Workload Data 9 Aug 10.doc

DOC document 72 KB Posted

Attached to
Launch Operations Support Contract (LOSC)
Solicitation number
FA4610-08-R-0016
Issued by

About this file

Work load file.

View the file

Other files

File Type Posted
Amendment 05.zip ZIP file
Amendment 04.zip ZIP file
J A Extension 1 Jul--30 Sep 2011.pdf PDF
Amendment 03.zip ZIP file
Pre-Proposal Conf Questions Round 4.docx DOCX document
Amendment 02.zip ZIP file
Round 3 LOSC addtl questions after preproposal conference set 2.docx DOCX document
GFP Locations.xlsx XLSX spreadsheet
ACA InDyne - CHI.pdf PDF
LOSC WO History.zip ZIP file
Launch Support Manpower Data.xlsx XLSX spreadsheet
Pre-Proposal Conference Questions —
Painter Master Agreement 16.pdf PDF
Painters Mastor Agreement 36.pdf PDF
Part II of Amendment 01 to RFP.zip ZIP file
Attch 5 SCA-WD 05-2064 Rev 11.doc DOC document
Attch 3 SCA-WD 2005-2154 Rev 13.docx DOCX document
Attch 4 SCA-WD 2005-2060 Rev 10.doc DOC document
Attch 9 - Mission Essential Contract Services.doc DOC document
Attch 1A2 Property Equipment Responsibility List.xlsx XLSX spreadsheet
Attch 1B1 Government Furnished Property - FAR 52.245-1.xlsx XLSX spreadsheet
Attch 1B2 Government Furnished As-Is Property - FAR 52.245-2.xlsx XLSX spreadsheet
Amendment 01 to RFP.pdf PDF
Attch 1 - Revised Performance Work Statement 28 Jun 10.doc DOC document
Attch 8 Davis Bacon WD CA080023 Rev 5.docx DOCX document
conformed RFP thru Amendment 01.doc DOC document
Attch 6 SCA-WD 1986-0431 Rev 35.docx DOCX document
Attch 1C - Revised Contract Data Requirements List CDRL 9 Aug 2010.docx DOCX document
Attch 1A1 Facility Responsibility List 28 Jun 10.xlsx XLSX spreadsheet
Zip Reference Publications.zip ZIP file
Pre Proposal Conference Attendees.pdf PDF
PowerPlantOpsData.xlsx XLSX spreadsheet
BackflowPreventerData.xlsx XLSX spreadsheet
Equipment PM History.xlsx XLSX spreadsheet
LOSC WO History.xlsx XLSX spreadsheet
Additional Information.docx DOCX document
SVPP WasteWater Discharge.xlsx XLSX spreadsheet
Facility Equipment Inspection Report.xlsx XLSX spreadsheet
Technical Procedures.xlsx XLSX spreadsheet
Pre-Proposal Conference Questions —
RFP Advisory LOSC--Removal of Draft Watermark.pdf PDF
Attch 8 Davis Bacon WD CA080023 Rev 5.docx DOCX document
Attch 1D -Environmental Requirements.docx DOCX document
DD Form 254 Continuation.doc DOC document
Attch 1A1 Facility Responsibility List 28 Jun 10.xlsx XLSX spreadsheet
Attch 7-Appendix C CBA Group Insurance Descriptions.pdf PDF
Attch 1C - Revised Contract Data Requirements List CDRL 8 Jun 2010.docx DOCX document
Attch 5 SCA-WD 05-2064 Rev 11.doc DOC document
Attch 9 - Mission Essential Contract Services.doc DOC document
Attch 1B1 Government Furnished Property - FAR 52.245-1.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

09 Aug 2010

WORKLOAD DATA

FOR

BIDDER’S TECHNICAL REFERENCE LIBARY

30TH SPACE WING – VANDENBERG AFB

LAUNCH OPERATIONS SUPPORT CONTRACT

FA4610-08-R-0016

THIS APPENDIX INCLUDING THE

TITLE PAGE CONSISTS OF 4 PAGES

I.2.2, I.2.2.4
Maintenance & Repair
The Contractor shall maintain and repair all Real Property (RP), Real Property Installed Equipment (RPIE), Aerospace Ground Equipment (AGE), infrastructure, and equipment [Real Property & Equipment – hereafter “P&E”] that are part of the properties listed in Attachments 1A2A thru 1A2D and facilities listed in Attachment 1A1.

Facilities and P&E are identified in Attachments 1A1 and 1A2A thru 1A2D – Faciltiy List andProperty/Equipment Responsibility List, Call Henry, Inc.

Other service providers include:

AFSPC HQ UPS Contract: Provides UPS sustainment for selected 3-phase systems on VAFB.

Sempra: Provides sustainment on their installed energy efficient devices.

WROCI Contractor: Sustains communication equipment and systems, to include non-facility UPS.

Civil Engineer: They or their contractor provides sustainment on the other side of the demarcation point as described in the technical terms. Fire hydrant system within a 25-mile radius of VAFB.

Material, Supplies, Equipment, Vehicle, Training, and Travel for M&R, Operations, and Support (e.g. management, administration)

I.2.2.2
Movement of Government-owned certified test weights for cranes & hoist maintained by others
An average of once a year per crane & hoist
I.2.2.3
Maintenance Agreement/Interface Agreement
Located in bidder’s library

I.2.2.4.2 thru I.2.2.4.4

Corrosion Control (CC)
CE’s Corrosion Control Contract: Provides corrosion control and painting of VAFB facilities.

FY07

14,733 hrs

NOTE: CC was descoped from LOSC contract in FY07 due to AF budget cuts. Follow on years were funded w/ end of year fallout monies and stimulus funding as special TA projects. Only FY07 reflects an active CC program.

FY08

34,838 hrs (End of Year Funding)

FY09

57,331 hrs (End of Year Funding)

24,200 hrs (Stimulus Funding)

NOTE: FY09 effort is continuing through FY10

I.2.2.4.5
Vegetation Removal
Molokai; Ewa Beach; Pillar Point; Anderson Peak; Pillar Point Scarper Peak, & Santa Ynez Peak; some areas at VAFB not done by ground maintenance contractor.
I.2.2.4.8
Generator/Switchgear Testing
There are 18 generators on contract under the LOSC.
I.2.2.4.10
GMD/MDA Facilities
Additional responsibilities and specific reporting requirements associated with GMD/MDA facilities.
I.2.2.4.11
Repair
Appendix 1A2A thru 1A2D P&E in an active and caretaker status
I.2.2.5
Engineering
Supports maintenance and repair actions to P&E and RCM functions.
I.2.2.6
Inspection/Testing/Certification
Appendix 1A2 P&E
I.2.3.1
South Vandenberg Power Plant Operation
Estimate 4000 crew hours each and 250 crew hours per year for non-launch supports.
I.2.3.2
Launch Support
Estimate 12 launches requiring up to 2000 hours for 24 countdowns per year supporting pre-launch and launch day operations.

The large majority of the launch day supports are done during non-normal duty hours.

I.2.4, I2.5
Other Services and Minor Facility Alteration
Other Services deemed necessary to support contract, not including services the Contractor provides as “support for others”; Task Assignment or Contract Work Request.
I.2.5.
Minor Facility Alteration
Estimate 500 hours per year. Estimated hours by disciplines are; 100 Electrical, 100 Plumber, 300 General Labor.
I.2.6.1
Attendance and Representation
In addition to the PMR and status meeting, the estimated number of regular meetings: 2-daylies, 4-weeklies, 4-monthlies, 3-quarterlies, 3 semi annuals

Estimate does not include meetings to discuss maintenance and repair problems and approach to customer

I.2.6.4, I.2.6.4.2
IWIMS Inputs
For each real property, except for the real property on Kaena Point, and Ewa. The estimated inputs are based on the frequency of inspections, number of anticipated repairs, number of trouble calls to schedule, close, and update till closed.
I.2.6.5.1
As-Built Drawings
Estimate 50 drawing sheets per year in as-built configuration drawings.
I.2.6.5.2
Central Library
Estimate 50 additional manuals need updating and replacement.
I.2.6.5.5
Property/Equipment Responsibility List
Does not include detail and number of smaller systems. Equipment demarcation responsibility is also defined by PWS Sections IV.2. Definitions and IV.5. Property and Equipment.
I.2.6.6.2
Aid in Support for Others
Estimate 8,000 hours per year
I.2.6.8.2
Assist Facility Manager with Work Request
Estimate number of time depends on the number of modification, alteration, new work, large-scale maintenance and repair that is required for P&E, plus the number of times a Work Request is needed to coordinate environmental, safety, fire, or digging requirements.
I.2.6.8.3.
Work/Job Closeout,

DD Form 1354 Estimate 250 per year in which the very large majority is for repair work done under the Range Support CLIN requiring the itemization of costs and project details for capitalization to the VAFB real estate office.

I.2.6.8.4
Certification Plan
Estimate 2 pressure vessel and 1 crane per year
I.2.2.4.12, II.C, II.G
Work Priority Classifications / Trouble Calls
E = Emergency, R= Routine, U = Urgent

Total trouble calls by fiscal year:

FY07: 1,590 R, 85 E, 210 U

FY08: 1,961 R, 85 E, 222 U

FY09: 1,753 R, 90 E, 238 U

FY10: 1,722 R, 104 E, 289 U (thru 7/10)

Reclassification of priorities by Government happens occasionally (estimated 10 per year). The large majority of reclassifications are downgrades.

I.3.4
Continuation of Mission Essential Functions
Estimate 1 event per year
I.4.1
Contract Work Request
Estimate 1 per year
I.4.2
Estimate for Task Assignments
Estimate 100 ROMs per year. Number of ROMs for 30 SW Form 35s depends on number of P&E repairs/breakdowns. TA actual: FY08 = 45, FY09 = 76, FY10 = 33 (Not all funded)
I.5.3.3
Job Order Number (JON) Cost Estimating
Estimate 20 JONs times the number of level three WBS
IV.6
Reimbursables
Material, Supplies, Equipment, Vehicle, Training, and Travel for Repair and Appendix 1A2, corrosion control effort, and expense to repair/replace damage GFP: Government price includes possessory tax, specialized training and its travel needs.