BackflowPreventerData.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Launch Operations Support Contract (LOSC)
Solicitation number
FA4610-08-R-0016
Issued by

About this file

Backflow data

View the file

Other files

File Type Posted
Amendment 05.zip ZIP file
Amendment 04.zip ZIP file
J A Extension 1 Jul--30 Sep 2011.pdf PDF
Amendment 03.zip ZIP file
Pre-Proposal Conf Questions Round 4.docx DOCX document
Amendment 02.zip ZIP file
Round 3 LOSC addtl questions after preproposal conference set 2.docx DOCX document
GFP Locations.xlsx XLSX spreadsheet
ACA InDyne - CHI.pdf PDF
LOSC WO History.zip ZIP file
Launch Support Manpower Data.xlsx XLSX spreadsheet
Pre-Proposal Conference Questions —
Painter Master Agreement 16.pdf PDF
Painters Mastor Agreement 36.pdf PDF
Part II of Amendment 01 to RFP.zip ZIP file
Attch 5 SCA-WD 05-2064 Rev 11.doc DOC document
Attch 3 SCA-WD 2005-2154 Rev 13.docx DOCX document
Attch 4 SCA-WD 2005-2060 Rev 10.doc DOC document
Attch 9 - Mission Essential Contract Services.doc DOC document
Attch 1A2 Property Equipment Responsibility List.xlsx XLSX spreadsheet
Attch 1B1 Government Furnished Property - FAR 52.245-1.xlsx XLSX spreadsheet
Attch 1B2 Government Furnished As-Is Property - FAR 52.245-2.xlsx XLSX spreadsheet
Amendment 01 to RFP.pdf PDF
Attch 1 - Revised Performance Work Statement 28 Jun 10.doc DOC document
Attch 8 Davis Bacon WD CA080023 Rev 5.docx DOCX document
conformed RFP thru Amendment 01.doc DOC document
Attch 6 SCA-WD 1986-0431 Rev 35.docx DOCX document
Attch 1C - Revised Contract Data Requirements List CDRL 9 Aug 2010.docx DOCX document
Attch 1A1 Facility Responsibility List 28 Jun 10.xlsx XLSX spreadsheet
Zip Reference Publications.zip ZIP file
Pre Proposal Conference Attendees.pdf PDF
PowerPlantOpsData.xlsx XLSX spreadsheet
Workload Data 9 Aug 10.doc DOC document
Equipment PM History.xlsx XLSX spreadsheet
LOSC WO History.xlsx XLSX spreadsheet
Additional Information.docx DOCX document
SVPP WasteWater Discharge.xlsx XLSX spreadsheet
Facility Equipment Inspection Report.xlsx XLSX spreadsheet
Technical Procedures.xlsx XLSX spreadsheet
Pre-Proposal Conference Questions —
RFP Advisory LOSC--Removal of Draft Watermark.pdf PDF
Attch 8 Davis Bacon WD CA080023 Rev 5.docx DOCX document
Attch 1D -Environmental Requirements.docx DOCX document
DD Form 254 Continuation.doc DOC document
Attch 1A1 Facility Responsibility List 28 Jun 10.xlsx XLSX spreadsheet
Attch 7-Appendix C CBA Group Insurance Descriptions.pdf PDF
Attch 1C - Revised Contract Data Requirements List CDRL 8 Jun 2010.docx DOCX document
Attch 5 SCA-WD 05-2064 Rev 11.doc DOC document
Attch 9 - Mission Essential Contract Services.doc DOC document
Attch 1B1 Government Furnished Property - FAR 52.245-1.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHI Master

01 April 2010 to 31 July 2010
TEST MONTHS: ZONE 1-Sept/Mar; ZONE 2-Oct/Apr; ZONE 3-Nov/May; ZONE 4-Jun/Dec; ZONE 5-Jan/Jul; ZONE 6-Feb/Aug; ZONE 7-Mar/Sep
ZONEBLDGEQUIPMENT ID NO.HAZARD TYPELAST TEST DATENEXT TEST DATELOCATIONMFRMODELSERIAL NUMBERSIZE
BACKFLOW DEVICES LOCATED AT PILLAR POINT
111-01-001-DCHigh03/11/1009/11/10Bottom of the Hill on right side of roadFebco860F05090614113"
11010-01-001-RPHigh03/11/1009/11/10Mechanical Room - Chiller Make-Up WaterFebco825YH428373/4"
11313-01-001-RPHigh03/11/1009/11/10Boiler Room - Make-Up WaterFebco825YJ0044703/4"
11313-OO-002-RPHigh03/11/1009/11/10Mechanical Room - Chiller Make-Up WaterFebco825YJ0061773/4"
BACKFLOW DEVICES LOCATED AT VAFB
17575-01-001-RPHigh03/19/1009/19/10South - Boiler room Heating make-up waterFebco RP825YH373153/4 "
17575-01-002-RPHigh03/19/1009/19/10Mechanical room chiller water make-upFebco RP825YH054581"
17575-01-001-DCLow09/04/0909/04/10

roberto eugenio: roberto eugenio:

Inspection moved to Sep09 due to zoning and will follow annually thereafter, requested by CE-Robert Coward, 28Aug09. Last test 03/27/09North end of Bldg-AHU room Make-up to humidifiersWilkens DC975XL75-0013/4"
1175175-01-001-RPHigh03/04/1009/04/10Make-Up water closed loop heating system-Mech RmWatts009A057201/2"
1178178-01-001-RPHigh03/04/1009/04/10Make-Up water closed loop heating system-Mech RmWatts009A057261/2"
1475475-OO-001-RPHigh03/04/1009/04/10Outside - Chiller Water Make Up - North side of facilityFebco825YJ020715

roberto eugenio: roberto eugenio:

Replaced defective assembly, 07Jul09, WO# 09023161. Previous S# H191133/4"
1475475-01-002-RPHigh03/04/1009/04/10Boiler Room - Boiler make up waterFebco825YA0544753/4"
1475

Newly Installed for the new Chiller Unit, Mar 2010. Added to the system & certified by Rjansen, WO#10014617, 03/04/10 (WO closed 03/20). 06/25/10, as per compliance to AFI that newly installed BP's must be recertified after 90 days on installation, this BP was recertified and tested today on WO#10021175. This WO was originally scheduled for Sept 2010 but was moved to June because of compliance to AFI-SW. However, the same WO will be utilized for Sept 2010 which will be the regular schedule for High Hazard Zone 1 BP's. 475-OO-003-RP High 06/25/10 Recertified 06/25/10, compliance to 30SWI 32-1066, CHI WO#10021175 09/25/10 Outside - Chiller Water Make Up - North side of facility Febco 825Y J030589 roberto eugenio: roberto eugenio:

Newly Installed for the new Chiller Unit, Mar 2010. Added to the system & certified by Rjansen, WO#10014617, 03/04/10 (WO closed 03/20)3/4"
1500500-01-001-RPHigh03/04/1009/04/10A/H Mechanical Room - Chilled Water make-upFebco825YJ0010473/4"
1510510-01-001-RPHigh03/04/1009/04/10Mechanical room - Make- up chilled waterFebco825YH204453/4"
1525525-01-001-RPHigh03/08/1009/08/10Bottom Interior Protection Inside Southwest wallWattsM21256913"
1525525-01-002-RPHigh03/08/1009/08/10Top Interior Protection Inside Southwest wallWattsM21256893"
1730730-OO-001-DCLow09/02/0909/02/10

roberto eugenio: roberto eugenio:

Test date moved per CE. Must be done on the month of SeptFire Suppression System-Outside West EndWatts7091096996"
1730730-OO-002-DCLow09/02/0909/02/10

roberto eugenio: roberto eugenio:

Per CE, must be done on the month of Sept onlyFire Suppression System-Outside West EndWatts709204003/4"
1730730-01-001-RPHigh03/08/1009/08/10North End Pit - Basement - chiller make- upFebco825YA1141853/4"
1731731-01-001-RPHigh03/08/1009/08/10Boiler room - Boiler Make Up WaterFebco825YU09453/4"
1763763-01-001-RPHigh03/08/1009/08/10Chiller water make-up basementFebco825YJ020739

roberto eugenio: roberto eugenio:

Old Unit: S#U1054

New Unit: S#J0207393/4"
1763763-01-003-RPHigh03/08/1009/08/10Chiller water make-up basementFebco825YJ0049383/4"
1789789-OO-001-RPLow09/01/09

roberto eugenio: roberto eugenio:

WO#09003920, done 12-08-08, per CE, annual test must be done on the month of Sept.09/01/10Outside - Domestic Water - South wallFebco825YBG19312"
2907907-01-001-RPHigh04/02/1010/02/10Chiller Water Make-up - Outside EastFebco825YH05180

roberto eugenio: roberto eugenio:

Correct S# H05180 inadvertently written as H05130 (updated as of 10/15/08)1 1/4"
2908908-OO-001-RPLow04/02/10

roberto eugenio: roberto eugenio:

WO#09003919, per CE Zoning must be done every month of April 10/01/10

Low Hazard RP's, moved from annual to semi-annual cert PMFire Suppression System -Outside -North end of facilityWatts RP9092487416"
2935935-OO-001-DCLow10/16/09

roberto eugenio: roberto eugenio:

WO#09003921, per CE, Zoning must be done every month of April10/16/10Double Check Fire system - Outside - Northwest cornerFebcoDC 805Y99111113404"
312801280-01-001-RPHigh05/07/1011/07/10Mechanical room chiller water makeupFebco825YH485341"
312801280-OO-002-RPLow05/07/1005/07/11
Low Hazard RP's, moved from annual to semi-annual cert PMDomestic Water - Outside North wallFebco825YH062311-1/4"
316391639-00-001-DCLow11/06/0911/06/10Fire Suppression System - Outside South of facilityWatts DCDA7091096976"
316391639-00-002-DCLow11/06/0911/06/10Fire Sprinkler System - Outside South of facilityWatts709203943/4"
316391639-OO-001-PVHigh05/07/1011/07/10Make Up Water to wash down tank - Outside East roofFebco765H3987681"
317641764-00-001-DCLow11/02/0911/02/10Fire Suppression System - Outside South of facilityWatts DC7091096834"
317641764-00-002-DCLow11/02/0911/02/10Fire System Detector Check - Outside South of facilityWatts DC007M3QT493603/4"
770007000-01-001-RPLow03/17/1009/01/10
Low Hazard RP's, moved from annual to semi-annual cert PMMake-up Reverse Osmosis & Water Softener - BasementFebco825YH043431-1/2"
770007000-01-002-RPHigh03/17/10

roberto eugenio: roberto eugenio:

All Sep09 PM's for 7K complex were actually done in 08/31/09 09/17/10 Basement-Chiller water make-up Febco RP 825Y J001736 roberto eugenio: roberto eugenio:

09-09-09, wrong S#A060076 & Size 3/4". Correct info updated per RJansen during Sep09 PM1"
770007000-01-003-RPHigh03/17/1009/17/10Basement-Steam room hot water make-up (See comment)Wilkins

roberto eugenio: roberto eugenio:

Replaced by CE-SABER, Old Eqpt. Febco, 825Y, 1", S#H33362 (During replacement of Boiler, Nov 2008)975XL30385351"
770007000-OO-004-RPHigh03/17/1009/17/10Outside - Make-Up water at cooling towerFebco RP825YH07831

roberto eugenio: roberto eugenio:

09/23/09, WO# 09027364, Replaced with new assembly. Old S#A1427741 1/4"
770007000-OO-005-RPHigh03/17/1009/17/10Outside - South loading dock make-up water to chillersFebco RP825YJ0045123/4"
770007000-OO-006-RPHigh03/17/1009/17/10Southwest corner of Building - Irrigation - Outside fenceFebco RP825YDA0550232"
770007000-OO-007-RPHigh03/17/1009/17/10Supply water to boiler rm - Outside NW cor- Outside fenceWatts RP9092339922"
770007000-OO-001-DCLow03/18/1003/18/11Fire Suppression System-Southend of Bldg 7000Febco870VN07021408336"
770007000-OO-002-DCLow03/18/1003/18/11Fire Suppression System-Northend of Bldg 7000Febco870VN07031907496"
77007

roberto eugenio: roberto eugenio:

Inadvertently assigned to Bldg 7005. Correct Bldg is 7007 (updated as of 03/20/08)7007-OO-001-DCLow03/18/1003/18/11Fire Suppression System-Southend of Fire SystemFebco850F06031711063"
770077007-OO-001-RPHigh03/18/10

roberto eugenio: roberto eugenio:

Repaired leaking BP on WO#09021275, completed 06/05/09. Replaced disc, tested & certified09/18/10Outside, Chiller-make up waterFebco825YT18661"
77011

roberto eugenio: roberto eugenio:

Newly replaced, 18Apr08 New S#J025636, replaced S#T7129, CHI WO#08011556 7011-01-001-RP High 03/10/10 09/10/10 Air Handler, mech room chiller make up water Febco 825Y J025636 roberto eugenio: roberto eugenio:

Replaced, old S#T71291"
770117011-OO-001-DCLow03/18/1003/18/11Fire Suppression System - Outside West of facilityFebco806YD94041906056"
770507050-01-001-RPHigh03/17/1009/17/10Air Handler mech room make up chiller waterFebco825YH013361-1/4"
770507050-OO-001-DCLow03/18/1003/18/11Fire Suppression System-Southend of Bldg 7000Febco870VN07041807226"
78401

roberto eugenio: roberto eugenio:

Added: 24Oct07, Previous Cert done by CE, on file8401-01-001-RPHigh03/09/1009/09/10Chiller & Boiler Make Up, Boiler RoomFebco825YT37243/4"
78401

roberto eugenio: roberto eugenio:

Added: 24Oct07, Previous Cert done by CE, on file8401-01-002-RPHigh03/09/1009/09/10Boiler Make Up, Boiler Room, adjacent to Bldg 8500Febco825YH373823/4"
78401

roberto eugenio: roberto eugenio:

Added: 24Oct07, Previous Cert done by CE, on file8401-01-003-RPHigh03/09/1009/09/10Humidifier Make-Up, Boiler RoomFebco825Y326603/4"
784018401-OO-001-DCLow03/09/1003/09/11Southeast of Bldg., Fire Suppression SystemFebco870VN07100408518"
785108510-01-001-RPHigh03/08/1009/08/10Mechanical room 4 chiller/boiler make upFebco RP825 YH056601 1/4"
785108510-OO-004-RPHigh03/09/1009/09/10Outside southwest corner make up chiller # 4Febco RP825YA1656721"
785108510-OO-005-RP

roberto eugenio: roberto eugenio:

12-10-08, WO#09003969, Repaired leaks & replaced defective partsHigh03/09/1009/09/10Outside Chiller Make UpFebco825YH291661"
785108510-01-006-RPHigh03/09/1009/09/10Mechanical Room boiler and chiller Make-UpFebco RP825YA0561001 1/2"
52115021150-01-001-RPHigh07/02/1001/02/11Mechanical room make up chiller waterFebco RP825YH099993/4"
52115021150-01-002-RPHigh07/02/1001/02/11Mechanical room make up humidifiersFebco825YH325553/4"
52115021150-01-003-RPHigh07/02/1001/02/11Mechanical room Make Up Water For BoilerFebco825YA1190553/4"
52115021150-00-001-DCLow01/05/1001/05/11Fire Suppression System - Outside West of facilityWatts774DCDA1040444"
52115021150-00-002-DCLow01/05/1001/05/11Fire Suppression System - Outside West of facilityWatts007M264203/4"
52120021200-01-001-RPHigh07/02/1001/02/11Mechanical room boiler Make up waterFebco825YH015133/4"
BACKFLOW DEVICES LOCATED AT MDA FACILITIES
2980980-01-001-RPHigh04/02/1010/02/10Boiler Rm-Boiler Make UpFebco825YJ0170343/4"
2980980-OO-001-DC
Newly Added 12/04/09 from CE. Next cert date, Apr 2010 due to zoningLow12/09/0910/01/10Outside-Left Side, Fire Supression SystemWilkins-Zurn450K010928"
2980980-OO-002-DC
Newly added from CE, 12/04/09. Next cert date, Apr 2010 due to zoningLow12/09/0910/01/10Outside-Right Side, Fire Supression SystemWilkins-Zurn450K010918"
2988988-OO-001-DCLow10/16/0910/16/10Outside, West-Fire SystemWilkins350DAN187854"
2988988-OO-002-DCLow10/16/0910/16/10Outside, West-Fire SystemWilkins950XL19753173/4"
317681768-01-001-RPHigh05/07/1011/07/10Mechanical Room-Industrial WaterWatts009M2QT2227881"
317681768-01-001-DCLow11/05/0911/05/10Inside Basement-Fire Supression SystemAmes2000SS1359496"
418191819-01-001-RPHigh06/09/1012/09/10On wall across boiler-Boiler Make-upFebco825YH604311"
418191819-OO-002-RPHigh06/02/1012/02/10Right side of bldg next to entrance-Feeds boiler & chillerFebco

roberto eugenio: roberto eugenio:

WO# 09013474, Replaced defective system; Watts, M#909, S#309822, 06Apr09825YJ0207443/4"
418191819-OO-003-RPHigh06/02/1012/02/10Mechanical Room, Domestic WaterFebco

roberto eugenio: roberto eugenio:

Replaced old system, Neptune 575, S#MGB20990, Jul 2008 WO#08015067825Y121522"
41829

Added to contract 10/01/09, MODP00103 roberto eugenio: roberto eugenio:

Inspection moved to Sep09 due to zoning and will follow annually thereafter, requested by CE-Robert Coward, 28Aug09. Last test 03/27/091829-OO-001-DCLow12/02/0912/02/10Fire System-Adjacent to Fire Water TankFebco85097070113124"
41894

Added to contract 10/01/09, MODP00103 Newly Installed for the new Chiller Unit, Mar 2010. Added to the system & certified by Rjansen, WO#10014617, 03/04/10 (WO closed 03/20). 06/25/10, as per compliance to AFI that newly installed BP's must be recertified after 90 days on installation, this BP was recertified and tested today on WO#10021175. This WO was originally scheduled for Sept 2010 but was moved to June because of compliance to AFI-SW. However, the same WO will be utilized for Sept 2010 which will be the regular schedule for High Hazard Zone 1 BP's.

roberto eugenio: roberto eugenio:

WO# 09013474, Replaced defective system; Watts, M#909, S#309822, 06Apr09 Recertified 06/25/10, compliance to 30SWI 32-1066, CHI WO#10021175 roberto eugenio: roberto eugenio:

Replaced old system, Neptune 575, S#MGB20990, Jul 2008 WO#080150671894-00-001-RPHigh06/09/1012/09/10Mech Room, Humidifier Make-UpWatts9092566253/4"
418941894-00-002-RPHigh06/09/1012/09/10AH Mech Room, Domestic WaterWatts9092186181-1/2"
419081908-OO-001-RPHigh06/09/1012/09/10Outside Pumphouse-Domestic WaterWilkins375L467283"
419141914-01-001-RPHigh06/09/1012/09/10OutsideTrailer, East Side, Domestic WaterWilkins475XL2888647

roberto eugenio: roberto eugenio:

Correct S# per Rjansen, 2888647, 08/04/091"
41916

roberto eugenio: roberto eugenio:

Newly added, First test due in Aug 2009 roberto eugenio: roberto eugenio:

Replaced defective assembly, 07Jul09, WO# 09023161. Previous S# H19113 roberto eugenio: roberto eugenio:

Newly Installed for the new Chiller Unit, Mar 2010. Added to the system & certified by Rjansen, WO#10014617, 03/04/10 (WO closed 03/20) roberto eugenio: roberto eugenio:

Test date moved per CE. Must be done on the month of Sept1916-01-001-RPHigh06/09/1012/09/10Outside East, Humidifier Make-UpWilkins475XL28888401"
419181918-01-001-RPHigh06/09/1012/09/10East of Storage Bldg, Outside, Chilled Water M-UpWilkins475XL2543553

roberto eugenio: roberto eugenio:

Correct S# per Rjansen, 2543553, 08/04/09. WO#09025104, repairs made, PC 09/30/091"
419191919-01-001-DCLow06/02/1006/02/11

Low Hazard RP's, moved from annual to semi-annual cert PM roberto eugenio: roberto eugenio:

Per CE, must be done on the month of Sept only roberto eugenio: roberto eugenio:

Correct S# per Rjansen, 2888647, 08/04/09 roberto eugenio: roberto eugenio:

Correct S# per Rjansen, 2543553, 08/04/09. WO#09025104, repairs made, PC 09/30/09 roberto eugenio: roberto eugenio:

WO#09003920, done 12-08-08, per CE, annual test must be done on the month of Sept.Fire Pump Room, Fire SystemWilkins-Zurn975XL29090102"
665106510-00-001-RPHigh02/02/1008/02/10Back entrance, mech rm, right wall-Boiler & ChillerWatts909QT535185

roberto eugenio: roberto eugenio:

Previous S# 535185 is incorrect per RJansen, 02/13/09 Again on 08/04/09, This BP was installed back due to new installation of boiler. Previous S# 535185 now utilized roberto eugenio: roberto eugenio:

WO#09003919, per CE Zoning must be done every month of April roberto eugenio: roberto eugenio:

Old Unit: S#U1054 New Unit: S#J020739 Low Hazard RP's, moved from annual to semi-annual cert PM roberto eugenio: roberto eugenio:

WO#09003921, per CE, Zoning must be done every month of April roberto eugenio: roberto eugenio:

Correct S# H05180 inadvertently written as H05130 (updated as of 10/15/08) Low Hazard RP's, moved from annual to semi-annual cert PM Low Hazard RP's, moved from annual to semi-annual cert PM roberto eugenio: roberto eugenio:

All Sep09 PM's for 7K complex were actually done in 08/31/09 roberto eugenio: roberto eugenio:

Replaced by CE-SABER, Old Eqpt. Febco, 825Y, 1", S#H33362 (During replacement of Boiler, Nov 2008) roberto eugenio: roberto eugenio:

09-09-09, wrong S#A060076 & Size 3/4". Correct info updated per RJansen during Sep09 PM roberto eugenio: roberto eugenio:

Inadvertently assigned to Bldg 7005. Correct Bldg is 7007 (updated as of 03/20/08) roberto eugenio: roberto eugenio:

09/23/09, WO# 09027364, Replaced with new assembly. Old S#A142774 roberto eugenio: roberto eugenio:

Newly replaced, 18Apr08 New S#J025636, replaced S#T7129, CHI

WO#08011556

roberto eugenio: roberto eugenio:

Repaired leaking BP on WO#09021275, completed 06/05/09. Replaced disc, tested & certified roberto eugenio: roberto eugenio:

Added: 24Oct07, Previous Cert done by CE, on file roberto eugenio: roberto eugenio:

Added: 24Oct07, Previous Cert done by CE, on file roberto eugenio: roberto eugenio:

Added: 24Oct07, Previous Cert done by CE, on file roberto eugenio: roberto eugenio:

Replaced, old S#T7129 roberto eugenio: roberto eugenio:

12-10-08, WO#09003969, Repaired leaks & replaced defective parts3/4"
665106510-00-002-RPHigh02/02/1008/02/10Back entrance, mech rm, right wall-Boiler & ChillerFebco825YJ0114523/4"
668196819-00-001-RPHigh02/03/1008/03/10Outside-Chiller Make UpWilkins975XL19436911"
56
27

&"Arial,Bold"&12CDRL A014 - CROSS &14CONNECTION & BACKFLOW PREVENTION SYSTEMS REPORT

&P &D

File details come from the government source that posted it. Updated .