Attachment 4 - Wage Determination Building LA10.doc
DOC document 36 KB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA4608-11-R-0020
About this file
Attachment 4-Wage Determination Building LA10
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4608-11-R-0020
Attachment 4
General Decision Number: LA100010 05/13/2011 LA10
Superseded General Decision Number: LA20080010
State: Louisiana
Construction Type: Building
Counties: Bossier, Caddo, Ouachita, Rapides and Webster
Counties in Louisiana.
BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 03/12/2010
1 03/19/2010
2 07/02/2010
3 08/13/2010
4 08/27/2010
5 09/03/2010
6 10/01/2010
7 11/12/2010
8 01/21/2011
9 02/11/2011
10 03/18/2011
11 05/13/2011
ELEC0194-005 09/05/2010
BOSSIER, CADDO, and WEBSTER PARISHES
Rates Fringes
ELECTRICIAN (includes low voltage wiring and installation of fire alarms, security systems, telephones, and computers)...................$ 24.75 8.97
* ELEC0446-006 03/01/2011
OUACHITA PARISH
Rates Fringes
ELECTRICIAN (includes low voltage wiring and installation of fire alarms, security systems, telephones, and computers)...................$ 20.60 1%+8.81
ELEC0576-005 03/01/2011
RAPIDES PARISH
Rates Fringes
ELECTRICIAN (includes low voltage wiring and installation of fire alarms, security systems, telephones, and computers)...................$ 23.50 5.70
PLUM0141-004 08/01/2010
BOSSIER, CADDO, and WEBSTER PARISHES
Rates Fringes
PLUMBER (includes HVAC pipe).....$ 24.52 10.43
PLUM0247-003 11/01/2010
RAPIDES PARISH
Rates Fringes
PLUMBER (includes HVAC pipe).....$ 23.05 8.08
PLUM0659-002 01/01/2011
OUACHITA PARISH
Rates Fringes
PLUMBER (includes HVAC pipe).....$ 22.35 8.60
SHEE0361-003 01/01/2009
BOSSIER, CADDO, OUACHITA, RAPIDES, AND WEBSTER PARISHES
Rates Fringes
Sheet Metal Worker (includes
HVAC duct).......................$ 24.18 9.10
SULA2004-001 03/24/2004
Rates Fringes
CARPENTER (includes acoustical; drywall hanging/framing; metal stud installation; formbuilding;
and formsetting).................$ 13.77 0.00
Cement Mason/Concrete Finisher...$ 12.92 0.00
GLAZIER..........................$ 14.00 0.81
HVAC MECHANIC (setting system only)............................$ 9.00 0.00
IRONWORKER
Metal Building Erection.....$ 11.48 2.71
Structural..................$ 15.76 4.30
Laborer, common..................$ 9.00 0.00
Power Equipment Operators
Backhoe/Excavator...........$ 13.05 2.30
Crane.......................$ 17.36 0.00
Forklift....................$ 13.00 0.00
Trackhoe....................$ 10.00 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .