Amendment No. 3_Solicitation No. FA449725R00110003.pdf

PDF 1 MB Posted

Attached to
100% Design, B501 Mission Planning Cell
Solicitation number
FA449725R0011
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation for a B501 Mission Planning Cell design project at Dover Air Force Base. The amendment incorporates several key updates: the Questions & Answers Document, an updated Statement of Work (SOW) dated 15 May 2025, a B500 Renovation Layout attachment, and updates to SOW attachment number conventions. The solicitation is set aside for small businesses under NAICS code 541310 with a size standard of $12,500,000, covering architectural, structural, interior design, and engineering services for a construction documentation project. The contract is firm-fixed price with a 330-calendar-day performance period and an estimated project magnitude between $500,000 and $1,000,000. Offerors must submit electronic proposals by noon EST on 30 April 2025, with questions due by 1:00 PM EST on 23 April 2025, and a mandatory site visit scheduled for 21 April 2025 at 10:00 AM EST.

View the file

Other files

File Type Posted
4. Solictation Questions and Answers Document_B501.pdf PDF
1H. SOW Attachment 8 - Dover AFB OPSEC Awareness Guide for Contractors.pdf PDF
1I. SOW Attachment 9 - Dover AFB AT Awareness for Contractors Trifold Apr 24.pdf PDF
1G. SOW Attachment 7 - B500 Renovation Layout.pdf PDF
1. SOW_B501_AE 100pct Design_15 May 2025.pdf PDF
1J. SOW Attachment 10 - Dover AFB AT Awareness Guide for Contractors (Apr 24).pdf PDF
Amendment No. 2_Solicitation No. FA449725R00110002.pdf PDF
Amendment No. 1_FA449725R0011 0001.pdf PDF
1B. SOW Attachment 2 - B501 Current Floor Plan.pdf PDF
1H. SOW Attachment 8 - DAFB AT Awareness for Contractors Trifold Apr 24.pdf PDF
1G. SOW Attachment 7 - Dover AFB OPSEC Awareness Guide for Contractors.pdf PDF
2. Bid Schedule_Bldg. 501 Mission Planning Cell.xlsx XLSX spreadsheet
1D. SOW Attachment 4 - B501 Generator Authorization Request.pdf PDF
1I. SOW Attachment 9 - DAFB AT Awareness Guide for Contractors (Apr 24).pdf PDF
1F. SOW Attachment 6 - A-E Requirements for Cost Estimates.pdf PDF
1. SOW_B501_AE 100pct Design_3 April 2025.pdf PDF
1E. SOW Attachment 5 - 1391 Template.docx DOCX document
Solicitation - FA449725R0011.pdf PDF
3. WD 2015-4217, Rev No. 29, dated 23 Dec 2024.pdf PDF
1A. SOW Attachment 1 - MPC Construction Security Plan (CSP).pdf PDF
1C. SOW Attachment 3 - B501 Initial Concept Renovation Floor Plan.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The Purpose of this Amendment is to: Block 14 (Description of Amendment/Modification):

1. Incorporate the Questions & Answers Document, Attachment #4.

2. Incorporate the updated SOW, dated 15 May 2025, Attachment 1.

3. Incorporate SOW Attachment 7 1G, B500 Renovation Layout.

4. Update SOW attachment number conventions for attachments 1G through 1K.

All other terms and conditions in the original solicitation still applies.

Section J - List of Attachments

Header Miscellaneous Text (Modified):

1. Statement of Work - B501 - 100% Design, dated 3 April 2025

1A. SOW Attachment 1 - MPC Construction Security Plan (CSP)

1B. SOW Attachment 2 - B501 Current Floor Plan

1C. SOW Attachment 3 - B501 Initial Concept Renovation Floor Plan

1D. SOW Attachment 4 - B501 Generator Authorization Request

1E. SOW Attachment 5 - 1391 Template

1F. SOW Attachment 6 - A-E Requirements for Cost Estimates

1G. SOW Attachment 7 - B500 Renovation Layout

1H. SOW Attachment 8 - Dover AFB OPSEC Awareness Guide for Contractors

1I. SOW Attachment 9 - DAFB AT Awareness for Contractors Trifold Apr 24

1J. SOW Attachment 10 - DAFB AT Awareness Guide for Contractors (Apr 24)

2. Bid Schedule Bldg. 501 Mission Planning Cell

3. Wage Determination, 2015-4217, Rev No. 29, dated 23 Dec 2024

4. Solicitation Questions and Answers Document

FA449725R00110003

SUMMARY OF CHANGES
List of Attachments
IDCode: J
Page: 1
Pages: 2
AmendNo: 0003
EffDate: 15 May 2025
ReqNo:
ProjNo: FJXT200026
IssCode: FA4497
AdmCode:
IssuedBy: FA4497 436 CONS LGC

639 ATLANTIC ST BLDG 639, CP 302 677 5068

DOVER AFB, DE 19902-5639

UNITED STATES

Princess Rivera , Email: princess.rivera.1@us.af.mil Telephone: 445-5223 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA449725R0011
SolDate: 10 Apr 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Anna George
ContDate:
CODate: 15 May 2025

File details come from the government source that posted it. Updated .