Atch 5 Demo Bldg 1710 DMAC Seed PWS and attachments.pdf

PDF 12 MB Posted

Attached to
Demolition Multiple Award Contract (DMAC) Federal contract opportunity
Solicitation number
FA4620-11-Q-B002
Issued by
Department of the Air Force Air Mobility Command

About this file

This attachment includes the seed PWS and all attachments except E (Hazmat Survey). This attachment will be revised at a later time.

View the file

Other files for this federal contract opportunity

Other files attached to Demolition Multiple Award Contract (DMAC), newest first.
File Type Posted
Amendment 3 with revised PWS dtd 23 June 2011.pdf PDF
Amendment 0002 as 0006.pdf PDF
Atch E HazMat Survey 10-0171.pdf PDF
PWS 10-0171 Bldg 1710 Rev 13June.pdf PDF
Atch H Spec 028301-Lead Paint Removal Specification.pdf PDF
Atch G Spec 028300-Asbestos Removal and Related Work.pdf PDF
Amend 1 remove LDs fix set aside.pdf PDF
RFP attach 6 orientation seminar PWS.pdf PDF
11-Q-B002.pdf PDF
11-Q-B002 attach 1 DMAC PWS w appendix A.pdf PDF
DMAC RFP attch 2 PPQ.pdf PDF
RFP attach 3 Reps Certs.pdf PDF
DMAC LIQUIDAM Template PWS appendix B.xlsx XLSX spreadsheet
DMAC RFP Attach 4 WD 05-2565 rev 10.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4620-11-Q-B002

Attachment 5

DEMOLITION MULTIPLE AWARD CONTRACT (DMAC)

PERFORMANCE WORK STATEMENT (PWS)

FOR

SEED PROJECT

DEMOLISH BUILDING 1710

FAIRCHILD AIR FORCE BASE, WASHINGTON

Project No.: GJKZ 10-0171 12 May 2011

1. DESCRIPTION. The contractor shall perform demolition services of Building 1710 and surrounding pavements at Fairchild AFB, WA. The contractor shall perform work In Accordance With (IAW) the basic DMAC contract and this PWS.

1.1. SCOPE OF WORK. The contractor shall abate, demolish, properly dispose of and restore site of Building 1710 and surrounding pavements. Work includes hazardous materials abatement IAW the DMAC basic PWS and the attached hazardous material abatement survey report (Appendix E). Demolition includes but is not limited to; all floor slabs, footings, concrete docks and asphalt parking and driveways as indicated in Appendix C. Site restoration shall be performed IAW the standards identified in the basic DMAC PWS.

1.2. UTILITIES.

1.2.1. Electrical Demolition. Building 1710, receives power from an underground service lateral.

This lateral originates at the wood pole located just east of the access road (see drawing Appendix B), and has a disconnect switch mounted on it. The riser receives power from 120/208 volt conductors at the top of the pole and provides power to an attached floodlight (See Appendix D).

1.2.1.2. Demolition Requirements. The contractor shall demolish service conductors between the building and the pole, the riser, the disconnect switch and the underground service conduit to a point five feet beyond the building foundation. The contractor shall leave the base of the riser flush with the ground. Disconnect the riser from the 120/208 volt pole top conductors and insulate and tape the conductor ends. Abandon any remaining service conduit to the pole The contractor shall not demolish the floodlight or the pole or pole guy. Coordinate all electrical pole work with the base Electrical Shop. .

1.2.1.2.1. The 120/208 volt pole top conductors are connected directly to the un-fused secondary of a service transformer. There is no over-current protection on the circuit. Coordinate the de-energizing of the pole top circuit with the Base Electrical Shop. Lockout/tag out procedures shall be used.

1.2.2. Propane Gas Service. The propane tank servicing Bldg 1710 has been disconnected and relocated leaving the concrete slab and gas line. The contractor shall remove the gas line between the propane tank and Building 1710 and the concrete slab.

1.2.3. Water Service. Water lines at Bldg. 1710 have previously been cut and capped at the main.

Abandon the PVC pipe water line in place between the cap and the building.

1.2.4. Sewer System. The sanitary sewer system at the site is a pressure mound sewer system with associated septic tank, sewer lines, and pump station. The contractor shall decommission the sewer system to include pumping the vaults, capping the lines, removing and disposing of the septic tank and pump. See Appendix B for workload data.

1.2.5. Air Conditioning Units. Check all air conditioning units for Freon. If the units contain Freon, the contractor shall reclaim the Freon and provide all required collection and disposal documentation to the Contracting Officer.

1.3. ABATEMENT.

1.3.1. Lead Paint. The contractor shall remove and dispose of lead paint as hazardous material.

Concrete or CMU painted with Lead-Based Paint (LBP) shall be separated and disposed of as normal waste and shall NOT BE RECYCLED. The quantity of concrete with LBP (identified in Appendix E) shall be specified in the abatement and disposal plans. Proof that materials are non-hazardous may be required at landfills.

1.3.2. Asbestos Containing Material. Asbestos containing material (ACM) shall require abatement and disposal as indicated in Appendix E. The contractor shall submit all required manifests and disposal receipts.

1.3.3. Other Hazardous Containing Materials. Other materials indentified in the Hazardous Materials Survey require abatement and disposal as indicated in the report. The contractor shall submit disposal receipts and manifests as required.

1.4. PAVEMENT REMOVAL. Remove all the paved parking, driveway areas and concrete docks, sidewalks and steps from the areas identified in Appendix C. Pavement is estimated to be between 3 and 5 inches thick. After removing pavement, the contractor shall leave a smooth, straight saw cut edge. The contractor shall provide at a minimum, a 4 inch thick and 2 foot wide crushed gravel base shoulder at the edge of the cut pavement.

1.5. SITE RESTORATION. Site restoration under this task order shall include the parking and driveway areas and areas disturbed by demolition. Remaining restoration shall be completed IAW the basic DMAC PWS.

2. SUBMITTALS. The contractor shall provide all applicable submittals per the DMAC basic PWS.

3. PERFORMANCE PERIOD. The period of performance for this task order is 120 calendar days. Notices to Proceed (NTP) will be issued as per paragraph 1.2.2. of the basic contract PWS. A limite d NTP will be issued to complete work associated with CLIN 0001-0002

4. LIQUIDATED DAMAGES: In accordance with contract clause 52.211-11, Liquidated Damages (LDs) will be assessed for failure to complete the three phases within the time specificied in the approved performance shedule.

• LDs for Phase I will be assessed in the amount of $188.00 per calendar day.

• LDs for Phase II will be assessed in the amount of $211.00 per calendar day

• LDs for Phase III will be assessed in the amount of $179.00 per calendar day

5. APPENDICES.

Appendix A – Project Location Appendix B – As-Built Drawings Appendix C – Demolition Plan Appendix D – Photographs Appendix E – Hazardous Materials Survey Appendix F – Price Schedule

X

X

X

X X

X

AV

IS

TA

M ar sh R d

Pu mp H ouse Rd

Dig Permits Fairchild AFB

Projection: UTM, Zone 11N Datum & Spheroid: WGS84

This Material is For Official Use Only.

92 CES/CEPT, IGI&S/Geobase USAF, Air Mobility Command

Fairchild AFB, WA 99011 247-9399 µ 0 20 4010

Feet

Grid Convergence:

0o 29' WEST Magnetic Declination:

15o 54' EAST May 15, 2009

1:480Scale

1 inch = 40 feet

Legend

G Water Junction

" Water Valve (Potable)

!. Water Tank

! Water Meter

X Water Fitting

G!. Fire Hydrant

" Storm Valve

! Storm Drain Inlet

#V Storm Drain Headwall

G Storm Junction

"/ Storm Oil-Water Separator

X Sewer Fitting

" Sewer Septic Tank

! Sewer Manhole

!. Sewer Lift Station

" Sewer Valve

"/ Sewer Oil-Water Separator

" Gas Valve

# Gas Test Station

#V Gas Rectifier

! Gas Meter

"/ Gas Anode

G Heating Junction

" Fuel Valve

# Fuel Test Station

! Fuel Tank

!. Fuel Source

#V Fuel Rectifier

"/ Fuel Pumphouse

G Fuel Junction

G!. Fuel Hydrant

"/ Monitoring Well Utility Pole

O Exterior Lighting

"/ Electric Xfmr Vault

# Electrical Transformer

" Electrical Switch

! Electrical Meter

G Electrical Junction b Radio Transmitter b Radio Receiver

F Comm Pedestal

X Comm Pullbox

! Comm Manhole

!H Comm Handhole

6 Comm Device

# Comm Antenna

" Comm Vault

#V Comm Sensor Water Line Water Line Abandoned Gas Line Gas Line Abandoned Fuel Line Fuel Line Abandoned Comm Line Sewer Line Sewer Line Abandoned Storm line Storm Line Abandoned Steam Line Steam Line Abandoned Electric Line Electric Line - OH Electric Line - UG Comcast Line Tunnel Abandonded Foundation

Print Date: 9/14/2010 DigPermit-P_11X17

1221643751C Polygon

1221643751C Callout Extent of Demolition Sawcut asphalt at boundary with asphalt to remain.

1221643751C Callout Remove and dispose all asphalt pavement.

1221643751C Callout Remove all concrete docks, steps and sidewalks

1221643751C Line

1221643751C Callout Remove Building 1710 including floor slabs and foundations.

1221643751C Text Box

GJKZ 10-0171

DEMOLISH BUILDING 1710

ATTACHMENT C -

DEMOLITION PLAN

1221643751C Callout Decommission Septic System - includes full removal of septic tank and pump station.

1221643751C Text Box

1221643751C Callout Demo propane tank slab and gas line.

1221643751C Typewritten Text @ 11 x 17

PRICE SCHEDULE

GJKZ 10-0171

Hazardous Materials Survey/Report To Support Future Demolition of Building 1710

Fairchild Air Force Base, Washington

CLIN DESCRIPTION QTY UNIT PRICE AMOUNT

0001 BASIC REQUIRMENT:

All labor, materials and equipment necessary to execute abatement of Building 1710, as described in the Performance Work Statement for 10-0171 and all General Requirements associated with the above listed work, complete.

LS

LUMP SUM

0002 BASIC REQUIRMENT:

All labor, materials and equipment necessary to execute demolition of the above floor level portion of Building 1710 as described in the Performance Work Statement for 10-0171 and all General Requirements associated with the above listed work, complete.

0003 BASIC REQUIRMENT:

All labor, materials and equipment necessary to execute demolition of the below floor level portion of Building 1710, including slabs and foundations, nearby pavements, and the septic system serving the building as described in the Performance Work Statement for 10-0171 and all General Requirements associated with the above listed work, complete.

0004 BASIC REQUIRMENT:

All labor, materials and equipment necessary to execute site restoration after demolition of Building 1710 as described in the Performance Work Statement for 10-0171 and all General Requirements associated with the above listed work, complete.

TOTAL CLINs 0001, 0002, 0003, and 0004 $

Text2: GKLJ 10-0171 Bldg 1710 Attachment D- Photograph 1 of 13 Text3: GJLK 10-0171 Bldg 1710 Attachment D Photograph 2 of 13 Text4: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 3 of 13 Text5: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 4 of 13 Text6: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 5 of 13 Text7: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 6 of 13 Text8: Project 10-0171 Bldg 1710 Attachment D Photograph 7 of 13 Text9: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 8 of 13 Text10: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 9 of 13 Text11: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 10 of 13 Text12: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 11 of 13 Text13: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 12 of 13 Text14: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 13 of 13 Text1: Attachment E