Attachment 4B - Wage Determination HIGHWAY LA13.docx

DOCX document 15 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA4608-11-R-0020
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 4B-Wage Determination Highway LA13

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Amendment 1.pdf PDF
Attachment 4 - Wage Determination Building LA10.doc DOC document
Attachment 2 - Environmental.doc DOC document
Attachment 7 - Storm Water.doc DOC document
Attachment 4A - Wage Determination HEAVY LA2.docx DOCX document
Attachment 8 - AFI 32-1001.doc DOC document
Attachment 1 - Revised SOW 29 Apr 2011.doc DOC document
Attachment 9 - Reservation Form.doc DOC document
Attachment 5 - AF66.doc DOC document
Attachment 3 - BAFBI 33-2.doc DOC document
Official SABER Solicitation.pdf PDF
Attachment 10 - Past Performance Survey.docx DOCX document
Attachment 6 - Insurance.doc DOC document
Pre-Bid Conference Slide - 29 July 2011.pdf PDF
SABER Pre-Proposal Conference Sing in Sheet.pdf PDF
Answers to Contractors questions during SABER Pre-Bid Conference.docx DOCX document
Attachment 7 - Storm Water.doc DOC document
Attachment 4 - Wage Determination.doc DOC document
SABER Draft Solicitation.doc DOC document
Attachment 6 - Insurance.doc DOC document
Attachment 9 - Reservation Form.doc DOC document
Attachment 8 - AFI 32-1001.doc DOC document
Attachment 2 - Environmental.doc DOC document
Attachment 1 - Revised SOW 29 Apr 2011.doc DOC document
Attachment 3 - BAFBI 33-2.doc DOC document
Attachment 10 - Past Performance Survey.docx DOCX document
Attachment 5 - AF66.doc DOC document
Pre Solicitation Notice modification 1.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4608-11-R-0020

Attachment 4B
9 of 9

General Decision Number: LA100013 05/13/2011 LA13

Superseded General Decision Number: LA20080013

State: Louisiana Construction Type: Highway Counties: Bossier, Caddo, Ouachita, Rapides and Webster Counties in Louisiana.

HIGHWAY CONSTRUCTION PROJECTS (Does not include building structures in rest area projects, includes the city of Shreveport)

Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 09/03/2010 3 02/11/2011 4 03/18/2011 5 05/13/2011

ELEC0194-009 09/03/2009

BOSSIER, CADDO, and WEBSTER PARISHES

Rates Fringes

ELECTRICIAN (including traffic signal wiring and installation) Lineman and Heavy Equipment Operator..........$ 24.15 8.73

* ELEC0446-008 03/01/2011

OUACHITA PARISH

Rates Fringes

ELECTRICIAN (including traffic signal wiring and installation)....................$ 20.60 1%+8.81

ELEC0576-008 03/01/2011

RAPIDES PARISH

Rates Fringes

ELECTRICIAN (including traffic signal wiring and installation)....................$ 23.50 5.70

SULA2004-013 07/07/2004

Rates Fringes

CARPENTER (including formbuilding/formsetting)........$ 13.80 0.00

Cement Mason/Concrete Finisher...$ 12.80 0.00

IRONWORKER, REINFORCING..........$ 15.51 0.00

Laborers Asphalt Raker...............$ 8.88 0.80 General including landscape/erosion...........$ 8.61 0.80 Guardrail...................$ 8.26 0.80 Jackhammer/Vibrator.........$ 8.00 0.00 Mason Tender................$ 9.20 0.80 Pipelayer...................$ 9.18 0.80 Striping/Pavement Marker including paint striping and attachment of reflector buttons...........$ 8.48 0.80 Traffic Control including flagger, sign placement, barricades, and cones.......$ 8.09 0.80

PILEDRIVERMAN....................$ 14.75 0.00

Power Equipment Operators Air Compressor..............$ 13.08 2.20 Asphalt Distributor.........$ 13.08 2.20 Asphalt Paving Machine......$ 12.87 0.18 Asphalt Screed..............$ 10.83 0.00 Asphalt/Aggregate Spreader..$ 11.76 0.00 Backhoe/Excavator...........$ 12.79 0.00 Broom/Sweeper...............$ 10.69 0.00 Bulldozer...................$ 13.21 0.00 Concrete Saw................$ 13.08 2.20 Crane.......................$ 14.38 0.00 Front End Loader............$ 11.01 0.00 Mechanic....................$ 13.08 2.20 Milling/Cold Planing Machine including rotomill and CMI cutter..............$ 12.14 0.00 Motor Grader/Blade..........$ 13.26 0.00 MTV/Shuttlebuggy............$ 11.68 0.00 Oiler.......................$ 13.08 2.20 Post Driver.................$ 12.49 0.00 Roller......................$ 11.38 0.00 Stabilizer..................$ 10.83 0.00 Trackhoe....................$ 13.00 0.00 Tractor.....................$ 13.00 0.00

Truck drivers Dump (all types)............$ 11.86 0.00 Flatbed.....................$ 11.20 0.00 Lowboy......................$ 12.18 0.00 Pickup including paint truck.......................$ 10.50 0.00 Tack........................$ 10.25 0.00 Water.......................$ 12.43 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Consitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .