Technical Procedures.xlsx

XLSX spreadsheet 176 KB Posted

Attached to
Launch Operations Support Contract (LOSC)
Solicitation number
FA4610-08-R-0016
Issued by

About this file

Technical Procedures

View the file

Other files

File Type Posted
Amendment 05.zip ZIP file
Amendment 04.zip ZIP file
J A Extension 1 Jul--30 Sep 2011.pdf PDF
Amendment 03.zip ZIP file
Pre-Proposal Conf Questions Round 4.docx DOCX document
Amendment 02.zip ZIP file
Round 3 LOSC addtl questions after preproposal conference set 2.docx DOCX document
GFP Locations.xlsx XLSX spreadsheet
ACA InDyne - CHI.pdf PDF
LOSC WO History.zip ZIP file
Launch Support Manpower Data.xlsx XLSX spreadsheet
Pre-Proposal Conference Questions —
Painter Master Agreement 16.pdf PDF
Painters Mastor Agreement 36.pdf PDF
Part II of Amendment 01 to RFP.zip ZIP file
Attch 5 SCA-WD 05-2064 Rev 11.doc DOC document
Attch 3 SCA-WD 2005-2154 Rev 13.docx DOCX document
Attch 4 SCA-WD 2005-2060 Rev 10.doc DOC document
Attch 9 - Mission Essential Contract Services.doc DOC document
Attch 1A2 Property Equipment Responsibility List.xlsx XLSX spreadsheet
Attch 1B1 Government Furnished Property - FAR 52.245-1.xlsx XLSX spreadsheet
Attch 1B2 Government Furnished As-Is Property - FAR 52.245-2.xlsx XLSX spreadsheet
Amendment 01 to RFP.pdf PDF
Attch 1 - Revised Performance Work Statement 28 Jun 10.doc DOC document
Attch 8 Davis Bacon WD CA080023 Rev 5.docx DOCX document
conformed RFP thru Amendment 01.doc DOC document
Attch 6 SCA-WD 1986-0431 Rev 35.docx DOCX document
Attch 1C - Revised Contract Data Requirements List CDRL 9 Aug 2010.docx DOCX document
Attch 1A1 Facility Responsibility List 28 Jun 10.xlsx XLSX spreadsheet
Zip Reference Publications.zip ZIP file
Pre Proposal Conference Attendees.pdf PDF
PowerPlantOpsData.xlsx XLSX spreadsheet
Workload Data 9 Aug 10.doc DOC document
BackflowPreventerData.xlsx XLSX spreadsheet
Equipment PM History.xlsx XLSX spreadsheet
LOSC WO History.xlsx XLSX spreadsheet
Additional Information.docx DOCX document
SVPP WasteWater Discharge.xlsx XLSX spreadsheet
Facility Equipment Inspection Report.xlsx XLSX spreadsheet
Pre-Proposal Conference Questions —
RFP Advisory LOSC--Removal of Draft Watermark.pdf PDF
Attch 8 Davis Bacon WD CA080023 Rev 5.docx DOCX document
Attch 1D -Environmental Requirements.docx DOCX document
DD Form 254 Continuation.doc DOC document
Attch 1A1 Facility Responsibility List 28 Jun 10.xlsx XLSX spreadsheet
Attch 7-Appendix C CBA Group Insurance Descriptions.pdf PDF
Attch 1C - Revised Contract Data Requirements List CDRL 8 Jun 2010.docx DOCX document
Attch 5 SCA-WD 05-2064 Rev 11.doc DOC document
Attch 9 - Mission Essential Contract Services.doc DOC document
Attch 1B1 Government Furnished Property - FAR 52.245-1.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PM Instructions

PMI TITLEPMI #FREQSTEP #PM INSTRUCTIONS
ABOVE GROUND STORAGE TANKPM05000700Have spill kit and absorbent pads readily available.
ABOVE GROUND STORAGE TANKPM05000720000031Check for signs of corrosion or leakage on tank exterior, inlet piping,
ABOVE GROUND STORAGE TANKPM05000720000031valves, connections and outlet piping.
ABOVE GROUND STORAGE TANKPM05000720000032Ensure equipment is in working order. Check vavles and connections on
ABOVE GROUND STORAGE TANKPM05000720000032inlet and outlet piping.
ABOVE GROUND STORAGE TANKPM05000720000033Check for cracks or deterioration on secondary containment
ABOVE GROUND STORAGE TANKPM05000720000034Ensure secondary containment is secured, closed and locked
ABOVE GROUND STORAGE TANKPM05000720000035Check for presence of material in annular spacing for double walled tanks.
ABOVE GROUND STORAGE TANKPM05000720000036Check secondary containment for accumulated liquids (POL or water). If
ABOVE GROUND STORAGE TANKPM05000720000036water is present check for oil sheen. Remove and oil sheen with absorbent
ABOVE GROUND STORAGE TANKPM05000720000036pads and dispose as hazardous waste. Drain water. Notify Environmental.
ABOVE GROUND STORAGE TANKPM05000720000037Ensure high-liquid level alarm and cut-off switch are functioning
ABOVE GROUND STORAGE TANKPM05000720000037properly.
ABOVE GROUND STORAGE TANKPM05000720000038Ensure hazardous material in tank is compatible with tank material.
ABOVE GROUND STORAGE TANKPM05000720000039Ensure that the tank and associated piping are labeled with tank contents
ABOVE GROUND STORAGE TANKPM050007200000310Ensure pumps and valves are vapor tight
ACCELEROGRAPHPM04000230000011Notify Facility Manager and all relevant authorities, (E.G. Fire Dept.),
ACCELEROGRAPHPM04000230000011when applicable, of work to be accomplished.
ACCELEROGRAPHPM04000230000012VERIFY BARCODE IS ATTACHED AND CORRECT
ACCELEROGRAPHPM04000230000013REMOVE EXCESS, UNAUTHORIZED OR UNSAFE STORED MATERIALS
ACCELEROGRAPHPM04000230000014CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
ACCELEROGRAPHPM04000230000015TIGHTEN TERMINALS & RESEAT CONNECTORS AS REQUIRED
ACCELEROGRAPHPM04000230000016CLEAN EXTERIOR OF UNIT
ACCELEROGRAPHPM04000230000017Notify Facility Manager and all relevant authorities, (E.G. Fire Dept.),
ACCELEROGRAPHPM04000230000017when applicable, of work accomplished and any pertinent information
ACCELEROGRAPHPM04000230000017regarding facility.
ACCELEROGRAPHPM04000230000018Notify Work Control Center of any follow up required.
AGITATORPM04000820000011Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AGITATORPM04000820000011etc.), when applicable, of work to be accomplished.
AGITATORPM04000820000012CHANGE OIL IN GEAR BOX
AGITATORPM04000820000013CHECK OIL LEVEL AND TOP OFF OR DRAIN & REPLACE
AGITATORPM04000820000014TAKE COUPLINGS APART AND CLEAN/GREASE
AGITATORPM04000820000015LUBRICATE LINKAGES AND BEARINGS AS NEEDED
AGITATORPM04000820000016Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AGITATORPM04000820000016etc), when applicable, of work accomplished and any pertinent information
AGITATORPM04000820000016regarding the facility.
AGITATORPM04000820000017Notify Work Control Center of any follow up required
AIR BOTTLE CHARGERPM04000130000011NOTIFY FACILITY MANAGER AND ALL RELEVANT AUTHORITIES (E.G. FIRE DEPT,
AIR BOTTLE CHARGERPM04000130000011ETC.), WHEN APPLICABLE, OF WORK TO BE ACCOMPLISHED.
AIR BOTTLE CHARGERPM04000130000012UNPLUG UNIT TO REMOVE POWER
AIR BOTTLE CHARGERPM04000130000013CLEAN EXTERIOR OF UNIT
AIR BOTTLE CHARGERPM04000130000014CLEAN OR REPLACE FILTERS, SCREENS, SEPARATORS.ETC
AIR BOTTLE CHARGERPM04000130000015IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
AIR BOTTLE CHARGERPM04000130000016CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
AIR BOTTLE CHARGERPM04000130000017TIGHTEN TERMINALS & CONNECTIONS AS REQ'D
AIR BOTTLE CHARGERPM04000130000018INSPECT LATCHES, COUPLINGS, CONTROLS, SWITCHES, ETC
AIR BOTTLE CHARGERPM04000130000019LUBRICATE MOVING PARTS
AIR BOTTLE CHARGERPM040001300000110IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
AIR BOTTLE CHARGERPM040001300000111INSPECT THE UNIT FOR AIR LEAKS
AIR BOTTLE CHARGERPM040001300000112REPAIR OR REPLACE DEFECTIVE PARTS AS NECESSARY
AIR BOTTLE CHARGERPM040001300000113ACTIVATE CONTROLLED SHUTDOWN
AIR BOTTLE CHARGERPM040001300000114NOTIFY FACILITY MANAGER AND ALL RELEVANT AUTHORITIES (E.G. FIRE DEPT,
AIR BOTTLE CHARGERPM040001300000114ETC.), WHEN APPLICABLE, OF WORK ACCOMPLISHED AND ANY PERTINENT
AIR BOTTLE CHARGERPM040001300000114INFORMATION REGARDING THE FACILITY.
AIR COMPRESSORPM04000420000011Notify Facility Manager and all relevant authorities, (E.G. Fire Dept.),
AIR COMPRESSORPM04000420000011when applicable, of work to be accomplished.
AIR COMPRESSORPM04000420000012POWER OFF UNIT, LOCKOUT AND TAGOUT DISCONNECT
AIR COMPRESSORPM04000420000013CLEAN EXTERIOR OF UNIT
AIR COMPRESSORPM04000420000014DRAIN CONDENSATE LIQUID FROM TANK
AIR COMPRESSORPM04000420000015CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
AIR COMPRESSORPM04000420000016TIGHTEN TERMINALS & RESEAT CONNECTORS AS REQUIRED
AIR COMPRESSORPM04000420000017ADJUST CONTROL SETTINGS AS REQUIRED
AIR COMPRESSORPM04000420000018CLEAN OR REPLACE INTAKE AIR CLEANER
AIR COMPRESSORPM04000420000019DRAIN AND CLEAN OIL / WATER TRAPS
AIR COMPRESSORPM040004200000110INSPECT PIPING, FITTINGS, VALVES, ETC FOR DAMAGE AND LEAKS
AIR COMPRESSORPM040004200000111INSPECT SAFETY VALVES, PRESS. REGULATORS & OUTPUT AIR FLTRS
AIR COMPRESSORPM040004200000112CHECK DRIVE TRAIN ALIGNMENT, TENSION AND WEAR
AIR COMPRESSORPM040004200000113ADJUST BELT OR CHAIN TENSION/ALIGNMENT AS REQUIRED
AIR COMPRESSORPM040004200000114INSPECT ALL VISIBLE MOVING PARTS FOR DEFECTS. REPORT FINDINGS.
AIR COMPRESSORPM040004200000115CLEAN OR REPLACE FILTER MEDIUM OR ELEMENTS, AS REQUIRED
AIR COMPRESSORPM040004200000116LUBRICATE MOTOR & SHAFT BEARINGS
AIR COMPRESSORPM040004200000117IN ACCORDANCE WITH MANUFACTERES RECOMMENDATIONS
AIR COMPRESSORPM040004200000118CHECK OIL LEVEL AND TOP OFF OR DRAIN & REPLACE
AIR COMPRESSORPM040004200000119REMOVE LOCKOUT AND RESTORE POWER TO UNIT
AIR COMPRESSORPM040004200000120IF EQUIPPED WITH INLINE VALVE, CLOSE INLINE VALVE JUST PAST
AIR COMPRESSORPM040004200000121COMPRESSORS AND MONITOR PRESSURE GAUGE, IF THERE IS A SIGNIFICANT
AIR COMPRESSORPM040004200000122DROP IN PRESSSURE, OPEN WORK ORDER TO CHECK SYSTEM FOR LEAKS
AIR COMPRESSORPM040004200000123Notify Facility Manager and all relevant authorities, (E.G. Fire Dept.),
AIR COMPRESSORPM040004200000123when applicable, of work accomplished and any pertinent information
AIR COMPRESSORPM040004200000123regarding facility.
AIR COMPRESSORPM040004200000124Notify Work Control Center of any follow up required.
AIR CONDITION UNIT (PACKAGE/CRAC)PM04000520000011Notify Facility Manager and all relevant authorities, (E.G. Fire Dept.),
AIR CONDITION UNIT (PACKAGE/CRAC)PM04000520000011when applicable, of work to be accomplished.
AIR CONDITION UNIT (PACKAGE/CRAC)PM04000520000012DISCONNECT UNIT FROM POWER, LOCKOUT AND TAG-OUT.
AIR CONDITION UNIT (PACKAGE/CRAC)PM04000520000183REPLACE FILTER MEDIUM OR ELEMENTS
AIR CONDITION UNIT (PACKAGE/CRAC)PM04000520000014CHECK AND ENSURE THAT RETURN AIR IS FREE OF ANY OBSTRUCTION
AIR CONDITION UNIT (PACKAGE/CRAC)PM04000520000015CHECK THE CONDITION OF THE FILTERS
AIR CONDITION UNIT (PACKAGE/CRAC)PM04000520000036CLEAN FAN, FAN BLADES, & MOTOR VENT AS REQUIRED
AIR CONDITION UNIT (PACKAGE/CRAC)PM04000520000037CHECK AND ENSURE THAT CABINET, COILS, DRIP PANS & DRAINS, ETC. ARE FREE OF
AIR CONDITION UNIT (PACKAGE/CRAC)PM04000520000037DUST OR DEBRIS OR ANY OBSTRUCTIONS
AIR CONDITION UNIT (PACKAGE/CRAC)PM04000530000018REPLACE DRIVE BELTS (If available on the unit)
AIR CONDITION UNIT (PACKAGE/CRAC)PM04000520000039CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
AIR CONDITION UNIT (PACKAGE/CRAC)PM040005200000310TIGHTEN TERMINALS & CONNECTIONS AS REQ'D
AIR CONDITION UNIT (PACKAGE/CRAC)PM040005200000311LUBRICATE MOTOR & SHAFT BEARINGS
AIR CONDITION UNIT (PACKAGE/CRAC)PM040005200000112REMOVE LOCKOUT AND RESTORE POWER TO UNIT
AIR CONDITION UNIT (PACKAGE/CRAC)PM040005200000113RUN THE UNIT AND OBSERVE FOR PROPER OPERATION
AIR CONDITION UNIT (PACKAGE/CRAC)PM040005200000314CHECK FOR NORMAL OPERATION, SUCTION & HEAD PRESSURE
AIR CONDITION UNIT (PACKAGE/CRAC)PM040005200000315ADD REFRIGERANT AS NEEDED. RECORD AMOUNT REQUIRED
AIR CONDITION UNIT (PACKAGE/CRAC)PM040005200000116Notify Facility Manager and all relevant authorities, (E.G. Fire Dept.),
AIR CONDITION UNIT (PACKAGE/CRAC)PM040005200000116when applicable, of work accomplished and any pertinent information
AIR CONDITION UNIT (PACKAGE/CRAC)PM040005200000116regarding facility.
AIR CONDITION UNIT (PACKAGE/CRAC)PM040005200000117Notify Work Control Center of any follow up required.
AIR COOLED CONDENSING UNITPM04004020000011Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AIR COOLED CONDENSING UNITPM04004020000011etc.), when applicable, of work to be accomplished.
AIR COOLED CONDENSING UNITPM04004020000012POWER OFF UNIT, LOCKOUT AND TAGOUT DISCONNECT
AIR COOLED CONDENSING UNITPM04004020000013INSPECT LATCHES, COUPLINGS, CONTROLS, SWITCHES, ETC
AIR COOLED CONDENSING UNITPM04004020000014INSPECT ALL MOTOR STARTER CONTACT POINTS
AIR COOLED CONDENSING UNITPM04004020000015INSPECT CONDITION OF BELTS, PULLEYS, ETC.
AIR COOLED CONDENSING UNITPM04004030000016REPLACE DRIVE BELTS
AIR COOLED CONDENSING UNITPM04004020000037RELPACE FILTER ELEMENTS, IF EQU'P
AIR COOLED CONDENSING UNITPM04004020000018INSPECT PIPING, FITTINGS, VALVES, ETC FOR DAMAGE AND LEAKS
AIR COOLED CONDENSING UNITPM04004020000019CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
AIR COOLED CONDENSING UNITPM040040200000110CLEAN CONDENSOR/WATER COILS
AIR COOLED CONDENSING UNITPM040040200000111CLEAN FAN, FAN BLADES, & MOTORS AS REQUIRED
AIR COOLED CONDENSING UNITPM040040200000112TIGHTEN, REPAIR OR REPLACE AS NECESSARY
AIR COOLED CONDENSING UNITPM040040200000113CHECK ROTATIONAL BALANCE, REBALANCE IF NECESSARY
AIR COOLED CONDENSING UNITPM040040200000114ADD REFRIGERANT AS NEEDED. RECORD AMOUNT REQUIRED
AIR COOLED CONDENSING UNITPM040040200000115REPAIR OR REPLACE DEFECTIVE PARTS AS NECESSARY
AIR COOLED CONDENSING UNITPM040040200000116MEASURE & RECORD OPERATING SUPPLY VOLTAGE & CURRENT
AIR COOLED CONDENSING UNITPM040040200000117MEASURE & RECORD OPERATING PRESSURE & TEMP.
AIR COOLED CONDENSING UNITPM040040200000118RESTORE POWER TO THE UNIT AND VERIFY PROPER OPERATION
AIR COOLED CONDENSING UNITPM040040200000119Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AIR COOLED CONDENSING UNITPM040040200000119etc), when applicable, of work accomplished and any pertinent information
AIR COOLED CONDENSING UNITPM040040200000119regarding the facility.
AIR COOLED CONDENSING UNITPM040040200000120Notify Work Control Center of any follow up required.
AIR CURTAINPM04014230000011POWER OFF UNIT, LOCKOUT AND TAGOUT DISCONNECT
AIR CURTAINPM04014230000012CHECK OPERATION OF AUTOMATIC DOOR SWITCH (IF EQUIPPED)
AIR CURTAINPM04014230000013CLEAN HOUSING, FAN, FAN MOTOR, ETC. (IF EQUIPPED)
AIR CURTAINPM04014230000014INSPECT FOR RUST, CORROSION, CRACKS, PINHOLES, ETC.
AIR CURTAINPM04014230000015REPAIR OR REFINISH, AS REQUIRED
AIR CURTAINPM04014230000016CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
AIR CURTAINPM04014230000017TIGHTEN TERMINALS & CONNECTIONS AS REQ'D
AIR CURTAINPM04014230000018LUBRICATE LINKAGES AND BEARINGS AS NEEDED
AIR CURTAINPM04014230000019RESTORE POWER TO THE UNIT AND VERIFY PROPER OPERATION
AIR CURTAINPM040142300000110ADJUST / STRAIGHTEN VANES, LINKS, & LOUVERS AS REQD
AIR DRYERPM04009920000061Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AIR DRYERPM04010020000061Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AIR DRYERPM04009920000061etc.), when applicable, of work to be accomplished.
AIR DRYERPM04010020000061etc.), when applicable, of work to be accomplished
AIR DRYERPM04009920000062CHECK FOR EXCESSIVE NOISE OR VIBRATION
AIR DRYERPM04010020000062POWER OFF UNIT, LOCKOUT AND TAGOUT DISCONNECT
AIR DRYERPM04009920000063POWER OFF UNIT, LOCKOUT AND TAGOUT DISCONNECT
AIR DRYERPM04010020000063CHECK MOTORS, BEARINGS, ETC FOR OVERHEATING
AIR DRYERPM04009920000064CHECK MOTORS, BEARINGS, ETC FOR OVERHEATING
AIR DRYERPM04010020000064DRAIN AND CLEAN OIL / WATER TRAPS
AIR DRYERPM04009920000065DRAIN AND CLEAN OIL / WATER TRAPS
AIR DRYERPM04010020000065CLEAN CONDENSOR/WATER COILS
AIR DRYERPM04009920000066CLEAN CONDENSOR/WATER COILS
AIR DRYERPM04010020000066CLEAN OR REPLACE FILTER MEDIUM OR ELEMENTS, AS REQ'D (IF EQP
AIR DRYERPM04009920000067CLEAN OR REPLACE FILTER MEDIUM OR ELEMENTS, AS REQ'D (IF EQP
AIR DRYERPM04010020000067CLEAN FAN, FAN BLADES, & MOTORS AS REQUIRED
AIR DRYERPM04009920000068CLEAN FAN, FAN BLADES, & MOTORS AS REQUIRED
AIR DRYERPM04010020000068INSPECT PIPING, FITTINGS, VALVES, ETC FOR DAMAGE AND LEAKS
AIR DRYERPM04009920000069INSPECT PIPING, FITTINGS, VALVES, ETC FOR DAMAGE AND LEAKS
AIR DRYERPM04010020000069CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
AIR DRYERPM040099200000610CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
AIR DRYERPM040100200000610TIGHTEN TERMINALS & CONNECTIONS AS REQ'D
AIR DRYERPM040099200000611TIGHTEN TERMINALS & CONNECTIONS AS REQ'D
AIR DRYERPM040100200000611REPAIR OR REPLACE DEFECTIVE PARTS AS NECESSARY
AIR DRYERPM040099200000612REPAIR OR REPLACE DEFECTIVE PARTS AS NECESSARY
AIR DRYERPM040100200000612LUBRICATE MOVING PARTS
AIR DRYERPM040099200000613LUBRICATE MOVING PARTS
AIR DRYERPM040100200000613IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
AIR DRYERPM040099200000614IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
AIR DRYERPM040100200000614RESTORE POWER TO THE UNIT AND VERIFY PROPER OPERATION
AIR DRYERPM040099200000615RESTORE POWER TO THE UNIT AND VERIFY PROPER OPERATION
AIR DRYERPM040100200000615Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AIR DRYERPM040100200000615etc), when applicable, of work accomplished and any pertinent information
AIR DRYERPM040100200000615regarding the facility.
AIR DRYERPM040099200000616Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AIR DRYERPM040100200000616Notify Work Control Center of any follow up required.
AIR DRYERPM040099200000616etc), when applicable, of work accomplished and any pertinent information
AIR DRYERPM040099200000616regarding the facility.
AIR DRYERPM040099200000617Notify Work Control Center of any follow up required.
AIR DRYERPM040100200000617VERIFY CONTROLS, SWITCHES, ETC. ARE OPERATING PROPELY
AIR DRYERPM040099200000618VERIFY CONTROLS, SWITCHES, ETC. ARE OPERATING PROPELY
AIR FILTERPM04013920000031RESTORE POWER TO THE UNIT AND VERIFY PROPER OPERATION
AIR FILTERPM04013920000032CHECK CONTROLS, DAMPERS, GAUGES ETC
AIR FILTERPM04013920000033INSPECT THE UNIT FOR AIR LEAKS
AIR FILTERPM04013920000034CLEAN OR REPLACE FILTER MEDIUM OR ELEMENTS, AS REQUIRED
AIR FILTERPM04013920000035RESTORE POWER TO THE UNIT AND VERIFY PROPER OPERATION
AIR HANDLING UNITPM04001120000011Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AIR HANDLING UNITPM04001120000011etc.), when applicable, of work to be accomplished.
AIR HANDLING UNITPM04001120000012POWER OFF UNIT, LOCKOUT AND TAGOUT DISCONNECT
AIR HANDLING UNITPM04001120000013INSPECT CONDITION OF BELTS, PULLEYS, ETC.
AIR HANDLING UNITPM04001130000014REPLACE DRIVE BELTS
AIR HANDLING UNITPM04001120000015INSPECT CONDITION OF DUCTS, PANELS, HOUSINGS, ETC.
AIR HANDLING UNITPM04001120000016CHECK LATCHES, HINGES, FASTENERS, ETC. ADJUST AS NECESSARY
AIR HANDLING UNITPM04001130000017REPLACE FILTER MEDIUM OR ELEMENTS
AIR HANDLING UNITPM04001120000018CLEAN CABINET INTERIOR AND EXTERIOR WALLS
AIR HANDLING UNITPM04001120000019INSPECT CONDITION OF COILS, DRIP PANS, DRAINS, ETC.. CLEAN AS NECESSARY W/
AIR HANDLING UNITPM04001120000019APPROVED CLEANSER
AIR HANDLING UNITPM040011200000110INSPECT CONDENSATE DRAINS AND REMOVE ANY OBSTRUCTIONS
AIR HANDLING UNITPM040011200000111REMOVE LOCKOUT AND RESTORE POWER TO UNIT
AIR HANDLING UNITPM040011200000112CHECK FOR EXCESSIVE NOISE/VIBRATION
AIR HANDLING UNITPM040011200000313RECORD VIBRATION AT DESIGNATED/RELEVANT TARGETS (IF APPLICABLE)
AIR HANDLING UNITPM040011200000114ADJUST BELT OR CHAIN TENSION/ALIGNMENT TO SPECS, AS NECESSARY
AIR HANDLING UNITPM040011200000315PERFORM IR SCAN OF ALL ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.,
AIR HANDLING UNITPM040011200000315AND ALL MOVING PARTS. RECORD IMAGES (IF APPLICABLE)
AIR HANDLING UNITPM040011200000116TIGHTEN TERMINALS & CONNECTIONS AS REQ'D
AIR HANDLING UNITPM040011200000117CHECK DUCTS/PIPING FOR LEAKS, SCAN WITH IR CAMERA AS REQ'D
AIR HANDLING UNITPM040011200000118LUBRICATE MOTOR and SHAFT BEARINGS (Pillow or Flange Type) AS NEEDED AND
AIR HANDLING UNITPM040011200000118IN ACCORDANCE TO MFR'S RECOMMENDATIONS
AIR HANDLING UNITPM040011200000119REPAIR OR REPLACE DEFECTIVE PARTS AS NECESSARY
AIR HANDLING UNITPM040011200000320CHECK CONTROLS, DAMPERS. VERIFY INTAKE/EXHAUST LOUVERS OPERATE FROM 0%
AIR HANDLING UNITPM040011200000320(SHUT) TO 100% (OPEN). MANUALLY OPERATE IF APPLICABLE. ALSO CLEAN, ADJUST
AIR HANDLING UNITPM040011200000320AND LUBRICATE AS REQUIRED.
AIR HANDLING UNITPM040011200000121PERFORM VISUAL INSPECTION FOR CORROSION, STRUCTURAL INTEGRITY AND
AIR HANDLING UNITPM040011200000121SURROUNDINGS OF THE UNIT. NOTE ANY ABNORMALITIES ON THE CRAFT COMMENTS AND
AIR HANDLING UNITPM040011200000121INFORM YOUR LEAD OR WORK CONTROL CENTER IMMEDIATELY FOR CORRECTIVE ACTION
AIR HANDLING UNITPM040011200000122Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AIR HANDLING UNITPM040011200000122etc), when applicable, of work accomplished and any pertinent information
AIR HANDLING UNITPM040011200000122regarding the facility.
AIR HANDLING UNITPM040011200000123Notify Work Control Center of any follow up required.
AIR PURIFICATION UNITPM04001520000061Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AIR PURIFICATION UNITPM04001520000061etc.), when applicable, of work to be accomplished
AIR PURIFICATION UNITPM04001520000062POWER OFF UNIT, LOCKOUT AND TAGOUT DISCONNECT
AIR PURIFICATION UNITPM04001520000063CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
AIR PURIFICATION UNITPM04001520000064BLOW CLEAN INT. OF ELECTRONICS TO REMOVE DUST AND LINT
AIR PURIFICATION UNITPM04001520000065TIGHTEN TERMINALS & RESEAT CONNECTORS AS REQUIRED
AIR PURIFICATION UNITPM04001520000066CLEAN OR REPLACE FILTER MEDIUM OR ELEMENTS, AS REQUIRED
AIR PURIFICATION UNITPM04001520000067CLEAN HOUSING, FAN, FAN MOTOR, ETC. (IF EQUIPPED)
AIR PURIFICATION UNITPM04001520000068REPAIR OR REPLACE DEFECTIVE PARTS AS NECESSARY
AIR PURIFICATION UNITPM04001520000069LUBRICATE MOTOR & SHAFT BEARINGS
AIR PURIFICATION UNITPM040015200000610IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
AIR PURIFICATION UNITPM040015200000611REMOVE LOCKOUT AND RESTORE POWER TO UNIT
AIR PURIFICATION UNITPM040015200000612MEASURE & RECORD POWER SUPPLY INPUT & OUTPUT VOLTAGES
AIR PURIFICATION UNITPM040015200000613MEASURE & RECORD AIR FLOW TEMPERATURE & VELOCITY
AIR PURIFICATION UNITPM040015200000614ADJUST AS REQUIRED
AIR PURIFICATION UNITPM040015200000615Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AIR PURIFICATION UNITPM040015200000615etc), when applicable, of work accomplished and any pertinent information
AIR PURIFICATION UNITPM040015200000615regarding the facility.
AIR PURIFICATION UNITPM040015200000616Notify Work Control Center of any follow up required.
ANNUAL BACK FLOW PREVENTERPM04001900HIGH HAZARD UNITS WILL BE TESTED EVERY 6 MONTHS IN COMPLIANCE WITH
ANNUAL BACK FLOW PREVENTERPM0400190030SW132-1066.
ANNUAL BACK FLOW PREVENTERPM04001930000011Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
ANNUAL BACK FLOW PREVENTERPM04001930000011etc.), when applicable, of work to be accomplished.
ANNUAL BACK FLOW PREVENTERPM04001930000012NOTIFY USERS OF PLANNED WATER SYSTEM SHUTOFF
ANNUAL BACK FLOW PREVENTERPM04001930000013INSPECT THE UNIT FOR WATER LEAKS
ANNUAL BACK FLOW PREVENTERPM04001930000014INSPECT FOR RUST, CORROSION, CRACKS, PINHOLES, ETC.
ANNUAL BACK FLOW PREVENTERPM04001930000015BACKFLOW DEVICES MUST BE TESTED BY A CERTIFIED PERSON USING AN APPROVED
ANNUAL BACK FLOW PREVENTERPM04001930000015TESTING DEVICE (COMPLIANCE TO AFPD 32-10, supercedes AFI 32-1066)
ANNUAL BACK FLOW PREVENTERPM04001930000016If unit is found not functioning properly, dissassemble unit, clean and
ANNUAL BACK FLOW PREVENTERPM04001930000016inspect all parts. Reaasemble and retest as applicable.
ANNUAL BACK FLOW PREVENTERPM04001930000017CLEAN OR REPLACE STRAINERS AS REQUIRED, WHEN APPLICABLE
ANNUAL BACK FLOW PREVENTERPM04001930000018REPAIR OR REPLACE DEFECTIVE PARTS AS NECESSARY
ANNUAL BACK FLOW PREVENTERPM04001930000019RESTORE UNIT TO PROPER CONFIGURATION
ANNUAL BACK FLOW PREVENTERPM040019300000110MANUALL OPERATE ALL ASSOCIATED VALVES FOR PROPER AND SMOOTH OPERATION
ANNUAL BACK FLOW PREVENTERPM040019300000111Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
ANNUAL BACK FLOW PREVENTERPM040019300000111etc), when applicable, of work accomplished and any pertinent information
ANNUAL BACK FLOW PREVENTERPM040019300000111regarding the facility.
ANNUAL BACK FLOW PREVENTERPM040019300000112Notify Work Control Center of any follow up work required.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100OBSERVE ALL ELECTRICAL HAZARD SAFETY MANDATES. ELECTRIC INSULATED BOOTS,
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100THIS MAINTENANCE INSTRUCTION CONTAINS MANY EXTERNAL DOCUMENT REFERENCES.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100GLOVES, AND EYE PROTECTION ARE REQUIRED PPE WHEN PERFORMING THIS TASK.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100THESE DOCUMENTS MUST BE ON HAND DURING WORK. THEY ARE THE APPLICABLE
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100SECTIONS OF: EWR 127-1, AFSPCMAN 91-710, ANSI/ASME B30 SERIES, CMAA 70 AND
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100TOOLS MUST BE RATED FOR VOLTAGE OF ELECTRICAL WORK.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM7000010074, AFOSH 91-46, NFPA, CFR (FED. OSHA), CAL OSHA, AND THE COMPREHENSIVE
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100MAINTENANCE PLAN BY GLOBAL CRANE INST.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100THE REQUIRED REFERENCES ARE THE APPLICABLE SECTIONS OF: EWR 127-1,
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100WORK HEIGHT HAZARD. FALL PROTECTION MUST BE WORN AND MUST BE ATTACHED TO A
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100AFSPCMAN 91-710, ANSI/ASME B30 SERIES, CMAA 70 AND 74, AFOSH 91-46, NFPA,
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100STRUCTURAL MEMBER CAPABLE OF A 5000# VERTICAL LOAD IF WORKING 6' OR MORE
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100ABOVE GROUND LEVEL OUTSIDE MEZZANINE OR IN AN UN-RAILGUARDED SPACE.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100CFR (FED. OSHA), CAL OSHA, AND THE COMPREHENSIVE MAINTENANCE PLAN FOR
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100CRANES AND HOISTS CREATED BY GLOBAL CRANE INSTITUTE
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100HEAVY MATERIAL HANDLING HAZARD. HARDHATS MUST BE WORN AT ALL TIMES. CLEAR
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100PERSONNEL WITHIN 25' OF CRANE ENVELOPE AND POST VISUAL WARNING SIGNS AROUND
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100THE WORK AREA PRIOR TO WORK.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100SITE MAINTENANCE LEAD SHALL PERFORM PRE-OP COMMUNICATION MEETING COVERING
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100HAZARDS, EMERGENCY PROCEDURES, MANDATORY SAFETY EQUIPMENT AND ACTIONS,
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000100PROPER COMMUNICATION, AND TEST/MAINTENANCE PROCEDURAL TASKS TO BE PERFORMED
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000011NOTIFY FACILITY MANAGER AND ALL RELEVANT AUTHORITIES PRIOR TO COMMENCING
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000011WORK.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000012PERFORM MAINTENANCE INSTRUCTION PM600032 IN CONJUNCTION WITH THIS WORK
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000012ORDER.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000013INFORM OR ASK FACILITY MANAGER TO INFORM FACILITY PERSONNEL OF IMPENDING
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000013WORK, CLEAR PERSONNEL WITHIN 25' OF CRANE ENVELOPE, AND POST WARNING SIGNS
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000013AROUND THE WORK AREA PRIOR TO COMMENCEMENT.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000014ENSURE ALL TEST WEIGHTS ARE PROPERLY MARKED WITH TOTAL WT. AND CERTIFYING
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000014AGENCY. INSPECT ENTIRE SURFACE FOR STRESS CRACKS. REBAR IS NOT TO BE USED
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000014AS A LIFTING POINT.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000015PERFORM ANNUAL CRITICAL CRANE 100% LOAD TEST IAW EWR 127-1 3.6.2.2.14,
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000015AFSPCMAN 91-710 V3 6.2.2.1 AND 6.2.5.2, ASME B30 SERIES, OSHA/AFOSH, AND
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000015ALL APPLICABLE STANDARDS AND REGULATIONS.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000016LIFT TEST LOAD APPROXIMATELY 2 FT. OFF GROUND LEVEL FOR 3 MINUTES OR MORE.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000016VERIFY HOIST DRUM ROTATION AND TEST WT. DRIFT IS WITHIN ACCEPTABLE LIMITS
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000016AS PER MFG RECOMMENDATIONS.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000017TEST HOIST OVERLOAD DETECTION SYSTEM. VERIFY ACTIVATION AT 110% OF RATED
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000017LOAD.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000018REMOVE ELECTRICAL POWER AND TEST HOLDING AND EMERGENCY BRAKE DRUMS.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000018MANUALLY RELEASE EACH BRAKE IN A MANNER THAT WILL TEST EACH INDIVIDUAL
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000018BRAKE FOR PROPER FUNCTION.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000019RESTORE POWER AND RAISE LOAD TO MAXIMUM HEIGHT AND LOWER IN 3 INCREMENTS,
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000019STOPPING EACH TIME TO VERIFY THERE IS NO UNCOMMANDED DRUM ROTATION OR TEST
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM70000130000019WEIGHT LOWERING.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000110TRANSPORT TEST WEIGHT, AS PRACTICAL, THE FULL LENGTH OF THE BRIDGE AND
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000110RUNWAY ONCE WITH TEST LOAD AT EACH EXTREME END OF THE BRIDGE.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000111MOVE TEST WEIGHT THROUGHOUT ENTIRE ENVELOPE STOPPING AT RANDOM TO TEST
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000111SMOOTH OPERATION.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000112TEST CRANE CONTROLS TO VERIFY REVERSING OR PLUGGING CAN CONTROL OR STOP
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000112THE HOIST, TROLLEY, AND BRIDGE MOTIONS.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000113TEST BRIDGE AND TROLLEY BRAKES FOR PROPER OPERATION IAW CMAA 70 AND 74 AND
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000113ANSI B30 SERIES.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000114TEST THE EMERGENCY LOAD LOWERING SYSTEM (IF EQU'D) NOT LOWERING THE TEST
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000114LOAD MORE THAN A FEW FEET. INSPECT BRAKES FOLLOWING THE EMERGENCY
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000114LOWERING SYS. TEST.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000115TEST THE BRIDGE, TROLLEY, AND HOIST AT EACH AVAILABLE SPECIFIED SPEED.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000116TEST THE LOAD SLIPPAGE DETECTION SYSTEM, AND VERIFY LOAD DROP IS WITHIN
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000116ACCEPTABLE LIMITS. FOR NON-FAIL SAFE MICRODRIVE SYSTEMS, SIMULATE
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000116ELECTRICAL AND MECHANICAL CLUTCH FAILURE.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000117FOLLOWING THE LOAD TEST, PERFORM NDE ON ALL SFP'S IAW RANGE SAFETY, ANSI
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000117METHODOLOGY, THE FOLLOWING HOOK INSPECTION STEPS OF THIS INSTRUCTION, AND
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000117THE NDE PLAN GIVEN BY THE MFG.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000118HOOK NDE SURFACE INSPECTION. INSPECT HOOK FOR CRACKS, NICKS, GOUGES, WEAR,
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000118DEFORMATION, AND MECHANICS OF LATCH. LUBRICATE AS REQUIRED. REJECT OR
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000118REPAIR AS NECESSARY.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000119INSPECT HOOK AND LOAD ATTACHMENTS AND SECURING MEANS. REJECT OR REPAIR AS
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000119NECESSARY.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000120MEASURE HOOKS FOR BENDING/TWISTING, THROAT OPENING, AND WEAR. HOOKS
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000120SHOWING TWISTING MORE THAN 10 DEG, THROAT OPENING EXCEEDING 15%, OR WEAR
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000120EXCEEDING 10% IS TO BE REJECTED IAW ASME B30.10-1.2.1.3
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000121INSPECT SLINGS IAW ITS CHAPTER IN ASME B30.9. INSPECTION TO INCLUDE, BUT
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000121NOT LIMITED TO, TEARS, BROKEN/DEFORMED STRANDS, CORROSION, KINKING,
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000121SUB-NOMINAL DIAMETER, AND CHAIN WEAR IAW ASME B30.9 TABLE 3.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000122CHECK THAT SLINGS ARE MARKED IAW ITS CHAPTER IN ASME B30.9 TO INCLUDE, BUT
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000122NOT LIMITED TO, MFG, GRADE AND SIZE, AND RATED LOAD. UNMARKED OR MISMARKED
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000122SLINGS SHALL BE REJECTED.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000123COORDINATE AND PROCEED TO PROOF TEST ALL AIR FORCE OWNED SLINGS USED TO
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000123HANDLE CRITICAL HARDWARE AT 200% OF THEIR RATED LOAD.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000124RECORD AND FILE TEST RESULTS OR FILE SUBCONTRACTOR TEST RESULTS OF ALL
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000124SLING AND/OR HOOK INSPECTION AND TESTING RESULTS WITH THE ASSOCIATED CRANE
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000124OR LOSC TOOL FILE.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000125CRANE/HOIST NO-LOAD FUNCTION TEST. FOLLOWING THE LOAD TEST, PERFORM
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000125COMPLETE FUNCTIONAL TEST OF ALL CONTROL SYSTEMS, SAFETY DEVICES, AND
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000125WARNING INDICATORS.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000126TEST ALL WARNING DEVICES: AUDIBLE BELLS/HORNS, VISUAL WARNING LIGHTS,
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000126TRAVEL WARNING INDICATORS, ETC. FOR PROPER OPERATION. SYSTEMS SHOULD BE
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000126OPERATIONAL AT ALL TIMES DURING CRANE USE.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000127INSPECT CAB FOR PROPERLY LABELED CONTROLS, OPERABLE LIGHTING, AND PROPER
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000127OPERATION OF DOOR AND LATCHING DEVICE.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000128TEST RADIO COMMUNICATIONS SYSTEM (IF EQUPD) FOR PROPER OPERATION.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000129TEST EVERY FUNCTION OF THE CRANE TO INCLUDE, BUT NOT LIMITED TO, TRAVEL
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000129LIMITS, LIFTING/LOWERING, BRAKING, FAIL-SAFE SYSTEMS, AND EMERGENCY STOPS
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000129AT ALL SPEEDS.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000130RECORD RESULTS OF LOAD TEST, MAINTENANCE INSPECTIONS, FUNCTIONAL
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000130INSPECTIONS, AND NON-DESTRUCTIVE EXAMINATIONS AND FILE WITH THE ASSOCIATED
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000130CRANE'S RECORDS. UPDATE ALL EQUIPMENT ID TAGS.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000131NOTIFY FACILITY MANAGER AND ALL RELEVANT AUTHORITIES OF WORK ACCOMPLISHED
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000131AND ANY PERTINENT INFORMATION REGARDING THE UNIT.
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000132NOTIFY WORK CONTROL OF WORK ACCOMPLISHED, AND OPEN REPAIR WORK ORDERS AS
ANNUAL CRANE/HOIST MAINTENANCE AND CERTIFICATIONPM700001300000132NECESSARY.
ANNUAL FIRE EXTINGUISHER CERTIFICATIONPM70000630000011IT IS THE RESPONSIBILITY OF FACILITY MANAGERS AND/OR TECHNICIANS TO
ANNUAL FIRE EXTINGUISHER CERTIFICATIONPM70000630000011PERFORM MONTHLY CHECK FOR EACH UNITS ASSIGNED
ANNUAL FIRE EXTINGUISHER CERTIFICATIONPM70000630000012SUBMIT/DELIVER FIRE EXTINGUISHER/S TO QS&E DEPARTMENT FOR THE ANNUAL
ANNUAL FIRE EXTINGUISHER CERTIFICATIONPM70000630000012CERTIFICATION
ANNUAL VEHICLE REGISTRATION RENEWALPM70001330000011It is the responsibility of the user to keep a valid copy of vehicle
ANNUAL VEHICLE REGISTRATION RENEWALPM70001330000011registration renewal and insurance at all times.
ANNUAL VEHICLE REGISTRATION RENEWALPM70001330000012Check and ensure that the vehicle is in excellent operating condition
ANNUAL VEHICLE REGISTRATION RENEWALPM70001330000012before closing the work order.
AUTOMATIC DAMPERPM04009430000011Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AUTOMATIC DAMPERPM04009430000011etc.), when applicable, of work to be accomplished.
AUTOMATIC DAMPERPM04009430000012INSPECT MECHANICAL CONDITION OF UNIT
AUTOMATIC DAMPERPM04009430000013INSPECT PNEUMATIC SYSTEM FOR LEAKS,ETC (IF EQUIPPED)
AUTOMATIC DAMPERPM04009430000014INSPECT OPERATION OF ACTUATOR
AUTOMATIC DAMPERPM04009430000015ADJUST / STRAIGHTEN VANES, LINKS, & LOUVERS AS REQD
AUTOMATIC DAMPERPM04009430000016CHECK FOR ERRATIC OR STICKY ACTION
AUTOMATIC DAMPERPM04009430000017REPAIR OR REPLACE DEFECTIVE PARTS AS NECESSARY
AUTOMATIC DAMPERPM04009430000018LUBRICATE MOVING PARTS IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
AUTOMATIC DAMPERPM04009430000019ADJUST OR RECALIBRATE CONTROL UNIT TO CORRECT POSITION AS NECESSARY
AUTOMATIC DAMPERPM040094300000110Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AUTOMATIC DAMPERPM040094300000110etc), when applicable, of work accomplished and any pertinent information
AUTOMATIC DAMPERPM040094300000110regarding the facility.
AUTOMATIC DAMPERPM040094300000111Notify Work Control Center of any follow up required.
AUTOMATIC DOORPM04008820000011Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AUTOMATIC DOORPM04008820000011etc.), when applicable, of work to be accomplished.
AUTOMATIC DOORPM04008820000012VERIFY TIMING & SPEED OF DOOR OPENING AND CLOSING
AUTOMATIC DOORPM04008820000013ADJUST AS REQUIRED
AUTOMATIC DOORPM04008820000014CHECK SAFETY DEVICES AND MATS OR SENSORS.
AUTOMATIC DOORPM04008820000015CHECK LATCHES, HINGES, FASTENERS, ETC.
AUTOMATIC DOORPM04008820000016CHECK OPERATION OF CYLINDERS, RODS, LINKAGES, CHAINS, ETC.
AUTOMATIC DOORPM04008820000017POWER OFF UNIT, LOCKOUT AND TAGOUT DISCONNECT
AUTOMATIC DOORPM04008820000018ADJUST, REPAIR OR REPLACE PARTS AS NECESSARY
AUTOMATIC DOORPM04008820000019CHECK LEVEL OF HYDRAULIC OIL & TOP OFF OR CHANGE (IF EQP'D)
AUTOMATIC DOORPM040088200000110IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
AUTOMATIC DOORPM040088200000111CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
AUTOMATIC DOORPM040088200000112TIGHTEN TERMINALS & CONNECTIONS AS REQ'D
AUTOMATIC DOORPM040088200000113REMOVE LOCKOUT AND RESTORE POWER TO UNIT
AUTOMATIC DOORPM040088200000114Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AUTOMATIC DOORPM040088200000114etc), when applicable, of work accomplished and any pertinent information
AUTOMATIC DOORPM040088200000114regarding the facility.
AUTOMATIC DOORPM040088200000115Notify Work Control Center of any follow up required.
AUTOMATIC GATEPM04016520000011Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
AUTOMATIC GATEPM04016520000011etc.), when applicable, of work to be accomplished.
AUTOMATIC GATEPM04016520000012VERIFY PROPER OPERATION OF THE UNIT
AUTOMATIC GATEPM04016520000013POWER OFF UNIT, LOCKOUT AND TAGOUT DISCONNECT
AUTOMATIC GATEPM04016520000014VERIFY CONDITION OF EXTERIOR COVERS AND HOUSINGS
AUTOMATIC GATEPM04016520000015CLEAN AND LUBRICATE FRICTION BEARING SURFACES
AUTOMATIC GATEPM04016520000016CHECK & ADJUST BELT OR CHAIN TENSION/ALIGNMENT IF APPLICABLE
AUTOMATIC GATEPM04016520000017CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC. TIGHTEN TERMINALS &
AUTOMATIC GATEPM04016520000017CONNECTIONS AS REQ'D
AUTOMATIC GATEPM04016520000018CHECK LIMIT SWITCH FOR PROPER OPERATION
AUTOMATIC GATEPM04016520000019INSPECT ACTUATOR ARM AND SHAFT FASTENERS
AUTOMATIC GATEPM040165200000110REPAIR OR REPLACE DEFECTIVE PARTS AS NECESSARY
AUTOMATIC GATEPM040165200000111REMOVE LOCKOUT AND RESTORE POWER TO UNIT
AUTOMATIC GATEPM040165200000112Notify Work Control Center of any follow up required.
BASIN AERATORPM04000720000011Notify Facility Manager and all relevant authorities, (E.G. Fire Dept.),
BASIN AERATORPM04000720000011when applicable, of work to be accomplished.
BASIN AERATORPM04000720000012POWER OFF UNIT, LOCKOUT AND TAGOUT DISCONNECT
BASIN AERATORPM04000720000013CHECK GEAR DRIVE OIL LEVEL AND TOP OFF OR CHANGE
BASIN AERATORPM04000720000014IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
BASIN AERATORPM04000720000015CHECK FOR WATER IN OIL TO VERIFY SHAFT SEAL CONDITION.
BASIN AERATORPM04000720000016CLEAN DIRT & DEBRIS FROM MOTOR WINDINGS
BASIN AERATORPM04000720000017CHECK THE MECHANICAL CONDITION OF THE UNIT
BASIN AERATORPM04000720000018TIGHTEN ALL FASTENERS (SCREWS, NUTS, BOLTS,ETC) AS REQD
BASIN AERATORPM04000720000019CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
BASIN AERATORPM040007200000110TIGHTEN, REPAIR OR REPLACE AS NECESSARY
BASIN AERATORPM040007200000111LUBRICATE MOVING PARTS
BASIN AERATORPM040007200000112IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
BASIN AERATORPM040007200000113RESTORE POWER TO THE UNIT AND VERIFY PROPER OPERATION
BASIN AERATORPM040007300000114Notify Facility Manager and all relevant authorities, (E.G. Fire Dept.),
BASIN AERATORPM040007300000114when applicable, of work accomplished and any pertinent information
BASIN AERATORPM040007300000114regarding facility.
BASIN AERATORPM040007300000115Notify Work Control Center of any follow up required.
BATTERY BANK/CHARGER CRIT APM04003120000011Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
BATTERY BANK/CHARGER CRIT APM04003120000011etc.), when applicable, of work to be accomplished.
BATTERY BANK/CHARGER CRIT APM04003120000012POWER OFF UNIT, LOCKOUT TAGOUT DISCONNECT
BATTERY BANK/CHARGER CRIT APM04003120000013INSPECT CONDITION OF THE UNIT
BATTERY BANK/CHARGER CRIT APM04003120000014CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
BATTERY BANK/CHARGER CRIT APM04003120000015TIGHTEN TERMINALS & RESEAT CONNECTORS AS REQD
BATTERY BANK/CHARGER CRIT APM04003120000016CLEAN EXTERIOR OF UNIT AND SURROUNDING AREA
BATTERY BANK/CHARGER CRIT APM04003120000017BLOW CLEAN INT. OF ELECTRONICS TO REMOVE DUST/LINT
BATTERY BANK/CHARGER CRIT APM04003120000018CHECK ELECTROLYTE LEVEL OF BATTERIES & TOP OFF IF REQD
BATTERY BANK/CHARGER CRIT APM04003120000019MEASURE AND RECORD BATTERY'S Z, V, I USING BATT IMPED. TESTER
BATTERY BANK/CHARGER CRIT APM040031200000110REPAIR/REPLACE PARTS AS NEEDED
BATTERY BANK/CHARGER CRIT APM040031200000111RESTORE POWER TO THE UNIT AND VERIFY PROPER OPERATION
BATTERY BANK/CHARGER CRIT APM040031200000112MEASURE & RECORD OPERATING INPUT/OUTPUT VOLT/CURR OF CHARGER
BATTERY BANK/CHARGER CRIT APM040031200000113Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
BATTERY BANK/CHARGER CRIT APM040031200000113etc), when applicable, of work accomplished and any pertinent information
BATTERY BANK/CHARGER CRIT APM040031200000113regarding the facility.
BATTERY BANK/CHARGER CRIT APM040031200000114Notify Work Control Center of any follow up required.
BATTERY CHARGER (OBSOLETE)PM04003230000011Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
BATTERY CHARGER (OBSOLETE)PM04003230000011etc.), when applicable, of work to be accomplished.
BATTERY CHARGER (OBSOLETE)PM04003230000012POWER OFF UNIT, LOCKOUT AND TAGOUT DISCONNECT
BATTERY CHARGER (OBSOLETE)PM04003230000013CLEAN EXTERIOR OF UNIT
BATTERY CHARGER (OBSOLETE)PM04003230000014BLOW CLEAN INT. OF ELECTRONICS TO REMOVE DUST AND LINT
BATTERY CHARGER (OBSOLETE)PM04003230000015CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
BATTERY CHARGER (OBSOLETE)PM04003230000016TIGHTEN TERMINALS & RESEAT CONNECTORS AS REQUIRED
BATTERY CHARGER (OBSOLETE)PM04003230000017INSPECT MECHANICAL CONDITION OF UNIT
BATTERY CHARGER (OBSOLETE)PM04003230000018REPAIR OR REPLACE DEFECTIVE PARTS AS NECESSARY
BATTERY CHARGER (OBSOLETE)PM04003230000019RESTORE POWER TO THE UNIT AND VERIFY PROPER OPERATION
BATTERY CHARGER (OBSOLETE)PM040032300000110MEASURE & RECORD OPERATING SUPPLY VOLTAGE & CURRENT
BATTERY CHARGER (OBSOLETE)PM040032300000111Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
BATTERY CHARGER (OBSOLETE)PM040032300000111etc), when applicable, of work accomplished and any pertinent information
BATTERY CHARGER (OBSOLETE)PM040032300000111regarding the facility.
BATTERY CHARGER (OBSOLETE)PM040032300000112Notify Work Control Center of any follow up required
BATTERY IMPEDANCE TEST ROUTE APM60001700WORK TASK INVOLVES HANDLING OF BATTERIES AND TERMINALS. TECHNICIAN MUST
BATTERY IMPEDANCE TEST ROUTE APM60001700WEAR GLOVES AND SAFETY GLASSES/GOGGLES.
BATTERY IMPEDANCE TEST ROUTE APM60001720000031Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
BATTERY IMPEDANCE TEST ROUTE APM60001720000031etc.), when applicable, of work to be accomplished.
BATTERY IMPEDANCE TEST ROUTE APM60001720000032UPLOAD ROUTE INFORMATION FROM SERVER TO BATTERY IMPEDANCE TEST EQUIPMENT.
BATTERY IMPEDANCE TEST ROUTE APM60001720000033ENSURE EQUIPMENT TO BE ANALYZED IS PROPERLY BARCODED.
BATTERY IMPEDANCE TEST ROUTE APM60001720000034NOTIFY FACILITY MANAGER(S) OF TASK TO BE PERFORMED AND WHICH EQUIPMENT IS
BATTERY IMPEDANCE TEST ROUTE APM60001720000034AFFECTED.
BATTERY IMPEDANCE TEST ROUTE APM60001720000035TAKE NOTE OF GENERAL CONDITION OF EQUIPMENT AND SURROUNDING AREA.
BATTERY IMPEDANCE TEST ROUTE APM60001720000036TAKE BATTERY IMPEDANCE READINGS AND SAVE INFORMATION INTO TESTING UNIT.
BATTERY IMPEDANCE TEST ROUTE APM60001720000037DOWNLOAD READINGS ONTO SERVER.
BATTERY IMPEDANCE TEST ROUTE APM60001720000038NOTIFY ENGINEERING DEPARTMENT OF ANY SUSPECTED ANOMALIES.
BATTERY IMPEDANCE TEST ROUTE APM60001720000039OPEN FOLLOW UP WORK ORDERS AS DEEMED NECESSARY.
BATTERY IMPEDANCE TEST ROUTE APM600017200000310ASSIST ENGINEERING DEPARTMENT WITH ANY DATA ANALYSIS.
BATTERY IMPEDANCE TEST ROUTE APM600017200000311Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
BATTERY IMPEDANCE TEST ROUTE APM600017200000311etc), when applicable, of work accomplished and any pertinent information
BATTERY IMPEDANCE TEST ROUTE APM600017200000311regarding facility.
BATTERY IMPEDANCE TEST ROUTE APM600017200000312Notify Work Control Center of any follow up required.�
BATTERY IMPEDANCE TEST ROUTE BPM60002500WORK TASK INVOLVES HANDLING OF BATTERIES AND TERMINALS. TECHNICIAN MUST
BATTERY IMPEDANCE TEST ROUTE BPM60002500WEAR GLOVES AND SAFETY GLASSES/GOGGLES.
BATTERY IMPEDANCE TEST ROUTE BPM60002520000061UPLOAD ROUTE INFORMATION FROM SERVER TO BATTERY IMPEDANCE TEST EQUIPMENT.
BATTERY IMPEDANCE TEST ROUTE BPM60002520000062ENSURE EQUIPMENT TO BE ANALYZED IS PROPERLY BARCODED.
BATTERY IMPEDANCE TEST ROUTE BPM60002520000063NOTIFY FACILITY MANAGER(S) OF TASK TO BE PERFORMED AND WHICH EQUIPMENT IS
BATTERY IMPEDANCE TEST ROUTE BPM60002520000063AFFECTED.
BATTERY IMPEDANCE TEST ROUTE BPM60002520000064TAKE NOTE OF GENERAL CONDITION OF EQUIPMENT AND SURROUNDING AREA.
BATTERY IMPEDANCE TEST ROUTE BPM60002520000065TAKE BATTERY IMPEDANCE READINGS AND SAVE INFORMATION INTO TESTING UNIT.
BATTERY IMPEDANCE TEST ROUTE BPM60002520000066DOWNLOAD READINGS ONTO SERVER.
BATTERY IMPEDANCE TEST ROUTE BPM60002520000067NOTIFY ENGINEERING DEPARTMENT OF ANY SUSPECTED ANOMALIES.
BATTERY IMPEDANCE TEST ROUTE BPM60002520000068OPEN FOLLOW UP WORK ORDERS AS DEEMED NECESSARY.
BATTERY IMPEDANCE TEST ROUTE BPM60002520000069ASSIST ENGINEERING DEPARTMENT WITH ANY DATA ANALYSIS.
BOILER OPERATION AND MAINTENANCEPM04002310000011Notify Facility Manager and all relevant authorities, (e.g. Fire Dept.,
BOILER OPERATION AND MAINTENANCEPM04002310000011etc.), when applicable, of work to be accomplished.
BOILER OPERATION AND MAINTENANCEPM04002310000012PERFORM WEEKLY OPERATION: After completing daily ops; visually check
BOILER OPERATION AND MAINTENANCEPM04002310000012valves, linkages, limit/safety/pressure switches, controls, conduct
BOILER OPERATION AND MAINTENANCEPM04002310000012housekeeping
BOILER OPERATION AND MAINTENANCEPM04002310000013AFTER PERFORMING DAILY AND WEEKLY OPERATION, PERFORM THE FOLLOWING MONTHLY
BOILER OPERATION AND MAINTENANCEPM04002310000013STEPS;
BOILER OPERATION AND MAINTENANCEPM04002320000014CHECK OPERATION OF BURNER CONTROL SYSTEM
BOILER OPERATION AND MAINTENANCEPM04002320000015CHECK SAFETY VALVE AND LOW WATER CUTOFF SYSTEMS FOR ABNORMAL SIGNS
BOILER OPERATION AND MAINTENANCEPM04002320000016CHECK ELECTRICAL WIRING, CONNECTIONS, TERMINALS, ETC.
BOILER OPERATION AND MAINTENANCEPM04002320000017CHECK ALL ASSOCIATED VALVES TO ENSURE PROPER OPERATION
BOILER OPERATION AND MAINTENANCEPM04002320000018PERFORM NECESSARY ADJUSTMENTS TO KEEP UNIT IN OPERATING CONDITION
BOILER OPERATION AND MAINTENANCEPM04002320000019INSPECT FOR RUST, CORROSION, CRACKS, PINHOLES, ETC.
BOILER OPERATION AND MAINTENANCEPM040023300000110FOR ANNUAL MAINTENANCE, LOCKOUT/TAGOUT THE UNIT
BOILER OPERATION AND MAINTENANCEPM040023200000111TURN OFF THE GAS SUPPLY & ALLOW UNIT TO COOL
BOILER OPERATION AND MAINTENANCEPM040023200000112CLEAN INTERIOR AND EXTERIOR OF THE UNIT
BOILER OPERATION AND MAINTENANCEPM040023200000113INSPECT INTERIOR FOR DEFECTIVE TUBES, GASKETS, FIREBRICK, ETC.
BOILER OPERATION AND MAINTENANCEPM040023200000114INSPECT THE UNIT FOR WATER LEAKS. CLEAN WATER SIDE SURFACES, REMOVE ALL
BOILER OPERATION AND MAINTENANCEPM040023200000114HEAD PLATES AND INSPECT TUBES, INSPECT WATER COLUMNS
BOILER OPERATION AND MAINTENANCEPM040023200000115CHECK CONDITION OF GAUGE GLASS.
BOILER OPERATION AND MAINTENANCEPM040023200000116INSPECT RELIEF VALVE, TRAPS, STEAM LINES, ETC
BOILER OPERATION AND MAINTENANCEPM040023200000117CLEAN ALL RUST, CORROSION, ETC FROM UNIT
BOILER OPERATION AND MAINTENANCEPM040023300000118CLEAN FIREBOX, BURNER, FLUE, ETC

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .