Launch Support Manpower Data.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Launch Operations Support Contract (LOSC)
Solicitation number
FA4610-08-R-0016
Issued by

About this file

Historical Launch manpower Data for various vehicles.

View the file

Other files

File Type Posted
Amendment 05.zip ZIP file
Amendment 04.zip ZIP file
J A Extension 1 Jul--30 Sep 2011.pdf PDF
Amendment 03.zip ZIP file
Pre-Proposal Conf Questions Round 4.docx DOCX document
Amendment 02.zip ZIP file
Round 3 LOSC addtl questions after preproposal conference set 2.docx DOCX document
GFP Locations.xlsx XLSX spreadsheet
ACA InDyne - CHI.pdf PDF
LOSC WO History.zip ZIP file
Pre-Proposal Conference Questions —
Painter Master Agreement 16.pdf PDF
Painters Mastor Agreement 36.pdf PDF
Part II of Amendment 01 to RFP.zip ZIP file
Attch 5 SCA-WD 05-2064 Rev 11.doc DOC document
Attch 3 SCA-WD 2005-2154 Rev 13.docx DOCX document
Attch 4 SCA-WD 2005-2060 Rev 10.doc DOC document
Attch 9 - Mission Essential Contract Services.doc DOC document
Attch 1A2 Property Equipment Responsibility List.xlsx XLSX spreadsheet
Attch 1B1 Government Furnished Property - FAR 52.245-1.xlsx XLSX spreadsheet
Attch 1B2 Government Furnished As-Is Property - FAR 52.245-2.xlsx XLSX spreadsheet
Amendment 01 to RFP.pdf PDF
Attch 1 - Revised Performance Work Statement 28 Jun 10.doc DOC document
Attch 8 Davis Bacon WD CA080023 Rev 5.docx DOCX document
conformed RFP thru Amendment 01.doc DOC document
Attch 6 SCA-WD 1986-0431 Rev 35.docx DOCX document
Attch 1C - Revised Contract Data Requirements List CDRL 9 Aug 2010.docx DOCX document
Attch 1A1 Facility Responsibility List 28 Jun 10.xlsx XLSX spreadsheet
Zip Reference Publications.zip ZIP file
Pre Proposal Conference Attendees.pdf PDF
PowerPlantOpsData.xlsx XLSX spreadsheet
Workload Data 9 Aug 10.doc DOC document
BackflowPreventerData.xlsx XLSX spreadsheet
Equipment PM History.xlsx XLSX spreadsheet
LOSC WO History.xlsx XLSX spreadsheet
Additional Information.docx DOCX document
SVPP WasteWater Discharge.xlsx XLSX spreadsheet
Facility Equipment Inspection Report.xlsx XLSX spreadsheet
Technical Procedures.xlsx XLSX spreadsheet
Pre-Proposal Conference Questions —
RFP Advisory LOSC--Removal of Draft Watermark.pdf PDF
Attch 8 Davis Bacon WD CA080023 Rev 5.docx DOCX document
Attch 1D -Environmental Requirements.docx DOCX document
DD Form 254 Continuation.doc DOC document
Attch 1A1 Facility Responsibility List 28 Jun 10.xlsx XLSX spreadsheet
Attch 7-Appendix C CBA Group Insurance Descriptions.pdf PDF
Attch 1C - Revised Contract Data Requirements List CDRL 8 Jun 2010.docx DOCX document
Attch 5 SCA-WD 05-2064 Rev 11.doc DOC document
Attch 9 - Mission Essential Contract Services.doc DOC document
Attch 1B1 Government Furnished Property - FAR 52.245-1.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Launch Operation Support

Actual Man-Hours Used
YearLaunch or Operation TypePower TechElecHVACTotalNotes
FY05Delta II804040160FY05 was a partial year, May - Sept 30
FY05MM III844242168
FY05Delta II48242496
FY05MM III41212183
FY05RLCC rehearsal21100211
FY05MM III34171768
FY05MM III38191976
FY06Titan IV5,3308888887,106Titan IV was an unusually protracted campaign, with many launch attempts and a lengthy SVPP support campaign. The Titan IV program has now ended and will not be launched again
FY06MM III46121270
FY06Pegasus963232160
FY06MM III722424120
FY06Minotaur632121105
FY06Delta II2967474444
FY06MM III722424120
FY06Delta IV1264242210
FY06MM III1974949295
FY06GBI1373434205
FY07RLCC rehearsal24200242
FY07Delta IV3186464446
FY07Delta II225532
FY07RLCC rehearsal190019
FY07MM III751919113
FY07Target Launch1032121145
FY07Pegasus701717104
FY07GBI1462929204
FY07Delta II1693434236
FY07Target Launch1032626155
FY07Delta II832828138
FY07GBI923131154
FY08RLCC rehearsal190019
FY08Delta II3577171500
FY08Atlas V1,8063013012,408
FY08MM III671717101
FY08MM III62161694
FY08Delta II1543131215
FY08MM III48242496
FY08Delta II831717116
FY08Target Launch51131376
FY09Delta II1303333195
FY09MM III781919117
FY09GBI822121123
FY09Navy Op Support620062
FY09Misc SVPP support310031
FY09Misc SVPP support150015
FY09Delta II3338383499
FY09Misc SVPP support200020
FY09Navy Op Support420042
FY09Taurus51131376
FY09Misc SVPP support100010
FY09Misc SVPP support15000150
FY09Misc SVPP support180018
FY09Delta II1985050297
FY09Misc SVPP support8008
FY09Atlas V rehearsal22800228
FY09MM III61151592
FY09MM III1062727160
FY10Delta II1704343255FY10 is a partial year, Oct 1 through June 30
FY10Atlas V2,4516136133,676
FY10Delta II2586565388
FY10Delta IV rehearsal860086
FY10GBI921818128
FY10Minotaur IV1172929176
FY10GBI1493737224
FY10MM III59151589
FY10MM III771919116
Legend
GBI = ground-based interceptor
MM III = Minuteman III
RLCC = Remote Launch Control Center
SVPP = South Vandenberg Power Plant

&"-,Bold"&12Historical Use of Launch Operations Support On LOSC Contract

FY05 - FY10

&P