Pre-Proposal Conf Questions Round 4.docx

DOCX document 13 KB Posted

Attached to
Launch Operations Support Contract (LOSC)
Solicitation number
FA4610-08-R-0016
Issued by

About this file

Additional questions received after Pre-Proposal Conference but prior to cutoff date.

View the file

Other files

File Type Posted
Amendment 05.zip ZIP file
Amendment 04.zip ZIP file
J A Extension 1 Jul--30 Sep 2011.pdf PDF
Amendment 03.zip ZIP file
Amendment 02.zip ZIP file
Round 3 LOSC addtl questions after preproposal conference set 2.docx DOCX document
GFP Locations.xlsx XLSX spreadsheet
ACA InDyne - CHI.pdf PDF
LOSC WO History.zip ZIP file
Launch Support Manpower Data.xlsx XLSX spreadsheet
Pre-Proposal Conference Questions —
Painter Master Agreement 16.pdf PDF
Painters Mastor Agreement 36.pdf PDF
Part II of Amendment 01 to RFP.zip ZIP file
Attch 5 SCA-WD 05-2064 Rev 11.doc DOC document
Attch 3 SCA-WD 2005-2154 Rev 13.docx DOCX document
Attch 4 SCA-WD 2005-2060 Rev 10.doc DOC document
Attch 9 - Mission Essential Contract Services.doc DOC document
Attch 1A2 Property Equipment Responsibility List.xlsx XLSX spreadsheet
Attch 1B1 Government Furnished Property - FAR 52.245-1.xlsx XLSX spreadsheet
Attch 1B2 Government Furnished As-Is Property - FAR 52.245-2.xlsx XLSX spreadsheet
Amendment 01 to RFP.pdf PDF
Attch 1 - Revised Performance Work Statement 28 Jun 10.doc DOC document
Attch 8 Davis Bacon WD CA080023 Rev 5.docx DOCX document
conformed RFP thru Amendment 01.doc DOC document
Attch 6 SCA-WD 1986-0431 Rev 35.docx DOCX document
Attch 1C - Revised Contract Data Requirements List CDRL 9 Aug 2010.docx DOCX document
Attch 1A1 Facility Responsibility List 28 Jun 10.xlsx XLSX spreadsheet
Zip Reference Publications.zip ZIP file
Pre Proposal Conference Attendees.pdf PDF
PowerPlantOpsData.xlsx XLSX spreadsheet
Workload Data 9 Aug 10.doc DOC document
BackflowPreventerData.xlsx XLSX spreadsheet
Equipment PM History.xlsx XLSX spreadsheet
LOSC WO History.xlsx XLSX spreadsheet
Additional Information.docx DOCX document
SVPP WasteWater Discharge.xlsx XLSX spreadsheet
Facility Equipment Inspection Report.xlsx XLSX spreadsheet
Technical Procedures.xlsx XLSX spreadsheet
Pre-Proposal Conference Questions —
RFP Advisory LOSC--Removal of Draft Watermark.pdf PDF
Attch 8 Davis Bacon WD CA080023 Rev 5.docx DOCX document
Attch 1D -Environmental Requirements.docx DOCX document
DD Form 254 Continuation.doc DOC document
Attch 1A1 Facility Responsibility List 28 Jun 10.xlsx XLSX spreadsheet
Attch 7-Appendix C CBA Group Insurance Descriptions.pdf PDF
Attch 1C - Revised Contract Data Requirements List CDRL 8 Jun 2010.docx DOCX document
Attch 5 SCA-WD 05-2064 Rev 11.doc DOC document
Attch 9 - Mission Essential Contract Services.doc DOC document
Attch 1B1 Government Furnished Property - FAR 52.245-1.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Launch Operations Support Contract (LOSC), FA4610-08-R-0016 Questions after Pre-Proposal Conference Round 4

1. Reference : L-7.1.2.2b. Discuss your understanding and familiarity with the GE Series Six Programmable Logic Controller, South Vandenberg power grid/substation configuration (including the multiple substation configuration scenarios used), the use of dual-fuel injection systems and fuel switching procedures, load bank operation, and permits to operate required at SVPP. Question: a. Will the Government please provide the operations and maintenance manuals/procedures, technical drawings etc. for the equipment and systems referenced in the RFP L-7.1.2.2b to include:.

1. General Electric series six programmable logic controllers

1. Power grid/substation configuration

1. Dual-fuel injection systems and fuel switching procedures

1. Load bank operation

b. Will the government please provide the respective manufactures’ technical information and operating guides/procedures for these items.

c. If this information is not available, can the Government arrange for the bidders to tour the SVPP facilities, equipment and systems to observe the plant and systems configuration.

Answer: Available operations and maintenance manuals will be uploaded/hardcopy provided to the Technical Reference Library (computer terminal) located in Building 11439, “The Bullpen” at Vandenberg AFB California NLT COB 3 Sep 2010.

2. The CBA states that: "The company will pay 50% of the difference between the Trainees pay and entry level rate for a "Level "I" to cover the trainees expenses for formal training provided by either the committee or a local college for specific classes identified in the approved Training Curriculum." Question: We could not find a wage for the Trainee or Level I in any of the released documents. Can you provide the referenced wages/rates?

Answer: There are no trainees or Level I individuals in the rate table or current CBA. Maintenance helper, boiler tender, and material handling laborer are the lowest classes listed.