Text version
CHI Master
| 01 April 2010 to 31 July 2010 | ||||||||||
| TEST MONTHS: ZONE 1-Sept/Mar; ZONE 2-Oct/Apr; ZONE 3-Nov/May; ZONE 4-Jun/Dec; ZONE 5-Jan/Jul; ZONE 6-Feb/Aug; ZONE 7-Mar/Sep | ||||||||||
| ZONE | BLDG | EQUIPMENT ID NO. | HAZARD TYPE | LAST TEST DATE | NEXT TEST DATE | LOCATION | MFR | MODEL | SERIAL NUMBER | SIZE |
| BACKFLOW DEVICES LOCATED AT PILLAR POINT | ||||||||||
| 1 | 1 | 1-01-001-DC | High | 03/11/10 | 09/11/10 | Bottom of the Hill on right side of road | Febco | 860 | F0509061411 | 3" |
| 1 | 10 | 10-01-001-RP | High | 03/11/10 | 09/11/10 | Mechanical Room - Chiller Make-Up Water | Febco | 825Y | H42837 | 3/4" |
| 1 | 13 | 13-01-001-RP | High | 03/11/10 | 09/11/10 | Boiler Room - Make-Up Water | Febco | 825Y | J004470 | 3/4" |
| 1 | 13 | 13-OO-002-RP | High | 03/11/10 | 09/11/10 | Mechanical Room - Chiller Make-Up Water | Febco | 825Y | J006177 | 3/4" |
| BACKFLOW DEVICES LOCATED AT VAFB | ||||||||||
| 1 | 75 | 75-01-001-RP | High | 03/19/10 | 09/19/10 | South - Boiler room Heating make-up water | Febco RP | 825Y | H37315 | 3/4 " |
| 1 | 75 | 75-01-002-RP | High | 03/19/10 | 09/19/10 | Mechanical room chiller water make-up | Febco RP | 825Y | H05458 | 1" |
| 1 | 75 | 75-01-001-DC | Low | 09/04/09 | 09/04/10 |
roberto eugenio: roberto eugenio:
| Inspection moved to Sep09 due to zoning and will follow annually thereafter, requested by CE-Robert Coward, 28Aug09. Last test 03/27/09 | North end of Bldg-AHU room Make-up to humidifiers | Wilkens DC | 975XL | 75-001 | 3/4" | ||||||
| 1 | 175 | 175-01-001-RP | High | 03/04/10 | 09/04/10 | Make-Up water closed loop heating system-Mech Rm | Watts | 009 | A05720 | 1/2" | |
| 1 | 178 | 178-01-001-RP | High | 03/04/10 | 09/04/10 | Make-Up water closed loop heating system-Mech Rm | Watts | 009 | A05726 | 1/2" | |
| 1 | 475 | 475-OO-001-RP | High | 03/04/10 | 09/04/10 | Outside - Chiller Water Make Up - North side of facility | Febco | 825Y | J020715 |
roberto eugenio: roberto eugenio:
| Replaced defective assembly, 07Jul09, WO# 09023161. Previous S# H19113 | 3/4" | ||||||||||
| 1 | 475 | 475-01-002-RP | High | 03/04/10 | 09/04/10 | Boiler Room - Boiler make up water | Febco | 825Y | A054475 | 3/4" | |
| 1 | 475 |
Newly Installed for the new Chiller Unit, Mar 2010. Added to the system & certified by Rjansen, WO#10014617, 03/04/10 (WO closed 03/20). 06/25/10, as per compliance to AFI that newly installed BP's must be recertified after 90 days on installation, this BP was recertified and tested today on WO#10021175. This WO was originally scheduled for Sept 2010 but was moved to June because of compliance to AFI-SW. However, the same WO will be utilized for Sept 2010 which will be the regular schedule for High Hazard Zone 1 BP's. 475-OO-003-RP High 06/25/10 Recertified 06/25/10, compliance to 30SWI 32-1066, CHI WO#10021175 09/25/10 Outside - Chiller Water Make Up - North side of facility Febco 825Y J030589 roberto eugenio: roberto eugenio:
| Newly Installed for the new Chiller Unit, Mar 2010. Added to the system & certified by Rjansen, WO#10014617, 03/04/10 (WO closed 03/20) | 3/4" | ||||||||||
| 1 | 500 | 500-01-001-RP | High | 03/04/10 | 09/04/10 | A/H Mechanical Room - Chilled Water make-up | Febco | 825Y | J001047 | 3/4" | |
| 1 | 510 | 510-01-001-RP | High | 03/04/10 | 09/04/10 | Mechanical room - Make- up chilled water | Febco | 825Y | H20445 | 3/4" | |
| 1 | 525 | 525-01-001-RP | High | 03/08/10 | 09/08/10 | Bottom Interior Protection Inside Southwest wall | Watts | M2 | 125691 | 3" | |
| 1 | 525 | 525-01-002-RP | High | 03/08/10 | 09/08/10 | Top Interior Protection Inside Southwest wall | Watts | M2 | 125689 | 3" | |
| 1 | 730 | 730-OO-001-DC | Low | 09/02/09 | 09/02/10 |
roberto eugenio: roberto eugenio:
| Test date moved per CE. Must be done on the month of Sept | Fire Suppression System-Outside West End | Watts | 709 | 109699 | 6" | |
| 1 | 730 | 730-OO-002-DC | Low | 09/02/09 | 09/02/10 |
roberto eugenio: roberto eugenio:
| Per CE, must be done on the month of Sept only | Fire Suppression System-Outside West End | Watts | 709 | 20400 | 3/4" | ||||||
| 1 | 730 | 730-01-001-RP | High | 03/08/10 | 09/08/10 | North End Pit - Basement - chiller make- up | Febco | 825Y | A114185 | 3/4" | |
| 1 | 731 | 731-01-001-RP | High | 03/08/10 | 09/08/10 | Boiler room - Boiler Make Up Water | Febco | 825Y | U0945 | 3/4" | |
| 1 | 763 | 763-01-001-RP | High | 03/08/10 | 09/08/10 | Chiller water make-up basement | Febco | 825Y | J020739 |
roberto eugenio: roberto eugenio:
Old Unit: S#U1054
| New Unit: S#J020739 | 3/4" | ||||||||||
| 1 | 763 | 763-01-003-RP | High | 03/08/10 | 09/08/10 | Chiller water make-up basement | Febco | 825Y | J004938 | 3/4" | |
| 1 | 789 | 789-OO-001-RP | Low | 09/01/09 |
roberto eugenio: roberto eugenio:
| WO#09003920, done 12-08-08, per CE, annual test must be done on the month of Sept. | 09/01/10 | Outside - Domestic Water - South wall | Febco | 825Y | BG1931 | 2" | ||||
| 2 | 907 | 907-01-001-RP | High | 04/02/10 | 10/02/10 | Chiller Water Make-up - Outside East | Febco | 825Y | H05180 |
roberto eugenio: roberto eugenio:
| Correct S# H05180 inadvertently written as H05130 (updated as of 10/15/08) | 1 1/4" | ||||
| 2 | 908 | 908-OO-001-RP | Low | 04/02/10 |
roberto eugenio: roberto eugenio:
WO#09003919, per CE Zoning must be done every month of April 10/01/10
| Low Hazard RP's, moved from annual to semi-annual cert PM | Fire Suppression System -Outside -North end of facility | Watts RP | 909 | 248741 | 6" |
| 2 | 935 | 935-OO-001-DC | Low | 10/16/09 |
roberto eugenio: roberto eugenio:
| WO#09003921, per CE, Zoning must be done every month of April | 10/16/10 | Double Check Fire system - Outside - Northwest corner | Febco | DC 805Y | 9911111340 | 4" | |||||
| 3 | 1280 | 1280-01-001-RP | High | 05/07/10 | 11/07/10 | Mechanical room chiller water makeup | Febco | 825Y | H48534 | 1" | |
| 3 | 1280 | 1280-OO-002-RP | Low | 05/07/10 | 05/07/11 |
| Low Hazard RP's, moved from annual to semi-annual cert PM | Domestic Water - Outside North wall | Febco | 825Y | H06231 | 1-1/4" | ||||||
| 3 | 1639 | 1639-00-001-DC | Low | 11/06/09 | 11/06/10 | Fire Suppression System - Outside South of facility | Watts DCDA | 709 | 109697 | 6" | |
| 3 | 1639 | 1639-00-002-DC | Low | 11/06/09 | 11/06/10 | Fire Sprinkler System - Outside South of facility | Watts | 709 | 20394 | 3/4" | |
| 3 | 1639 | 1639-OO-001-PV | High | 05/07/10 | 11/07/10 | Make Up Water to wash down tank - Outside East roof | Febco | 765 | H398768 | 1" | |
| 3 | 1764 | 1764-00-001-DC | Low | 11/02/09 | 11/02/10 | Fire Suppression System - Outside South of facility | Watts DC | 709 | 109683 | 4" | |
| 3 | 1764 | 1764-00-002-DC | Low | 11/02/09 | 11/02/10 | Fire System Detector Check - Outside South of facility | Watts DC | 007M3QT | 49360 | 3/4" | |
| 7 | 7000 | 7000-01-001-RP | Low | 03/17/10 | 09/01/10 |
| Low Hazard RP's, moved from annual to semi-annual cert PM | Make-up Reverse Osmosis & Water Softener - Basement | Febco | 825Y | H04343 | 1-1/2" |
| 7 | 7000 | 7000-01-002-RP | High | 03/17/10 |
roberto eugenio: roberto eugenio:
All Sep09 PM's for 7K complex were actually done in 08/31/09 09/17/10 Basement-Chiller water make-up Febco RP 825Y J001736 roberto eugenio: roberto eugenio:
| 09-09-09, wrong S#A060076 & Size 3/4". Correct info updated per RJansen during Sep09 PM | 1" | |||||||
| 7 | 7000 | 7000-01-003-RP | High | 03/17/10 | 09/17/10 | Basement-Steam room hot water make-up (See comment) | Wilkins |
roberto eugenio: roberto eugenio:
| Replaced by CE-SABER, Old Eqpt. Febco, 825Y, 1", S#H33362 (During replacement of Boiler, Nov 2008) | 975XL | 3038535 | 1" | |||||||
| 7 | 7000 | 7000-OO-004-RP | High | 03/17/10 | 09/17/10 | Outside - Make-Up water at cooling tower | Febco RP | 825Y | H07831 |
roberto eugenio: roberto eugenio:
| 09/23/09, WO# 09027364, Replaced with new assembly. Old S#A142774 | 1 1/4" | ||||||||||
| 7 | 7000 | 7000-OO-005-RP | High | 03/17/10 | 09/17/10 | Outside - South loading dock make-up water to chillers | Febco RP | 825Y | J004512 | 3/4" | |
| 7 | 7000 | 7000-OO-006-RP | High | 03/17/10 | 09/17/10 | Southwest corner of Building - Irrigation - Outside fence | Febco RP | 825YD | A055023 | 2" | |
| 7 | 7000 | 7000-OO-007-RP | High | 03/17/10 | 09/17/10 | Supply water to boiler rm - Outside NW cor- Outside fence | Watts RP | 909 | 233992 | 2" | |
| 7 | 7000 | 7000-OO-001-DC | Low | 03/18/10 | 03/18/11 | Fire Suppression System-Southend of Bldg 7000 | Febco | 870V | N0702140833 | 6" | |
| 7 | 7000 | 7000-OO-002-DC | Low | 03/18/10 | 03/18/11 | Fire Suppression System-Northend of Bldg 7000 | Febco | 870V | N0703190749 | 6" | |
| 7 | 7007 |
roberto eugenio: roberto eugenio:
| Inadvertently assigned to Bldg 7005. Correct Bldg is 7007 (updated as of 03/20/08) | 7007-OO-001-DC | Low | 03/18/10 | 03/18/11 | Fire Suppression System-Southend of Fire System | Febco | 850 | F0603171106 | 3" |
| 7 | 7007 | 7007-OO-001-RP | High | 03/18/10 |
roberto eugenio: roberto eugenio:
| Repaired leaking BP on WO#09021275, completed 06/05/09. Replaced disc, tested & certified | 09/18/10 | Outside, Chiller-make up water | Febco | 825Y | T1866 | 1" |
| 7 | 7011 |
roberto eugenio: roberto eugenio:
Newly replaced, 18Apr08 New S#J025636, replaced S#T7129, CHI WO#08011556 7011-01-001-RP High 03/10/10 09/10/10 Air Handler, mech room chiller make up water Febco 825Y J025636 roberto eugenio: roberto eugenio:
| Replaced, old S#T7129 | 1" | ||||||||||
| 7 | 7011 | 7011-OO-001-DC | Low | 03/18/10 | 03/18/11 | Fire Suppression System - Outside West of facility | Febco | 806YD | 9404190605 | 6" | |
| 7 | 7050 | 7050-01-001-RP | High | 03/17/10 | 09/17/10 | Air Handler mech room make up chiller water | Febco | 825Y | H01336 | 1-1/4" | |
| 7 | 7050 | 7050-OO-001-DC | Low | 03/18/10 | 03/18/11 | Fire Suppression System-Southend of Bldg 7000 | Febco | 870V | N0704180722 | 6" | |
| 7 | 8401 |
roberto eugenio: roberto eugenio:
| Added: 24Oct07, Previous Cert done by CE, on file | 8401-01-001-RP | High | 03/09/10 | 09/09/10 | Chiller & Boiler Make Up, Boiler Room | Febco | 825Y | T3724 | 3/4" |
| 7 | 8401 |
roberto eugenio: roberto eugenio:
| Added: 24Oct07, Previous Cert done by CE, on file | 8401-01-002-RP | High | 03/09/10 | 09/09/10 | Boiler Make Up, Boiler Room, adjacent to Bldg 8500 | Febco | 825Y | H37382 | 3/4" |
| 7 | 8401 |
roberto eugenio: roberto eugenio:
| Added: 24Oct07, Previous Cert done by CE, on file | 8401-01-003-RP | High | 03/09/10 | 09/09/10 | Humidifier Make-Up, Boiler Room | Febco | 825Y | 32660 | 3/4" | ||
| 7 | 8401 | 8401-OO-001-DC | Low | 03/09/10 | 03/09/11 | Southeast of Bldg., Fire Suppression System | Febco | 870V | N0710040851 | 8" | |
| 7 | 8510 | 8510-01-001-RP | High | 03/08/10 | 09/08/10 | Mechanical room 4 chiller/boiler make up | Febco RP | 825 Y | H05660 | 1 1/4" | |
| 7 | 8510 | 8510-OO-004-RP | High | 03/09/10 | 09/09/10 | Outside southwest corner make up chiller # 4 | Febco RP | 825Y | A165672 | 1" | |
| 7 | 8510 | 8510-OO-005-RP |
roberto eugenio: roberto eugenio:
| 12-10-08, WO#09003969, Repaired leaks & replaced defective parts | High | 03/09/10 | 09/09/10 | Outside Chiller Make Up | Febco | 825Y | H29166 | 1" | |||
| 7 | 8510 | 8510-01-006-RP | High | 03/09/10 | 09/09/10 | Mechanical Room boiler and chiller Make-Up | Febco RP | 825Y | A056100 | 1 1/2" | |
| 5 | 21150 | 21150-01-001-RP | High | 07/02/10 | 01/02/11 | Mechanical room make up chiller water | Febco RP | 825Y | H09999 | 3/4" | |
| 5 | 21150 | 21150-01-002-RP | High | 07/02/10 | 01/02/11 | Mechanical room make up humidifiers | Febco | 825Y | H32555 | 3/4" | |
| 5 | 21150 | 21150-01-003-RP | High | 07/02/10 | 01/02/11 | Mechanical room Make Up Water For Boiler | Febco | 825Y | A119055 | 3/4" | |
| 5 | 21150 | 21150-00-001-DC | Low | 01/05/10 | 01/05/11 | Fire Suppression System - Outside West of facility | Watts | 774DCDA | 104044 | 4" | |
| 5 | 21150 | 21150-00-002-DC | Low | 01/05/10 | 01/05/11 | Fire Suppression System - Outside West of facility | Watts | 007M2 | 6420 | 3/4" | |
| 5 | 21200 | 21200-01-001-RP | High | 07/02/10 | 01/02/11 | Mechanical room boiler Make up water | Febco | 825Y | H01513 | 3/4" | |
| BACKFLOW DEVICES LOCATED AT MDA FACILITIES | |||||||||||
| 2 | 980 | 980-01-001-RP | High | 04/02/10 | 10/02/10 | Boiler Rm-Boiler Make Up | Febco | 825Y | J017034 | 3/4" | |
| 2 | 980 | 980-OO-001-DC |
| Newly Added 12/04/09 from CE. Next cert date, Apr 2010 due to zoning | Low | 12/09/09 | 10/01/10 | Outside-Left Side, Fire Supression System | Wilkins-Zurn | 450 | K01092 | 8" |
| 2 | 980 | 980-OO-002-DC |
| Newly added from CE, 12/04/09. Next cert date, Apr 2010 due to zoning | Low | 12/09/09 | 10/01/10 | Outside-Right Side, Fire Supression System | Wilkins-Zurn | 450 | K01091 | 8" | |||
| 2 | 988 | 988-OO-001-DC | Low | 10/16/09 | 10/16/10 | Outside, West-Fire System | Wilkins | 350DA | N18785 | 4" | |
| 2 | 988 | 988-OO-002-DC | Low | 10/16/09 | 10/16/10 | Outside, West-Fire System | Wilkins | 950XL | 1975317 | 3/4" | |
| 3 | 1768 | 1768-01-001-RP | High | 05/07/10 | 11/07/10 | Mechanical Room-Industrial Water | Watts | 009M2QT | 222788 | 1" | |
| 3 | 1768 | 1768-01-001-DC | Low | 11/05/09 | 11/05/10 | Inside Basement-Fire Supression System | Ames | 2000SS | 135949 | 6" | |
| 4 | 1819 | 1819-01-001-RP | High | 06/09/10 | 12/09/10 | On wall across boiler-Boiler Make-up | Febco | 825Y | H60431 | 1" | |
| 4 | 1819 | 1819-OO-002-RP | High | 06/02/10 | 12/02/10 | Right side of bldg next to entrance-Feeds boiler & chiller | Febco |
roberto eugenio: roberto eugenio:
| WO# 09013474, Replaced defective system; Watts, M#909, S#309822, 06Apr09 | 825Y | J020744 | 3/4" | |||||
| 4 | 1819 | 1819-OO-003-RP | High | 06/02/10 | 12/02/10 | Mechanical Room, Domestic Water | Febco |
roberto eugenio: roberto eugenio:
| Replaced old system, Neptune 575, S#MGB20990, Jul 2008 WO#08015067 | 825Y | 12152 | 2" |
| 4 | 1829 |
Added to contract 10/01/09, MODP00103 roberto eugenio: roberto eugenio:
| Inspection moved to Sep09 due to zoning and will follow annually thereafter, requested by CE-Robert Coward, 28Aug09. Last test 03/27/09 | 1829-OO-001-DC | Low | 12/02/09 | 12/02/10 | Fire System-Adjacent to Fire Water Tank | Febco | 850 | 9707011312 | 4" |
| 4 | 1894 |
Added to contract 10/01/09, MODP00103 Newly Installed for the new Chiller Unit, Mar 2010. Added to the system & certified by Rjansen, WO#10014617, 03/04/10 (WO closed 03/20). 06/25/10, as per compliance to AFI that newly installed BP's must be recertified after 90 days on installation, this BP was recertified and tested today on WO#10021175. This WO was originally scheduled for Sept 2010 but was moved to June because of compliance to AFI-SW. However, the same WO will be utilized for Sept 2010 which will be the regular schedule for High Hazard Zone 1 BP's.
roberto eugenio: roberto eugenio:
WO# 09013474, Replaced defective system; Watts, M#909, S#309822, 06Apr09 Recertified 06/25/10, compliance to 30SWI 32-1066, CHI WO#10021175 roberto eugenio: roberto eugenio:
| Replaced old system, Neptune 575, S#MGB20990, Jul 2008 WO#08015067 | 1894-00-001-RP | High | 06/09/10 | 12/09/10 | Mech Room, Humidifier Make-Up | Watts | 909 | 256625 | 3/4" | ||
| 4 | 1894 | 1894-00-002-RP | High | 06/09/10 | 12/09/10 | AH Mech Room, Domestic Water | Watts | 909 | 218618 | 1-1/2" | |
| 4 | 1908 | 1908-OO-001-RP | High | 06/09/10 | 12/09/10 | Outside Pumphouse-Domestic Water | Wilkins | 375 | L46728 | 3" | |
| 4 | 1914 | 1914-01-001-RP | High | 06/09/10 | 12/09/10 | OutsideTrailer, East Side, Domestic Water | Wilkins | 475XL | 2888647 |
roberto eugenio: roberto eugenio:
| Correct S# per Rjansen, 2888647, 08/04/09 | 1" | |
| 4 | 1916 |
roberto eugenio: roberto eugenio:
Newly added, First test due in Aug 2009 roberto eugenio: roberto eugenio:
Replaced defective assembly, 07Jul09, WO# 09023161. Previous S# H19113 roberto eugenio: roberto eugenio:
Newly Installed for the new Chiller Unit, Mar 2010. Added to the system & certified by Rjansen, WO#10014617, 03/04/10 (WO closed 03/20) roberto eugenio: roberto eugenio:
| Test date moved per CE. Must be done on the month of Sept | 1916-01-001-RP | High | 06/09/10 | 12/09/10 | Outside East, Humidifier Make-Up | Wilkins | 475XL | 2888840 | 1" | |
| 4 | 1918 | 1918-01-001-RP | High | 06/09/10 | 12/09/10 | East of Storage Bldg, Outside, Chilled Water M-Up | Wilkins | 475XL | 2543553 |
roberto eugenio: roberto eugenio:
| Correct S# per Rjansen, 2543553, 08/04/09. WO#09025104, repairs made, PC 09/30/09 | 1" | |||||
| 4 | 1919 | 1919-01-001-DC | Low | 06/02/10 | 06/02/11 |
Low Hazard RP's, moved from annual to semi-annual cert PM roberto eugenio: roberto eugenio:
Per CE, must be done on the month of Sept only roberto eugenio: roberto eugenio:
Correct S# per Rjansen, 2888647, 08/04/09 roberto eugenio: roberto eugenio:
Correct S# per Rjansen, 2543553, 08/04/09. WO#09025104, repairs made, PC 09/30/09 roberto eugenio: roberto eugenio:
| WO#09003920, done 12-08-08, per CE, annual test must be done on the month of Sept. | Fire Pump Room, Fire System | Wilkins-Zurn | 975XL | 2909010 | 2" | |||||
| 6 | 6510 | 6510-00-001-RP | High | 02/02/10 | 08/02/10 | Back entrance, mech rm, right wall-Boiler & Chiller | Watts | 909QT | 535185 |
roberto eugenio: roberto eugenio:
Previous S# 535185 is incorrect per RJansen, 02/13/09 Again on 08/04/09, This BP was installed back due to new installation of boiler. Previous S# 535185 now utilized roberto eugenio: roberto eugenio:
WO#09003919, per CE Zoning must be done every month of April roberto eugenio: roberto eugenio:
Old Unit: S#U1054 New Unit: S#J020739 Low Hazard RP's, moved from annual to semi-annual cert PM roberto eugenio: roberto eugenio:
WO#09003921, per CE, Zoning must be done every month of April roberto eugenio: roberto eugenio:
Correct S# H05180 inadvertently written as H05130 (updated as of 10/15/08) Low Hazard RP's, moved from annual to semi-annual cert PM Low Hazard RP's, moved from annual to semi-annual cert PM roberto eugenio: roberto eugenio:
All Sep09 PM's for 7K complex were actually done in 08/31/09 roberto eugenio: roberto eugenio:
Replaced by CE-SABER, Old Eqpt. Febco, 825Y, 1", S#H33362 (During replacement of Boiler, Nov 2008) roberto eugenio: roberto eugenio:
09-09-09, wrong S#A060076 & Size 3/4". Correct info updated per RJansen during Sep09 PM roberto eugenio: roberto eugenio:
Inadvertently assigned to Bldg 7005. Correct Bldg is 7007 (updated as of 03/20/08) roberto eugenio: roberto eugenio:
09/23/09, WO# 09027364, Replaced with new assembly. Old S#A142774 roberto eugenio: roberto eugenio:
Newly replaced, 18Apr08 New S#J025636, replaced S#T7129, CHI
WO#08011556
roberto eugenio: roberto eugenio:
Repaired leaking BP on WO#09021275, completed 06/05/09. Replaced disc, tested & certified roberto eugenio: roberto eugenio:
Added: 24Oct07, Previous Cert done by CE, on file roberto eugenio: roberto eugenio:
Added: 24Oct07, Previous Cert done by CE, on file roberto eugenio: roberto eugenio:
Added: 24Oct07, Previous Cert done by CE, on file roberto eugenio: roberto eugenio:
Replaced, old S#T7129 roberto eugenio: roberto eugenio:
| 12-10-08, WO#09003969, Repaired leaks & replaced defective parts | 3/4" | ||||||||||
| 6 | 6510 | 6510-00-002-RP | High | 02/02/10 | 08/02/10 | Back entrance, mech rm, right wall-Boiler & Chiller | Febco | 825Y | J011452 | 3/4" | |
| 6 | 6819 | 6819-00-001-RP | High | 02/03/10 | 08/03/10 | Outside-Chiller Make Up | Wilkins | 975XL | 1943691 | 1" | |
| 56 | |||||||||||
| 27 |
&"Arial,Bold"&12CDRL A014 - CROSS &14CONNECTION & BACKFLOW PREVENTION SYSTEMS REPORT
&P &D