the 92 CONS Contracting Officer during the performance period.

1021.10 028300 - 12

H. Local Exhaust System. Pressure differential recordings for each work day shall be reviewed by the Abatement Contractor’s Supervisor. The Abatement Contractor shall notify the 92 CONS Contracting Officer immediately of any variance in the pressure differential which could cause exposure of adjacent unsealed areas to asbestos fiber concentrations in excess of 0.1 fiber per cubic centimeter. The Abatement Contractor will notify the 92 CONS Contracting Officer of the governing criteria for pressure recordings.

I. Training. Submit, to the 92 CONS Contracting Officer for approval, certificates signed by each employee that the employee has received training in the proper handling of materials that contain asbestos; glove bag training; understands the health implications and risks involved, including the illnesses possible from exposure to airborne asbestos fibers; understands the use and limits of the respiratory equipment to be used; and understands the results of monitoring of airborne quantities of asbestos as related to health and respiratory equipment.

J. Employee Certification. Where required by state or local law, all employees shall have valid asbestos worker certification applicable to the level of work or responsibility for which the employee is assigned.

K. Respirator Program. Within 5 work days after Notice to Proceed, submit to the 92 CONS

Contracting Officer for approval, a written respirator program in compliance with all parts of 29

CFR 1910.1001.

L. Safety Plan. Submit to the 92 CONS Contracting Officer for approval, a written Safety and

Occupational Health Program (SOHP) and a comprehensive site-specific Accident Prevention Plan (APP). The APP shall include the submission during the project, of Activity Hazard Analyses for each major phase of work. The hazard communication program shall be incorporated into the APP.

M. Coordination. Coordinate preparation and processing of submittals with the General Contractor.

Transmit each submittal sufficiently in advance of performance of related service activities to avoid delay.

N. Coordinate each submittal with fabrication, purchasing, testing, delivery, or other submittals and related activities that require sequential activity.

O. Coordinate transmittal of different types of submittals for related elements of the work so processing will not be delayed by the need to review submittals concurrently. Asbestos Supervisor Reports must be submitted daily.

P. The Owner and the 92 CONS Contracting Officer reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

PART 2 - PRODUCTS

2.1 MATERIALS AND EQUIPMENT

1021.10 028300 - 13

A. Abatement Contractor equipment shall meet all applicable codes and regulations for asbestos containing material abatement/disposal, other demolition/disposal operations, and site work.

B. Workers shall be fully protected with appropriate respirators and protective clothing from the time of first disturbance of asbestos-containing or contaminated materials prior to commencing actual asbestos abatement and until final clean-up is completed.

C. Respirators Select respirators from those approved by the Mine Safety and Health Administration

(MSHA), or by the National Institute for Occupational Safety and Health (NIOSH) under the provisions of 30 CFR Part 11.

1. Respirators for Handling Asbestos. Provide personnel engaged in the removal and demolition of asbestos material from negative pressure enclosures and authorized visitors with the proper level of respiratory protection for the asbestos abatement activities.

2. Optional Respirators for Handling Asbestos. Use Type C continuous flow or pressure-demand, supplied air respirators, unless the Contractor can establish via monitoring results of past projects of similar nature that the average airborne concentrations will not exceed 10 times the permissible exposure limits, i.e., 8-hour time-weighted average (TWA) and ceiling limits. When the exposure limits are established, the respirators presented in 29 CFR 1926 and WAC 296-62- 07715 that afford adequate protection at such concentrations of airborne asbestos may be used. If the Abatement Contractor decides to provide respirators other than Type C continuous flow or pressure demand, supplied air respirator, the Abatement Contractor shall determine the exposure of each employee to airborne asbestos during each type of abatement operation.

D. Protective Clothing. Provide personnel (including authorized visitors) exposed to airborne concentrations of asbestos fibers with fire retardant disposable protective whole body clothing, head coverings, gloves, and foot coverings. Provide disposable plastic or rubber gloves to protect hands.

Cloth gloves may be worn inside the plastic or rubber gloves for comfort, but shall not be used alone. Make sleeves secure at the wrists and make foot coverings secure at the ankles by the use of tape.

E. Eye Protection. Provide goggles/safety glasses to personnel engaged in asbestos operations when the use of a full face respirator is not required.

2.2 EQUIPMENT REQUIREMENTS

A. Danger Signs and Labels: Provide danger signs and labeled barricades at all approaches to asbestos contaminated work areas. Formats below show signs and labels for asbestos work areas.

Abatement Contractor shall adapt signs and labels to reflect the type of hazardous material present:

asbestos materials. Locate signs at such a distance that personnel may read the sign and take the necessary protective steps required before entering the area. Provide labels and affix to all materials, scrap, waste, debris, and other products contaminated with asbestos.

1. Danger Sign Vertical format conforming to 29 CFR 1910.145(d)(4) and WAC 296-24-14007 (4), minimum 20 by 14 inches displaying the following legend in the lower panel.

Legend Notation

1021.10 028300 - 14

Asbestos 1 inch Sans Serif Gothic or Block

Dust Hazard 3/4 inch Sans Serif Gothic or Block

Avoid Breathing Dust 1/4 inch Gothic

Wear Assigned Protective Equipment 1/4 inch Gothic

Do Not Remain in Area Unless Your Work Requires it 1/4 inch Gothic

Breathing Asbestos Dust May be Hazardous to Your Health 14 point Gothic

NOTE: Spacing between lines shall be at least equal to the height of the upper of any two lines.

2. Warning Labels - Provide labels of sufficient size to be clearly legible, displaying the following legend:

DANGER

CONTAINS ASBESTOS FIBERS

AVOID CREATING DUST

BREATHING ASBESTOS DUST MAY

CAUSE SERIOUS BODILY HARM

3. Warning Signs Provide signs of sufficient size to be clearly legible, displaying the following legend:

DANGER

ASBESTOS

CANCER AND LUNG DISEASE HAZARD

AUTHORIZED PERSONNEL ONLY

RESPIRATORS AND PROTECTIVE CLOTHING

ARE REQUIRED IN THIS AREA

B. Plastic Sheeting shall be necessary on critical barriers during course of work.

C. Tape shall be capable of sealing joints of adjacent sheets of plastic sheets and for attachment of plastic sheet to finished or unfinished surfaces of dissimilar materials and capable of adhering under both dry and wet conditions, including use of amended water.

D. Surfactant (Wetting Agent) shall be ENVIRO-WET, ASBESTO-WET, NANCOL or equivalent approved by the Engineer consisting of 50 percent polyoxyethylene ether and 50 percent of

1021.10 028300 - 15 polyoxyethylene or polyglycol ester and shall be mixed with water in accordance with manufacturer's directions.

E. Impermeable Containers shall be properly labeled 6 mil plastic bags capable of being sealed.

Containers shall be labeled in accordance with OSHA Regulation 29 CFR, 1926.58 and WAC 296-6205411. Containers must be both air and water tight. Containers shall be transported to disposal site in an enclosed vehicle fully sealed with 6 mil. polyethylene sheeting.

F. Air Scrubbing Equipment shall be utilized continuously from first disturbance of Class I friable

ACM until completion of successful final inspection and shall be high efficiency particulate absolute (HEPA) filtration systems equipped with filtration equipment in compliance with ANSI Z9.2-1979, local exhaust ventilation. No air movement system or air filtering equipment shall discharge unfiltered air outside work areas. The exchange rate shall be maintained at no less than 4 air changes per hour as calculated by the Supervisor. The Abatement Contractor is responsible for continuous monitoring and recording of pressure differential across isolation barriers using a pressure differential monitoring device. Pressure differential shall be maintained at a minimum of 0.02" H2O.

G. Sealable plastic bags shall be 6 mil minimum thickness for transportation and disposal of asbestos contaminated material.

H. Special materials to protect objects in the work areas shall be utilized.

PART 3 - EXECUTION

3.1 ASBESTOS CONTAINING MATERIAL REMOVAL WORK PROCEDURE

A. Perform asbestos related work in accordance with 29 CFR 1910.1001 or 29 CFR 1926.1101 as applicable. Use wet removal procedures. Personnel shall wear and utilize protective clothing and equipment. Eating, smoking, or drinking shall not be permitted in the asbestos control area.

Personnel of other trades not engaged in the removal and demolition of asbestos shall not be exposed at any time to airborne concentrations of asbestos unless all the personnel protection provisions of this specification are complied with by the trade personnel. Disconnect electrical service before wet removal is performed.

1. Class I Asbestos Materials Removal:

a. The Class I asbestos containing materials must be removed inside negative pressure enclosures as identified in the Abatement Contractor’s work plan submittal and approved by the 92 CONS Contracting Officer.

b. Position HEPA filtration air scrubbing equipment in a manner that creates continuous air filtration in the work zone during removal activities.

B. Access to Isolated Work Area by Others. Except for the Abatement Contractor's authorized personnel, and the 92 CONS Contracting Officer, or regulatory officials conducting compliance inspections, the Abatement Contractor shall limit access to the work area.

1021.10 028300 - 16

C. General. Monitoring of airborne concentrations of asbestos fibers shall be in accordance with 29 CFR 1910.1001, 29 CFR 1926.1101, and as specified herein.

1. Review. Personnel and procedures utilized by the Abatement Contractor are subject to review of the 92 CONS Contracting Officer. All air monitoring shall be performed by the Abatement Contractor’s qualified monitoring personnel.

2. Records. Documentation shall be kept for each filter sample procured as to worker sampled, work area, location, date and time taken, volume of air drawing through filter, pump identification number and calibration.

3. Samples. The samples shall be forwarded to an independent testing laboratory, approved by the 92 CONS Contracting Officer for analysis. The laboratory analyst shall sign and submit permanent records of all samples analyzed to the 92 CONS Contracting Officer with the sample records. Each sample must be labeled as to location, results of analysis, date, laboratory and project.

D. Monitoring Prior to Asbestos Work. Provide area monitoring and establish the reference TWA one-day prior to masking and sealing operations for each demolition site.

1. Pre-abatement Air Sampling. A minimum of one (1) air sample inside each work area and one

(1) air sample outside each work area shall be taken before abatement is completed in that area. Minimum sample shall be 480 liters.

2. Post Abatement Air Sampling. A minimum of one (1) air sample inside each work area and one (1) air sample outside each work area shall be taken after abatement is completed in that area. Minimum sample shall be 480 liters.

E. The Abatement Contractor shall determine current waste handling, transportation and disposal regulations for the work site and each waste disposal landfill. Abatement Contractor shall comply fully with these regulations and all US Department of Transportation and EPA requirements. Label and signs shall be in accordance with EPA and OSHA standards.

F. Final Work Area Cleanup. Abatement Contractor shall clean all surfaces in the work area and any other contaminated areas with water and/or with HEPA filtered vacuum equipment. After cleaning the work area, perform a visual inspection to ensure that the work area is free of visible asbestos debris. During this settling period, no entry, activity, or ventilation will be allowed.

G. Post abatement air sampling shall be taken within 24 hour of final cleaning. When the final inspection by the 3rd Party Industrial Hygienist and air sampling test results are satisfactory, the decontamination systems and remaining barriers shall be removed.

3.2 CLEAN-UP

A. Remove visible accumulations of asbestos-contaminated material and debris. Wet clean all surfaces within the work area.

1021.10 028300 - 17

B. During cleaning operations windows, doors shall remain sealed and any HEPA filtration negative air pressure systems, air filtration and decontamination enclosure systems shall remain in service.

C. Clean all surfaces in the work area and any other contaminated areas with water and/or with HEPA vacuum equipment. After cleaning the work area, allow surfaces to dry completely (6 hrs.

minimum) and again wet clean or clean with HEPA vacuum equipment all surfaces in the work area.

D. Sealed drums and all equipment used in the work area shall be included in the clean-up and shall be removed from work areas, via the decontamination enclosure system, at an appropriate time in the cleaning sequence.

E. Clean external surfaces of contaminated containers and equipment thoroughly by wet sponging before moving such items into the decontamination enclosure system for final cleaning and removal to uncontaminated areas. Ensure that contaminated equipment and equipment leaves work areas through the decontamination enclosure system after thorough cleaning and double bagging.

3.3 DISPOSAL

A. Remove sealed and labeled containers as asbestos waste, as applicable, and dispose of such containers at an authorized disposal site in accordance with the requirements of disposal authority.

Procedures for hauling and disposal shall comply with 40 CFR 61, Subpart M, and state, regional and local standards.

END OF SECTION 028300