Attch 7-Appendix B CBA Wage rate tables LOSC 2009-2014.pdf

PDF 65 KB Posted

Attached to
Launch Operations Support Contract (LOSC)
Solicitation number
FA4610-08-R-0016
Issued by

About this file

Attachment 7 to LOSC Solicitation--Appendix B

View the file

Other files

File Type Posted
Amendment 05.zip ZIP file
Amendment 04.zip ZIP file
J A Extension 1 Jul--30 Sep 2011.pdf PDF
Amendment 03.zip ZIP file
Pre-Proposal Conf Questions Round 4.docx DOCX document
Amendment 02.zip ZIP file
Round 3 LOSC addtl questions after preproposal conference set 2.docx DOCX document
GFP Locations.xlsx XLSX spreadsheet
ACA InDyne - CHI.pdf PDF
LOSC WO History.zip ZIP file
Launch Support Manpower Data.xlsx XLSX spreadsheet
Pre-Proposal Conference Questions —
Painter Master Agreement 16.pdf PDF
Painters Mastor Agreement 36.pdf PDF
Part II of Amendment 01 to RFP.zip ZIP file
Attch 5 SCA-WD 05-2064 Rev 11.doc DOC document
Attch 3 SCA-WD 2005-2154 Rev 13.docx DOCX document
Attch 4 SCA-WD 2005-2060 Rev 10.doc DOC document
Attch 9 - Mission Essential Contract Services.doc DOC document
Attch 1A2 Property Equipment Responsibility List.xlsx XLSX spreadsheet
Attch 1B1 Government Furnished Property - FAR 52.245-1.xlsx XLSX spreadsheet
Attch 1B2 Government Furnished As-Is Property - FAR 52.245-2.xlsx XLSX spreadsheet
Amendment 01 to RFP.pdf PDF
Attch 1 - Revised Performance Work Statement 28 Jun 10.doc DOC document
Attch 8 Davis Bacon WD CA080023 Rev 5.docx DOCX document
conformed RFP thru Amendment 01.doc DOC document
Attch 6 SCA-WD 1986-0431 Rev 35.docx DOCX document
Attch 1C - Revised Contract Data Requirements List CDRL 9 Aug 2010.docx DOCX document
Attch 1A1 Facility Responsibility List 28 Jun 10.xlsx XLSX spreadsheet
Zip Reference Publications.zip ZIP file
Pre Proposal Conference Attendees.pdf PDF
PowerPlantOpsData.xlsx XLSX spreadsheet
Workload Data 9 Aug 10.doc DOC document
BackflowPreventerData.xlsx XLSX spreadsheet
Equipment PM History.xlsx XLSX spreadsheet
LOSC WO History.xlsx XLSX spreadsheet
Additional Information.docx DOCX document
SVPP WasteWater Discharge.xlsx XLSX spreadsheet
Facility Equipment Inspection Report.xlsx XLSX spreadsheet
Technical Procedures.xlsx XLSX spreadsheet
Pre-Proposal Conference Questions —
RFP Advisory LOSC--Removal of Draft Watermark.pdf PDF
Attch 8 Davis Bacon WD CA080023 Rev 5.docx DOCX document
Attch 1D -Environmental Requirements.docx DOCX document
DD Form 254 Continuation.doc DOC document
Attch 1A1 Facility Responsibility List 28 Jun 10.xlsx XLSX spreadsheet
Attch 7-Appendix C CBA Group Insurance Descriptions.pdf PDF
Attch 1C - Revised Contract Data Requirements List CDRL 8 Jun 2010.docx DOCX document
Attch 5 SCA-WD 05-2064 Rev 11.doc DOC document
Attch 9 - Mission Essential Contract Services.doc DOC document
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CBA RATE SCHEDULE Appendix B - Rate Tables

FISCAL YEAR 2009 - 2014 LOSC

Group Family Oct 1, 2009 Oct 1, 2010 Oct 1, 2011 Oct 1, 2012 Oct 1, 2013

Electrical, Maintenance and Repair, Group "A"

Operations Lead 32.72$ 33.62$ 34.55$ 35.50$ 36.73$

Maintenance Electrician A 29.97$ 30.87$ 31.80$ 32.75$ 33.98$

Maintenance Electrician B 28.31$ 29.16$ 30.03$ 30.93$ 32.09$

Fire Alarm System Technician A 29.97$ 30.87$ 31.80$ 32.75$ 33.98$

Fire Alarm System Technician B 28.31$ 29.16$ 30.03$ 30.93$ 32.09$

Mechanical, Maintenance and Repair, Group "B"

Operations Lead 32.72$ 33.62$ 34.55$ 35.50$ 36.73$

Plumber, Maintenance A 29.59$ 30.48$ 31.39$ 32.33$ 33.55$

Plumber, Maintenance B 28.11$ 28.95$ 29.82$ 30.72$ 31.87$

HVAC Mechanic A 29.97$ 30.87$ 31.80$ 32.75$ 33.98$

HVAC Mechanic B 28.31$ 29.16$ 30.03$ 30.93$ 32.09$

Equipment Maintenance and Repair, Group "C"

Operations Lead 29.74$ 30.55$ 31.39$ 32.25$ 33.35$

Crane/Hoist Maintenance Mechanic 26.99$ 27.80$ 28.64$ 29.50$ 30.60$

Machinery Maintenance Mechanic 26.99$ 27.80$ 28.64$ 29.50$ 30.60$

General, Maintenance and Repair, Group "D"

Operations Lead 29.38$ 30.18$ 31.00$ 31.85$ 32.94$

Facility Maintenance A 26.63$ 27.43$ 28.25$ 29.10$ 30.19$

Facility Maintenance B 22.12$ 22.78$ 23.46$ 24.17$ 25.08$

Maintenance Helper 19.38$ 19.96$ 20.56$ 21.17$ 21.97$

RayburnF Text Box

FA4610-08-R-0016

Attachment 7 - Appendix B

Appendix B - Rate Tables

LOSC

Plant and System Operation, Group "E"

Operations Lead 32.72$ 33.62$ 34.55$ 35.50$ 36.73$

Stationary Engineer A 29.97$ 30.87$ 31.80$ 32.75$ 33.98$

Stationary Engineer B 28.31$ 29.16$ 30.03$ 30.93$ 32.09$

Boiler Tender 23.93$ 24.65$ 25.39$ 26.15$ 27.13$

Materials and Warehousing, Group "F"

Supply Technician 25.86$ 26.64$ 27.44$ 28.26$ 29.32$

Material Expeditor / Warehouse A 24.57$ 25.31$ 26.07$ 26.85$ 27.86$

Material Expeditor / Warehouse B 21.59$ 22.24$ 22.90$ 23.59$ 24.48$

Storekeeper A 24.57$ 25.31$ 26.07$ 26.85$ 27.86$

Storekeeper B 21.59$ 22.24$ 22.90$ 23.59$ 24.48$

Storekeeper C 19.15$ 19.72$ 20.31$ 20.92$ 21.71$

Material Handling Laborer 16.70$ 17.21$ 17.72$ 18.25$ 18.94$

Support Personnel, Group "G"

CMMS Work Control Clerk A 23.50$ 24.21$ 24.94$ 25.68$ 26.65$

CMMS Work Control Clerk B 21.41$ 22.06$ 22.72$ 23.40$ 24.28$

General Office Clerk 20.41$ 21.02$ 21.65$ 22.30$ 23.14$

Secretary A 23.50$ 24.21$ 24.94$ 25.68$ 26.65$

Secretary B 18.28$ 18.83$ 19.39$ 19.97$ 20.72$

RayburnF Text Box FA4610-08-R-0016 Attachment 7 - Appendix B

File details come from the government source that posted it. Updated .