Attachment 2 - Environmental.doc
DOC document 244 KB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA4608-11-R-0020
About this file
Attachment 2- Environmental
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4608-11-R-0020
Attachment 2
FA4608-11-R-0020
Attachment 2
ENVIRONMENTAL REQUIREMENTS
FOR
CONTRACTORS
WORKING ON
BARKSDALE AIR FORCE BASE
Asset Management
2 CEA
334 Davis Avenue West Suite 208
Barksdale AFB LA 71110-2078
(318) 456-4629
FAX: (318) 456-5274
March 2010 The Contractor shall follow the requirements of all local, state, federal and Air Force environmental regulations and instructions. This includes, but is not limited to: 40 CFR Parts 350, 355, 370 and 372; LAC 33:V.Chapter 101; base pamphlet, Environmental Requirements for Contractors; OSHA 1910.120 , and AFI 32-7086 Hazardous Materials Management. 40CFR 112 Subparts A & D , LAC 33:IX, and Sec 438 EISA.
Hazardous Materials on Barksdale Air Force Base (POC: Mr. Brian Larrimer, 2 CES/CEAN 456-5295) The contractor will comply with The Emergency Planning and Community Right-to-Know Act (EPCRA); LA Department of Public Safety, Office of State Police, LAC 33:V.Chapter 101, Hazardous Material Information Development, Preparedness and Response Act; and AFI 32-7086, Hazardous Materials Management.
The contractor will provide to 2 CES/CEAN a list of all Hazardous Materials and corresponding Material Safety Data Sheets (MSDSs) prior to commencement of work on base. The contractor will be responsible for keeping this list and MSDSs current.
Hazmat usage will be reported to the 2 LRS/LGRDMH, Hazmart. The Hazmart is located in Building 5946. Their phone is (318) 456-7045. Hours of operation are Mon-Friday 0700-1600.
The contractor will be responsible for the safe handling of all potentially hazardous materials while on Barksdale Air Force Base. In the case of a release of a Hazmat into the environment, the contractor will immediately notify the Base Fire Department (911) and 2 CES/CEA, (318) 456-4629. The contractor should, if done safely, stop the spill and initiate clean-up. If base personnel are involved in clean-up operations, the contractor’s responsibility will include the reimbursement of all costs incurred by the government to include supplies, man-hours, and disposal of the waste.
HAZMAT will be defined as any item or class of items referenced in Federal Standard 313D, paragraph 3.2 and all Class I and Class II ODS.
Policy for the Handling, Storage and Disposal of Hazardous Waste on Barksdale AFB
(POC: Ms. Marcy Harris 2 CES/CEAN 456-3096) The Contractor shall follow the requirements of all local, state, federal and Air Force environmental regulations and instructions. This includes, but is not limited to: 40 CFR Parts 260 – 280; LAC 33:V; Environmental Requirements for Contractors; and AFI 32-7042.
Prior to the beginning of any process, which will generate a Hazardous Waste (HW), the Contractor will inform CEAN of the proposed action, the duration of the action and the amount of waste, which will be generated. All HW will be handled and stored in strict compliance with federal, state and, local laws/regulations. Contractors will be held fully liable for any negligence which results in a Notice of Violation or other penalty.
HW will be defined as a solid waste which exhibits a characteristic such as flammability, corrosivity, reactivity, or toxicity, as identified in LAC:33.V.4901, or is otherwise listed in LAC:33.V.4901. Any mixture of a solid waste and a listed HW is also considered a HW. If in doubt please contact CEAN Hazardous Waste Program Manager for determination if waste is hazardous. It must be understood that proper management of any waste generated; hazardous or non-hazardous will be the responsibility of the contractor. Hazardous waste generated by the contractor on BAFB will be disposed of by the base. The contractor is responsible for collecting and containerizing all HW generated in a Department of Transportation (DOT) approved container compatible with the waste. The contractor will call the Central Accumulation Point (CAP) (318) 456-8580, hours of operation Mon-Friday 0700-1600 to schedule pick-up or turn-in of containerized hazardous waste. Questions can be directed to the Hazardous Waste Program Manager at (318) 456-3096.
Preservation of Historical, Archeological, and Cultural Resources
(POC: Mr. Gary Mackey 2 CES/CEAO 456-5262)
The Contractor will take precautions to preserve all preexisting historical, archeological and cultural resources. If during project execution the contractor observes unusual items that might have historical, or archeological value, such observations shall be reported as soon as possible to the Contracting Officer. An important SOP pertaining to inadvertent discovery of human remains can be found at the end of this document.
Protection of Fish and Wildlife
(POC: Mr. Bruce Holland 2 CES/CEANR 456-4088)
The contractor shall perform all work required to minimize interference or disturbance to fish and wildlife. The contractor will not be allowed to alter water flows or disturb native habitat adjacent to the work area that in the opinion of the Contracting Officer are critical to fish and wildlife.
Protection of Water Resources
(POC: Ms. Babs Legan 2 CES/CEAN 456-5256)
The contractor shall not pollute any streams, rivers, or waterways through direct discharge or by stormwater run-off. The contractor shall comply with all applicable federal, state, local laws and the BAFB Storm Water Pollution Prevention Plan and BAFB Spill Control and Countermeasures Plan. The BAFB plans may be reviewed during normal working hours at the CEA office in Building 3433.
Contractors at sites that will disturb 5 or more acres must follow all applicable requirements of LPDES Storm Water General Permit for Construction Activity, Permit No. LAR 10000. Included are requirements to develop a SWPPP, submit a Notice of Intent, perform scheduled self-inspections, and upon project completion, submit a Notice of Termination. Permits, NOIs, and NOTs are available from the LDEQ Water Permits Division. The Base Environmental Office requires that the contractor furnish the Base Storm Water Program Manager, (318) 456-5256 with copies of these documents. The state of Louisiana will invoice the contractor for the NOI (approx. $275.00); no money is due upon submittal.
Contractors for construction sites that disturb at least 1, but less than 5 acres of soil must comply with the LPDES Storm Water General Permit for Small Construction Activities, Permit No. LAR 200000 available from the LDEQ Water Permits Division. One requirement of this permit is to develop and follow a site specific Storm Water Pollution Prevention Plan. The Asset Management office has a fill-in-the-blank template available. Whether you chose to use the template or your own form, a copy of your plan must be submitted to the Asset Management office before you may begin ground disturbance. Please be advised that scheduled self-inspections are also part of this state requirement. There is NO application or fee for this permit. When a construction project is complete and the site has been stabilized in accordance with permit Part III.D.2.a.2, the permittee shall submit a Completion Report form (see Appendix B of the permit). The form must be signed and dated and submitted to the Permits Division by January 28 of the year following the calendar year in which the project was completed.
Projects that have a footprint greater than 5000 square feet must implement EISA Section 438 which requires site planning, design, construction, and maintenance strategies to maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property with regard to the temperature, rate, volume, and duration of flow. US EPA guidance for compliance can be found at Storm Water Compliance Sec 438.
In addition to the permitting and plan requirements noted above, the contractor staging area and work area(s) shall be maintained in a neat and orderly manner and cleaned up at the end of each duty day. The contractor shall not store petroleum, chemical, or waste containers where the contents will be exposed to rainfall. Containers shall remain closed at all times except when dispensing materials from or transferring materials to other containers. Drip pans shall be placed under dispensers when in use. All containers or tanks of petroleum products with a capacity greater than 55 gallons must have secondary containment or have a specific contingency plan to minimize spills and address the cleanup of spills in the contractors Storm Water Pollution Prevention Plan for the project. Equipment with a tank capacity of more than 55 gallons, when not operating, is also covered by this requirement. If you will have 1320 gallons or more of total petroleum products stored in containers with at least 55 gallon capacity (equipment tanks count in this total) at the project site or any support sites, Federal law requires that you develop and implement a Spill Prevention, Control, and Countermeasures Plan (SPCC plan). For this reason, it is highly recommended that you NOT exceed this threshold. If you must have a SPCC Plan, then a copy shall be filed with the Base Storm Water Program Manager, Ms. Babs Legan at (318) 456-5256.
Regardless of the quantity of petroleum products on site, the contractor shall have spill kits available on site and shall clean-up all spills immediately. Spill kit contents shall be sufficient to control and clean-up a spill equivalent to the largest container on site that does not have secondary containment. Spill debris shall be properly containerized and disposed of by the Contractor. If the spill debris is a hazardous waste, disposal shall be in accordance with the hazardous waste section of this document. CEA should be notified prior to disposal of any waste material resulting from the clean up of spills.
Herbicides
(POC: Entomology Shop 2 CES/CEOUE 456-1814)
Only herbicides authorized by the Environmental Protection Agency (EPA) shall be used. Contractor personnel applying herbicides shall have all proper certificates necessary for herbicide application in the State of Louisiana. The contractor shall submit on an AF Form 3000, for approval, the type of herbicide to be used and the manufacturer’s application instructions. These materials shall be approved by 2 CES (entomology). Any license or certificates needed by the contractor or his employees for the application of herbicides must be submitted to the Contracting Officer on an AF Form 3000 prior to application of the herbicide. The contractor is required to turn in, on a monthly basis, documentation as to the type and amount of herbicide applied, location used, and reason for application. Storage of Herbicides and all associated application equipment shall be in strict compliance with all Federal and State requirements regulating such items.
Compliance with Air Regulations.
(POC: Mr. Chuck Pursley 2 CES/CEAN 456-5917)
The contractor will ensure all pre-construction Air Permits are coordinated through CE. Items include but are not limited to: boilers, paint booths, storage tanks, generators, and other combustion devices. Any changes to the Scope of Work shall be presented to the CEAN Compliance section, allowing reasonable time for modification to applicable Air Permits. Questions can be directed to Mr. Chuck Pursley, Compliance/Air Coordinator.
Recycling Requirements
(POC: Mr. Alfredo Garza 2 CES/CEAN 456-5293)
In accordance with AFI 32-7042 and EO 13514, recycling should take place whenever feasible. Place all ferrous and nonferrous metals in approved separate containers and sell for scrap or donate to the base recycling program. All items recycled shall be reported to CEAN Recycling Program Manager at 456-5293 by weight and commodity. The base recycles metal, cardboard, office paper, aluminum, concrete, milled asphalt, dirt. We also supply containers and transportation for some products. Please contact Mr. Alfredo Garza, at the above work number or cell phone (318) 834-5551 prior to beginning your construction project to get your recycling off to a successful start.
Landfills There are NO permitted landfills on base; any reference to disposal at a landfill means an approved off-base landfill. All leaves, branches and limbs shall be removed from the base and disposed of at a state approved composting facility. At no time will yard waste be mixed with other types of waste generated by the contractor. The contractor shall provide the government a copy of the disposal ticket within five days of the end of the month. ABSOLUTELY NO DUMPING OF ANY KIND WILL BE PERMITTED ON BASE.
Underground Storage Tank Requirements
(POC: Mr. Bob Cote 2 CES/CEAN 456-3522)
All work associated with USTs will be coordinated with Mr. Bob Cote, Storage Tanks Program Manager, at the above work number or cell phone (318) 469-3167. The contractor is responsible for completing all required Louisiana Department of Environmental Quality (LDEQ) forms and conducting all Underground Storage Tank (UST) related work in accordance with the appropriate regulations and manufacturers’ specifications. In the case of UST closure, the contractor will prepare a closure report which meets LDEQ/UST Division requirements. The contractor is responsible for disposal of removed USTs and associated piping in an LDEQ/UST Division-approved manner.
Above Ground Storage Tanks Requirements
Installation of Above ground Storage Tanks (AST) or day tanks will be coordinated with Mr. Bob Cote. All Above Ground Storage Tanks will be installed according to manufacturers specifications and comply with all federal, state and local regulations.
Environmental Restoration Program (ERP) Requirements
(POC: Mr. Wallace Robertson 2 CES/CEAOR 456-5286)
Any proposed activities at or adjacent to ERP sites must be coordinated with Mr. Wallace Robertson prior to initiating the activity. Information concerning the location and status of ERP sites can be obtained through the CEA office.
Polychlorinated Biphenyl (PCB) Requirements
(POC: Mr. Chuck Pursley 2 CES/CEAN 456-5917)
The contractor shall not remove any fluid containing electrical device (transformer, regulator, switch, etc.) from BAFB without prior coordination with 2 CES/CEOUE Exterior Electric (318) 456-8197, and the Asset Management Office (318) 456-4629.
Lead Based Paint (LBP) Requirements
(POC: Mr. Chuck Pursley 2 CES/CEAN 456-5917)
The contractor will determine the existence of LBP prior to removal of paint. If it is found that LBP exists, follow the requirements of 40CFR745 and 29CFR1926.62 . All paint chips will be collected and tested to determine if the chip should be disposed of as hazardous waste (see section on page 3) or industrial waste.
Inadvertent Discovery of Native American Remains
(POC: Mr. Gary Mackey 2 CES/CEAO 456-5262)
Purpose: To outline procedures to be followed in the case of inadvertent (Accidental) discovery of Native American remains and/or funerary items on Barksdale AFB.
Applicability: This SOP applies to all organizations and activities operating on Barksdale AFB (both public and private).
Authority:
Comprehensive Agreement Between Barksdale Air Force Base (AFB), Louisiana and the Caddo Indian Tribe of Oklahoma (Caddo Nation), Native American Graves Protection and Repatriation Act of 1990 (P.L. 101-601, 104 STAT. 3048, 25 USC 3001-3013 and 43 CFR 10) Procedure:
During excavation or maintenance work if bones or funerary items are found, work shall immediately cease. Funerary items are defined as pottery vessels or pieces of vessels, bits of cloth, ceramic figurines or ornaments.
The base Cultural Resource Manager (CRM) shall be contacted at 456-5262. If the CRM cannot be contacted, the Programs Development Manager (PDM) shall be contacted at 456-3119.
Nothing in the excavation shall be moved or touched after discovery.
Cover, or otherwise protect the site from the elements.
Follow all instructions from the CRM or PDM.
Depending upon the material discovered, the site may be off limits during archeological or criminal investigation analysis.
Work at the site may not resume, until official approval is given by the CRM or PDM.
Urban Tree Protection
(POC: Mr. Everett Lejeune 2 CES/CEANR 456-3353)
The contractor shall take all necessary precautions to preserve the existing Urban Forest assets on Barksdale Air Force Base. Prior to beginning any project involving work near or around trees the contractor shall contact the base Urban Forester at the above number for review and approval of work to be accomplished around trees. Do not store equipment or materials next to trees. Keep a 12 foot clearance around each tree; no digging, free of dirt, equipment, materials, or any other object.
Attachment 1
Contractor Information Sheet for Hazardous Material Reporting
PROJECT NAME:
PROJECT NUMBER:
COMPANY NAME:
DATES OF CONTRACT:
LOCATION ON BASE:
PHONE NUMBER (On-Base if available):
NAME OF CONTACT:
SHOP CODE (Assigned by HAZMART):
INFORMATION
| Material Name |
| Container Type |
| QTY |
| Size |
| Total Qty to be Used (Estimated) |
| NSN/LSN completed by HAZMART |
| Barcode #s |
completed by HAZMART
Attachment 2
HAZMAT USAGE LOG
DATE: _____________ CONTRACTOR:________________ PROJ#:________________
| BARCODE |
| ITEM |
| AMOUNT USED (ounces) |
| DATE USED |
| CUMULATIVE QUANTITY (if needed) |
| NAME of USER |
PAGE
_1356852562