Atch 5 Demo Bldg 1710 DMAC Seed PWS and attachments.pdf
PDF 12 MB Posted
- Attached to
- Demolition Multiple Award Contract (DMAC) Federal contract opportunity
- Solicitation number
- FA4620-11-Q-B002
About this file
This attachment includes the seed PWS and all attachments except E (Hazmat Survey). This attachment will be revised at a later time.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 3 with revised PWS dtd 23 June 2011.pdf | ||
| Amendment 0002 as 0006.pdf | ||
| Atch E HazMat Survey 10-0171.pdf | ||
| PWS 10-0171 Bldg 1710 Rev 13June.pdf | ||
| Atch H Spec 028301-Lead Paint Removal Specification.pdf | ||
| Atch G Spec 028300-Asbestos Removal and Related Work.pdf | ||
| Amend 1 remove LDs fix set aside.pdf | ||
| RFP attach 6 orientation seminar PWS.pdf | ||
| 11-Q-B002.pdf | ||
| 11-Q-B002 attach 1 DMAC PWS w appendix A.pdf | ||
| DMAC RFP attch 2 PPQ.pdf | ||
| RFP attach 3 Reps Certs.pdf | ||
| DMAC LIQUIDAM Template PWS appendix B.xlsx | XLSX spreadsheet | |
| DMAC RFP Attach 4 WD 05-2565 rev 10.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4620-11-Q-B002
Attachment 5
DEMOLITION MULTIPLE AWARD CONTRACT (DMAC)
PERFORMANCE WORK STATEMENT (PWS)
FOR
SEED PROJECT
DEMOLISH BUILDING 1710
FAIRCHILD AIR FORCE BASE, WASHINGTON
Project No.: GJKZ 10-0171 12 May 2011
1. DESCRIPTION. The contractor shall perform demolition services of Building 1710 and surrounding pavements at Fairchild AFB, WA. The contractor shall perform work In Accordance With (IAW) the basic DMAC contract and this PWS.
1.1. SCOPE OF WORK. The contractor shall abate, demolish, properly dispose of and restore site of Building 1710 and surrounding pavements. Work includes hazardous materials abatement IAW the DMAC basic PWS and the attached hazardous material abatement survey report (Appendix E). Demolition includes but is not limited to; all floor slabs, footings, concrete docks and asphalt parking and driveways as indicated in Appendix C. Site restoration shall be performed IAW the standards identified in the basic DMAC PWS.
1.2. UTILITIES.
1.2.1. Electrical Demolition. Building 1710, receives power from an underground service lateral.
This lateral originates at the wood pole located just east of the access road (see drawing Appendix B), and has a disconnect switch mounted on it. The riser receives power from 120/208 volt conductors at the top of the pole and provides power to an attached floodlight (See Appendix D).
1.2.1.2. Demolition Requirements. The contractor shall demolish service conductors between the building and the pole, the riser, the disconnect switch and the underground service conduit to a point five feet beyond the building foundation. The contractor shall leave the base of the riser flush with the ground. Disconnect the riser from the 120/208 volt pole top conductors and insulate and tape the conductor ends. Abandon any remaining service conduit to the pole The contractor shall not demolish the floodlight or the pole or pole guy. Coordinate all electrical pole work with the base Electrical Shop. .
1.2.1.2.1. The 120/208 volt pole top conductors are connected directly to the un-fused secondary of a service transformer. There is no over-current protection on the circuit. Coordinate the de-energizing of the pole top circuit with the Base Electrical Shop. Lockout/tag out procedures shall be used.
1.2.2. Propane Gas Service. The propane tank servicing Bldg 1710 has been disconnected and relocated leaving the concrete slab and gas line. The contractor shall remove the gas line between the propane tank and Building 1710 and the concrete slab.
1.2.3. Water Service. Water lines at Bldg. 1710 have previously been cut and capped at the main.
Abandon the PVC pipe water line in place between the cap and the building.
1.2.4. Sewer System. The sanitary sewer system at the site is a pressure mound sewer system with associated septic tank, sewer lines, and pump station. The contractor shall decommission the sewer system to include pumping the vaults, capping the lines, removing and disposing of the septic tank and pump. See Appendix B for workload data.
1.2.5. Air Conditioning Units. Check all air conditioning units for Freon. If the units contain Freon, the contractor shall reclaim the Freon and provide all required collection and disposal documentation to the Contracting Officer.
1.3. ABATEMENT.
1.3.1. Lead Paint. The contractor shall remove and dispose of lead paint as hazardous material.
Concrete or CMU painted with Lead-Based Paint (LBP) shall be separated and disposed of as normal waste and shall NOT BE RECYCLED. The quantity of concrete with LBP (identified in Appendix E) shall be specified in the abatement and disposal plans. Proof that materials are non-hazardous may be required at landfills.
1.3.2. Asbestos Containing Material. Asbestos containing material (ACM) shall require abatement and disposal as indicated in Appendix E. The contractor shall submit all required manifests and disposal receipts.
1.3.3. Other Hazardous Containing Materials. Other materials indentified in the Hazardous Materials Survey require abatement and disposal as indicated in the report. The contractor shall submit disposal receipts and manifests as required.
1.4. PAVEMENT REMOVAL. Remove all the paved parking, driveway areas and concrete docks, sidewalks and steps from the areas identified in Appendix C. Pavement is estimated to be between 3 and 5 inches thick. After removing pavement, the contractor shall leave a smooth, straight saw cut edge. The contractor shall provide at a minimum, a 4 inch thick and 2 foot wide crushed gravel base shoulder at the edge of the cut pavement.
1.5. SITE RESTORATION. Site restoration under this task order shall include the parking and driveway areas and areas disturbed by demolition. Remaining restoration shall be completed IAW the basic DMAC PWS.
2. SUBMITTALS. The contractor shall provide all applicable submittals per the DMAC basic PWS.
3. PERFORMANCE PERIOD. The period of performance for this task order is 120 calendar days. Notices to Proceed (NTP) will be issued as per paragraph 1.2.2. of the basic contract PWS. A limite d NTP will be issued to complete work associated with CLIN 0001-0002
4. LIQUIDATED DAMAGES: In accordance with contract clause 52.211-11, Liquidated Damages (LDs) will be assessed for failure to complete the three phases within the time specificied in the approved performance shedule.
• LDs for Phase I will be assessed in the amount of $188.00 per calendar day.
• LDs for Phase II will be assessed in the amount of $211.00 per calendar day
• LDs for Phase III will be assessed in the amount of $179.00 per calendar day
5. APPENDICES.
Appendix A – Project Location Appendix B – As-Built Drawings Appendix C – Demolition Plan Appendix D – Photographs Appendix E – Hazardous Materials Survey Appendix F – Price Schedule
X
X
X
X X
X
AV
IS
TA
M ar sh R d
Pu mp H ouse Rd
Dig Permits Fairchild AFB
Projection: UTM, Zone 11N Datum & Spheroid: WGS84
This Material is For Official Use Only.
92 CES/CEPT, IGI&S/Geobase USAF, Air Mobility Command
Fairchild AFB, WA 99011 247-9399 µ 0 20 4010
Feet
Grid Convergence:
0o 29' WEST Magnetic Declination:
15o 54' EAST May 15, 2009
1:480Scale
1 inch = 40 feet
Legend
G Water Junction
" Water Valve (Potable)
!. Water Tank
! Water Meter
X Water Fitting
G!. Fire Hydrant
" Storm Valve
! Storm Drain Inlet
#V Storm Drain Headwall
G Storm Junction
"/ Storm Oil-Water Separator
X Sewer Fitting
" Sewer Septic Tank
! Sewer Manhole
!. Sewer Lift Station
" Sewer Valve
"/ Sewer Oil-Water Separator
" Gas Valve
# Gas Test Station
#V Gas Rectifier
! Gas Meter
"/ Gas Anode
G Heating Junction
" Fuel Valve
# Fuel Test Station
! Fuel Tank
!. Fuel Source
#V Fuel Rectifier
"/ Fuel Pumphouse
G Fuel Junction
G!. Fuel Hydrant
"/ Monitoring Well Utility Pole
O Exterior Lighting
"/ Electric Xfmr Vault
# Electrical Transformer
" Electrical Switch
! Electrical Meter
G Electrical Junction b Radio Transmitter b Radio Receiver
F Comm Pedestal
X Comm Pullbox
! Comm Manhole
!H Comm Handhole
6 Comm Device
# Comm Antenna
" Comm Vault
#V Comm Sensor Water Line Water Line Abandoned Gas Line Gas Line Abandoned Fuel Line Fuel Line Abandoned Comm Line Sewer Line Sewer Line Abandoned Storm line Storm Line Abandoned Steam Line Steam Line Abandoned Electric Line Electric Line - OH Electric Line - UG Comcast Line Tunnel Abandonded Foundation
Print Date: 9/14/2010 DigPermit-P_11X17
1221643751C Polygon
1221643751C Callout Extent of Demolition Sawcut asphalt at boundary with asphalt to remain.
1221643751C Callout Remove and dispose all asphalt pavement.
1221643751C Callout Remove all concrete docks, steps and sidewalks
1221643751C Line
1221643751C Callout Remove Building 1710 including floor slabs and foundations.
1221643751C Text Box
GJKZ 10-0171
DEMOLISH BUILDING 1710
ATTACHMENT C -
DEMOLITION PLAN
1221643751C Callout Decommission Septic System - includes full removal of septic tank and pump station.
1221643751C Text Box
1221643751C Callout Demo propane tank slab and gas line.
1221643751C Typewritten Text @ 11 x 17
PRICE SCHEDULE
GJKZ 10-0171
Hazardous Materials Survey/Report To Support Future Demolition of Building 1710
Fairchild Air Force Base, Washington
CLIN DESCRIPTION QTY UNIT PRICE AMOUNT
0001 BASIC REQUIRMENT:
All labor, materials and equipment necessary to execute abatement of Building 1710, as described in the Performance Work Statement for 10-0171 and all General Requirements associated with the above listed work, complete.
LS
LUMP SUM
0002 BASIC REQUIRMENT:
All labor, materials and equipment necessary to execute demolition of the above floor level portion of Building 1710 as described in the Performance Work Statement for 10-0171 and all General Requirements associated with the above listed work, complete.
0003 BASIC REQUIRMENT:
All labor, materials and equipment necessary to execute demolition of the below floor level portion of Building 1710, including slabs and foundations, nearby pavements, and the septic system serving the building as described in the Performance Work Statement for 10-0171 and all General Requirements associated with the above listed work, complete.
0004 BASIC REQUIRMENT:
All labor, materials and equipment necessary to execute site restoration after demolition of Building 1710 as described in the Performance Work Statement for 10-0171 and all General Requirements associated with the above listed work, complete.
TOTAL CLINs 0001, 0002, 0003, and 0004 $
Text2: GKLJ 10-0171 Bldg 1710 Attachment D- Photograph 1 of 13 Text3: GJLK 10-0171 Bldg 1710 Attachment D Photograph 2 of 13 Text4: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 3 of 13 Text5: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 4 of 13 Text6: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 5 of 13 Text7: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 6 of 13 Text8: Project 10-0171 Bldg 1710 Attachment D Photograph 7 of 13 Text9: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 8 of 13 Text10: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 9 of 13 Text11: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 10 of 13 Text12: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 11 of 13 Text13: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 12 of 13 Text14: Project GJLK 10-0171 Bldg 1710 Attachment D Photograph 13 of 13 Text1: Attachment E