Pre Solicitation Notice modification 1.docx

DOCX document 11 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA4608-11-R-0020
Issued by
Department of the Air Force Global Strike Command

About this file

Pre-Solicitation notice modification 1.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Amendment 1.pdf PDF
Attachment 1 - Revised SOW 29 Apr 2011.doc DOC document
Attachment 9 - Reservation Form.doc DOC document
Attachment 5 - AF66.doc DOC document
Attachment 3 - BAFBI 33-2.doc DOC document
Official SABER Solicitation.pdf PDF
Attachment 10 - Past Performance Survey.docx DOCX document
Attachment 6 - Insurance.doc DOC document
Attachment 4A - Wage Determination HEAVY LA2.docx DOCX document
Attachment 4B - Wage Determination HIGHWAY LA13.docx DOCX document
Attachment 8 - AFI 32-1001.doc DOC document
Attachment 4 - Wage Determination Building LA10.doc DOC document
Attachment 2 - Environmental.doc DOC document
Attachment 7 - Storm Water.doc DOC document
SABER Pre-Proposal Conference Sing in Sheet.pdf PDF
Answers to Contractors questions during SABER Pre-Bid Conference.docx DOCX document
Pre-Bid Conference Slide - 29 July 2011.pdf PDF
Attachment 2 - Environmental.doc DOC document
Attachment 1 - Revised SOW 29 Apr 2011.doc DOC document
Attachment 3 - BAFBI 33-2.doc DOC document
Attachment 10 - Past Performance Survey.docx DOCX document
Attachment 5 - AF66.doc DOC document
SABER Draft Solicitation.doc DOC document
Attachment 6 - Insurance.doc DOC document
Attachment 9 - Reservation Form.doc DOC document
Attachment 8 - AFI 32-1001.doc DOC document
Attachment 7 - Storm Water.doc DOC document
Attachment 4 - Wage Determination.doc DOC document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The Pre-Solicitation notice had the following changes:

1. The Issue RFP date changed from 27 June 2011 to 22 July 2011.

2. The Pre-bid Conf/Site visit being held at the Associated General contractors Facility has been changed from 07 July 2011 to 29 July 2011.

File details come from the government source that posted it. Updated .